Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Res 21-50 Aspen Ranch Design Guidelines
Aspen Ranch © 2021 “D E S I G N G U I D E L I N E S” A premier address in Westlake, Texas, Aspen Ranch will be the creation of three magnificent homes in a private gated community. This will be an opportunity to enjoy a unique maintenance free lifestyle in a gated community that will become one of the premier addresses in the Town of Westlake and the State of Texas. Aspen Ranch is a unique neighborhood of three estate homesites, focused on the creation of a community with a true sense of quality and timeless tradition. As en Ranch __________________ ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 2 of 61 TABLE OF CONTENTS SECTION 1 INTRODUCTION 5 1.1 Design Guidelines 5 1.2 Architectural Review Board/ARB 5 1.3 Next Steps and Submittal Requirements 5 SECTION 2 DESIGN REVIEW PROCEDURES 6 2.1 Architectural Review Fee 6 2.2 Pre‐Design Conference 6 2.3 Conceptual Design Submittal 7 2.4 Preliminary Design Submittal & Review Meeting 7 2.5 Final Plan Submittal 8 2.6 Plan Review and Approval Process 9 2.7 Changes after Final Approval 9 2.8 Variances 9 2.9 Pre‐Construction Meeting 10 2.10 Material Mock‐up 10 2.11 Appeal Process 10 SECTION 3 CONSTRUCTION REGULATIONS 11 3.1 Construction Area 11 3.2 Construction Hours 11 3.3 Sanitary Facilities 11 3.4 Debris and Trash Removal 11 3.5 Construction Trailers 11 3.6 Noise and General Nuisances 12 3.7 Construction Sign 12 SECTION 4 FLATWORK AND LANDSCAPE DESIGN SUBMITTAL 13 4.1 Flatwork Mock‐up Submittal and Approval 13 4.2 Landscape Design Submittal and Approval 13 SECTION 5 ACCESORY STRUCTURES SUBMITTAL 15 SECTION 6 COMPLIANCE 16 6.1 Certificate of Compliance 16 6.2 Enforcement Policy and Procedure 16 ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 3 of 61 SECTION 7 SITE AND LANDSCAPE GUIDELINES 17 7.1 Building Setbacks, Lot Coverage and Heights 17 7.2 Retaining Walls 18 7.3 Drives & Walks 18 7.4 Walls / Fencing / Screening 19 7.5 Side and Rear Yard Fencing Materials 19 7.6 Wood Fencing 19 7.7 Masonry Walls 20 7.8 Party Walls and Fences 20 7.9 Screening 20 7.10 Landscape Requirements 20 7.11 Required Landscape Materials 21 7.12 Irrigation System 22 7.13 Exterior Lighting 22 7.14 Landscape Installation 22 SECTION 8 ARCHITECTURE 24 8.1 Exterior Materials and Detailing 26 8.2 Exterior Paint and Stain Colors 30 8.3 Windows 30 8.4 Balconies and Verandas 31 8.5 Roofs 32 8.6 Garages and Parking 34 8.7 Address Block 34 8.8 Mailbox 34 8.9 Gutters and Downspouts 35 8.10 Utilities 35 SECTION 9 EXTERIOR LIGHTING 36 9.1 Architectural Lighting 36 9.2 Landscape Lighting 38 SECTION 10 ARBESSORY STRUCTURES 39 10.1 Cabanas/Arbors/Gazebos/Storage Buildings/Pergolas 39 10.2 Sports Courts / Recreational Equipment / Playhouse 39 10.3 Pools / Spas / Water Features 39 SECTION 11 AMENDMENTS AND OR CHANGES 40 ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 4 of 61 APPENDICIES A Common Architectural Detailing Issues 41 B. Landscape Plant Material Selections 47 C. Landscape Control & General Guidelines 50 D. Approved Material Selections 54 E. Material Mock‐ups 55 F. Submittal Review Forms and Applications 57 G. Enforcement Policy and Procedures 61 LIST OF EXHIBITS Exhibit 1 – Drive and Lead Walks 19 Exhibit 2 – Landscape Screening of Equipment 20 Exhibit 3 – Incorrect Material Transitions 27 Exhibit 4 – Proper Material Transitions 27 Exhibit 5 – Examples of Incorrect Detailing 28 Exhibit 6 – Examples of Correct Detailing 28 Exhibit 7 – Flush ¾” Mortar Joints with Mortar Smear 29 Exhibit 8 – Unacceptable Faux Balconies 32 Exhibit 9 – Acceptable Balconies 32 Exhibit 10 – Recessed Single Garage Doors 34 Exhibit 11 – Gutters and Downspouts 35 Exhibit 12 – Porch Lanterns 36 Exhibit 13 – Garage Lights 37 Exhibit 14 – Visible Security Flood Lights 37 Exhibit 15 – Required Tree Lights 38 ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 5 of 61 SECTION 1 INTRODUCTION 1.1 DESIGN GUIDELINES The Design Guidelines are intended to provide standards, guidelines and procedures for all improvements constructed in Aspen Ranch. The overall goals of the Design Guidelines are: a) Enhance visual order, privacy, and design compatibility throughout the neighborhood. b) Promote the personal vision of each resident while maintaining design harmony within the community. c) Build lasting value. The Design Guidelines apply to: a) Residences. b) Fences, walls, cabanas and accessory structures. c) Site or landscape improvements. (Seasonal color is exempt.) d) Renovation, expansion and modification of any of the above. The Design Guidelines are required by and subject to the Declaration of Covenants, Conditions and Restrictions (CCRs) for Aspen Ranch, as amended from time to time. The Design Guidelines are intended to clarify and supplement the CCRs not to amend them. Please refer to the CCRs for a description of certain procedures, rights, remedies, and limitations of liability of the Architectural Review Board (ARB) and the Aspen Ranch Homeowner’s Association (HOA). Because the Design Guidelines are amended from time to time, Builders and Owners must be sure they obtain the most current Design Guidelines from the HOA. 1.2 ARCHITECTURAL REVIEW BOARD (ARB) The purpose of the ARB is to administer the Design Guidelines. 1.3 NEXT STEPS AND SUBMITTAL REQUIREMENTS The following is an outline of the basic steps required to obtain ARB approval for construction of new homes: ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 6 of 61 Pre‐Design Conference Recommended Section 2.2 Conceptual Design Submittal Recommended Section 2.3 Preliminary Design Submittal Required Section 2.4 Final Plan Submittal Required Section 2.5 Final Plan Approval Required Section 2.6 Pre‐Construction Meeting Recommended Section 2.9 Final Mock‐Up Approval Required Section 2.10 Flatwork Submittal Approval Required Section 4.1 Landscape Plan Submittal Required Section 4.2 Landscape Plan Approval Required Section 4.2 Certificate of Compliance Required Section 6.1 The following is an outline of the basic steps required to obtain ARB approval for construction of accessory structures: Preliminary Design Submittal Required Section 2.4 Final Plan Approval Required Section 2.6 Certificate of Compliance Required Section 6.1 SECTION 2 DESIGN REVIEW PROCEDURES 2.1 ARCHITECTURAL REVIEW FEE There is a $3,000 non‐refundable Architectural Review Fee for new residences to cover review costs including professional fees. This fee must be received by the HOA prior to Preliminary Design submittal. The Fee is subject to periodic revision. Additional fees will be assessed for repeated resubmissions and for any new or modified structures not constructed with the initial residence. 2.2 PRE‐DESIGN CONFERENCE (RECOMMENDED) All first time Applicants (Builders, Owners, Architects, and/or Designers) are encouraged to meet with the ARB to review the Design Guidelines and ask questions before starting conceptual design. It is REQUIRED that all design work be performed by a Licensed Architect by the State of Texas. Topics for discussion at this meeting typically include lot orientation, adjacent architectural compatibility, streetscape, site issues, overall site plan, building envelope, special design criteria (if any), and clarification of development requirements and philosophies. Applicants are encouraged to bring photos or sketches to provide examples of architectural ideas. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 7 of 61 2.3 CONCEPTUAL DESIGN SUBMITTAL (RECOMMENDED) Conceptual Design submittal is optional but strongly recommended. Submittal Materials (2 sets each): a) Front Elevation and any Street Side Elevations b) Floor Plans c) Roof Plan d) Site Plan Maximum sheet size for review is 30” x 42”. The ARB will not begin its review until all submittal materials are received. The ARB will review this design for massing, style, lot fit, its relationship to neighboring residences and the building’s proposed relationship to the natural terrain and mature growth trees. The ARB will either approve the design or explain why it is disapproved. 2.4 PRELIMINARY DESIGN SUBMITTAL & REVIEW MEETING (REQUIRED) Preliminary Design Submittal should include design sketches that adequately convey existing site conditions and constraints, residence orientation, massing, design character, and adjacent relationships. Submittal Materials (2 sets each): a) Submittal Review Form (see Appendix F) b) Site Plan showing site modifications, building footprint, easements, setbacks, streets, equipment, a/c locations, driveway, walks, walls, fencing, existing trees. Additionally, the Site Plan must identify: i. Second story windows facing adjacent lots and the view corridor from those windows. Architect must clearly show there is no impact from the second‐floor windows toward and affecting the privacy of the adjacent lot. ii. Trees subject to removal iii. Structures, landscape, walls, and fences on adjacent lots c) Floor Plans (may be combined with the Site Plan) d) All exterior elevations showing plate heights, roof pitches, materials, and other information necessary for a complete description of the architecture of the residence. It is imperative that the elevations adequately convey the proposed architectural style and associative detailing. Appropriate historic photos/imagery of major architectural building elements and details are encouraged. e) Roof Plan ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 8 of 61 All required drawings should be drawn to a minimum scale of 1/8” = 1’. Maximum sheet size for review is 30” x 42”. The ARB will not begin its review until all submittal materials are received. 2.5 FINAL PLAN SUBMITTAL (REQUIRED) Final Plan Submittal must include completed drawings for construction incorporating all the elements required for the Preliminary Design Review Meeting. The ARB will not begin its review until all submittal materials are received. a) Submittal Review Form (see Appendix E) b) Site Plan drawn to a scale of not less than 1” = 20’, showing dimensioned footprint of all proposed structures and all site improvements, setbacks and easements, a/c and utilities locations, equipment, gates, driveway and walks (and materials), new and existing fencing (and materials), new and existing retaining walls (top and bottom of wall elevations and materials), and existing trees. Structures, landscape, walls, and fences on adjacent lots must be shown. c) Floor Plans showing ceiling heights, window and door types, sizes, and header heights, room dimensions, overall square footages, drawn to a scale of ¼” = 1’. d) All Exterior Elevations showing plate heights, roof pitches, natural and finished grades, materials, lighting fixtures, and other information necessary for a complete description of the architecture of the residence. It is imperative that the elevations adequately convey the proposed architectural style and associative detailing. Appropriate historic photos/imagery of major architectural building elements and details are encouraged. e) Details of eaves and other critical elements of design to sufficiently represent the visual expression of the building. Enhanced eave detailing is required. f) Roof Plan showing all roof pitches, dormers, skylights, chimneys, features and gutters & downspouts. g) Electrical Plans showing interior and exterior lighting. h) Exterior Color/Materials Selection for all exterior elements must be submitted in written form and illustrated on field mock‐up for ARB approval. Note: All grading, excavation, fill, drainage, and site work must be done in accordance with Town of Westlake drainage requirements. Changes to grading of the lot that will alter drainage flows (addition of retaining walls, construction of swimming pools or accessory buildings, installation of landscaping beds, etc.) may require a Grading Permit from the Town. When considering modifications to the grading of a lot, efforts must be taken to preserve existing trees. Tree wells and other techniques may be utilized, with approval by the ARB, if existing grades cannot be maintained. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 9 of 61 2.6 PLAN REVIEW AND APPROVAL PROCESS Unless otherwise stated herein, the review and approval process for designs and plans is as follows. Designs or plans submitted to the ARB for review are not deemed to have been received by the ARB unless the design or plan is submitted with a Submittal Review Form (see Appendix E). The Submittal Review Form is used to document the dates of ARB actions such as the date the application is received, reviewed, and/or approved. The ARB will endeavor to acknowledge the receipt of your completed application within 10 days of your submission. If you have not received a timely acknowledgement of receipt from the ARB, please contact the HOA to check on the status of your submission The ARB shall, within twenty (20) days after receipt of each required submission of plans, advise the Applicant, in writing, at an address specified by the Applicant at the time of submission of: a) the approval of plans; b) the approval of plans subject to the plan being modified per minor comments; or c) the disapproval of plans, specifying the segments or features of the plans which are objectionable and suggestions, if any, for the curing of such objections. In the event the ARB fails to advise the Applicant by written notice within the time set forth above of either the approval or disapproval of the plans, the Applicant may give the ARB written notice of such failure to respond, stating that, unless the ARB responds within ten (10) days of receipt of such notice, approval shall be deemed granted. However, no plans, whether expressly approved or deemed approved pursuant to the foregoing, shall be inconsistent with the Design Guidelines unless a variance has been granted in writing pursuant to the CCRs. Construction activity may not commence prior to final plan approval or without written approval from the ARB. The Applicant should apply for Town of Westlake building permit only after receiving Final Plan approval from the ARB. 2.7 CHANGES AFTER FINAL APPROVAL Any changes or revisions to the plans by the Town of Westlake or the Applicant after Final Plan Approval must be reviewed and approved by the ARB. 2.8 VARIANCES The ARB may authorize variances from compliance with the Design Guidelines and any required procedures when circumstances such as topography, natural obstructions, hardship or aesthetic or environmental considerations so require. Such variances shall not (i) be effective unless in writing; (ii) be contrary to the restrictions set forth in the CCRs; or (iii) estop the ARB from denying a variance in other circumstances. For purposes of this Section, the inability to obtain ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 10 of 61 approval of any governmental agency, the issuance of any permit, or the terms of any financing shall not constitute hardships. The ARB reserves the right to waive any of the procedural steps outlined in this document provided that the Applicant demonstrates good reason to the ARB. 2.9 PRE‐CONSTRUCTION MEETING (RECOMMENDED) Prior to commencing construction, first‐time Applicants are encouraged to meet with the ARB to review the Approved Final Plans and the Construction Regulations (see Section 3). The Builder should bring a copy of the Building Permit and the Construction Schedule to the Pre‐Construction Meeting. 2.10 MATERIAL MOCK‐UP ‐ REQUIRED As of the commencement of construction activities, a material/construction mock‐up must be erected and maintained on the site. See Appendix E for mock‐up details and ARB review requirements. No application of finish materials will be allowed prior to the ARB’s approval of the mock‐up. 2.11 APPEAL PROCESS If the ARB disapproved a plan, the Applicant, within ten (10) days after the ARBʹs disapproval of a plan, may make a written request for a hearing before the ARB to reconsider the application. If the Applicant timely requests a hearing under Section 7.8 of the CCRs, the hearing shall be held in executive session of the ARB, affording the applicant a reasonable opportunity to be heard. The ARB shall notify the applicant in writing of its decision within ten (10) days after the hearing. The Applicant shall have the right to appeal the ARBʹs decision to the Board. To perfect the right to appeal the ARB’s decision, a written notice of appeal must be received by the Board within ten (10) days after the date of the written notice to the Applicant of the results of the hearing. Any hearing before the Board shall be held in the same manner as the hearing before the ARB. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 11 of 61 SECTION 3 CONSTRUCTION REGULATIONS Requirements of this section are in addition to any governmental requirements. 3.1 CONSTRUCTION AREA All construction activity must occur completely within the Owner’s lot and may not encroach on Aspen Ranch common areas, rights‐of‐way or neighboring lots. 3.2 CONSTRUCTION HOURS Construction hours are subject to the Town’s regulations. 3.3 SANITARY FACILITIES Each builder shall be responsible for providing and maintaining adequate sanitary facilities on their lots. Portable toilets must be located and shielded behind the required field mock‐up. 3.4 DEBRIS AND TRASH REMOVAL The Owner is strictly responsible for ensuring that all construction trash, debris and other refuse material is properly disposed of on a daily basis and that no trash, debris or other refuse material is placed on any other lot or property. Any cleanup costs incurred by the ARB in enforcing these requirements will be billed to the Owner as needed. Trash containers must be maintained on site throughout construction. This includes regularly scheduled removal to alleviate container overflow. Streets in front of the lot must be kept clean and clear of debris. Runoff from truck and equipment cleaning must be contained within the construction area. 3.5 CONSTRUCTION TRAILERS The use of construction trailers may be approved by the ARB on case‐by‐case basis. Owner/Builder must submit a scaled site plan showing proposed location and methods for access, parking and screening. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 12 of 61 3.6 NOISE AND GENERAL NUISANCES All contractors must make an effort to mitigate construction noise so as not to disturb existing homeowners. The Owner, Builder and all contractors, subcontractors and their employees must park all vehicles on the Owner’s lot. Construction vehicles will not be allowed to remain overnight. Contractors’ vehicles and equipment must not obstruct the flow of traffic on the streets. In addition, fines may be assessed by the ARB if vehicles or equipment are parked, or materials are stored under existing trees without adequate tree protection. Radios able to be heard from adjacent homes or similar devices will not be allowed. Contractors, subcontractors and their employees must wear shirts. Dogs will not be allowed. Any liquids leaked from any vehicle must be immediately and completely removed from the site and surrounding area. 3.7 CONSTRUCTION SIGN A Builder may install one sign per property not exceeding 4 square feet in area. The sign may be either a realtor sign or a builder sign, not both. Builder and Realtor may combine information on one sign that exceeds the 4 square feet and must submit mockup design to the ARB for prior approval. The ARB will allow the architect to place one sign per lot not to exceed 4 square feet. The signage may include only the following: a) Aspen Ranch b) Name of company(s) or person(s) c) Address/Description of the Lot d) Phone Number(s) ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 13 of 61 SECTION 4 FLATWORK AND LANDSCAPE DESIGN SUBMITTAL Flatwork Design and Landscape Design may be submitted for approval at any time prior to installation. Landscape plans must be prepared by a landscape architect, or a designer licensed in the State of Texas. 4.1 FLATWORK MOCK‐UP SUBMITTAL AND APPROVAL Submittal Materials: A Flatwork Mock‐Up of materials displaying patterns, colors and textures must be erected on site for approval prior to Landscape Design approval. The Flatwork Mock‐Up must be at least 2 feet by 2 feet in size. No flatwork may be installed prior to ARB review and approval. 4.2 LANDSCAPE DESIGN SUBMITTAL AND APPROVAL Submittal Materials (1 set of each plan referenced below): a) Submittal Review Form (see Appendix F). b) Indicate all existing and new structures, pools, spas, etc. c) Planting Plan with location, species (common name), container size, height and spread, and installation spacing of all proposed plant materials. d) Location of existing trees with species, caliper size, and proposed method of protection indicated. e) Border and edging materials identified. f) Required trees noted with common name, height and spread, caliper, and required tree lighting on photocell. g) Hardscape Areas showing all rock outcroppings, decks or patios, service yards, driveways, lead‐walks and detailing all materials, colors and patterns. h) Accessory Structures / pools showing locations, plans, elevations, equipment, materials and colors. i) Fencing / Wall plans showing all fencing, walls, screening, and materials and their coordination with any existing fencing or walls. j) Exterior lighting indicating locations, shielding, and specifications. k) Equipment located and required screening indicated. l) Irrigation Plan m) Modifications to Grading and Drainage Plan including direction of flows, proposed drainage structures and piping, swales, existing and proposed contours (at 1‐foot intervals), and all necessary spot grade elevations. n) Any new retaining walls indicated, and supplemental construction drawings attached showing: ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 14 of 61 i. Height relative to finished floor ii. Location iii. Material to be used (random stone patterns are prohibited) iv. Elevation drawings (if required by ARB) v. Drainage All required drawings should generally be a minimum scale of 1” = 20’. Maximum sheet size for review is 30” x 42”. The ARB will not begin its review until all submittal materials are received. No landscaping may be installed prior to ARB review and approval. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 15 of 61 SECTION 5 ACCESSORY STRUCTURES SUBMITTAL The ARB requires the following items to be submitted when requesting approval for pools, spas, cabanas, arbors, outdoor kitchens, fireplaces, fire pits, gazebos, sport courts, play structures, yard ornaments and other accessory structures. The committee reserves the right to request additional information for clarification purposes. Submittal Materials (1 set of each plan referenced below): a) Submittal Review Form (see Appendix E). b) Pool Plan from the pool contractor, including contractor contact information. c) Site Plan including: i. All property lines, setbacks, and easements ii. Existing structure/improvement locations iii. Fencing and gate locations and materials iv. Proposed locations of pool, spa, cabana, and equipment v. Property construction access d) Landscape Plan including: i. Landscaping to be removed ii. New landscaping: list plant type, location and size iii. Location of existing trees and proposed method of protection iv. Lighting plan including fixture specifications v. Method of equipment screening e) Materials List including: i. Pool, decking, structures, retaining walls ii. Colors f) Drainage Plan including: i. New surface drainage patterns ii. Pool overflow terminations iii. Deck drains terminations g) If retaining walls are required, please provide: i. Location ii. Height relative to existing grade iii. Material iv. Elevation drawings if visible from outside the property h) If new fencing is required, please provide: i. Location ii. Height iii. Materials and colors iv. Transitions v. Attachment to existing fences or walls. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 16 of 61 i) Any proposed cabana, arbor, or gazebo must include the following: i. Site Plan (generally using a 1”=20’ minimum scale) ii. Floor Plans (generally using a ¼“ = 1’ minimum scale) with electrical iii. Elevations (generally using a ¼“ = 1’ minimum scale) iv. Architectural details, materials and colors v. Roof Plan (generally using a ¼“ = 1’ minimum scale) vi. See Section 6.1 Maximum sheet size for review is 30” x 42”. The ARB will not begin its review until all submittal materials are received. SECTION 6 COMPLIANCE 6.1 CERTIFICATE OF COMPLIANCE (REQUIRED) After construction of the residence and any accessory structures and installation of the landscaping, the Builder/Owner must submit a request to the ARB for a CERTIFICATE OF COMPLIANCE in accordance with the approved plans and Design Guidelines. The ARB will issue a Notice to Comply if discrepancies are identified. Any items not in compliance must be corrected before a Certificate of Compliance can be issued. (Please note that the Homeowners Association will not issue a Resale Certificate without a Certificate of Compliance. A title company cannot close the sale of a home without the Resale Certificate.) 6.2 ENFORCEMENT POLICY AND PROCEDURES If during construction the ARB observes any deviation from the approved Final Plan documents, the ARB may enforce the Design Guidelines as described on Appendix G attached hereto. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 17 of 61 SECTION 7 SITE, BUILDING AND LANDSCAPE GUIDELINES 7.1 BUILDING SETBACKS, LOT COVERAGE AND HEIGHT 7.1.1 Estate Lots (All Lots) Minimum Front Yard Setback: 10 feet; but 5 feet for side facing or “swing in” garages, courtyards and accessories structures Minimum Rear Yard Setback: 40 feet Minimum Side Yard Setback: 0 feet; but 40 feet adjacent to Westlake Ranch and Aspen Ln Note: The principal structure may be located on the property line; the total length of the building to be located on the property line shall not exceed 20% of the average lot depth. Maximum Lot Coverage: Per Westlake Ordinance Maximum Building Height (1): 48 feet from each independent (or different) finished floor elevation to the highest roof ridge for that floor as shown on the required architectural cross sections. Maximum Building Height (2): Minimum Dwelling Area: SECOND STORY RESTRICTIONS “THE FISHER CORRIDOR” Two story construction is prohibited for any building elements that are constructed in the “Fisher Protective Corridor.” This area runs the distance of Aspen Ranch form north to south along the eastern most property line and is a zone beginning from the eastern property line and extending toward the west for 40 feet. Any approved structure built in this zone must be a one-story accessory structure and not exceed 12- foot top plate height as measured from the finished floor and the roof pitch does not exceed 6/12 unless otherwise approved by the ARB. 3,000 square feet of contiguous, air‐ conditioned living space ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 18 of 61 7.1.2 SPECIAL SETBACK PROVISION Special Setback Provisions: The primary structure on Lot 1F shall be setback a minimum of 40 feet from Aspen Lane. Accessory structures may be constructed within the 40‐foot setback area provided the accessory structure is setback from Aspen Lane and the eastern and southern boundary line of the development under the guidelines provided by the Town of Westlake of one foot in distance for every foot of building height. 7.2 RETAINING WALLS Altering the grading of a lot may require the construction of a retaining wall. In lieu of side yard retaining walls, a slope of 3:1 (maximum) must be achieved between the foundation slab and any drainage swell on the side or rear of the property. Stem walls are encouraged where possible in lieu of lot line retaining walls. With the exception of retaining walls installed by the Developer, retaining walls located in front yards or in a side or rear yard facing any open space must be constructed of stone approved by the ARB. The builder or property Owner on the high side of the lot is responsible for installing and maintaining retaining walls between properties. 7.3 DRIVES & WALKS The ARB will review all colors, patterns and materials for drives, walkways and steps. Driveways: All driveways must be constructed from one of the following materials: brick pavers, interlocking pavers or concrete with salt with stain finish. Additionally, any concrete salt with stain finish drives must be bordered with stone or brick (see Exhibit 1). If stamped stained concrete is used, the border may be a designed element of the stamped design but must be a different complementary color. All driveways must be a minimum of 2 feet off the side property line. Where drives abut retaining walls on side lot lines, the driveway may abut an existing retaining wall on the high side. The top of curb must not exceed the top of the retaining wall. The back side of the driveway curb must not be exposed. Walkways & Steps: All walkways and steps from the public sidewalk or front driveway to the front entry must be constructed of the same finishes and with borders as described for driveways. A walkway must extend from the public walk (if any) to the front porch. A walkway from a driveway to the front porch is optional. The front porch must be of stone, brick pavers. The lead walk and front entry driveway material will stop at the back of the public sidewalk (if any). All public sidewalks and the front entry driveway approach area, up to the public sidewalk, must be a broom finish concrete, no staining or coloration is allowed on this area. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 19 of 61 Drives and Lead Walks EXHIBIT 1 7.4 WALLS / FENCING / SCREENING The ARB must approve the height, detailing, and location of all walls or fences, front yard to side yard fencing transitions, and neighbor to neighbor fence transitions. However, fence height and spacing must meet Town of Westlake and State safety requirements. 7.5 SIDE AND REAR YARD FENCING MATERIALS With the exception of masonry walls constructed by the developer, side yard and rear yard fences located adjacent to a street or common area must be constructed of the standard black iron which must terminate at the front with the standard iron column. The height of side yard and rear yard fencing shall be a maximum of 8 feet and shall transition to match the height of adjacent fences. Side yard and rear yard fences located adjacent to other lots may be constructed of standard black iron as well, or masonry to match the residence or the development perimeter fencing. 7.6 WOOD FENCING Wood fencing is prohibited in Aspen Ranch unless approved by the ARB for special conditions. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 20 of 61 7.7 MASONRY WALLS Masonry walls must be constructed to match the materials and design of the main residence and may extend to a maximum height of 8 feet. 7.8 PARTY WALLS AND FENCES Each wall or fence built as a part of the original construction on the lot which separates two adjoining lots will constitute a party structure. Party walls and fences shall be maintained and repaired by the Owners of the adjoining lots in accordance with the CCRs. 7.9 SCREENING Equipment, generators, air conditioning compressors, storage areas, woodpiles, garbage receptacles, and similar items must be visually screened from streets, common areas and neighboring lots by solid evergreen landscape materials or, if approved by the ARB, by masonry walls that are an integral part of the residence design. Motor courts shall be screened from the view of adjacent properties by solid fencing or landscaping consisting of large evergreen shrubs (See Exhibit 2). Unacceptable ‐ no screening Proper screening using landscaping EXHIBIT 2 Screening of air conditioning unit or other equipment 7.10 LANDSCAPE REQUIREMENTS The intent for the design and installation of landscaping is to achieve a matured and full landscape feel upon initial installation to include large shade trees, exterior landscape lighting, layered foundation plantings, and lush mature native plant materials. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 21 of 61 A plant material list (see Appendix B) has been developed as a base palette to guide the development of the landscape design for the lot. Layered foundation plantings with lush, mature plant materials 7.11 REQUIRED LANDSCAPE MATERIALS An acceptable landscape design and installation must create the look and feel of a mature and established yard and home. Plant sizes shall be specified for immediate effect. Side and rear elevations visible at grade from streets or common areas must have continuous, layered foundation plantings. The required landscape materials for each home include: Shrubs and Ornamental Plantings Front Yard 2 rows of minimum 24‐inch tall evergreen shrubs located along the foundation excluding porches and patios. A minimum of 4 small canopy/ornamental trees (a minimum of 2 ½ inch caliper or 6‐foot tall). Trees Front Yard A minimum of 2 Live Oaks or Red Oaks (minimum 5‐inch caliper) located in the front yard. Rear Yard A minimum of 1 large shade tree (minimum of 4‐inch caliper). ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 22 of 61 The ARB strongly encourages nursery grown trees. In the sole discretion of the ARB, existing trees on the lot may satisfy the above requirements. Absolutely no existing trees may be removed without the ARB’s prior written approval. Refer to the Landscape Plant Material Selections for acceptable and unacceptable plant materials. 7.12 IRRIGATION SYSTEM Each Lot must have and maintain an underground automatic irrigation system for the purpose of providing sufficient water to all front, side and rear yard landscaping. The system must comply with Town of Westlake irrigation codes. 7.13 EXTERIOR LIGHTING All exterior lighting for identification, pools, patios, and landscaping must be subdued and indirect “night lighting.” Nuisance lighting and/or glare must be avoided. Light fixtures must be located and designed to avoid spillover onto adjacent lots and the fixtures must be shielded from view. Flood lights that wash the elevation of the home are not allowed. There must be a Landscape Lighting electrical circuit connected to an electric photocell. Required or existing front yard trees must be lighted with 2 LED bulbs with shields; pointing down; ranging from 50 – 150 Watt depending on height of tree. All required lighting must be controlled by photocell and not be connected to any manual switches. All required lighting must come on at dusk and remain on until dawn and kept in working order at all times. 7.14 LANDSCAPE INSTALLATION All required landscaping must be installed prior to the issuance of a Certificate of Compliance. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 23 of 61 ASPEN RANCH ~ Proposed Site Plan ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 24 of 61 SECTION 8 ARCHITECTURE The ARB encourages innovation and creative solutions in the design of each residence as long as the proposed design is consistent with the overall design philosophy of Aspen Ranch. The vocabulary selected is based on the architectural traditions of Texas Hill Country Influence. Visual authenticity for any style is required and each element of a residence should be derived from that style, from hardware to building form. Under certain circumstances, the ARB may require additional landscaping to soften a particularly strong design interpretation. The architectural style and detailing of each residence will be closely scrutinized by the ARB and approval of such will be a subjective aesthetic determination by the ARB. The ARB will use its judgment to make determinations about the suitability of the proposed design based on the unique characteristics of each Lot within the development. All building elements must be detailed to provide scale appropriate to the architectural period and style of the residence. Multiple, haphazard or arbitrary wall and roof offsets will be discouraged. The building mass must relate to the chosen architectural style for Aspen Ranch. Excessive wall/plate heights that create ill‐proportioned massing or violate the proportions/scale of the chosen ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 25 of 61 architectural style will not be approved. The following requirements, some of which are restated for absolute clarity, shall apply to the Texas Hill Country Influence of architectural designs. a) Painted brick is not allowed. Instead, a random smearing of mortar over masonry may be used. A full coverage “smear” will be considered by the ARB. b) The color black is not considered an approvable paint color selection. c) Large flat roof areas should be limited and will be considered on a case‐by‐case basis by the ARB. d) Enhanced cornice, fascia, and eaves must be detailed consistent with the architectural style. e) All visible gutters and downspouts must be smooth round material. f) Homes leaning more contemporary using stucco and high‐quality wood trim or limited wood siding will be considered on a case‐by‐case basis by the ARB. While the requirements contained with these Guidelines shall apply to Transitional styles of architectural designs, the ARB may consider the following exceptions as needed to properly execute Transitional styles of architecture. a) As an exception to Section 8.1.3, a limited use of wood for accents may be allowed on visible elevations as a design element. b) As an exception to Sections 8.1.8 and 8.3.2, cast stone window surrounds on stucco homes and cast stone or shaped brick surrounds for brick homes may not be required. c) Barrel tile roof elements used as detail, trim or eaves detail may be allowed by the ARB on a case‐by‐case basis. d) Solid wood timbers may be used on headers. Transitional styles of architectural designs will be heavily scrutinized by the ARB. Therefore, the Pre‐Design Conference and Conceptual Design Submittal steps of the Design Review procedures outlined in Section 2 of these Guidelines are mandatory. During these steps, the ARB determines if the use of a Transitional style of architecture is acceptable or unacceptable. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 26 of 61 8.1 EXTERIOR MATERIALS & DETAILING 8.1.1 EXTERIOR WALL MATERIALS Exteriors of residences shall be designed with a unified exterior material on all sides. The transitions from one material to another will be closely scrutinized. If a mix of materials are employed, they must be consistent with the architectural style of the residence. All materials and colors must be mocked up in the field in sufficient quantities to satisfactorily exhibit their final textures and colors for the ARB to review (see Appendix E) for minimum mock‐up requirements). 8.1.2 TYPE OF MATERIALS Except as provided in Section 8.1.8, exterior materials must be 100% masonry (brick, cast stone, or stone) on all walls visible from any street or common area, and 80% masonry on each (not cumulative) remaining non‐visible elevations. Section 8.1.8 permits 3‐coat stucco or cementitious plaster as approved by the ARB. Front and visible side or rear elevation materials must be congruently detailed. Materials must wrap exterior corners and must extend to a non‐visible point or logical interior corner before transitioning. (This applies to water tables, eave details, jambs and headers at fenestration elements as well as entire elevations.) Incorrect: Materials transitioning at outside corners, mid‐wall, or not wrapping jambs ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 27 of 61 EXHIBIT 3 Incorrect material transitions EXHIBIT 4 Proper transition of materials using inside corner ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 28 of 61 8.1.3 EXTERIOR DETAILING Exterior detailing will be closely scrutinized. Detailing must be architecturally correct for the style of the residence and faux details will not be permitted. Non‐functioning/ faux vent Water table upside down without offset No offset EXHIBIT 5 Examples of incorrect detailing EXHIBIT 6 Example of correct water table detailing ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 29 of 61 8.1.4 MORTAR The ARB shall approve a blend of brick and stone colors to be used on all residences. All masonry must employ a flush ¾” minimum mortar joint and a random smearing of mortar over the masonry is encouraged. Only cream, gray or white mortar will be permitted. Brick or stone that is proposed must be used on the mock‐up and approved by the ARB. A previous approved submittal does not represent automatic future approval of the same material. . EXHIBIT 7 Proper application of flush ¾” – 1” mortar joints with mortar smear 8.1.5 CHIMNEY All exposed portions of the fire breast, flue and chimney must be clad in brick, stone or a combination thereof, matching the materials used on the residence. On a limited basis, the ARB will allow the use of 3‐coat stucco in accordance with Section 8.1.8. Exterior Insulation and Finishing System (EIFS) is not allowed on any exterior elevation or chimney in Aspen Ranch. All Chimney cap designs must be submitted for ARB approval. No exposed metal spark arrestors will be permitted. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 30 of 61 8.1.6 STONE TYPE AND DESIGN Desired building stone shall be submitted to the ARB for approval. The coursing pattern must relate to the style of architecture. Random shape coursing patterns will be closely reviewed. No mixing of stone types will be allowed. Stone colors must be of a uniform palette with minimal color variations. A salt & pepper appearance will not be allowed. 8.1.7 CAST STONE OR NATURAL STONE Cast Stone or Natural Stone shall be buff, white or cream color with or without pitting accents. Mortar color must be similar in color and tone to the building stone used. 8.1.8 STUCCO EXTERIOR SURFACES ARB may permit stucco or cementitious plaster on visible exterior elevations in Aspen Ranch. Stucco must be a 3‐coat system with a ¾” hand troweled finished, providing a smooth (but not totally uniform) texture. No heavy swirls will be permitted. The color must be finished with slight color variations for rustication. When using stucco, stucco applied over masonry is required except on small second story walls that are not a major massing of the structure. All windows and doors must be recessed a minimum of 4 inches from the wall plane. See Section 8.6 for garage door recess requirements. 8.2 EXTERIOR PAINT AND STAIN COLORS Exterior paint and stain colors approved for use in the development are in the muted earth tones of beige, brown, taupe and gray. A previous approved submittal does not represent automatic future approval of the same material. All exterior colors must be submitted and approved by the ARB. Black, all primary and secondary colors, fluorescent colors, and other colors that the ARB deems to be loud, clashing, or garish are expressly prohibited. 8.3 WINDOWS Window openings are typically square or vertical in orientation, designs may require horizontal orientation and will be reviewed closely by the ARB. All window types should be selected and detailed appropriate to the architectural style of the residence. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 31 of 61 8.3.1 TYPE OF WINDOWS All windows must be from the Appendix D Approved Materials Selections. Reflective glass or darkly tinted glass is prohibited. No solar screens will be permitted. All windows visible from any street or common area (whether on the front, side, or rear) shall be divided lite casement windows and shall be, wood with aluminum clad exterior, or iron. No skylights may be visible from any street or common area. 8.3.2 WINDOW, DOOR AND BALCONY RESTRICTIONS Second story windows and balconies shall be located so as to restrict direct views into adjacent windows, patios, yards, and/or courtyards as reasonably possible. ARB approval of all second‐floor windows and balconies is required to make a reasonable effort to maintain the privacy of the surrounding property Owners. Clerestory windows are permitted on the view restricted side provided that second story walkways, catwalks, etc. have no view impact on adjacent properties. Opaque windows to include glass block or other obscure window types will be considered on restricted elevations. 8.3.3 SHUTTERS Window shutters when employed must have complete hardware and match the size and shape of the opening. Shutter location, size and design must be clearly illustrated on the architectural plans submitted for approval by the ARB. 8.3.4 HEADERS AND SILLS All window and door headers, jambs and sills, which are visible from the street or common areas, must be constructed of cast stone, natural stone, decorative shaped brick, solid wood timber or a combination thereof. Any windows or doors visible from any street on a wall with a brick facade MUST have headers, jambs and sills of all cast stone or all shaped brick. All windows or doors must have congruent wall material of no less than 6” above the opening and below the fascia. 8.4 BALCONIES AND VERANDAS Balconies and verandas on the front elevations are important and encouraged but should be developed as appropriate design features to the architectural style of the residence. Balcony railings must be consistent in character and detail with the rest of the structure. Cantilevered balconies must be detailed consistent to the architectural style. Faux balconies will not be allowed. Balconies may have iron or stone railing systems. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 32 of 61 EXHIBIT 8 Unacceptable use of faux balconies EXHIBIT 9 Properly Designed Acceptable Balconies 8.5 ROOFS Special attention must be given to the roof massing and slopes. Roof pitches must match at visible locations. Roof forms, pitches, materials, or other architectural elements which are not an integral part of the design and appropriate to the architectural style will not be acceptable. Roofs shall be pitched for the respective style of architecture chosen. Roofs that are too steep or too shallow for the style of the residence are expressly prohibited. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 33 of 61 8.5.1 ROOF MATERIALS Acceptable roof materials for Aspen Ranch are: a) High quality clay or concrete tile, barrel or flat (with a thickness similar to clay) b) Natural slate tile c) Traditional standing seam copper or other metal approved by the ARB 8.5.2 VENT STACKS AND OTHER ROOF PENETRATIONS Vent stacks and other roof penetrations shall be placed on roof planes other than those visible from streets or common areas, unless specifically approved by the ARB, and must be painted to match roof color. Vent stacks will be required to be ganged together and the number of roof penetrations limited. 8.5.3 CORNICE, FASCIA, AND EAVES Enhanced cornice, fascia, and eaves must be detailed consistent with the architectural style of the residence and be constructed on all elevations visible from the streets and common areas. 8.5.4 SATELLITE DISHES AND ANTENNAS Satellite Dishes and antennas shall not be installed in locations visible from streets, common areas or other residences unless specifically approved by the ARB. Only one dish or antenna is permitted. A maximum of an 18‐inch diameter dish is permitted. 8.5.5 SOLAR COLLECTORS Solar Collectors, if used, must be integrated into the building design and constructed of materials that minimize their visual impact. If located on the roof of a home, Solar Collectors shall not be located on the roof facing the street. If located on the roof the Solar Collectors must: a. Not extend higher than or beyond the roof ridgeline b. Conform to the slope of the roof c. Have a top edge that is parallel to the roofline and d. Have a frame, support bracket, or visible piping or wiring that is silver, black or dark bronze and the collectors bend with the color of the roof to the greatest extent possible. Solar Collectors that become non‐functioning or inoperable must be removed by the Owner. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 34 of 61 8.6 GARAGES AND PARKING Each residential dwelling erected on any lot shall provide garage space and parking for a minimum of 3 conventional automobiles. Each lot shall also provide for a minimum of 2 off‐ street parking spaces. All garage entries visible from a public street must be single garage doors and be recessed at least 18 inches from the wall face (see Exhibit 10) with the exception that the minimum recess for garage doors located within a porte‐cochere or an interior facing auto court may be reduced to 12 inches from the wall face. Masonry materials must wrap the inside jambs. All garage doors shall be equipped with automatic remote‐controlled door openers and shall remain closed when not in use. The ARB shall approve placement of all garages, door designs, and door materials. Decorative wood doors are required on all garages. Garage door colors must be submitted for approval prior to installation on the residence. EXHIBIT 10 Example of recessed single garage doors 8.7 ADDRESS BLOCK Unless otherwise approved by the ARB, the Address Block may be cast stone, natural stone or other material approved by the ARB and mounted recessed into the facade of the house in an obvious location. It will be a rectangular shape with a minimum size of 9”x 15” and a maximum size of 11”x 18” mounted. It will have the house number and be illuminated at night. 8.8 MAIL BOX The developer will provide all mail box installation specifications. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 35 of 61 8.9 GUTTERS AND DOWNSPOUTS The entire structure must be guttered with downspouts. All gutter and downspouts on the front of the house and any side visible from a street or common area shall be molded from copper or paint grip metal and shall be smooth round material (see Exhibit 11). All downspouts except those emptying directly into streets or driveways shall be tied into underground drainage systems. Gutters shall not drain across property lines without benefit of an easement. EXHIBIT 11 Smooth and Rounded Gutters and Downspouts 8.10 UTILITIES The supply conduit for electrical meters and telephone boxes visible from streets or common areas shall enter the foundation beneath the final yard grade so that the facilities are recessed in the wall and the box fronts and meter are the only items visible. Any facilities visible from the street must be fully screened with solid fencing or mature evergreen landscape material. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 36 of 61 SECTION 9 EXTERIOR LIGHTING All exterior lighting for identification, pools, and landscaping shall be LED “moonlight” temperature and subdued and indirect. Nuisance lighting and/or glare must be avoided. All front exterior lighting must be on a dusk‐to‐dawn photocell (no switch). Natural gas lamps are required at all building entrances in Aspen Ranch. The preference will be for minimal architectural lighting and maximum landscape lighting to enhance the aesthetic quality of the site. 9.1 ARCHITECTURAL LIGHTING 9.1.1 PORCH AND ENTRANCE LIGHTING All front porches and entrances must have no less than one down light on the porch and one bracket light beside the front entrance. When present, Porte Cochere lights must also be on photocell with no switches. Architectural up lighting will not be permitted. The design of required lighting fixtures shall be consistent with the architectural style of the residence and is subject to ARB approval (See Exhibit 12). EXHIBIT 12 Proper design and placement of porch lanterns ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 37 of 61 9.1.2 GARAGE LIGHTING All visible garage doors must have one exterior recessed light centered above each door or a wall mounted bracket light at each door (See Exhibit 13) EXHIBIT 13 Properly installed garage lights 9.1.3 SECURITY LIGHTING General illumination or security flood lights will not be allowed on visible elevations of residences. When up‐lighting is employed, it must be completely screened from view. All flood lights must be fully shielded to prevent glare (See Exhibit 14). EXHIBIT 14 Improper use of security flood lights (Visible and not shielded) ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 38 of 61 9.2 LANDSCAPE LIGHTING 9.2.1 PHOTOCELL All required exterior lighting must be controlled by photocell and not be connected to any manual switches. All required lighting must come on at dusk and remain on until dawn and kept in working order at all times. 9.2.2 TYPE OF LIGHTING The bulb of choice for landscape and hardscape elements will be an LED “moonlighting temperature”. 9.2.3 TREE LIGHTING There must be a Landscape Lighting electrical circuit connected to an electric eye photocell. All trees “required” for the front yards or any side yard adjacent to a street per the Landscape requirements must have 2 landscape “Full Cutoff”, fully shielded, down‐facing outdoor lighting fixtures (See Exhibit 15). EXHIBIT 15 Example of required tree lights 9.2.4 SHIELDING All exterior Lighting fixtures must be full cut‐off meaning that light rays emitted by the fixture (either directly from the lamp or indirectly from the fixture) are projected below the horizontal plane passing through the lowest point on the fixture from which light is emitted. Additionally, the light source shall be fully shielded, and ground landscape fixtures must not be visible. Facade up lighting is not allowed. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 39 of 61 SECTION 10 ACCESSORY STRUCTURES 10.1 CABANAS / ARBORS / GAZEBOS / STORAGE BUILDINGS / PERGOLAS Any accessory structures must be carefully designed to maintain the architectural integrity and aesthetic continuity of the main residence in massing, scale, materials, detailing, and color. If provided, these types of accessory structures may be located in the rear or side yard and must meet Town of Westlake required setbacks. Any accessory structure should be located and designed to respect adjacent properties (views, privacy, noise, etc.) and be consistent with the primary structure design and material use. 10.2 SPORTS COURTS / RECREATIONAL EQUIPMENT / PLAYHOUSE All site elements such as furniture, flagpoles, artwork, play equipment, etc. directly visible from streets or common areas must be submitted and approved by the ARB prior to installation. No reflective materials or bright colors will be allowed. The submittal is to include, but not limited to, detailed information on size, location, materials, colors, mounting details and lighting. Flag poles are not permitted in Aspen Ranch. Recreational equipment and/or a playhouse shall be limited to the side yard or rear yard and must be a minimum of 10 feet from all property lines. Recreational equipment must be constructed of timber with a maximum height of 12 feet from grade. Roof structures on play equipment must be constructed of wood (no fabric or plastic roof materials). Playhouse roof and façade materials and colors must be similar to the main residence. A playhouse shall not exceed 80 square feet and 8 feet in height. Recreational equipment and/or a playhouse must be submitted to ARB for approval. No bright colors will be allowed. Tree houses are not allowed. The placement of a basketball goal/pole should generally be located to reduce visual and use impact to neighboring properties. Only one goal/pole per lot is permitted. Sports courts are permitted but lighting of sports courts is prohibited. Rain barrels must be located in the rear or side yard and be screened from view from any street or common area. A rain barrel may not exceed 50 gallons in capacity. 10.3 POOLS / SPAS / WATER FEATURES In general, pools, spas, and other water features are to be designed in ground and to be integral parts of the overall design of the lot and visually blend with the landscape. Air conditioning and swimming pool equipment must be screened from the view of any street and/or common area. See Exhibit 2 for a photo of proper screening. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 40 of 61 SECTION 11 AMENDMENTS AND OR CHANGES The Declarant has the right to amend the Design Guidelines at its sole discretion. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 41 of 61 APPENDIX A Common Architectural Detailing Issues Architectural detailing should be directly influenced by the architectural style of the residence and should be correct interpretations of the classical detailing of that style. The ARB encourages research and thoughtful interpretations of this detailing. What follows are examples of typical misinterpretations and examples of how they should be constructed. Dormers Incorrect dormer detailing Correct dormer detailing ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 42 of 61 Doors Incorrect door shape coordinating shapes Architectural shapes are not consistent and will not be allowed by the ARB Correct door shapes Matching architectural shapes ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 43 of 61 Equipment Screening Incorrect / No screening Equipment is not screened and is readily visible from the view of a street or common area Proper Screening ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 44 of 61 UNACCEPTABLE FAUX ELEMENTS False balconies False windows False wall offsets UNACCEPTABLE RAKE AND FASCIA DETAILING No fascia “Pork Chop” rake terminations ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 45 of 61 Arbitrary Massing Curved Swoops Swoops (if used) must be smooth curves not angular. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 46 of 61 WATER TABLES Unacceptable Designs of Water Tables Over projected Upside down Upside down and no projection Acceptable Design of Water Tables ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 47 of 61 APPENDIX B Landscape Plant Material Selections Acceptable Plant Material (plants not on the list must be submitted to the ARB for approval prior to their use) Plant Materials All plant material is to conform to American Standard for Nursery Stock ANSIZ60.1 All plants shall conform to quantity and quality standards as set forth in USDA Standard for Nursery Stock, Publication No. 260.01 Canopy Trees Ornamental Trees Large Evergreen Shrubs Small and Intermediate Shrubs and Ornamentals Grasses Vines Groundcover Approved Sod: St. Augustine, Zoysia or Bermuda Sod, overseed winter months with rye grass. Plant Material Substitutions When a specific type of plant material ceases to become generally available, then the ARB shall have the right, in its sole discretion, to recommend appropriate substitutions. Alternate recommendations of plant material not appearing above can be made yet must be approved by the ARB. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 48 of 61 Canopy Trees Minimum size 5” caliper or 100 gal. Bald Cypress Bur Oak Cedar Elm Chinquapin Oak Deodar Cedar Honey Locust Lace Bark Elm Live Oak Pecan Shumard Oak Texas Red Oak Large Shrubs Minimum size: 25 to 35 gal. Arizona Cypress Cherry Laurel Chinese Photinia Crape Myrtle Oleander Possum haw Russian Olive Texas Mountain Laurel Vitex Windmill Palm Yaupon Holly Ornamental Trees Minimum size: 45 gal. Aristocrat Pear Bradford Pear Canaert Redcedar Chinese Pistache Crabapple Desert Willow Eldarica Pine Fan d‐Arc Osage Orange Honey Mesquite Japanese Black Pine Japanese Persimmon Mexican Plum Panicled Golden Raintree Redbud Soap Berry Bald Cypress Bur Oak Cedar Elm Chinquapin Oak Deodar Cedar Japanese Persimmon Mexican Plum Panicled Golden Raintree Medium, Small and Dwarf Shrubs Minimum size: 5 to 15 gal. Dwarf Buford Holly Dwarf Chinese Holly Dwarf Yaupon Holly Nandina: Harbour Dwarf, Gulf Stream, Nana Red Yucca Rosemary Tea Rose ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 49 of 61 Small Shrubs Barberry Bridal Wreath Spirea China Rose Dwarf Buford Holly Dwarf Palmetto Flowering Quince Glossy Abelia Grayleaf Cotoneaster Indian Hawthorn Japanese Boxwood Juniper Nandina Compact Tea Rose Grasses Minimum size: 1 to 5 gal. Bermuda Grass Buffalo Grass St. Augustine Grass Tall fescue Zoysia Grass Ground Cover Ajuga Asiatic Jasmine English Ivy Liriope Monkey Grass Santolina Trailing Juniper Vinca Vines Boston Ivy Carolina Jasmine Confederate Jasmine Coral Honeysuckle Coralvine English Ivy Fig Ivy Improved Trumpet Vine Lady Banksia Mermaid Rose Rosa X Fotuniana Silverlace Vine Virginia Creeper Wisteria Perennials Autumn Sage Baby Sun/Sunray Coreopsis Bearded Iris Bouncing Bet Daylily Garden Canna Goldstrum Rudbeckia Indian Blanket Louisiana Iris Mealy Cup Sage Moonbeam Perennial Verbena Pink Rain Lily Purple Coneflower Rosemary Society Garlic Sweet Violet White Rain Lily ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 50 of 61 APPENDIX C Landscape Control & General Guidelines Landscape Development Plans Plans for any installed landscape or major alterations to existing gardens in or upon any site must be approved by the ARB. Submitted plans must include all aspects outside the residence including utilities, hardscape, structures, pools and fountains, planting and irrigation per the design of a registered licensed landscape architect and licensed irrigator. Site Line requirements Landscape treatment shall not interfere with sight line requirements at street or driveway intersections. It is the responsibility of the Owners and the Owner’s consultants to make sure that all such requirements are provided for. Site line requirements and visibility triangles must be delineated on the landscape plans. Regulatory Requirements a) Contractors are responsible for pulling all applicable permits with governing municipalities and notify appropriate agencies prior to work and receive certification of approval and completion at the termination of work. b) Give adequate and required legal notice to Owner, utility organization and governing authorities prior to commencing work. c) Coordinate operations with other trades, utility firms, and affected police departments to assure continuity of access and service in conformance with the applicable requirements of these organizations. d) Insurance shall be written for not less than any limit of liability specified as part of the Contract. Certification of such insurance shall be filed with the Owner. e) Location of the irrigation must be coordinated with planting prior to the installation of plant materials. Any damage to known utility lines during landscape and irrigation construction must be repaired by the landscape subcontractor at their cost. Warranties/Guarantees Warranty: included coverage for one continuous growing season; replace dead or unhealthy plants. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 51 of 61 Replacements: plants of the same size and species, planted in the next growing season, will have a new warranty commencing on date of replacement. Any plant material that is not healthy, dies, is dying, or the design value of which has been so injured or damaged as to render it unsuitable for the purpose intended shall be replaced immediately by the Contractor at no cost to the Owner. The removal of plant material, additional fertilizer, and topsoil necessary for replacement shall be at the contractor’s expense. Soil compaction for all on grade and over structure planters shall be guaranteed for 1.5 years against improper compaction, excessive settling, and rapid decomposition of soil. Materials Other Than Plants Topsoil a) All existing topsoil stripped for this work and suitable for re‐use must be stored on site and reused. b) If the quality or existing topsoil is inadequate to complete the work, furnish sufficient topsoil of approved quality to properly install all work as specified. Mulch a) Organic‐Commercial grade shredded hardwood mulch. b) Inorganic‐ decorative rock gravel, pea gravel, etc. Mulch planting beds and individual trees and shrub planting pits should be at a uniform dept of 1.5”. Mulch shall be kept out of the crown of shrubs and off buildings, sidewalks, lighting standards, and other structures. Mulch elevation needs to match adjacent finished grade and paving surface. Erosion Control Must comply with all Town of Westlake requirements. Guying and Wrapping a) Cable clamp and turnbuckles shall be heavy galvanized or stainless, strong forged steel. Turnbuckles shall be 3/8‐inch eye with 6‐inch minimum opening. b) Flags for marking guys shall be 18‐inch sections of white one‐inch diameter PVC pipes. c) All guys are to be positioned in same direction pattern of wires must be symmetrical and uniform. Tree guys and stakes shall be removed within one year of planting d) Wire stays for tree support shall be pliable, number 12‐14‐gauge galvanized wire. e) 12” x 12” long non‐stretch fabric with grommets. f) Tree paint shall be waterproof, asphalt base paint with antiseptic properties for use on tree wounds and shall be compliant with “best practices” ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 52 of 61 Edging Edging for all landscaping should be made of masonry products such as brick, limestone and other approved materials to match hardscape designs. Proper foundations must be clearly illustrated on the plans and used in all conditions for longevity. Commercial steel edging will only be allowed on a case‐by‐case basis. Irrigation Requirements An automatic underground irrigation system approved by the ARB shall be installed in all landscaped areas on site by a licensed irrigator registered by the State of Texas and shall be designed to ensure that all landscape vegetation is watered as necessary to sustain its design intent. Controllers shall be located on the plans and verified in the field. Controllers must be screened and not visible to the public, yet readily accessible. Irrigation System should achieve full coverage and be maintained properly a) Adjust heads for 100% coverage b) Minimal or No overspray on hardscape c) Consideration given to amount of water used on landscaping elements and natural mature growth trees Controllers/Automatic a) Control system should be digital and programmable. b) Should be set to achieve proper and adequate watering without over watering c) Should also be adjusted seasonally Underground Pipe Installation should be done by a licensed irrigator and follow these guidelines: a) Trenching around mature trees must be done by hand b) Use minimum trench size: 4 inches c) Minimum cover over branch and outlet piping: 12 inches d) Minimum cover over main line and control wiring: 18 inches e) No piping should remain exposed upon completion of installation Pruning All pruning of mature trees should be completed by a licensed arborist ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 53 of 61 Disposal of Debris a) After completion of planting operations b) Remove all excess planting materials c) Legally dispose of excess materials Weeding a) Remove all weeds b) Application of all weed control materials by licensed Professionals Cleaning a) Paved areas to be free of planting materials b) Remove accumulated debris in planting beds/lawn areas c) Properly remove from site all litter, leaves, clippings d) BLOWING DEBRIS ON STREET, DRIVES OR OTHER PROPERTY IS EXPRESSLY PROHIBITED! Replacements a) Promptly replace all damaged plant material b) Match existing size and original species c) Substitution of plant material allowed per ARB recommendation ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 54 of 61 APPENDIX D Approved Material Selections BRICK SELECTIONS ‐ SAMPLE MUST BE SUBMITTED ON MOCK‐UP Please remember that approval for a brick on one house does not grant approval for use of that brick on any other home. Brick, stone or stucco combinations must be of complementary colors not contrasting colors. Note: Painted brick, brick of gray and white tones are all prohibited unless expressly approved by the ARB. STONE SELECTION ‐ SAMPLE MUST BE SUBMITTED ON MOCK‐UP PAINT & STAIN SELECTIONS ‐ SAMPLE MUST BE SUBMITTED ON MOCK‐UP Exterior paint and stain colors approved for use in the development are in the muted earth tones of beige, brown, taupe and gray. A previous approved submittal does not represent automatic future approval of the same material. All exterior colors must be submitted and approved by the ARB. Black, all primary and secondary colors, fluorescent colors, and other colors that the ARB deems to be loud, clashing, or garish are expressly prohibited. ROOF SELECTIONS (OR OTHERS AS SPECIFICALLY APPROVED BY THE ARB) ‐ SAMPLE MUST BE SUBMITTED ON MOCK‐UP Glazed roof tiles are prohibited. When using clay tiles or slate shingles, a minimum of three (3) different muted earth tone complimentary colors that create a subtle multi‐color surface shall be utilized. All colors and materials of roof surfaces are subject to ARB approval. WINDOW SELECTIONS ‐ SAMPLE MUST BE SUBMITTED ON MOCK‐UP WINDOW SELECTIONS (OR OTHERS AS SPECIFICALLY APPROVED BY THE ARB) ‐ SAMPLE MUST BE SUBMITTED ON MOCK‐UP Approved Manufacturers: Anderson Windows Pella Windows Marvin Windows Kolbe and Kolbe Windows Weathershield Windows Lincoln Windows JELD‐WEN ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 55 of 61 APPENDIX E Material Field Mock‐up 1) Purpose The purpose of the on‐site Mock‐up is two‐fold. Primarily it is designed to provide an accurate example of what the home will look like after it’s constructed, and secondly to provide the ARB with a sample of materials to approve colors. We want you to build a slightly smaller version of what is going to be installed on the house. It is to be built exactly as you would build the home, showing the approriate detailing and correct installation. 2) Timing The Mock‐up must be completed by the time the foundation is poured, so as to provide enough time for review and approval and to prevent delays in ordering or delivery of materials. It is required that the Mock‐up be used as a screen for the Porta‐Potty. The Mock‐up may be removed from the lot when landscaping is installed. Applicant must provide written detail of selections to the ARB for review. This must include all manufactures, colors, sizes, grouts, mortars, materials, etc… ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 56 of 61 3) Size The Mock‐up is to be constructed with the dimensions of 8 tall, 5 feet wide, and 5 feet deep. Reference the exhibit drawing shown above. 4) Windows All windows or doors must have congruent material of no less than 6” above the opening and below the fascia. The Builder must install the window in such a place as to provide enough room for the masonry surround and or header detail on the window, the brick wall material on all sides of the window, the rowlock or moulding trim, the water table, and the masonry material below the water table. Reference the exhibit drawing. Windows may not be installed on the home until the Mock‐up is approved in writing by the ARB. 5) Water table (if used) You will need to properly install the water table with an adequate foundation off‐set and brick ledge. The masonry below the water table must extend all the way out to the edge of the water table element above it. Reference the exhibit drawing. 6) Mortar Joints All masonry must employ a flush ¾” minimum mortar joint and a random smearing of mortar over the masonry is encouraged. 7) Roof The Builder must install the roof form as applicable to the design of the residence. Therefore, swoops, gables, hips, special conditions, etc. must be included in the Mock‐ up. 8) Other Required Details If the design of the residence includes elements such as diapering, wood corbels, timber and nogging, rake/fascia transitions, cast stone banding, crown mould at fascia’s, intricate dormer designs, special window trims, or stucco texture and mottling, these must be included in the Mock‐up. All elements of the Mock‐up must be installed before the ARB can review the Mock‐up. No partial submittals will be reviewed. The Mock‐up must be approved prior to installing any exterior materials, including windows ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 57 of 61 APPENDIX F Submittal Review Forms and Applications Submittal Review Application (page 1) DATE LOT # Block # LOT ADDRESS LOT OWNER/BUILDER ADDRESS PHONE ( ) Fax( ) Mbl.( ) EMAIL ARCHITECT ADDRESS PHONE ( ) Fax( ) Mbl.( ) EMAIL LANDSCAPE ARCHITECT ADDRESS PHONE ( ) Fax( ) Mbl.( ) EMAIL OTHER ADDRESS PHONE ( ) Fax( ) Mbl.( ) EMAIL ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 58 of 61 Aspen Ranch Submittal Review Form (page 2) □ Pre‐Design Conference Requirements: □ Review Fee □ Conceptual Design Submittal (optional) □ Preliminary Design Submittal Requirements: □ Submittal Review Form □ Site Plan □ Floor Plans □ Exterior Elevations □ Roof Plan Date Received: Action: Date Approved: □ Final Plan Submittal Requirements: □ Submittal Review Form □ Site Plan □ Grading Plan □ Floor Plans □ Exterior Elevations □ Details □ Roof Plan □ Electrical Plans □ Exterior Color / Material Selections Date Received: Action: Date Approved: □ Final Plan Submittal Resubmission Date Received: Action: Date Approved: Pre‐Construction Meeting Construction Deposit Building Permit ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 59 of 61 Aspen Ranch Submittal Review Form (page 3) □ Landscape Plan Submittal Requirements: □ Submittal Review Form □ Planting Plan □ Hardscape □ Accessory Structures Plans & Elevations □ Fencing & Wall Plans □ Exterior Lighting □ Irrigation Plan Date Received: Action: Date Approved: □ Field Mock‐up Date Notified: Action: Date Approved: □ Accessory Structure Submittal Requirements: Pools □ Submittal Review Form □ Site Plan □ Pool Plan □ Landscape Plan □ Drainage Plan □ Property Access Plans Accessory Structures □ Floor Plan □ Exterior Elevations □ Details □ Roof Plan □ Electrical Plans □ Exterior Color / Material Selections Date Received: Action: Date Approved: □ Certificate of Compliance Date Notified: Action: Date Approved: ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 60 of 61 ASPEN RANCH CERTIFICATE OF COMPLIANCE Checklist and Application Date Requested Dated Reviewed Lot# Block# Lot Address Lot Owner Address Phone Fax Builder Address Phone Fax Certificates of Compliance are issued according to the Covenants, Conditions, and Restrictions (CC&R’s) section concerning Notice of Compliance. This is to make any home purchaser aware of any deficiencies existing on a home that are not in accordance with the CC&R’s or Design Guidelines for the subdivision. If this residence is not in compliance with the CC&R’s of this community any deficiencies must be remedied before an Approved Certificate of Compliance will be issued. Failure to correct any item will result in a fine being levied against the residence which may ultimately result in a lien being placed on the property. Improvement / Architecture completed according to plans Address block in place Landscaping completed according to approved plans Equipment (HVAC, Electric, Gas, Pool) screening in place Lead walk, Porch, and Driveway materials in compliance Required front lighting on Photocell, no switches Half round gutters and downspouts installed on all visible elevations Fencing locations and materials in compliance All signage, debris, and trash removed _____ Other COMMENTS: Any items not in compliance must be corrected and a follow up observation requested by the Builder/Owner in order for a Certificate of Compliance to be issued. ASPEN RANCH “D E S I G N G U I D E L I N E S” Aspen Ranch © 2021 Page 61 of 61 APPENDIX G Enforcement Policy and Procedures The ARB will make periodic observations to review construction for compliance with the approved plans. If construction does not conform to the approved plans, the Design Guidelines and the CCRs, the ARB will issue a Notice to Comply. The Builder will have 7 days to correct any noted discrepancies. If, after 7 days, the corrections are not made, the Builder and Owner will be notified by letter of failure to correct the discrepancy and will incur a daily fine from day 8 of first notice until the correction is made to the approval of the ARB. The amount of the fine (up to a maximum of $500/day) will be left to the determination of the ARB. The following outlines the Fining Policy and Procedures. If at any time during construction the ARB observes any item out of compliance with the approved Final Plan documents or if any alterations or changes are found that have not been approved, the ARB may take the following steps. I. First Notice – The ARB will notify the Builder/Owner with a phone call or written notice to make them aware of the discrepancies. At this time the Builder/Owner should notify the ARB of their plan and time table for correction of the discrepancies. The ARB will note this verbal exchange in the file of the particular lot. II. Second Notice – The ARB will review the discrepancies for the corrections on the date that was verbally agreed upon by the Builder/Owner and the ARB. If the ARB notes that the discrepancies have not been corrected, the ARB will issue a Notice to Comply in writing. The ARB will describe the specific instances of non‐compliance and will require the Builder/Owner to comply or resolve the discrepancies by a specific date in the Notice to Comply. III. Third Notice – The ARB will review the discrepancies again on the date given in the Notice to Comply letter. If on that date the discrepancies have not been corrected, a FINE will be assessed to the Builder/Owner. It is not the desire for the ARB to fine anyone but in certain instances when the ARB cannot get a timely response it will resort to a fine in order that the ARB may be certain the home is built in accordance with the CC&R’s and the Design Guidelines. In addition, other fines may be assessed when deemed necessary by the ARB due to other violations and issues resulting in non‐ compliance with these Design Guidelines.