HomeMy WebLinkAboutRes 00-52 Authorizing a Contract with the Hogan CorporationTOWN OF WESTLAKE RESOLUTION 00-52 A RESOLUTION OF THE BOARD OF ALDERMEN OF THE TOWN OF WESTLAKE, TEXAS, AUTHORIZING THE TOWN MANAGER TO ENTER INTO A CONTRACT WITH THE HOGAN CORPORATION FOR THE ENGINEERING OF APPROXIMATELY 4,100 LINEAR FEET OF 12 -INCH WATER MAIN AND 3,100 LINEAR FEET OF 8 -INCH WATER MAIN; AND DECLARING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE TOWN OF WESTLAKE, TEXAS: SECTION 1: That the Board of Aldermen of the Town of Westlake, Texas, hereby authorize the Town Manager to enter into a contract with The Hogan Corporation for the engineering of approximately 4,100 linear feet of 12 -inch water main and 3,100 linear feet of 8 -inch water main, attached to this resolution as Exhibit A. SECTION 2: That this Resolution shall become effective upon its passage and approval. PASSED AND APPROVED ON THIS 13'm DAY OF NOVEMBER, 2000. 2'�" l Scott Bradley, Mayor ATTEST: diTg& Crosswy, ToGn Secretary Trent O. Petty, Town Manager APPROVED AS TO FORM: CEIVito THE HOGAN CORPORATION Engineers • Planners • Consultants October 17, 2000 Honorable Mayor and Board of Aldermen Town of Westlake 3 Village Circle, Suite 207 Westlake, Texas 76262 Re: Nater Main Extensions Dear Mayor and Board Members: The Hogan Corporation (Engineer) has been requested by Mr. Trent Petty, Town Manager, to prepare plans, specifications, and bidding documents -for the construction of approximately 4,100 linear feet of 12 -inch water main and 3,100 linear feet of 8 -inch water main. The proposed water mains will extend from the new Dove Road water main to Stagecoach Hills and to Aspen Lane. This letter details the scope of services requested and includes a proposal to perform those services. We herewith offer the Town of Westlake (Town) our professional engineering and technical services for the Design, Bidding and Construction phases for development of approximately 4,100 linear feet of new 12 -inch water main and approximately 3,100 linear feet of new 8 -inch water main, including all related appurtenances. The Engineer will prepare construction plans, specifications, and bidding documents, and assist the Town in receiving bids, awarding a contract, and conducting general review of construction on the above referenced project in accordance with the plans and specifications. The projected cost of construction for this project, including pipe, embedment, fire hydrants, valves and related appurtenances, is approximately $283,000*. A "Projected Cost of Construction" tabulation is attached for your reference. * The cost projection included above was prepared for budget purposes only and is not guaranteed as the exact amount which will be bid for furnishing and installing the proposed improvements. This cost does NOT include the cost of easement nor right-of-way acquisition, if needed. Member, Consulting Engineers Council of Texas Member, American Consulting Engineers Council .�� TEL: (972) 380-4646 18333 Preston Road, Suite 456 Dallas, Texas 7525r- TEL: 525E A description of the services to be performed is as follows: DESIGN PHASE: The Engineer will proceed with the performance of services in this phase as follows: 1, Establish the scope of any field survey investigations that may be necessary for the design of the Project, and with the Town's approval, arrange for such surveys to be conducted for the Town's account, and assist in interpreting the results. 2. Prepare construction plans and specifications, and contract documents for the improvements to be constructed; 3. Identify any necessary easements and/or right-of-way needed. Procurement of necessary easement/right-of-way will be an additional service; d. Prepare detailed cost projections and bidder's proposal forms of the improvements to be constructed; 5. Furnish three (3) sets of copies of plans, specifications, and bidding documents to the Town for review and approval. ADDITIONAL SERVICES: 1. Printing of all plans and specifications required, which would be in addition to the three (3) sets to be furnished as described above. 2. Provide design surveying services, if needed, as distinguished from the surveying services described above and contracted separately by the Town. 3. Boundary survey and documents for easement and/or right -of --way acquisition, if needed. BIDDING PHASE: The Engineer will proceed with the performance of services in this phase as follows: 1. Assist the Town in securing bids, issuing notice to bidders, and notifying construction news publications. The notice to bidders will be furnished to the Town for publication in the local news media. 2. Assist the Town in the opening, tabulation, and analysis of the bids received, and furnish recommendations- on the award of contract or the appropriate actions to be taken by the Town. CONSTRUCTIONREVIEW PHASE: After award of contract, the Engineer will proceed with the following general review of construction services: 1. Assist in the preparation of formal contract documents for construction contract. 2. Assist in conducting pre -construction conference with the contractor. 3. Make periodic visits to the site (as distinguished from the continuous services of a Resident Project Representative) to observe the progress and the quality of work and to attempt to determine in general if the work is proceeding in accordance with the contract documents- In performing these services, the Engineer will endeavor to protect the Town against defects and deficiencies in the work of contractors; the Engineer will report any observed defects or deficiencies immediately to the Town; however, it is understood that the Engineer does not guarantee the contractor's performance nor is he responsible for supervision of the contractor's operation and employees. 4. Consult and advise with the Town during construction, make recommendations to the Town regarding the materials and workmanship, and prepare change orders with the Town's approval. 5. Check and review samples, catalog data, schedules, shop drawings, laboratory, shop and mill tests of material and equipment and other data which the contractor is required to submit for conformance with the design concept of the Project and compliance with the information given by the contract documents. 6. Assist the Town in arranging for testing of materials and laboratory control during construction to be conducted at the Town's expense, and assist in interpreting the results of such tests. 7. Interpret intent of the plans and specifications for the Town and contractor. 8. Prepare monthly and final estimates for payment to the contractor. 9. Conduct, in company with the Town's representative, a final inspection of the Project for conformance with the design concept of the Project and compliance with the contract documents, and review and comment on the certificate of completion and the recommendation for final payment to the contractor. 10. Prepare revisions of construction drawings with the assistance of the Town Project personnel and the construction contractor, reflecting changes in the Project made during construction. The Engineer shall provide these "Record Drawings" to the Town as one set of reproducible sheets and two sets of prints. ADDITIONAL SERVICES: Additional services to be performed by the Engineer, if authorized by the Town, which are not included in the above described basic services, are described as follows. 1. Printing of all final plans and specifications over and above those paid for by bidders and/or contractors. 2. Providing shop, mill, and field or laboratory inspection of materials and equipment. 3. Preparation of any required Operation and 'Maintenance Manuals or conducting operator training, and preparation of Environmental Impact Assessments or Statements. 4. Appearance before regulatory agencies or courts as an expert witness in any litigation with third parties or condemnation proceedings arising from the development or construction of the Project including the preparation of engineering data and reports for assistance to the Town. 5. Furnishing the services of a Resident Project Representative to act as the Town's on-site Representative during the construction phase, if requested by the Town. BASIS OF COMPENSATION: I . Availability of Funds The Town agrees that funds, to the extent required, are currently available and sufficient to complete the proposod engineering services authorized under this Proposal. - All invoices submitted by the Engineer and approved by the Town shall be paid within thirty (30) days of the invoice date. For any payments not made within thirty (30) days, a charge will be made monthly in the amount of one and one-half percent (1-1/2%) of the unpaid balance, beginning thirty (30) days from the date of the statements. 2. Design Phase The total compensation for the Design, Bidding, and Construction Review Phase Services will be on a lump sum basis. The Town shall make payments to the Engineer for performing the engineering services described on a monthly billing basis in proportion to that part of the services proposed therein which has been accomplished, as evidenced by monthly statements submitted by the Engineer and approved by the Town. Final payment shall be due upon completion of the services described. The lump sum amounts for each phase shall be as follows: Design Phase $ 21,500 Bidding Phase $ 1,500 Construction Review $ 4,000 Total $ 27,000 3. Additional Services For performing any required services described in Additional Services above, the Engineer is to be paid on a monthly billing basis at the per diem rates of personnel's salary cost times a multiplier of 2.5, with all direct non -labor and subcontract expenses to be reimbursed at invoice cost plus 10% for handling. It is projected that Field Surveying Services for design will not exceed $9,800.00 and GPS Services will not exceed $1,800.00. Easement and/or right-of-way documents, if needed, can be provided for an additional fee. TIME FOR COMPLETION: The Engineer will work expeditiously to complete all of the services described herein in the shortest length of time possible. The time projected for substantially completing the Design Phase Services is sixty (60) calendar days after receipt of field survey data for design. The completion time for the Bidding Phase Services is approximately thirty (30) days after authorization to advertise is issued by the Town, while the Construction Review Phase Services are projected to be one hundred and twenty (120) days. The above mentioned times do not account for delays related to acquisition of easements or rights-of-way, or any other delays which are not within the control of the Town or Engineer. This Letter Proposal is being submitted in two (2) counterparts. If it meets with your approval, please execute both copies in the spaces provided, retain one (1) copy for your files, and return one (1) copy to our office. We certainly appreciate the privilege of performing these services for you. Respectfully submitted, THE HOGAN CORPORATION . arry son, P.E. Vice res' ent APPROVED The foregoing terms and conditions of this Letter Proposal are hereby approved by the Town of Westlake, Texas. By Trent Petty, Awn Manager .Attest Date. Town of Westlake October 2000 Capital Improvements Program Projected Cost of Construction - Water Main Extensions 12" Waterline Extension to Aspen Lane 12" & 8" Waterline Extension to Stagecoach Hills $283,441 Project Costs Project Costs Item # Est. Qty. Unit Description Unit Price Amount 1 2,500 L, F. Furnish and Install 12 -inch PVC,.0-900 Water Line $35.00 $87,500 2 80 L. F. Furnish and Install 8 -inch PVC, C-900 Water Line $29.00 $2,320 3 4 Ea. Furnish and Install 12 -inch Gate Valve $1,300.00 $5,200 4 1 Ea. Furnish and Install 8 -inch Tapping Sleeve and Valve $2,200.00 $2,200 5 4 Ea. Furnish and Install Fire Hydrant Assemblies $2,500.00 $10,000 6 50 S.Y. Sawcut, Removal and Replacement of Existing Asphalt $45.00 $2,250 7 2,500 L. F. For Furnishing and Maintaining Trench Safety System $1.00 $2,500 8 2,500 S.Y. Furnish and Install Broadcast Seeding of disturbed areas $1.50 $3,750 15% Contingency Subtotal Base Project $19,613 $115,720 Subtotal + Contingency 15% Contingency $17,358 $14,300.00 Subtotal + Contingency Surveying $133,078 $6,400 Engineering $12,700.00 Surveying $5,200 Total Projected Project Cost $150,978 12" & 8" Waterline Extension to Stagecoach Hills Projected Construction Total $283,441 Project Costs Item # Est. Qty. Unit Description Unit Price Amount 1 1,600 L. F. Furnish and Install 12 -inch PVC, C-900 Water Line $35.00 $56,000 2 3 Ea. Furnish and Install 12 -inch Gate Valve $1,300.00 $3,900 1 3,100 L. F. Furnish and Install 8 -inch PVC, C-900 Water Line $29.00 $89,900 2 4 Ea. Furnish and Install 8 -inch Gate Valve $800.00 $3,200 3 1 Ea. Furnish and Install 8 -inch Tapping Sleeve and Valve $2,200.00 $2,200- 4 9 Ea. Furnish and Install Fire Hydrant Assemblies $2,500.00 $22,500 5 100 S.Y. Sawcut, Removal and Replacement of Existing Asphalt $45.00 $4,500 6 4,700 L. F. For Furnishing and Maintaining Trench Safety System $1.00 $4,700 7 2,500 S.Y. Furnish and Install Broadcast Seeding of disturbed areas $1.50 $3,750 Subtotal Base Project $130,750 15% Contingency $19,613 Subtotal + Contingency $150,363 Engineering $14,300.00 Surveying $6,400 Total Projected Project Cost $171,063 Projected Construction Total $283,441 Projected Engineering Total $27,000 Projected Surveying Total $11,600 Projected Project Total $322,041 THC 223-03.20 THE HGGAN CORPORATION Page 1 of 1 Al% FUTURE WESTP5-RT -PKwy, aft 20' WATER_ (UNDER CONSTRUCTION) "PR WATER, ............... ­ ...... 0.............i. — - ---------- PROP, 8' :/WATER ......... . ................. .... ...... D 47 Q EY o C2 J 0. C C, co C[771 1'=1000' ................. ............. 20' WATER (UNDER CONSTRUCTION) :c n TOWN OF WESTLAKE, TEXAS MISCELLANEOUS WATER IMPROVEMENTS WATER MAIN EXTENSION TO STAGECOACH HILLS THE HOGAN CORPORATION Engineers - Planners • CorwItarb DALLAS - AUSTIN JASPER 9/2Qoo TOWN OF WESTLAKE, TEXAS MISCELLANEOUS WATER IMPROVEMENTS WATER MAIN EXTENSION TO ASPEN LANE THE HOGAN CORPORATION Engineers - Planners - Cbrmftants DALLAS - AUSTIN - JASPER ---- - ----- ",I ...... K=1000' 16WATER� '---�(UNDER CONSTRUCTION) ....... 4 1 DOVE PROP 12' uj 0- — — WATER -------- Ld LD - ----------- - - ............ cf OJ .......... diRR ......... . . .. ................. 13 A .9 - - - - - - - - - - - - - - — - - - TOWN OF WESTLAKE, TEXAS MISCELLANEOUS WATER IMPROVEMENTS WATER MAIN EXTENSION TO ASPEN LANE THE HOGAN CORPORATION Engineers - Planners - Cbrmftants DALLAS - AUSTIN - JASPER