Loading...
HomeMy WebLinkAboutRes 08-55 Approving Sub Contractors Identified by Steele and FreemanTOWN OF WESTLAKE RESOLUTION NO. 0855 APPROVING THE SUB CONTRACTORS IDENTIFIED BY STEELE & FREEMAN, INC., THE CONSTRUCTION MANAGER AT -RISK, FOR CONSTRUCTION OF PHASE I ARTS AND SCIENCES CENTER. WHEREAS, the Town of Westlake is working to become leaders in premier educational facilities and programs; and WHEREAS, Westlake desires to produce well educated future leaders and thinkers; and WHEREAS, Westlake desires to be business partners with Westlake Academy; and WHEREAS, the Board of Alderman finds that the Arts & Sciences Center benefits the public and is in the best interest of the public, citizens of Westlake, Westlake Academy students and their parents.; and WHEREAS, the Board of Alderman finds that the Arts & Sciences Center is necessary for the enhancement of the Civic Campus; and WHEREAS, the key sub contractors identified by Steel & Freeman, Inc. are as follow; Earthwork — Holbrook Concrete — DRM Masonry — Miracle Construction Site Utility Wright Construction Pavement Markings — Striping Plus Structural Steel — Crist Industries Sealants — George D Alan Roofing — Lon Smith Wood Doors/Hardware — Woodards — Res door Plaster — Anchor Drywall — Midwest Drywall Specialties — King Science Lab — ALC Roller Shades Kites HVAC/Plumbing — Berger Engineering As this project progresses over the next ten to twelve months S & F will provide the Town with an updated list of any additional sub contractor used to complete the project. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE TOWN OF WESTLAKE, TEXAS: SECTION 1. All matters stated in the Recitals above are found to be true and correct and are incorporated herein by reference as if copied in their entirety. SECTION 2. The Board of Aldermen of the Town of Westlake hereby approves the key sub contractors identified by Steele & Freeman, Inc., for the construction of the Arts & Sciences Center construction of Phase I at the Civic Campus. PASSED AND APPROVED ON THIS 22nd DAY OF SEPTEMBER 2008. ATTEST: i Sutter, TRMC, Town Secretary APPROVED AS TO FO 4"�u' d&z"e,- Lau Wheat, Mayor "Bry7er,ager Amendment 1 Town of Westlake Civic Campus Expansion Arts and Science Center September 22, 2008 A121 /CMc - 2003 and AGC Document 565 Standard Form of Agreement Between Owner and Construction Manager Amendment 1 1. Amendment #1 2. Exhibit `A' - Documents 3. Exhibit `B' - Allowances 4. Exhibit `C' - Clarifications 5. Exhibit `D' - Schedule Town of Westlake Civic Campus Expansion Arts and Science Center 6. Exhibit `E' -Alternates September 22, 2008 7. Exhibit `F' - Unit Prices 8. Exhibit `G' - GMP •_ Document A121TM We - 2003 Amendment No.1 AMENDMENT NO.1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Section 2.2 of the Agreement, dated September 22, 2008 between Town of Westlake (Owner) and Steele & Freeman, Inc., General Corporation (the Construction Manager), for Town of Westlake Civic Campus Expansion Arts and Sciences Center (the Project), the Owner and Construction Manager establish a Guaranteed Maximum Price and Contract Time for the Work as set forth below. ARTICLE I GUARANTEED MAXIMUM PRICE The Construction Manager's Guaranteed Maximum Price for the Work, including the estimated Cost of the Work as defined in Article 6 and the Construction Manager's Fee as defined in Article 5, is Four Million One Hundred Fifteen Thousand Two Hundred Twenty One dollars ( $4,115,221.00 ). This Price is for the performance of the Work in accordance with the Contract Documents listed and attached to this Amendment and marked Exhibits A through G, as follows: Exhibit A Drawings, Specifications, addenda and General, Supplementary and other Conditions of the Contract on which the Guaranteed Maximum Price is based, pages 1 through 4, dated 09/22/2008 Exhibit B Allowance items, pages 1 through 1 , dated 09/22/2008 . Exhibit C Assumptions and Clarifications made in preparing the Guaranteed Maximum Price, pages I through 1 , dated 09/22/2008. Exhibit D Completion Schedule, pages 1 through I, dated 09/22/2008 . Exhibit E Alternate Prices, pages I through 1 , dated 09/22/2008 . Exhibit F Unit Prices, pages 1 through 1 , dated 09/22/2008. Exhibit G Guaranteed Maximum Price, pages 1 through 1, dated 09/22/2008. ARTICLE II CONTRACT TIME The date of Substantial Completion established by this Amendment is: July 19, 2009 provided Notice to Proceed and Building Permit are issued by September 22, 2008. OWNER CONSTRUCTION MANAGER ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the Jeff margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Init. AIA Document A121 TMCMc — 2003 Amendment No. I. Copyright O 1991, 1998 and 2003 by The American Institute of Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:00:59 on 09/12-/2008 under Order No.1000325529_1 which expires on 10/2512008, and is not for resale. User Notes: (2242129429) ('-L�( Z-e-� (Sig tore) (Printed name and title /67 2,008 Date ATT T Y/yrL/II Inst. AIA Document A121 TMCMc — 2003 Amendment No. 1. Copyright© 1991, 1998 and 2003 by The American Institute of Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to tate 1 maximum extent passible under the law. This document was produced by AIA software at 12:00:59 on 09/12/2008 under Order No.1000325529_1 which expires on 1012512008, and is not for resale. User Notes: (2242129429) STEELE & FREEMAN, INC. CONSTRUCTION MANAGERS - GENERALCONTRACTORS 1301 Lawson Road - Fort Worth, Texas 76131 Amendment 1 1 AIA A121/CMc Exhibit 'A' - Project Manual & Drawings Date: September 22, 2008 Project: Town at Westlake Civic Campus Expansion Architect: Gideon Tool Arts and Science Center Architect Project No.: 07121,00 Town of Westlake, Texas SH Job No.: 4103 Projeci Manual Section Description Dated Bidding Requirements 00320 Geotechnical Investigation July 25, 2008 00700 General Conditions July 25, 2008 00800 Supplementary Conditions July 25, 2008 Division 1 General Requirements 01100 Summary July 25, 2008 01210 Ailawances July 25, 2008 01230 Alternates July 25, 2008 01250 Contract Modification Procedures July 25, 2008 01270 Unit Prices July 25, 2008 01290 Payment Procedures July 25, 2008 01310 Project Management and Coordination July 25, 2008 Request for Interpretation July 25, 2008 01320 Construction Progress Documentation July 25, 2008 01330 Submittal Procedures July 25, 2008 Submittal Checklist July 25, 2008 01420 References July 25, 2008 01451 Quality Control July 25, 2008 01500 Temporary Facilities and Controls July 25, 2008 01530 Mold Prevention Measures July 25, 2008 01570 Erosion and Sedimentation Control July 25, 2008 01600 Materials and Equipment July 25, 2008 Substitution Request Form July 25, 2008 01725 Field Engineering July 25, 2008 01731 Cutting and Patching July 25, 2008 01740 Cleaning July 25, 2008 01750 Starting and Adjusting July 25, 2008 01770 Closeout Procedures July 25, 2008 01780 Closeout Submittals July 25, 2008 01820 Demonstration and Training July 25, 2008 Division 2 Site Work 02100 Site Preparation July 25, 2008 02200 Earthwork July 25, 2008 02212 Finish Grading July 25, 2008 02230 Site Clearing July 25, 2008 02340 Subgrade Stabilization Judy 25, 2008 02362 Termite Control July 25, 2008 02372 Drilled Piers {S} July 25, 2008 02661 Water Distribution Systems Outside Building Lines July 25, 2008 02721 Storm Drain System Outside Building Lines July 25, 2008 02733 Sanitary Sewerage System Outside Building Lines July 25, 2008 02752 Reinforced Cement Concrete Pavement July 25, 2008 02783 Precast Concrete Pavers July 25, 2008 02810 Irrigation System July 25, 2008 02920 Lawns and Grasses July 25, 2008 02930 Exterior Planting July 25, 2008 Division 3 Concrete 03100 Cast -In -Place Concrete July 25, 2008 03200 Concrete Floor Finishing July 25, 2008 03250 Special Concrete Floor Finishes (Alternate *I) July 25, 2008 03300 Structural Concrete (5) July 25, 2008 03347 Concrete Sealer July 25, 2008 03360 Concrete Polishing July 25, 2008 Division 4 Masonry 04055 Masonry Materials July 25, 2008 04450 Stone Veneer July 25, 2008 04720 Cast Stone July 25, 2008 04810 Unit Masonry Assemblies July 25, 2008 04815 Glass Unit Masonry Assemblies July 25, 2008 Amendment 1 Page 1 or 4 Project Manual Section Description Dated Division 5 Metals 05100 Structural Steel (S) July 25, 2008 05200 Steel Joists (S) July 25, 2008 05300 Metal Roof Deck (S( July 25, 2008 05400 Cold Formed Metal Framing July 25, 2008 05500 Metal Fabrications July 25, 2008 05521 Steel Pipe and Tube Railings July 25, 2008 Division 6 Wood and Plastics 06100 Rough Carpentry July 25, 2008 06130 Heavy Timber Construction July 25, 2008 06150 Glue Laminated Wood Decking July 25, 2008 06170 Glue Laminated Wood Beams July 25, 2008 06200 Finish Carpentry July 25, 2008 066650 Solid Polymer Fabrications July 25, 2008 Division 7 Thermal and Moisture Protection 07210 Building Insulafion July 25, 2008 07214 Sprayed Fiber Insulation July 25, 2008 07260 Vapor Barriers and Retarders July 25, 2008 07266 Vapor Permeable Fluid Applied Moisture Barrier July 25, 2008 07321 Concrete Root Tiles July 25, 2008 07415 Pre -formed Metal Soffits July 25, 2008 07540 Thermoplastic Membrane Roofing July 25, 2008 07620 Sheet Metal Flashing and Trim July 25, 2008 07700 Roof Specialties and Accessories July 25, 2008 07840 Firestopping July 25, 2008 07920 Joint Sealants July 25, 2008 Division 8 Doors and Windows 08110 Steel Doors and Frames July 25, 2008 08212 Stile and Rail Wood Doors July 25, 2008 08311 Access Doors and Frames July 25, 2008 08361 Sectional Overhead Door July 25, 2008 08710 Door Hardware July 25, 2008 08800 Glazing July 25, 2008 Division 9 Finishes 09205 Furring and Lathing July 25, 2008 09220 Portland Cement Plaster July 25, 2008 09250 Gypsum Board July 25, 2008 09300 Ceramic and Stone Tile July 25, 2008 09510 Suspended Acoustical Ceilings July 25, 2008 09651 Resilient Base and Accessories July 25, 2008 09681+ Carpet Tile July 25, 2008 09725 Dry Erase Wall Covering July 25, 2008 09726 Tackable Wall Coverings July 25, 2008 09775 Fiberglass Reinforced Plastic Panels Juiy 25, 2008 09841 Acoustical Wall Panels July 25, 2008 09910 Paints July 25, 2008 09966 High -build Glazed Coatings July 25, 2008 Division 10 Specialties 101100 Visual Display Boards July 25, 2008 10160 Metal Toilet Compartments July 25, 2008 10265 Impact Resistant Wall Protection July 25, 2008 10400 Signs July 25, 2008 10515 Wood Lockers July 25, 2008 10523 Fire Extinguishers and Cabinets July 25, 2008 10800 Toilet Accessories July 25, 2008 10990 Miscellaneous Specialties July 25, 2008 Division 11 Equipment 11060 Stage Curtains and Track July 25, 2008 11133 TV Hanger Assemblies July 25, 2008 11610 Laboratory Fume Hoods July 25, 2008 Division 12 Furnishings 12350 Manufactured Casework July 25, 2008 12494 Roller Shades July 25, 2008 12540 Interior Baffles July 25, 2008 Division 13 Special Constructlon 13100 Lightning Protection July 25, 2008 13851 Fre Alarm July 25, 2008 13915 Fire Suppression Piping July 25, 2008 Division 15 Mechanical 15050 Basic Mechanical Materials and Methods July 25, 2008 15060 Hangers and Supports July 25, 2008 15075 Mechanical Identification July 25, 2008 15081 Duct Insulation July 25, 2008 15083 Pipe Insulation July 25, 2008 05140 Domestic Water Piping July 25, 2008 15150 Waste and Vent Piping July 25, 2008 15160 Storm Drainage Piping July 25, 2008 15183 Refrigerant Piping July 25, 2008 Amendment 1 Page 2 or 4 15194 Fuel Gas Piping July 25, 2008 15221 Chemical Waste Piping July 25, 2008 15410 Plumbing Fixtures July 25, 2008 15430 Plumbing Specialties July 25, 2008 15486 Fuel Fired Domestic Water Heaters July 25, 2008 15732 Rooftop Air Conditioners July 25, 2008 15738 Split System Air Conditioning Units July 25, 2008 15814 Metal Ducts - Low Pressure July 25, 2008 15992 Testing, Adjusting, and Balancing July 25, 2008 Project Manual Section Description Dated Division 16 Electrical 16050 Basic Mechanical Materials and Methods July 25, 2008 16060 Grounding and Bonding July 25, 2008 16120 Conductors and Cables July 25, 2008 16130 Raceways and Boxes July 25, 2008 16140 Wiring Devices Joly 25, 2008 16442 Panelboards July 25, 2008 16460 Transformers July 25, 2008 16511 Interior Lighting July 25, 2008 Drawings Item/Sheet No. Description Dated A0.01 Index Sheet July 25, 2008 CIVIL C1,1 Cover sheet July 25, 2008 C1.2 General Notes July 25, 2008 C2J Dimensional Control and Paving Plan July 25, 2008 C2.2 On-Site Details July 25, 2008 C3.1 Drainage Area Map July 25, 2008 C3.2 Storm Drain Plan July 25, 2008 C4.1 Grading Plan July 25, 2008 CS.i Utility Plan July 25, 2008 C5.2 Water System Details July 25, 2008 C5.3 Sanitary Sewer Details July 25, 2008 C6.1 Erosion Control Plan July 25, 2008 C6.2 Erosion Control Details July 25, 2008 LANDSCAPE -1.00 Landscape Plan July 25, 2008 L1.01 Landscape Details July 25, 2008 ARCHITECTURAL A1.01 ADA Graphics July 25, 2008 A1.02 ADA Graphics July 25, 2008 A1.03 Life Safety Plan July 25, 2008 A1.04 Site Plan July 25, 2008 A1.05 Site Details July 25, 2008 A2.00 Floor Plan July 25, 2008 A2.01 Not Used July 25, 2008 A2.02 Roof Plan July 25, 2008 A3.00 Exterior Elevations July 25, 2008 A3.01 Building Sections July 25, 2008 A3.02 Not Used July 25, 2008 A3.03 Wali Sections July 25, 2008 A3.04 Wall Sections July 25, 2008 A3.05 Wall Sections July 25, 2008 A4.01 Enlarged Plans & Elevations, Phase One July 25, 2008 A4.02 Enlarged Pians & Elevations Complete Phase July 25, 2008 A4.03 Enlarged Plans & Elevations, Section Chimney July 25, 2008 A4.04 Enlarged Plans & Elevations, Bathrooms July 25, 2008 A5.01 Interior Elevations July 25, 2008 A5.02 Interior Elevations July 25, 2008 A5.03 Interior Elevations Juiy 25, 2008 A5.04 Interior Elevations July 25, 2008 A6.01 Reflected Ceiling Plan July 25, 2008 A8.01 Details July 25, 2008 A8.02 Details July 25, 2008 A8.03 Details July 25, 2008 A8.04 Details July 25, 2008 A8.05 Details July 25, 2008 A9.01 Partition Types July 25, 2008 A9.02 Opening Types and Schedule July 25, 2008 11.00 Furniture Plan July 25, 2008 11.01 Finish Plan July 25, 2008 12.01 Millwork Sections and Details Amendment 7 Page 3 of 4 Drawings Description Dated STRUCTURAL 51.01 General Notes July 25, 2008 52.01 Ground Level Framing Plan July 25, 2008 52.01 R Ground Level Slab Reinforcing Pion July 25, 2008 52.02 Roof Framing Plan July 25, 2008 52.03 Roof Overbuild Framing Plan July 25, 2008 53.01 Typical Concrete Details July 25, 2008 53.02 Concrete Details and Sections July 25, 2008 54.01 Typical Masonry Details July 25, 2008 55.01 Typical Steel Details July 25, 2008 55.02 Typical Steel Details July 25, 2008 55.03 Steel Details and Sections July 25, 2008 55.04 Steel Details and Sections July 25, 2008 55.05 Steel Details and Sections July 25, 2008 56.01 Timber Details and Sections July 25, 2008 MEP MECHANICAL Mo.I Legends, Symbols & Schedules July 25, 2008 M2.1 Floor Plan - Mechanical July 25, 2008 M2.2 Roof Plan - Mechanical July 25, 2008 M5.1 Control Diagrams July 25, 2008 M5,2 Control Diagrams July 25, 2008 M5.3 Control Diagrams July 25, 2008 M6.1 Details July 25, 2008 ELECTRICAL E1.1 Electrical Legends and Notes July 25, 2008 E2.0 Site Lighting and Photometric Plan July 25, 2008 E2.1 Lighting Floor Plan - Electrical July 25, 2008 E3.1 Power Floor Plan - Flectrical July 25, 2008 E3.2 Power Roof Plan - Electrical July 25, 2008 E4,1 Electrical Details and Schedules July 25, 2008 PLUMBING P1.1 Plumbing Legends, Notes and Schedules July 25, 2008 P2.0 Underfloor Plumbing Floor Plan July 25, 2008 P2.1 Floor Plan - Plumbing July 25, 2008 P2.2 Roof Plan - Plumbing July 25, 2008 P3.1 Plumbing Isometric Riser Diagrams July 25, 2008 P4.1 Plumbing Details July 25, 2008 FIRE PROTECTION FPI .l Legends & Notes July 25, 2008 FP2.1 Floor Plan July 25, 2008 Addendum Item Description Dated Addendum #1 August 13, 2008 Addendum #2 August 15, 2008 Amendment 1 Page 4 or 4 Ift STEELE & FREEMAN, INC. CONSTRUCTION MANAGERS GENERAL CONTRACTORS 1301 Lawson Road • Fort Worth,Texas 76131 Amendment 1 I AIA A121 /CMc Exhibit'B' - Allowances Date: September 22, 2008 Project: Town of Westlake Civic Campus Expansion Architect: Gideon Tool Arts and Science Center Architect Project No.: 07121.00 Town of Westlake, Texas SFI Job No.: 4103 Allowances Description L Owner's Betterment $ 82,304 Construction Contingency $ 82,304 Dumpster Gate $ 5,000 Landscape and Irrigation $ 55,000 Interior Signage $ 10,000 Back Box FF&F - Phase ll $ 250,000 Amendment 1 Page 1 of 1 STEELE & FREEMAN, INC. CONSTRUCTION MANAGERS - GENERAL CONTRACTORS 1301 Lawson Road • Font Worth, Texas 7$131 Project: Town of Westlake Civic Campus Expansion Arts and Science Center Town of Westlake, Texas SFI Job No.: 4103 List of Clarifications, Qualifications and Assumptions Amendment 1 I AIA A121 /Il Exhlbit'C' - Assumptions/Clarifications Date: Architect: Architect Project No.: September 22, 2008 Gideon Tool 07121.00 Clarifications 1 Permit fees, plan review fees, tap fees, impact fees and all other city fees to be paid by the Owner 2 All material testing and inspection fees are paid by the Owner 3 All savings recognized from buy-out, allowances and addltionai Value Engineering Options shall be accumulated in Contractors Contingency for use by the CM 4 All piers are uncased Exclusions 5 Westlake Academy FF&E and Startup School Supplies Cost 6 Town of Westlake 'Soft Cost' 7 Town of Westalke Site Utility Relocation Cast Items Furnished /installed by owner 8 Voice, Data and Cable Wiring 9 Computer, Network and Phone Equipment 10 Security & Access Controls 1 1 CCTV & Surveillance Systems 12 Public Announcement System 13 Construction Dumpster Cost 14 Energy Code lnspections 15 Temporary Water Utility Costs 16 Residential Appliances 17 Interior Baffles 18 Monument Sign 19 Power Transformer Amendment 1 Page T of 1 Amendment 1 J AIA A121/CMc dbSTEELE & FREEMAN, INC. Exhibit'D' - Schedule CONSTRUCTION MANAGERS GENERAL CONTRACTORS 1301 Lawson Road • Fort Worth,Texas 76131 Date: September 22, 2008 Project: Town of Westlake Clvic Campus Expansion Architect: Gideon Tool Arts and Science Center Architect Project No.: 07121.00 Town of Westlake, Texas SFI Job No.: 4103 Completion Schedule Substantial completion: July 19, 2009, provided Notice to Proceed and Building Permit are issued by September, 22 2008. Amendment) Pagel of 1 Alternates STEELE & FREEMAN, INC. CONSTRUCTION MANAGERS - GENERALCONTRACTORS 13011 Lawson Road - FortWorth,Texas 76131 Project: Town of Westlake Civic Campus Expansion Arts and Science Center Town of Westlake, Texas SFI Job No.: 4103 Amendment 1 I AIA A121 /CMC Exhibit'E' - Alternates Date: Architect: Architect Project No.: September 22, 2008 Gideon Tool 07121.00 I Description Amount Cost to Add Phase 11 Shell $ 889,237 2 Cost to Finish Out Phase II $ 1,123,691 30 $ Phase 1: Substitute stone in lieu of plaster on all exterior walls of the building $ 13,048 3b Revised Storm Drain Layout Phase II: Substitute stone in lieu of plaster on all exterior walls of the building $ 27,262 4 3 Stain the concrete floors in Break-out space #418 and corridors #417 & 419 $ 9,425 5 6 _ Stain &. polish concrete floors in Break-out space #418 and corridors #417 & 419 $ 14,660 Substitute fabric wall boards in the Break-out space #418 in lieu of the Cork Boards; plus add fabric panel wall boards along north wall of the corridor #417 between office. $ 34,018 7 8 $ Substitute two linear wood trims on the wall of Break-out space #418, in lieu of the base bid reveal and add two linear wood trims in corridor #417, add wood trim on door frames and $ 48,637 Include an allowance of $10,000 for two decorative wood -cross braces in corridor #417 in two locations (material coast only) $ 15,079 5 9 $ Substitute epoxy tops on all casework including perimeter casework and movable tables in lieu of Acid resistant countertops Included in Base Bid 101 Delete Physics Lab Phase 1: Substitute laminate wood soffit in lieu of metal soffit on exterior perimeter overhangs. $ 50,171 Accepted Alternate Total: $ - Value Engineering Options Alternate Light Fixture Package 1 $ (12,873) Accepted VE Options Total 1 $ Amendment 1 Page 1 of i Description Amount 1 Alternate Wood Door and Hardware: Particle Board Core WD & Commercial Grade $ (30,027) 2 Revised Storm Drain Layout $ (5,815) 3 Delete Phase 11 Foundation and Dumpster Enclosure $ (127,173) 4 Delete PH II 2nd and 3rd Tier Retaining Walls $ (36,473) 5 Furnish/Install High School Grade Laboratory Casework in lieu of specified 'University Level'- (2) $ (14,029) 6 Delete Physics Lab $ (18,477) 7 Furnish/Install Monier Concrete Tile Roof in lieu of specified - Phase I Only $ (21,693) Alternate Light Fixture Package 1 $ (12,873) Accepted VE Options Total 1 $ Amendment 1 Page 1 of i STEELE & FREEMAN. INC. CONSTRUCTION MANAGERS • GENERAL CONTRACTORS 1301 Lawson Road • Fort Worth, Texas 76131 Project: Civic Campus Arts and Science Center Town of Westlake, Texas SH Job No.: 4103 Unit Prices Drilled Piers Amendment 1 J AIA A121/CMc Exhibit 7 - Unit Prices Date: September 22, 2008 Architect: Gideon Toal Architect Project No.: 07121.00 Diameter Cn.l Add [$/LF1 I deductf$lLF} Cosed ($/LF) 18 $25.55 $10.84 $23.22 24 $37.88 $17.44 $33.20 Cosing Nlobilizotiorl $4,500 Amendment 1 Page 1 of 1 STEELE & FREEMAN, INC, CONSTRJCUON MANAGERS • GENERAL CONTRACTORS 130E Lawson Road • Fort Worth, Texas 76131 Project: Town of Westlake Civic Campus Expansion Arts and Science Center Town of Westlake, Texas SH Job No.: 4103 Amendment 1 1 AIA A121 /CMc Exhibit 'G' - Guaranteed Maximum Price Date: Architect: Architect Project No.: Septemher 22, 2008 Gideon Toal 07121.00 Guaranteed Maximum Price Recap Town of Westlake Civic Campus Expansion Arts & Sciences Center Construction Cost $ 4,115,221 Accepted Alternates: .Description Amount Y None Selected i - Accepted Alternate Total: $ Accepted Value Engineering Options: Description Amount None Selected $ _ Accepted Value Engineering Options Total: $ Guaranteed Maximum Price: $ 4,115,221 Amendment 1 Page 1 or I