HomeMy WebLinkAboutRes 20-01 Adoption of Tarrant County Hazard Mitigation Action Plan, January 2020 TOWN OF WESTLAKE
RESOLUTION 20-01
A RESOLUTION BY THE TOWN COUNCIL OF THE TOWN OF WESTLAKE, TEXAS,
APPROVING ADOPTION OF THE TARRANT COUNTY HAZARD MITIGATION
ACTION PLAN,JANUARY 2020.
WHEREAS, The Town of Westlake, Texas (the "Town") recognizes the threat that natural
hazards pose to people and property within Tarrant County; and
WHEREAS, the County of Tarrant has prepared a multi-hazard mitigation plan, hereby
known as Tarrant County Hazard Mitigation Action Plan, January 2020 in accordance with the
Disaster Mitigation Act of 2000; and
WHEREAS, Tarrant County Hazard Mitigation Action Plan, January 2020 identifies
mitigation goals and actions to reduce or eliminate long-term risk to people and property in the
Town of Westlake from the impacts of future hazards and disasters; and
WHEREAS, the Town and the Firm desire to enter into an engagement agreement (the
"Engagement Agreement") that sets forth the agreement between the parties with respect to bond
counsel services; and
WHEREAS, adoption by the Town of Westlake demonstrates their commitment to the
hazard mitigation and achieving the goals outlined in the Tarrant County Hazard Mitigation Action
Plan, January 2020.
WHEREAS,the Town Council finds that the passage of this Resolution is in the best interest
of the people of Westlake.
NOW, THEREFORE,BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF
WESTLAKE, TEXAS:
SECTION 1: THAT, all matters stated in the Recitals hereinabove are found to be true and
correct and are incorporated herein by reference as if copied in their entirety.
SECTION 2: THAT the Town of Westlake Town Council does hereby approves adopting
the Tarrant County Hazard Mitigation Action Plan, January 2020 (Exhibit "A".
SECTION 3: If any portion of this Resolution shall, for any reason, be declared invalid by
any court of competent jurisdiction, such invalidity shall not affect the remaining provisions hereof
and the Council hereby determines that it would have adopted this Resolution without the invalid
provision.
SECTION 4: That this resolution shall become effective from and after its date of passage.
Resolution 20-01
Page 1 of 2
PASSED AND APPROVED ON THIS 27TH DAY OF JANUARY 2020.
ATTEST: Laura Wheat, Mayor
a ya Morrls, Assistant to the Town Secretary Amanda DeGan, Town Manager
APPROVED AS TO FORM:
L. Stanton Lowry, Town Atto ey
for WEST
TE X PAS
Resolution 20-01
Page 2 of 2
20ϮϬ
Tarrant County Hazard Mitigation
Action Plan
This page intentionally left blank.
Executive Summary
We cannot control when or where a tornado or other natural hazard will strike, but we can save lives and
reduce property damage by understanding the risks and taking action to address those risks. In the
process, we can increase resilience in our community, environment, and economy. Participating
jurisdictions in the Tarrant County Hazard Mitigation Action Plan (HazMAP) are dedicated to the
protection of local citizens and their property, and to the improvement of the quality of life for all
residents.
Mitigation has been defined as “sustained action to reduce or eliminate long-term risk to human life and
property from natural, human-caused, and technological hazards.”1 It is fundamentally a loss-prevention
function characterized by planned, long-term alteration of the built environment to ensure resilience
against natural and human-caused hazards. This loss-prevention function has been illustrated by the
Multi-Hazard Mitigation Council study of the Federal Emergency Management Agency (FEMA) mitigation
projects, which shows that for every dollar invested in mitigation, six dollars of disaster losses were
avoided.2
Mitigation should form the foundation of every emergency management agency’s plans and procedures.
Emergency management agencies should adopt mitigation practices to reduce, minimize, or eliminate
hazards in their community. The Tarrant County Hazard Mitigation Action Plan identifies the hazards
faced by participating jurisdictions, vulnerabilities to these hazards, and mitigation strategies for the
future. The plan fulfills the requirements of the Federal Disaster Mitigation Act as administered by the
Texas Division of Emergency Management (TDEM) and the Federal Emergency Management Agency
(FEMA).
1 State of Texas Mitigation Handbook, page 1-1.
2 Natural Hazard Mitigation Saves: 2017 Interim Report, page 1.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ŝ
The planning area for this plan is for Tarrant County, Texas (m arked in red on the Texas map) and includes
the following jurisdictions:
¾City of Arlington
¾City of Azle
¾City of Bedford
¾City of Blue Mound
¾City of Colleyville
¾City of Crowley
¾City of Dalworthington Gardens*
¾Town of Edgecliff Village*
¾City of Euless
¾City of Everman*
¾City of Forest Hill
¾City of Fort Worth
¾City of Grapevine
¾City of Haltom City
¾City of Haslet
¾City of Hurst
¾City of Keller
¾City of Kennedale
¾City of Lake Worth
¾Town of Lakeside
¾City of Mansfield*
¾North Central Texas Council of Governments (NCTCOG)
¾City of North Richland Hills
¾Town of Pantego*
¾City of Richland Hills
¾City of River Oaks*
¾City of Saginaw
¾City of Southlake
¾Unincorporated Tarrant County
¾University of North Texas Health and Science Center*
¾City of Watauga
¾Town of Westlake
¾City of Westworth Village
*Jurisdictions that did not participate in the 2015 Tarrant County HazMAP.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ŝŝ
The following map shows the locations of all participating jurisdictions except the unincorporated areas
of the county. A map of these areas can be found in the Unincorporated Tarrant County annex.
This HazMAP is the result of two years of study, data collection, analysis, and community feedback.
Representatives and citizens from participating jurisdictions attended public meetings to discuss the
hazards their communities face and the vulnerabilities those hazards present. Representatives from each
participating jurisdiction reviewed drafts of the HazMAP and added input to the mitigation strategies
presented in the plan. Tarrant County citizens were also active participants in the development of the
plan. Citizens attended public meetings that were advertised online, on bulletin boards, and in
newsletters to share their concerns about hazards faced in the community and how to mitigate the
effects of these hazards.
All participants involved in this plan understand the benefits of developing and implementing mitigation
plans and strategies. Elected officials, public safety organizations, planners, and many others have
worked together to develop and implement this HazMAP, displaying that they have the vision to
implement mitigation practices and therefore reduce the loss of life and property in their communities.
Source: Texas Almanac.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ŝŝŝ
Acronyms
DFW- Dallas-Fort Worth
EMC- Emergency Management Coordinator
EOC- Emergency Operations Center
FEMA- Federal Emergency Management Agency
HazMAP- Hazard Mitigation Action Plan
HMPT- Hazard Mitigation Planning Team
LPT- Local Planning Team
N/A- Not Applicable
NCEI- National Centers for Environmental Information
NCTCOG- North Central Texas Council of Governments
NFIP- National Flood Insurance Program
NFPA- National Fire Protection Association
NWS- National Weather Service
OWS- Outdoor Warning Siren
RLP- Repetitive Loss Properties
SRLP- Severe Repetitive Loss Properties
TDEM- Texas Division of Emergency Management
TxDOT- Texas Department of Transportation
UNTHSC- University of North Texas Health and Science Center
UTA- University of Texas at Arlington
WUI- Wildland-Urban Interface
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ŝǀ
Contents
Executive Summary ........................................................................................................................................ i
Acronyms ..................................................................................................................................................... iv
Section 1: Introduction ................................................................................................................................. 1
1.1 Overview ............................................................................................................................................. 1
1.2 Authority ............................................................................................................................................. 1
1.3 Scope ................................................................................................................................................... 1
1.4 Purpose ............................................................................................................................................... 2
1.5 Mitigation Goals .................................................................................................................................. 2
1.6 Plan Organization ................................................................................................................................ 3
1.7 Tarrant County Hazard Mitigation Strategy Maintenance Process .................................................... 4
1.8 Tarrant County Hazard Mitigation Action Plan Adoption ................................................................... 4
Section 2:Planning Process .......................................................................................................................... 5
2.1 Collaborative Process .......................................................................................................................... 5
2.1.1 HMPT Points of Contacts ............................................................................................................. 6
2.2 Public Involvement.............................................................................................................................. 8
2.3 Existing Data and Plans ....................................................................................................................... 8
2.4 Timeframe ........................................................................................................................................... 9
2.5 Planning Meetings ............................................................................................................................ 10
Section 3: Hazard Identification and Risk Assessment ............................................................................... 13
3.1 Hazard Overview ............................................................................................................................... 14
3.2 Changes in Development .................................................................................................................. 15
3.2.1 Major Disaster Declarations since the 2015 HazMAP................................................................ 15
3.2.2 Increase in Vulnerability ............................................................................................................ 16
3.2.3 Decrease in Vulnerability ........................................................................................................... 22
3.3 Profiling Natural Hazards .................................................................................................................. 24
3.3.1 Drought ...................................................................................................................................... 27
3.3.2 Earthquake ................................................................................................................................. 32
3.3.3 Expansive Soils ........................................................................................................................... 38
3.3.4 Extreme Heat ............................................................................................................................. 39
3.3.5 Flooding ...................................................................................................................................... 42
3.3.6 Thunderstorms ........................................................................................................................... 55
3.3.7 Tornadoes .................................................................................................................................. 61
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ǀ
3.3.8 Wildfire....................................................................................................................................... 66
3.3.9 Winter Storms ............................................................................................................................ 68
3.4 Technological Hazards ...................................................................................................................... 71
3.5 Vulnerabilities ................................................................................................................................... 72
3.5.1 National Critical Facilities and Infrastructure ............................................................................ 72
3.5.2 Natural Environment- Federally Protected Species ................................................................... 76
3.5.3 Historic Buildings and Districts ................................................................................................... 76
3.5.4 Local Critical Facilities and Infrastructure .................................................................................. 76
3.6 Extent ................................................................................................................................................ 77
Section 4: Mitigation Strategy .................................................................................................................... 78
4.1 Mitigation Strategy ........................................................................................................................... 79
4.2 Funding Priorities .............................................................................................................................. 79
4.3 Mitigation Goals ................................................................................................................................ 79
4.4 Action Items ...................................................................................................................................... 80
Section 5: Jurisdictional Annexes ................................................................................................................ 81
Section 6: Executing the Plan ...................................................................................................................... 83
6.1 Plan Implementation ........................................................................................................................ 83
6.2 Evaluation ......................................................................................................................................... 83
6.3 Multijurisdictional Strategy and Considerations............................................................................... 84
6.4 Plan Update ....................................................................................................................................... 84
6.5 Plan Maintenance ............................................................................................................................. 84
6.6 Continued Public Involvement .......................................................................................................... 85
6.7 Incorporation into Existing Planning Mechanisms ........................................................................... 86
Section 7: Conclusion .................................................................................................................................. 87
Appendix A: Meeting Documentation ........................................................................................................ 89
Public Announcements............................................................................................................................ 90
Attendance Records .............................................................................................................................. Ϯϲϭ
Appendix B: Supporting Documents ......................................................................................................... Ϯϴϳ
Annotated List of Rare Species in Tarrant County ................................................................................ Ϯϴϴ
Historic Sites in Tarrant County ............................................................................................................ ϮϵϮ
Natural Cooperative Soil Survey ........................................................................................................... ϯϮϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ǀŝ
Section 1: Introduction
1.1 Overview
The Tarrant County Hazard Mitigation Action Plan (HazMAP) as written fulfills the requirements of the
Disaster Mitigation Act of 2000 (DMA 2000), which is administered by the Federal Emergency
Management Agency (FEMA). The Disaster Mitigation Act provides federal assistance to state and local
emergency management entities to mitigate the effects of disasters. The HazMAP also encourages
cooperation among various organizations across political subdivisions.
The 20ϮϬ HazMAP is an update of the 2015 FEMA-approved HazMAP. The title was changed from the
Local Mitigation Action Plan to Hazard Mitigation Action Plan to clearly specify the intent of the
document. With each update, new challenges are identified, new strategies proposed, and when
incorporated, the updated plan grows in complexity, but not necessarily in utility.
The content in this plan update is designed and organized to be as reader-friendly and functional as
possible. The structure and format of this plan has significantly changed from the initial mitigation plan
adopted in 2015; however, the quality of information has been maintained.
This update fulfills the requirements of the DMA 2000. The Tarrant County Hazard Mitigation Planning
Team (HMPT) and the North Central Texas Council of Governments (NCTCOG) reviewed the evolution of
its planning processes throughout the previous three years. The following plan is the result of that effort.
The information provided in Section 3 reflects the impact of the hazards on all of Tarrant County, not
solely the participating jurisdictions. The results of the vulnerability analysis and risk assessment, including
historical events, are documented in the individual annexes for participating jurisdictions.
The historical events documented in Section 3 reflect the events that impacted the entire county, not
solely the unincorporated areas of the county. Reference to Tarrant County in Section 3 refers to the
county as a whole and not solely unincorporated Tarrant County.
1.2 Authority
The purpose of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (Stafford Act), as
amended by the Disaster Mitigation Act of 2000, is “to reduce the loss of life and property, human
suffering, economic disruption, and disaster assistance costs resulting from natural disasters.” Section
322 of the act specifically addresses mitigation planning and requires state and local governments to
prepare multi-hazard mitigation plans as a precondition for receiving FEMA mitigation grants.
Understanding that identifying the risks within the community and working collectively toward the
prevention of is vital, NCTCOG has taken the lead role in the development of the Tarrant County HazMAP.
1.3 Scope
The scope of the Tarrant County HazMAP encompasses all participating entities in Tarrant County, as
noted in the Executive Summary. This plan identifies natural and, for some jurisdictions, technological
hazards that could threaten life and property in the communities. Assessing technological hazards is not
a requirement for this hazard mitigation action plan, but select jurisdictions have included these hazards
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭ
in this plan. The scope of this plan includes both short and long-term mitigation strategies,
implementation, strategies, and possible sources of project funding to mitigate identified hazards.
1.4 Purpose
This HazMAP is intended to enhance and complement federal and state recommendations for the
mitigation of natural and technological hazards in the following ways:
Substantially reduce the risk of loss of life, injuries, and hardship from the destruction of natural
and technological disasters.
Improve public awareness of the need for individual preparedness and building safer, more
disaster resilient communities.
Develop strategies for long-term community sustainability during community disasters.
Develop governmental and business continuity plans that will continue essential private sector
and governmental operations during disasters.
Tarrant County is susceptible to a number of different natural hazards that have potential to cause
property loss, loss of life, economic hardship, and threats to public health and safety. Occurrence of
natural disasters cannot be prevented; however, their impact on people and property can be lessened
through hazard mitigation measures.
Mitigation planning is imperative to lessen the impact of disasters in Tarrant County. This plan is an
excellent method by which to organize Tarrant County’s mitigation strategies. The implementation of the
plan and its components is vital to preparing a community that is resilient to the effects of a disaster. The
implementation of this HazMAP can reduce loss of life and property and allow the participating
communities to operate with minimal disruption of vital services to citizens. This HazMAP provides a risk
assessment of the hazards Tarrant County is exposed to and puts forth several mitigation goals and
objectives that are based on that risk assessment.
This Tarrant County Hazard Mitigation Action Plan was developed by the Tarrant County Hazard
Mitigation Planning Team (HMPT). The plan represents collective efforts of citizens, elected and
appointed government officials, business leaders, non-profit organizations, and other stakeholders. This
plan, and updating the plan, and timely future updates of this plan, will allow Tarrant County and
participating jurisdictions to comply with the Disaster Mitigation Act of 2000 and its implementation
regulations, 44 CFR Part 201.6, thus resulting in eligibility to apply for federal aid for technical assistance
and post-disaster hazard mitigation project funding. The update will also prioritize potential risks and
vulnerabilities in an effort to minimize the effects of disasters in the participating communities.
1.5 Mitigation Goals
The goals are to protect life and reduce bodily harm from natural hazards, and to lessen the impacts of
natural hazards on property and the community through hazard mitigation. These goals are the basis of
this plan and summarize what the Tarrant County Hazard Mitigation Planning Team will accomplish by
implementing this plan.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯ
1.6 Plan Organization
The 20ϮϬ Tarrant County HazMAP is organized into seven sections which satisfy the mitigation
requirements in 44 CFR Part 201.6, with two appendices providing the required supporting
documentation.
1. Section 1: Introduction
a. Describes the purpose of the Tarrant County Hazard Mitigation Action Plan and
introduces the mitigation planning process.
2. Section 2: Planning Process
a. Describes the planning process and organization for each participating jurisdiction,
satisfying requirements 201.6(c)(1), 201.6(b)(2), 201.6(b)(1), 201.6(b)(3),
201.6(c)(4)(iii), and 201.6(c)(4)(i).
3. Section 3: Hazard Identification and Risk Assessment
a. Describes the hazards identified, location of hazards, previous events, and
jurisdictional profiles, satisfying requirements 201.6(c)(2)(i) and 201.6(c)(2)(ii).
4. Section 4: Mitigation Strategy
a. Reflects on the mitigation actions previously identified and examines the ability of
Tarrant County and participating jurisdictions to implement and manage a
comprehensive mitigation strategy, satisfying requirements 201.6(c)(1),
201.6(c)(3)(i), 201.6(c)(3)(ii), 201.6(c)(3)(iii), 201.6(c)(3)(iv), 201.6(c)(4)(ii), and
201.6(b)(3).
5. Section 5: Individual Jurisdictional Annexes
a. Each annex contains five chapters. Each participating jurisdiction has written an
annex detailing the planning process, hazard analysis, capabilities, mitigation
strategies and action items, and plan maintenance information, satisfying
requirements 201.6(c)(1), 201.6(b)(2), 201.6(b)(1), 201.6(b)(3), 201.6(c)(4)(iii),
201.6(c)(4)(i), 201.6(c)(2)(i), and 201.6(c)(2)(ii).
b. To clarify, any reference to “chapter” will refer to a jurisdiction’s annex, while
“section” will refer to a section in the main body of this HazMAP.
6. Section 6: Plan Maintenance
a. Describes plan monitoring, evaluating, and updating strategies, plan incorporation,
and future public updates for each participating jurisdiction, satisfying requirements
201.6(c)(4)(i), 201.6(c)(4)(ii), and 201.6(c)(4)(iii).
7. Section 7: Conclusion
8. Appendix A: Documentation from Planning and Public Meetings
9. Appendix B: Supporting Documentation
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯ
1.7 Tarrant County Hazard Mitigation Strategy Maintenance Process
The Tarrant County Hazard Mitigation Planning Team, consisting of a representative from each
participating jurisdiction, will continue to collaborate as a planning group in coordination with the North
Central Texas Council of Governments Emergency Preparedness Department. Primary contact will be
through emails and conference calls, with strategy meetings to occur at least annually. The points of
contact for the county, jurisdictions, and NCTCOG will jointly lead the plan maintenance and update
process by:
Assisting jurisdictional Local Planning Teams in updating their individual contributions to the
county Hazard Mitigation Action Plan.
Assisting interested Local Planning Teams that would like to begin their mitigation planning
process.
Facilitating Tarrant County HazMAP meetings and disseminating information.
Collaborating data for the county-wide sections.
Requesting updates and status reports on planning mechanisms.
Requesting updates and status reports on mitigation action projects.
Assisting jurisdictions with mitigation grants.
Assisting jurisdictions with implementing mitigation goals and action projects.
Providing mitigation training opportunities.
Maintaining documentation of local adoption resolutions for the Tarrant County Hazard
Mitigation Action Plan.
1.8 Tarrant County Hazard Mitigation Action Plan Adoption
Once the Tarrant County Hazard Mitigation Action Plan has received FEMA “Approved Pending Local
Adoption” each participating jurisdiction will take the Tarrant County HazMAP to their Commissioners
Court or city councils for final public comment and local adopt ion. A copy of the resolution will be inserted
into the Tarrant County HazMAP and held on file at the North Central Texas Council of Governments.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰ
Section 2:Planning Process
Requirement
§201.6(b)
An open public involvement process is essential to the development of an
effective plan. In order to develop a more comprehensive approach to
reducing the effects of natural disasters, the planning process shall include:
§201.6(b)(1)An opportunity for the public to comment on the plan during the drafting
stage and prior to plan approval;
§201.6(b)(2)
An opportunity for neighboring communities, local and regional agencies
involved in hazard mitigation activities, and agencies that have the authority
to regulate development, as well as businesses, academia and other private
and non-profit interests to be involved in the planning process; and
§201.6(b)(3)Review and incorporation, if appropriate, of existing plans, studies, reports,
and technical information.
§201.6(c)(1)
[The plan shall document] the planning process used to develop the plan,
including how it was prepared, who was involved in the process, and how the
public was involved.
§201.6(c)(4)(i)[The plan maintenance process shall include a] section describing the method
and schedule of monitoring, evaluating, and updating the mitigation plan
within a five-year cycle
2.1 Collaborative Process
During the planning process, jurisdictions were encouraged to work with neighboring jurisdictions within
the county, local and regional agencies, and other mitigation partners in order to develop a unified
approach to mitigation and to address situations that could affect one another.
Bringing together mitigation strategies from the unincorporated area of the county and its 33 participating
jurisdictions into a unified plan is a strategy that offers a model for county-wide coordination. The Tarrant
County Hazard Mitigation Planning Team (HMPT) was comprised of leaders from each participating
jurisdiction’s Local Planning Team (LPT), and other relevant agencies. Each LPT provided local hazard
information and capabilities. Each jurisdiction’s vulnerabilities and mitigation needs were explicitly
recognized in the strategy, along with those of the overall county.
The following stakeholders were invited to participate in the mitigation planning process via email by
participating jurisdictions and to attend public meetings via the participating jurisdictions’ websites and
public flyers. Stakeholders were encouraged to review the plan and provide relevant information and
feedback.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱ
Organization Represented Position
Tarrant County Emergency Management Coordinator
Wise County Emergency Management Coordinator
Johnson County Emergency Management Coordinator
Parker County Emergency Management Coordinator
Denton County Emergency Management Coordinator
Ellis County Emergency Management Coordinator
Dallas County Emergency Management Coordinator
U.S. Army Corps of Engineers Director – Civil Works
U.S. Army Corps of Engineers Lake Grapevine Manager
Tarrant County Environmental Services Director
Tarrant County Community College District Director of Emergency Management
University of Texas at Arlington Emergency Management Coordinator
Tarrant Regional Water District Lake Patrol
Independent School Districts of Participating Jurisdictions Superintendents
Naval Air Station Fort Worth Joint Reserve Base Emergency Management Coordinator
Texas Department of Transportation Emergency Operations
Utility Providers Emergency Operations
Local Emergency Planning Committee Emergency Management Coordinator
Texas Division of Emergency Management District Coordinator, Field Response
Texas Division of Emergency Management Hazard Mitigation Planner
State Fire Marshal’s Office District 6, Inspector
National Weather Service – Fort Worth Warning & Coordination Meteorologist
NCTCOG’s Emergency Preparedness Planning Council Chair
NCTCOG’s Regional Emergency Preparedness Advisory
Council Chair
Local City and Town Councils Local elected officials
The North Central Texas Council of Governments was responsible for plan facilitation and coordination
with Tarrant County HMPT members and stakeholders throughout the process.
2.1.1 HMPT Points of Contacts
The following are members of the Tarrant County Hazard Mitigation Planning Team (HMPT). These HMPT
members were also the point(s) of contact for their respective jurisdiction during this plan update. Local
Planning Team (LPT) members for each jurisdiction are in their respective jurisdictional annex.
Tarrant County HMPT Members
Jurisdiction Job Title Role in the HMPT
Arlington Emergency Management Administrator Jurisdictional
information
Arlington Emergency Management Coordinator Jurisdictional
information
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲ
Jurisdiction Job Title Role in the HMPT
Azle Emergency Management Coordinator Jurisdictional
information
Bedford Deputy Chief of Emergency Operations Jurisdictional
information
Blue Mound Fire Chief/Emergency Management Coordinator Jurisdictional
information
Colleyville Emergency Management Coordinator Jurisdictional
information
Crowley Emergency Management Coordinator Jurisdictional
information
Dalworthington
Gardens Deputy Emergency Management Coordinator Jurisdictional
information
Edgecliff Village Fire Chief/Emergency Management Coordinator Jurisdictional
information
Euless Emergency Management Coordinator Jurisdictional
information
Everman Director of Emergency Services Jurisdictional
information
Forest Hill Fire Chief/Emergency Management Coordinator Jurisdictional
information
Fort Worth Emergency Management Coordinator Jurisdictional
information
Grapevine Emergency Management Coordinator Jurisdictional
information
Haltom City Emergency Management Coordinator Jurisdictional
information
Haslet Emergency Management Coordinator Jurisdictional
information
Hurst Fire Chief/Emergency Management Coordinator Jurisdictional
information
Keller Fire Chief/Emergency Management Coordinator Jurisdictional
information
Kennedale Fire Chief/Emergency Management Coordinator Jurisdictional
information
Lake Worth Fire Marshal/Emergency Management Coordinator Jurisdictional
information
Lakeside Emergency Management Coordinator Jurisdictional
information
Mansfield Emergency Management Coordinator Jurisdictional
information
NCTCOG Emergency Preparedness Specialist Jurisdictional
information
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳ
Jurisdiction Job Title Role in the HMPT
North Richland Hills Emergency Management Coordinator Jurisdictional
information
Pantego Police Chief/Emergency Management Coordinator Jurisdictional
information
Richland Hills Fire Chief/Emergency Management Coordinator Jurisdictional
information
River Oaks Emergency Management Coordinator Jurisdictional
information
Saginaw Fire Chief/Emergency Management Coordinator Jurisdictional
information
Southlake Emergency Management Coordinator Jurisdictional
information
University of North
Texas Health Science
Center (UNTHSC)
Associate Director, Emergency Management and
Business Continuity
Jurisdictional
information
Unincorporated Tarrant
County Emergency Management Coordinator Jurisdictional
information
Watauga Emergency Management Coordinator Jurisdictional
information
Westlake Fire Chief/Emergency Management Coordinator Jurisdictional
information
Westworth Village Emergency Management Coordinator Jurisdictional
information
2.2 Public Involvement
As stated in the Executive Summary, citizens attended public meetings that were advertised online, on
bulletin boards, and in newsletters to share their concerns about hazards faced in the community and
how to mitigate the effects of these hazards. Some jurisdictions also used public surveys and posted the
HazMAP online for citizens to view and comment on.
NCTCOG hosted a public meeting on behalf of jurisdictions on February 6, 2018 at the Tarrant County
Northeast Courthouse. The jurisdictions who used this opportunity to reach the public were in attendance
and advertised the meeting within their jurisdiction.
The public had the chance to learn about natural hazards in Tarrant County and why jurisdictions were
developing a plan to mitigate the effects of these hazards. Citizens signed in and sat through the
presentation but did not have any comments or questions at the end.
The supporting documentation, advertisements, and details of this meeting and other meetings or
outreach strategies are documented within Appendix A in this HazMAP.
2.3 Existing Data and Plans
Existing hazard mitigation information and other relevant Hazard Mitigation Action Plans were reviewed
during the development of this plan. Data was gathered through numerous sources, including Geographic
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴ
Information Systems (GIS). The intent of reviewing existing material was to identify existing data and
information, shared objectives, and past and ongoing activities that can help inform the mitigation plan.
It also helps identify the existing capabilities and planning mechanisms to implement the mitigation
strategy. The table below outlines the sources used to collect data for the plan:
Data Source Data Incorporation Purpose
County appraisal data,
census data, city land use
data
Population and
demographics
Population counts, parcel data,
and land use data
National Centers for
Environmental Information
(NCEI)
Hazard occurrences Previous event occurrences and
mapping for hazards
Texas Forest Service/Texas
Wildfire Risk Assessment
Summary Report
Wildfire threat and urban
interface
Mapping and wildfire
vulnerability
National Dam Inventory Dam information High-hazard dam list
Federal Emergency
Management Agency (FEMA)
Digital Flood Insurance Rate
Map (DFIRM) Flood Zones,
National Flood Insurance
Program (NFIP) studies
Flood zone maps and NFIP
information
GIS mapping of flood zones and
NFIP data
October 2017 NFIP Flood
Insurance Manual Change
Package
NFIP Information
Repetitive Loss Properties and
Community Rating System (CRS)
ratings
State of Texas Hazard
Mitigation Plan, 2013 and 2018 Hazards and mitigation strategy Support the goals of the state
2015 Tarrant County HazMAP All sections This is an update of that plan
2017 Marion County HazMAP Hazard profiles Adopt FEMA-approved format
of plan
Hazard Mitigation: Integrating
Best Practices into Planning Planning process Use proven techniques in
developing the HazMAP
Environmental Protection
Agency (EPA) Superfund
National Priority List
Protected sites Risk assessment- identify critical
areas
National Register of Historic
Places Historic districts Risk assessment
Texas Parks & Wildlife List of
Rare Species
Endangered or protected
species Risk assessment
2.4 Timeframe
The planning process for the update of the Tarrant County Hazard Mitigation Action Plan was
approximately two years. The table below is the timeline followed.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵ
Activity Time Period
Kickoff meeting August 17, 2017
Created planning teams September 30, 2017
Capabilities assessment February 15, 2018
Hazard identification & risk assessment March 5, 2018
Public outreach completed March 31, 2018
Mitigation strategy (goals & action items)
reviewed
March 19-April 15, 2018
Reviewed HazMAP draft May 15- June 15, 2018
Updated plan as needed June 15- June 30, 2018
Final draft reviewed June 30- July 6, 2018
Send HazMAP to TDEM/make revisions as
needed
As Applicable
Send to FEMA/ make revisions as needed As Applicable
Adoption & signatures Once “Approved Pending Adoption” designated
received.
Activities were either led or monitored by the North Central Texas Council of Governments (NCTCOG) and
public outreach strategies were conducted by the participating jurisdictions. The details of these activities
are provided in the individual annexes of the jurisdictions.
2.5 Planning Meetings
During the planning process, each Local Planning Team (LPT) met to discuss relevant information from the
jurisdiction and to review objectives and progress of the plan. The goals of these meetings were to gather
information and to provide guidance for the jurisdictions throughout the planning stages.
The following table is a snapshot of the meetings held by the North Central Texas Council of Governments
and the HazMAP participants:
Date Meeting Location
August 7, 2017 Kickoff meeting Tarrant County Northeast
Courthouse
September 18, 2017 NCTCOG Program Directors meeting NCTCOG
October 26, 2017 Capabilities (Richland Hills, White
Settlement) Richland Hills Fire Station
November 1, 2017 Capabilities (Pantego, Mansfield) NCTCOG
November 1, 2017 Capabilities (Forest Hill, Kennedale) NCTCOG
November 3, 2017 Capabilities (Southlake, Westlake) Southlake Department of Public
Safety Headquarters
November 7, 2017 Capabilities (Lake Worth, Lakeside,
Saginaw, Azle) Lake Worth Fire Station
November 7, 2017 Capabilities (Dalworthington Gardens) NCTCOG
November 8, 2017 Capabilities (River Oaks) River Oaks City Hall
November 9, 2017 Capabilities (Bedford) Bedford Fire Station
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬ
Date Meeting Location
November 9, 2017 Capabilities (Blue Mound, Haslet,
Watauga) Watauga Fire Station
November 20, 2017 NCTCOG planning team NCTCOG
January 10, 2018 Bedford planning team meeting Bedford Fire Station
January 31, 2018 Hazard workshop NCTCOG
February 6, 2018 Public meeting & workshop Tarrant County Northeast
Courthouse
February 8, 2018 UNTHSC hazard meeting with planning
team UNTHSC
February 9, 2018 Bedford hazard meeting with planning
team Bedford Fire Station
February 19, 2018 River Oaks hazard meeting with planning
team NCTCOG
March 15, 2018 Kennedale hazard meeting with planning
team Kennedale Fire Station
April 5, 2018 Mitigation workshop for all participants Crowley Recreation Center
April 11, 2018 Mitigation workshop for all participants Richland Hills Link Recreation
Center
April 16, 2018 Haslet mitigation meeting with planning
team Haslet Fire Station
April 18, 2018 Southlake mitigation meeting with
planning team Southlake DPS HQ
April 18, 2018 Kennedale mitigation meeting with
planning team Kennedale Fire Station
April 19, 2018 NCTCOG mitigation meeting with
planning team NCTCOG
April 26, 2018 UNTHSC hazard meeting with planning
team UNTHSC
April 26, 2018 Dalworthington Gardens mitigation
strategy meeting with planning team
Dalworthington Gardens Police
Station
May 4, 2018 Fort Worth mitigation strategy meeting
with planning team
Joint Emergency Operations
Center
May 9, 2018
Tarrant County Unincorporated
mitigation strategy meeting with
planning team
NCTCOG
June 14, 2018 Lake Worth mitigation strategy meeting
with planning team Lake Worth Fire Station
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭ
This page intentionally left blank.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮ
Section 3: Hazard Identification and Risk
Assessment
Requirement
§201.6(c)(2)(i)
[The risk assessment shall include a] description of the type, location and extent
of all natural hazards that can affect the jurisdiction. The plan shall include
information on previous occurrences of hazard events and on the probability of
future hazard events.
§201.6(c)(2)(ii)[The risk assessment shall include a] description of the jurisdiction’s
vulnerability to the hazards described in paragraph (c)(2)(i) of this section. This
description shall include an overall summary of each hazard and its impact on
the community. All plans approved after October 1, 2008 must also address NFIP
[National Flood Insurance Program] insured structures that have been
repetitively damaged by floods. The plan should describe vulnerability in terms
of:
§201.6(c)(2)(ii)(A)The types and numbers of existing and future buildings, infrastructure, and
critical facilities located in the identified hazard areas;
§201.6(c)(2)(ii)(B)An estimate of the potential dollar losses to vulnerable structures identified in
this section and a description of the methodology used to prepare the estimate.
§201.6(c)(2)(ii)(C)Providing a general description of land uses and development trends within the
community so that mitigation options can be considered in future land use
decisions.
§201.6(c)(2)(iii)For multi-jurisdictional plans, the risk assessment section must assess each
jurisdiction’s risks where they vary from the risks facing the entire planning area.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯ
3.1 Hazard Overview
Through an assessment of previous federally declared disasters in Texas, historical events and potential
events in Tarrant County, and a review of available local mitigation action plans, it was determined that
this Hazard Mitigation Action Plan (HazMAP) will address the risks associated with the following 9 natural
hazards:
¾Drought
¾Earthquakes
¾Expansive Soils
¾Extreme Heat
¾Flooding (including dam failure)
¾Thunderstorms (including hail, wind, lightning)
¾Tornadoes
¾Wildfires
¾Winter Storms
Since the adoption of the previous HazMAP, the definition of a thunderstorm now includes hail, high
winds, and lightning. These individual hazards within a thunderstorm will not be listed separately.
In 2013, Tarrant County began experiencing earthquakes. It is suspected that dormant fault lines have
been disturbed. Earthquakes have been added to the list of natural hazards profiled in this update for
jurisdictions that feel they could be potentially impacted by them.
Because dams are man-made structures, dam failures are typically considered technological hazards.
However, since most dam failures result from prolonged periods of rainfall, they are often cited as
secondary or cascading effects of natural flooding disasters and are not identified as a primary hazard.
This plan update incorporates the risk and vulnerabilities related to dam failure, when applicable, in the
flooding section.
Due to the frequency of occurrence and high impact of hazards during this planning period, the ranking
order of these hazards has changed since the 2015 plan. Each participating jurisdiction conducted a risk
assessment and prioritized the hazards affecting their planning area and determined their best course of
action. This information, along with historical events, vulnerabilities, future probability, and impacts are
documented within the individual annexes. The definition of vulnerability is the susceptibility of people,
property, industry, resources, ecosystems, or historical buildings and artifacts to the negative impact of a
disaster.3 The participating jurisdictions have taken into account the possible effects on population,
economy, existing and future structures, improved property, critical facilities and infrastructure, and the
natural environment for each hazard.
Participating jurisdictions understand that identifying technological hazards is not required for a
mitigation plan and jurisdictions that chose to do so did so voluntarily. The ranking of natural hazards and
technological hazards will remain separate in this HazMAP.
3 FEMA Module 2-5 Understanding Vulnerability.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰ
3.2 Changes in Development
Tarrant County has a vibrant and diverse economy that attracts new and relocating businesses, retail
development, and new housing construction. If business is to succeed, then economic development must
flourish. A collaboration of public and private agencies, along with businesses and individuals, is always
ready to step forward to promote the excellent quality of life that makes the community a great place to
live, work, and raise families.
Changes in development include population variability, climate variability, and various mitigation actions
implemented. Individual jurisdictions have identified specific changes in development, when applicable,
in their annexes.
3.2.1 Major Disaster Declarations since the 2015 HazMAP
The following table lists the recent major disaster declarations that have occurred since the approval of
Tarrant County’s 2015 HazMAP:
Declared Disaster
Code Incident Period Date Declared Description
DR-4159 October 30-31, 2013 December 29, 2013 Severe storms and
flooding
DR-4136 April 17-20, 2013 August 2, 2013 West, Texas fertilizer
explosion
DR-4223 May 4- June 23, 2015 May 29, 2015
Severe storms,
tornadoes, straight-line
winds, and flooding
DR-4245 October 22-31, 2015 November 25, 2015
Severe storms,
tornadoes, straight-line
winds, and flooding
DR-4255 December 26, 2015-
January 21, 2016 February 9, 2016
Severe winter storms,
tornadoes, strait-line
winds, and flooding
DR-4266 March 7-29, 2016 March 19, 2016
Severe storms,
tornadoes, and
flooding
DR-4269 April 17-30, 2016 April 25, 2016 Severe storms and
flooding
DR-4272 May 26-June 24, 2016 June 11, 2016 Severe storms and
flooding
DR-4332 August 23-September
15, 2017 August 25, 2017 Hurricane Harvey
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱ
3.2.2 Increase in Vulnerability
Climate Variability
A key factor to an increase in vulnerability is climate variability. According to the United States
Environmental Protection Agency (EPA),
Texas’s climate is changing. Most of the state has warmed between one-half and one degree
Fahrenheit (°F) in the past century. In the eastern two-thirds of the state, average annual rainfall
is increasing, yet the soil is becoming drier. Rainstorms are becoming more intense, and floods
are becoming more severe... In the coming decades, storms are likely to become more severe,
deserts may expand, and summers are likely to become increasingly hot and dry, creating
problems for agriculture and possibly human health. Our climate is changing because the earth is
warming. People have increased the amount of carbon dioxide in the air by 40% since the late
1700s. Other heat-trapping greenhouse gases are also increasing. These gases have warmed the
surface and lower atmosphere of our planet about one degree during the last 50 years.
Evaporation increases as the atmosphere warms, which increases humidity, average rainfall, and
the frequency of heavy rainstorms in many places—but contributes to drought in others…4
The following is an article from the Dallas Morning News that describes the effects of climate change
specifically in North Texas, where Tarrant County is located:
The United States has just come off a record year for weather and climate disasters and, by most
accounts, it's only going to get worse.
Last year hurricanes Harvey, Irma, and Maria; the wildfires and floods in California; and tornado
outbreaks in the Midwest and the South delivered $306.2 billion in damages, more than any year
in history when adjusted for inflation.
Texas is particularly vulnerable to a changing climate. It has had more costly weather-related
disasters than any other state, and those events will happen more often as air and ocean
temperatures climb, scientists say.
"Climate change is not just about polar bears," said Katharine Hayhoe, a climate scientist at Texas
Tech University with an impressive YouTube following. "It will affect North Texas profoundly."
Between 2041 and 2050, Dallas-Fort Worth may see August temperatures rise from a mean of 86
degrees Fahrenheit at the end of the 20th century to 94 degrees, with extremes rising above 120,
reports one study by scientists at the University of Texas at Arlington.
Longer droughts and more extreme rainstorms will pose a challenge for those who manage
drinking water supplies, those who raise cattle, and those who oversee our roads and railways.
The changes may also have unexpected effects on people's daily lives, including jobs. Intense heat
can imperil cars and airplanes, evaporate drinking water supplies, and halt outdoor labor such as
farm work and construction.
Adam Smith, a scientist with the federal government's main climate agency, the National Oceanic
and Atmospheric Administration, calls Texas "the disaster capital of the United States."
4 What Climate Change Means for Texas. August 2016. EPA 430-F-16-045. United States Environmental Protection
Agency.< https://archive.epa.gov/epa/sites/production/files/2016-09/documents/climate-change-tx.pdf>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲ
As Smith explains, Texas is susceptible to almost every kind of weather and climate hazard, from
extreme cold to extreme heat, from severe drought and wildfires to torrential floods. Texas is also
home to a booming population and critical infrastructure, including the petrochemical plants that
were damaged in Hurricane Harvey.
"Texas is a hot-spot for a wide range of extreme natural events due to its geography," said Smith.
"We expect many of these extremes to become more frequent and intense as time moves
forward."
While uncertainty is built into climate models, scientists have a high degree of confidence in many
of the changes they observe and predict.
The bigger, longer and more common an event is, the greater the accuracy with which scientists
can project how climate change will impact it, said Hayhoe, a lead author of a November 2017
climate change report overseen by scientists at 13 federal agencies. Larger events have more data
associated with them and can be easier to model.
Researchers are very confident that climate change will increase both average and extreme
temperatures. They are also confident that climate change is likely to increase the risk of heavy
precipitation in many areas and may bring stronger droughts to the south-central and
southwestern parts of the U.S.
Projected impacts on smaller-scale events like tornadoes and ha ilstorms are less well understood.
One area of consensus is the cause of climate change. "It is extremely likely that human activities,
especially emissions of greenhouse gases, are the dominant cause of the observed warming since
the mid-20th century," note the authors of the Fourth National Climate Assessment, a
Congressionally mandated review that scientists conduct every four years. They add that there
are no convincing alternative explanations.
Below is how these changes will affect our area, the evidence behind the projections, and how
confident scientists are in each of these findings.
Heat
More record-setting heat in North Texas is a virtual certainty. Already, we are living through the
warmest period in the history of modern civilization, the federal report found, and that warming
will accelerate.
Climate science contrarians often attack the models on which climate projections are based.
Myron Ebell, who led President Donald Trump's transition team at the Environmental Protection
Agency, accepts that humans are most likely responsible for warming, but he says models have
exaggerated the outcome. Ebell is director of the Center for Energy and Environment at the
Competitive Enterprise Institute, a libertarian advocacy group based in Washington, D.C. He
acknowledges that he is not a scientist.
In fact, researchers have used models to predict global temperature changes for more than 50
years, and the models' projections have been fairly accurate over the long term. In the early 21st
century, a discrepancy appeared between observed and modeled temperatures-a period dubbed
the "global warming slowdown" or "hiatus."
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳ
Scientists have published scores of studies on the mismatch and tied it to several factors that
contributed to lower-than-expected observed temperatures. Those factors include a series of
small volcanic eruptions, the cooling effects of which scientists had underestimated, and lower
than expected solar output.
Findings from those studies are helping to improve climate model simulations and helping
scientists better understand why there are differences between simulations and observations in
the early 21stcentury, said Ben Santer, a climate scientist at the Lawrence Livermore National
Laboratory.
Global average temperatures increased about 1.8 degrees Fahrenheit in the last 115 years. In
Dallas, they climbed from about 65 degrees Fahrenheit during the early part of the 20th century
to 68 degrees Fahrenheit during the most recent decade. If nothing is done to reduce emissions
of carbon dioxide and other greenhouse gases, average temperatures in the city may reach the
low 70s by 2050 and surpass 75 degrees by the end of the century.
The Dallas area warmed twice as fast as the North Texas region as a whole due to urbanization
combined with long-term warming, said John Nielsen-Gammon, Texas' state climatologist and a
professor at Texas A&M University.
Rapid development in Dallas accelerates the so-called "urban heat island" effect. Man-made
building materials absorb and lock in more heat than soil and natural landscapes, so urban areas
are generally warmer than rural areas, especially after sunset.
While some northern areas stand to benefit from warmer weather, that is not the case for Dallas-
Fort Worth. "North Texas and a lot of the southern United States are quite close to thresholds
where things get really bad," said Amir Jina of the University of Chicago's Harris School of Public
Policy.
Earlier this year, he and colleagues published a study in the journal Science that estimated
economic damage from climate change in each county of the United States.
Once temperatures reach the high 90s, equal to or above body temperature, fatality rates go up.
And Jina's study predicts 24 extra deaths per 100,000 people each year in Dallas County by the
end of the century if global emissions increase at the same rate they have been. That would be
600 extra deaths per year at the county's 2015 population level.
Heat also affects roads. A 2015 study by the University of Texas at Arlington (UTA) that focused
on the impact of climate change on transportation predicted "an increase in wildfires along paved
highways, heat-induced stress on bridges and railroads, air-conditioning problems in public
transport vehicles and heat-related accidents by failure of individual vehicles and heat-related
stress."
The study concluded, "These impacts can be translated into substantial mobility and economic
loss."
Drought
Along with heat will come stronger drought, which "has profound economic impacts," said
Hayhoe.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴ
The prediction that North Texas will have longer and more severe droughts is based on multiple
factors, including the relationship between high temperatures and soil dryness and the presence
of more frequent and longer lasting high-pressure systems in summer that suppress rainfall and
deflect storms away from our area.
Hayhoe points to Texas' 2010-2013 drought as a probable sign of things to come. Although this
drought occurred naturally, as a result of a strong La Niña eve nt that typically brings dry conditions
to our area, it was exacerbated by extreme heat. That event created severe hay shortages for
cattle farmers and led some ranchers to prematurely slaughter their herds or export them out of
state.
"Cotton can be drought-resistant, but not cattle," said Hayhoe.
The 2015 UTA study predicts a reduction in soil moisture of 10% to 15%in all seasons by 2050,
which can also lead to cracked pavement and the premature loss of roads, railways, and other
infrastructure.
Heat and drought also pose a problem for drinking water supplies, which North Texas sources
from surface reservoirs that will be increasingly prone to evaporation. Hayhoe says some water
managers are considering pumping the reservoirs underground during exceptionally hot and dry
conditions, or covering them with polymer "blankets."
The blankets are an invisible layer of organic molecules that can help reduce evaporation.
Floods
While it's not likely that annual precipitation totals will change in North Texas, rainfall patterns
likely will. Hayhoe and Nielsen-Gammon both say we will likely see enhanced "feast or famine"
cycles with torrential rainstorms in the spring followed by longer than usual dry periods.
These predictions carry a high degree of certainty, because climatologists have already recorded
this trend playing out.
"Rainfall becoming more extreme is something we expect because we've observed this not just in
North Texas but throughout the United States, and models consistently predict it will continue to
happen," said Nielsen-Gammon.
Severe rainstorms, the UTA scientists predict, will have the capacity to flood highway exit and
service roads in the Federal Emergency Management Agency (FEMA) 100-year floodplain.
"While the state highway system was built above flooding levels, the connector roads may be
easily flooded," said Arne Winguth, a climate scientist at UTA who co-authored the report.
Tornadoes and hail
Two events climate scientists cannot reliably project are hailstorms and tornadoes. "A lot of the
things we care about are too small-scale to predict with more confidence," said Nielsen-Gammon.
"The historical record is not large enough for longer-term forecasts."
There is some evidence that tornadoes, like rainstorms, are becoming more concentrated on
fewer days and that their season has become less predictable.
The same is true with hail. "One thing we expect to happen with a warming climate is that the
average humidity in the lower atmosphere may decrease, and if that happens it's easier for hail
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵ
to stay frozen," said Nielsen-Gammon. "That factor might increase hailstorms, but that's just one
of many factors that do affect hail."
Economy
Jina of the University of Chicago predicted in his study that climate change would decrease Dallas
County's annual income by 10% to 20% in the coming decades unless emissions are reduced.
"North Texas is one of the worst-affected places in the country," he said. Much of the loss comes
from higher mortality rates, soaring air-conditioning costs, and reduced labor productivity.
To track labor productivity, Jina and his colleagues examined national time-use surveys, diaries
kept by thousands of volunteers across the country, and compared them with local weather data.
He found that on extremely hot days, people tended to stop working about 30 minutes early.
"There's direct evidence that people concentrate less well, make more mistakes and their brain
just functions less efficiently if it's too hot," he said. Heat also disrupts sleep. "The general lack of
productivity leads to them saying, 'No more work today.'"
The good news is that many climate-change effects are manageable. They do require local and
federal authorities to plan ahead and take action, said Smith of the National Oceanic and
Atmospheric Administration.
"It is important," he said, "to address where we build, how we build and also to build protections
for populations already exposed in vulnerable areas."5
All participating jurisdictions are experiencing the effects of climate variability. The following information
is part of the climatic impact vulnerability assessment conducted by the North Central Texas Council of
Governments Department of Transportation and the University of Texas at Arlington (UTA) and is a
compilation of historical climate data and projected future climate information for the Dallas-Fort Worth
(DFW) Metropolitan Area:
The UTA climate group gathered climate and weather data from 1900 to 2010 to interpret the
historic trends in extremes and variability of temperature and precipitation suggesting an increase
in temperature, particularly in the summer season, and an increase in rainfall and rainfall
intensity, primarily during the spring season.
Historic weather-related disruption of transportation is mainly related to extreme events like
snow and ice storms as well as damages by severe supercell-type thunderstorms.
Future climate prediction suggests extreme temperatures of up to 125°F by the end of 21st
century, exceeding historic heat waves by 12°F.
By 2050, soil moisture is reduced by 10-15% in all seasons compared to historic values due to
increase in temperatures. This suggests a higher risk of infrastructure damage by cracking and,
together with elevated temperatures, a higher-than-present risk of fires, particularly in wooded
neighborhoods.
Higher likelihood of drought will also amplify the urban heat island, particularly during summer
months, that can result in up to 10°F temperature difference between downtown Dallas and
adjacent rural locations.
5 Climate change to bring North Texas longer droughts, heavy rains, 120-degree temps within 25 years. Kuchment,
Anna. 2018, February 15. <https://www.dallasnews.com/news/climate-change-1/2018/02/15/climate-change-to-
bring-texas-longer-droughts-heavy-rains-120-temps-august-within-25-years>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬ
An increase in mean rainfall by up to 10% and severe thunderstorms by up to 40% in the spring
season will likely lead to a higher risk of flooding affecting the infrastructure.
Extreme flooding events exceeding historic floods are expected as a result of more tropical storm
systems occurring in the fall season.6
Population Increase
National forecasts of population and economic growth indicate that this region will continue to add
residents and jobs well into the future. The 2030 projections produced by the North Central Texas Council
of Governments (NCTCOG) use the year 2000 as a base year and project population and employment in
five-year increments to 2030. Over the 30-year horizon, the 16-county North Texas region is anticipated
to add 1.6 million households with a corresponding 4.1 million people and 2.3 million non-construction
jobs. This represents an average annual population growth rate of 2.6% for these 30 years, a magnitude
of growth never before experienced in the North Central Texas region. NCTCOG forecasts reflect only one
set of growth assumptions. If circumstances change, real growth outcomes might be considerably
different.7
The following table reflects the changes in participating jurisdictions’ demographics since the adoption of
the 2015 HazMAP. Red text represents an increase in population.
Jurisdiction 2015 Population Estimate 2017 Population Estimate
Arlington 379,370 382,230
Azle 11,140 11,800
Bedford 48,060 48,560
Blue Mound 2,390 2,390
Colleyville 23,760 24,630
Crowley 14,130 14,440
Euless 54,050 54,870
Forest Hill 12,380 12,500
Fort Worth 792,720 815,430
Grapevine 48,520 49,130
Haltom City 42,640 42,740
Haslet 1,660 1,720
Hurst 38,340 38,410
Keller 42,890 44,620
Kennedale 7,130 7,420
Lake Worth 4,680 4,710
Lakeside 1,330 1,690
Mansfield 56,368 (2010 population) 63,670
North Richland Hills 66,300 67,120
Richland Hills 7,920 7,920
6 Climate Change/Extreme Weather Vulnerability and Risk Assessment for Transportation Infrastructure in Dallas
and Tarrant Counties. March 24, 2015.
<http://www.uta.edu/faculty/awinguth/Research/NCTCOG_FHWAClimateChangePilot_RevisedFinal_3-24-15.pdf>
7 North Texas to 2030: Extending the Trends. Vision North Texas.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭ
Jurisdiction 2015 Population Estimate 2017 Population Estimate
Saginaw 20,480 21,320
Southlake 27,710 28,880
Watauga 23,590 23,600
Westlake 1,120 1,310
Westworth Village 2,620 2,620
Tarrant County 1,922,470 1,966,440
Source: North Central Texas Regional Data Center.
Mansfield has a 2010 population estimate, as they had a city mitigation plan approved in 2010. There is
no data available for NCTCOG population changes from 2015-2017. Change in population for
Dalworthington Gardens, Edgecliff Village, Pantego, River Oaks, and the University of North Texas
Health Science Center (UNTHSC) are not included, as these jurisdictions are new participants on the ϮϬϮϬ
Tarrant County HazMAP. The following chart reflects the 2017 population estimate for these new
participants:
Jurisdiction 2017 Population Estimate
Dalworthington Gardens 2,330
Edgecliff Village 3,220
Everman 6,348
NCTCOG 367 (employees)
Pantego 2,470
River Oaks 7,310
UNTHSC 5,000 (student, faculty, staff)
3.2.3 Decrease in Vulnerability
Factors that decrease vulnerability to hazards include the mitigation actions that are addressed in
jurisdictional annexes and the adoption of new codes and policies. The Environment & Development
Department at NCTCOG plays a major role in regional coordination and management of reports and
projects that improve regional resilience to natural hazards through the following programs:
The Corridor Development Certificate (CDC) – The CDC process aims to stabilize flood risk along
the Trinity River. The CDC process does not prohibit floodplain development but ensures that any
development that does occur in the floodplain will not raise flood water levels or reduce flood
storage capacity. A CDC permit is required to develop land within a specific area of the Trinity
floodplain called the Regulatory Zone, which is similar to the 100-year floodplain.
o Under the CDC process, local governments retain ultimate control over floodplain
permitting decisions, but other communities along the Trinity River Corridor are given the
opportunity to review and comment on projects in their neighbor’s jurisdiction. As the
Metroplex economy continues to grow and develop, the CDC process will prevent
increased flood risks
The Trinity River COMMON VISION Program- Local governments along the Trinity River launched
a regional initiative that has stimulated excitement and galvanized support for a new Trinity
River COMMON VISION. It is composed of these elements:
o A safe Trinity River, with stabilization and reduction of flooding risks.
o A clean Trinity River, with fishable and swimmable waters.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮ
o An enjoyable Trinity River, with recreational opportunities linked by a trails system within
a world-class greenway.
o A natural Trinity River, with preservation and restoration of riparian and cultural
resources
o A diverse Trinity River, with local and regional economic, transportation and other public
needs addressed.
NCTCOG-OneRain Contrail Flood Warning Software- Contrail software that delivers automated
real-time data collection, processing, validation, analysis, archiving and visualization of
hydrometeorological and environmental sensor data.
The integrated Stormwater Management (iSWM) Program- The iSWM™ Program for
Construction and Development is a cooperative initiative that assists cities and counties to
achieve their goals of water quality protection, streambank protection, and flood mitigation,
while also helping communities meet their construction and post-construction obligations under
state stormwater permits.
o Development and redevelopment by their nature increase the amou nt of imperviousness
in our surrounding environment. This increased imperviousness translates into loss of
natural areas, more sources for pollution in runoff, and heightened flooding risks. To help
mitigate these impacts, more than 60 local governments are cooperating to proactively
create sound stormwater management guidance for the region through the integrated
Stormwater Management (iSWM) Program.
16-County Watershed Management Initiative- Communities from across the region come
together to collaborate on how to reduce the risks of flooding in their communities.
Texas Smartscape- Texas SmartScape™ is a landscape program crafted to be "smart" for North
Central Texas. Based on water-efficient landscape principles, it promotes the use of plants suited
to our region's soil, climate, and precipitation that don't require much—if any—additional
irrigation, pesticides, fertilizer, or herbicides to thrive.
o The two main goals of the program are to:
Improve stormwater runoff quality
Conserve local water supplies
The article below details a major project underway in Tarrant County and addresses smart development
along the Trinity River. Typically, development in a hazard-prone area, such as a floodplain, is recognized
as a factor that increases the vulnerability of an area, but this smart approach to design and development
actually decreases vulnerability.
A Smart Approach to Land Development along the Trinity River
The Trinity River is a major part of Fort Worth's rich and colorful history. In 1849, an army outpost
was established on the banks of the river at the confluence of the West Fork and the Clear Fork,
and that convergence anchors the downtown area today.
The "Master Plan" for the Trinity River is a concept literally decades in the making. Encouraged by
community volunteers in the 1980s, developed by urban designers and specialty consultants in
the 1990s, and adopted by city council in 2003, the Trinity River Vision Master Plan encompasses
88 miles of the Trinity River and its greenbelts and tributaries throughout the Fort Worth area.
The "vision" has always been to advocate for this natural resource, keeping the river beautiful,
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯ
accessible, enjoyable, and productive and to make sure it remains a valuable asset for the entire
community.
The plan includes a major restoration of the park’s ecosystem and provides numerous and diverse
recreational amenities. These are secondary, however, to the flood control aspects. According to
a 2006 report conducted by the Army Corps of Engineers, 86% of the levies in the project area
failed flood testing. This further motivated developer to move forward with re-structuring the
area.
The plan focuses on eight segments of the Trinity River and its tributaries: Clear Fork North, Clear
Fork South, Marine Creek, Mary's Creek, Sycamore Creek, West Fork East, West Fork West, and
the Central City area now called Trinity Uptown. It considers environmental quality, conservation,
recreation facilities, trail developments, reforestation, beautification, and linkage to
neighborhoods, downtown, and other special districts. The plan also addresses adjoining land
uses, transportation, and how other facilities best complement and benefit from the greenways.
When completed, Gateway Park will be three times the size of Central Park in New York City,
making it the largest urbanized park in the country.8
3.3 Profiling Natural Hazards
The Tarrant County Hazard Mitigation Action Plan (HazMAP) is a tool to assist in the identification and
documentation of natural hazards faced by the county and participating jurisdictions. Hazard profiles were
created by compiling data from the North Central Texas Council of Governments (NCTCOG) regional
natural hazards risk assessments, damage assessments, hazard data, and geographic information.
Of the 15 hazards identified in the State of Texas Hazard Mitigation Plan, the Hazard Mitigation Planning
Team (HMPT) identified nine that could affect participating jurisdictions in Tarrant County. Coastal
erosion, land subsidence, and hurricane/tropical storm will not be profiled because of their extremely low
risk to the participating jurisdictions. Dam failure is an accidental or unintentional collapse, breach, or
other failure of an impoundment structure that results in downstream flooding. Though there are 63 dams
are in the county, no jurisdiction has claimed to be at severe risk to flooding from dam failure in the next
five years.
Drought, earthquakes, expansive soils, extreme heat, thunderstorms, tornadoes, and winter storms have
a county-wide impact, which includes all participating jurisdictions. Wildfires are most likely a threat to
jurisdictions that are rural with undeveloped land. Flooding is also expected anywhere in the county, but
is most likely a threat to jurisdictions containing 100-year floodplains or bodies of water.
The Tarrant County Hazard Mitigation Planning Team (HMPT) has identified the following natural hazards
as having the potential to cause damage in the county and participating jurisdictions:
¾Drought
¾Earthquakes
¾Expansive Soils
¾Extreme Heat
¾Flooding
8 Trinity River Vision. <https://www.tarrantcounty.com/en/county/supermenu-contents/residents/trinity-river-
vision.html>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰ
¾Thunderstorms
¾Tornadoes
¾Wildfires
¾Winter Storms
Drought, earthquakes, expansive soils, extreme heat, thunderstorms, tornadoes, and winter storms do
not have geographic boundaries and can impact the entire county equally, which includes all participating
jurisdictions. Wildfires can be expected to threaten rural and urban jurisdictions with undeveloped land.
Flooding is a severe threat to jurisdictions containing 100-year floodplains or bodies of water.
WĂƌƚŝĐŝƉĂƚŝŶŐũƵƌŝƐĚŝĐƚŝŽŶƐƚŚĂƚĚŝĚŶŽƚĐůĂŝŵǁŝůĚĨŝƌĞƐĂƐĂŚĂnjĂƌĚĚŝĚƐŽďĞĐĂƵƐĞƚŚĞƌĞŚĂƐďĞĞŶŶŽ
ŚŝƐƚŽƌLJŽĨŝŵƉĂĐƚƐ͕ƚŚƵƐƚŚĞƌĞŝƐŶŽĞdžƉĞĐƚĂƚŝŽŶŽĨŝŵƉĂĐƚƐŝŶƚŚĞĨƵƚƵƌĞ͘ Additionally, a jurisdiction may
not have claimed wildfires as a hazard due to the urban landscape of the jurisdiction as well as the
swift response from the fire department. Referencing the following table, jurisdictions that are not
at risk to wildfires include ĞĚĨŽƌĚ͕ ůƵĞ DŽƵŶĚ͕Forest Hill, >ĂŬĞ tŽƌƚŚ͕ the North Central Texas
Council of Governments, Pantego, Saginaw, Watauga, and Westworth Village.
WĂƌƚŝĐŝƉĂƚŝŶŐũƵƌŝƐĚŝĐƚŝŽŶƐƚŚĂƚĚŽŶŽƚĐůĂŝŵĨůŽŽĚŝŶŐĂƐĂŚĂnjĂƌĚǁŽƵůĚĚŽƐŽĞŝƚŚĞƌďĞĐĂƵƐĞƚŚĞƌĞĂƌĞ
ŶŽĨůŽŽĚƉůĂŝŶƐ͕ƚŚĞƌĞĂƌĞŶŽĐƌŝƚŝĐĂůĂƐƐĞƚƐŝŶĂĨůŽŽĚƉůĂŝŶ͕ŽƌƚŚĞƌĞŚĂƐďĞĞŶŶŽŚŝƐƚŽƌLJŽĨŝŵƉĂĐƚƐ͕
ƚŚƵƐƚŚĞƌĞŝƐŶŽĞdžƉĞĐƚĂƚŝŽŶŽĨŝŵƉĂĐƚƐŝŶƚŚĞĨƵƚƵƌĞ͘This is not the case in Tarrant County, as all
participants have identified flooding as a potential threat to their communities.
The table on the next page reflects the rankings of each hazard, per jurisdiction.
Jurisdiction Drought Earthquake Expansive Soils Extreme Heat Flooding Thunderstorms Tornadoes Wildfires Winter Storms Arlington 5 9 8 6 1 3 2 7 4
Azle 7 9 8 6 2 3 1 5 4
Bedford 6 8 2 5 4 1 3 Eͬ 7
Blue Mound 3 9 5 4 7 1 2 Eͬ6
Colleyville 8 9 5 6 2 1 3 7 4
Crowley 5 9 8 7 3 2 1 6 4
Dalworthington Gardens 2 9 6 1 4 3 5 7 8
Edgecliff Village 8 9 7 4 5 1 2 3 6
Euless 6 9 5 4 3 1 2 8 7
Everman 7 9 5 4 1 3 2 8 6
Forest Hill 8 7 6 5 4 2 1 N/A 3
Fort Worth 7 9 8 6 2 1 4 5 3
Grapevine 5 9 8 7 3 2 1 6 4
Haltom City 6 7 5 4 1 3 2 9 8
Haslet 7 9 4 6 5 1 2 8 3
Hurst 8 9 5 4 3 2 1 7 6
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱ
Jurisdiction Drought Earthquake Expansive Soils Extreme Heat Flooding Thunderstorms Tornadoes Wildfires Winter Storms Keller 8 9 5 7 4 2 1 6 3
Kennedale 5 9 8 7 3 2 1 6 4
Lake Worth 7 8 4 2 5 1 3 Eͬ6
Lakeside 4 9 5 3 7 1 2 6 8
Mansfield 6 9 3 7 2 1 4 8 5
NCTCOG 7 8 6 4 5 1 3 N/A 2
North Richland Hills 2 3 4 5 1 6 7 8 9
Pantego 4 8 5 3 7 1 2 N/A 6
Richland Hills 4 8 2 3 5 1 6 ϵ 7
River Oaks 8 9 7 3 6 1 2 5 4
Saginaw 8 5 3 7 6 2 1 N/A 4
Southlake 5 9 8 4 2 3 1 7 6
Tarrant County 6 9 7 4 3 1 2 5 8
UNTHSC 6 8 5 4 7 1 2 9 3
Watauga 3 8 5 4 7 1 2 N/A 6
Westlake 7 8 9 6 5 1 2 3 4
Westworth Village 8 7 6 5 4 1 2 N/A 3
The following natural hazard profiles are listed in alphabetical order and do not represent their rank, as
each jurisdiction prioritized the hazards independently. This section covers part of the requirement of 44
CFR 201.6(c)(2)(i) and 44 CFR 201.6 (c)(2)(ii).
The information provided in this section reflects the impact of the hazards on all of Tarrant County, not
solely the participating jurisdictions. The results of the vulnerability analysis and risk assessment,
including historical events, are documented in the individual annexes for participating jurisdictions.
The historical events documented in this section reflect the events that impacted the entire county, not
solely the unincorporated areas of the county.
Reference to Tarrant County in this section refers to the county as a whole and not solely
unincorporated areas of Tarrant County.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϲ
3.3.1 Drought
Drought can be defined as a water shortage caused by the natura l reduction in the amount of precipitation
expected over an extended period of time, usually a season or more in length. It can be aggravated by
other factors such as high temperatures, high winds, and low relative humidity. Tarrant County
experiences a cycle of extended wet and drought conditions that can extend over a period of months even
years. Extended periods of drought can have an enormous impact on an area by affecting the abundance
of water supply, the agriculture economy, and foundations of structures. Drought may affect the entire
Tarrant County planning area equally.
The following maps and chart reflect the annual changes in drought conditions between the years 2015
to 2018. Tarrant County has experienced an increase in drought conditions over the years, with 2016 being
the wettest year during this time period.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϳ
http://droughtmonitor.unl.edu
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϴ
Source: United States Drought Monitor. DϬ D1 D2 D3 D4 As shown in the Percent Area graph, 2014-2015 had the greatest severity and longest time period of D3-D4 drought conditions. Besides major crop damage, these extreme drought conditions have the potential to put Tarrant County in extreme fire danger and could cause widespread water shortage and restrictions, creating a water emergency.dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϵ
The following chart describes the drought monitoring indices along with drought severity, return period,
and a description of the possible impacts of the severity of drought.
The following map reflects the Keetch-Byram Drought Index (KBDI) for Tarrant County and the state of
Texas. KBDI is an index used to determining forest fire potential. The drought index is based on a daily
water balance, where a drought factor is balanced with precipitation and soil moisture (assumed to have
a maximum storage capacity of 8-inches) and is expressed in hundredths of an inch of soil moisture
depletion.
The drought index ranges from 0 to 800, where a drought index of 0 represents no moisture depletion,
and an index of 800 represents absolutely dry conditions. Presently, this index is derived from ground
based estimates of temperature and precipitation derived from weather stations and interpolated
manually by experts at the Texas Forest Service (TFS) for counties across the state. Researchers at Texas
A&M University are working with the TFS to derive this index fr om AVHRR satellite data and NEXRAD radar
rainfall within a GIS.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬ
Historical Events of Drought since 2015
Column Definitions: 'Dth': Deaths, 'Inj': Injuries, 'PrD': Property Damage, 'CrD': Crop Damage
Location Date Time Type Dth Inj PrD CrD
Totals: 0 0 2.00K 7.00K
Tarrant (Zone) 02/01/2015 00:00 Drought 0 0 0.00K 2.00K
Tarrant (Zone) 03/01/2015 00:00 Drought 0 0 0.00K 3.00K
Tarrant (Zone) 04/01/2015 00:00 Drought 0 0 0.00K 1.00K
Tarrant (Zone) 08/25/2015 00:00 Drought 0 0 0.00K 0.00K
Tarrant (Zone) 09/01/2015 00:00 Drought 0 0 0.00K 1.00K
Tarrant (Zone) 10/01/2015 00:00 Drought 0 0 2.00K 0.00K
Totals: 0 0 2.00K 7.00K
Source: National Centers for Environmental Information.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭ
In total, property damage from drought totals $2,000 and crop damage totals $7,000. Calculations of
annualized losses due to drought events were conducted using historical data obtained from the National
Climatic Data Center. The annualized loss value can be interpreted as the impact expected from drought
in terms of annualized human losses and human injuries, and annualized property losses. As observed in
the table, Tarrant County can expect approximately an annual $667 in property losses, and $2,334 of crop
losses each year as a result of drought, with no injuries or deaths expected from this event.
In Texas, local governments are empowered to take action on the behalf of those they serve. When
drought conditions exist, a burn ban can be put in place by a county judge or county Commissioners Court
prohibiting or restricting outdoor burning for public safety.9
3.3.2 Earthquake
An earthquake is a sudden motion or trembling caused by an abrupt release of accumulated strain on the
tectonic plates that comprise the earth's crust. The theory of plate tectonics holds that the earth's crust
is broken into several major plates. These rigid, 50- to 60- mile thick plates move slowly and continuously
over the interior of the earth, meeting in some areas and separ ating in others. As the tectonic plates move
together they bump, slide, catch, and hold. Eventually, faults along or near plate boundaries slip abruptly
when the stress exceeds the elastic limit of the rock, and an earthquake occurs.
The ensuring seismic activity and ground motion provoke secondary hazards: surface faulting and ground
failure. The vibration or shaking of the ground during an earthquake is referred to as ground motion. In
general, the severity of ground motion increases with the amount of energy released and decreases with
distance from the causative fault or epicenter. When a fault ruptures, seismic waves are propagated in all
directions, causing the ground to vibrate at frequencies ranging from 0.1 to 30 Hz. Seismic waves are
referred to as P waves, S waves, and surface waves. Due to the risk associated with a distant quake,
earthquakes may affect the entire planning area equally. Tarrant County has a very low earthquake risk,
with a total of 18 earthquakes since 1931. The United States Geological Survey (USGS) database shows
that there is a 0.18% chance of a major earthquake within 30 miles of Tarrant County within the next 50
years. The largest earthquake within 30 miles of Tarrant County was a 3.6 Magnitude in 2017.10
9 Fire Danger: Texas Burn Bans. Texas A&M Forest Service. 2018.
<http://texasforestservice.tamu.edu/TexasBurnBans/>
10 Homefacts. Earthquake Information for Tarrant County, Texas. 2018.
<https://www.homefacts.com/earthquakes/Texas/Tarrant-County.html>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮ
Historical Events of Earthquakes since 2015
The jurisdictions in Tarrant County are identified in blue. The remaining earthquakes occurred within 30
miles of Tarrant County, thus increasing the likelihood of a future earthquake in Tarrant County.
Legend
Tarrant
County
2017 2016 2015
Time Magnitude Location in North Texas
2017-09-14T16:45:38.990Z 2.6 3.7 miles East-Southeast of Euless
2017-09-01T16:27:50.070Z 2.1 3.1 miles South-Southwest of Farmers Branch
2017-08-25T11:41:34.560Z 3 3.1 miles South of Farmers Branch
2017-06-21T22:52:05.320Z 2.8 1.2 miles Southwest of Reno
2017-05-01T16:10:09.410Z 2.3 1.2 miles Southwest of Fort Worth
2016-09-22T12:37:00.020Z 2.4 3.1 miles Northeast of Irving
2016-09-12T14:03:51.210Z 2.6 3.1 miles North-Northwest of Venus
2016-02-04T15:46:56.360Z 2.7 4.3 miles South-Southwest of Mansfield
2016-01-31T06:06:21.570Z 2.1 1.2 miles West of Irving
2015-12-17T22:29:55.710Z 3 0.6 miles South-Southeast of Haslet
2015-12-17T04:24:08.840Z 2.1 2.5 miles North-Northwest of Irving
2015-12-07T00:27:24.860Z 2.8 1.2 miles East of Irving
2015-12-06T00:44:08.510Z 2.1 3.7 miles South-Southwest of Farmers Branch
2015-12-04T14:22:58.700Z 2.1 3.7 miles North-Northeast of Irving
2015-12-04T06:56:03.250Z 2.6 3.7 miles South of Farmers Branch
2015-12-03T21:35:59.000Z 2.8 3.1 miles North-Northeast of Irving
2015-11-16T03:09:02.770Z 2.4 3.7 miles North of Irving
2015-11-15T22:07:51.400Z 2 2.5 miles North-Northeast of Irving
2015-11-03T02:37:41.390Z 2.2 2.5 miles North of Irving
2015-10-29T22:24:39.570Z 2.5 1.9 miles Northeast of Irving
2015-10-28T01:33:37.110Z 2.2 3.1 miles North of Irving
2015-10-27T13:01:07.520Z 2.3 3.7 miles North-Northeast of Irving
2015-10-23T12:30:04.520Z 2.6 2.5 miles Northwest of Venus
2015-10-23T12:11:07.850Z 2.1 4.3 miles Northwest of Venus
2015-10-19T23:12:03.180Z 2.3 3.1 miles North of Irving
2015-10-19T22:39:47.980Z 2.7 3.1 miles South-Southwest of Farmers Branch
2015-10-18T00:17:37.060Z 2.4 3.7 miles South-Southwest of Farmers Branch
2015-10-04T05:57:09.220Z 2.1 3.7 miles North-Northeast of Irving
2015-10-01T21:28:26.140Z 2.7 1.2 miles East of Irving
2015-09-22T10:18:43.020Z 2.4 3.1 miles South-Southwest of Farmers Branch
2015-09-20T23:25:08.930Z 2.6 0.6 miles North-Northwest of Irving
2015-09-16T21:55:24.080Z 2.1 1.9 miles North of Irving
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯ
Time Magnitude Location in North Texas
2015-09-14T21:04:59.040Z 2 3.1 miles South of Farmers Branch
2015-09-12T12:16:16.840Z 2.2 1.2 miles Northeast of Irving
2015-09-12T09:34:20.660Z 2.5 2.5 miles Northeast of Irving
2015-08-31T08:15:37.160Z 1.8 2.5 miles East-Northeast of Irving
2015-08-25T20:59:47.930Z 2.2 2.5 miles North of Irving
2015-08-25T20:18:31.760Z 2.1 1.2 miles North of Irving
2015-08-12T11:13:28.340Z 2.7 2.5 miles Northeast of Irving
2015-07-18T15:30:09.260Z 2.6 2.5 miles Northeast of Irving
2015-07-16T00:17:49.460Z 1.8 2.5 miles North of Irving
2015-07-13T11:03:56.270Z 2.4 1.2 miles North-Northeast of Irving
2015-06-28T05:40:35.630Z 2.1 3.7 miles Northwest of Irving
2015-06-27T10:19:02.930Z 2.3 3.7 miles South of Farmers Branch
2015-06-15T09:37:14.520Z 2.4 3.1 miles Southeast of Mansfield
2015-06-13T13:34:47.480Z 2.3 3.7 miles South of Farmers Branch
2015-05-18T18:14:29.920Z 3.3 3.1 miles North of Irving
2015-05-10T01:59:31.750Z 2.4 4.3 miles North of Venus
2015-05-09T16:12:38.390Z 2.7 4.3 miles Northeast of Irving
2015-05-07T22:58:05.200Z 4 3.1 miles North of Venus
2015-05-04T13:57:59.870Z 2.7 3.7 miles West of University Park
2015-05-04T08:49:27.750Z 2.1 2.5 miles West-Northwest of University Park
2015-05-03T16:12:04.480Z 2.5 4.3 miles Northeast of Irving
2015-05-03T15:11:16.150Z 3.2 2.5 miles North of Irving
2015-04-03T08:58:11.070Z 2.2 3.1 miles South-Southeast of Farmers Branch
2015-04-03T04:28:37.020Z 2.3 3.7 miles North-Northeast of Irving
2015-04-03T03:04:49.640Z 2.5 3.7 miles Northeast of Irving
2015-04-02T22:36:21.040Z 3.3 3.1 miles North-Northeast of Irving
2015-04-02T10:38:06.000Z 2.7 2.5 miles North-Northeast of Irving
2015-03-25T04:57:14.320Z 2.6 3.1 miles Northwest of Venus
2015-03-14T07:31:16.290Z 2.7 3.1 miles North-Northeast of Irving
2015-03-12T14:41:14.790Z 2 2.5 miles South-Southwest of Farmers Branch
2015-03-12T01:55:02.270Z 2.4 3.1 miles South-Southwest of Farmers Branch
2015-03-08T03:12:22.340Z 2.2 2.5 miles East-Northeast of Irving
2015-02-27T12:18:21.710Z 3.1 2.5 miles East-Northeast of Irving
Source: U.S. Geological Survey.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϰ
Tarrant County and participating jurisdictions experienced a few earthquakes during the time period
analyzed for this plan. There is the potential for future earthquake events, as Azle and Irving faults were
recently discovered. Earthquakes from surrounding areas can also affect the participating jurisdictions.
Though no dollar-amount of destruction was found, it is expected that all county and jurisdictional assets
are considered vulnerable and can be exposed to this hazard. Assets near the Azle and Irving fault lines
are most vulnerable to an earthquake event. Loss estimates are based on total amount over a period of
time. The Tarrant County Hazard Mitigation Action Plan reports no loss estimates.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϯϲ
In the picture above, it shows that most earthquakes since 1973 have occurred in the neighboring state
of Oklahoma. If an Oklahoma earthquake is large enough, participating jurisdictions in Tarrant County
can feel the shake, as Oklahoma is about 180 miles north. Jurisdictions in Tarrant County have
experienced multiple earthquakes since 2009.
The picture above reflects the level of ground shaking from earthquakes in 2017. Tarrant County is at a
Level V or VI on the Modified Marcelli Intensity Chart, with shaking being moderate to strong.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϳ
3.3.3 Expansive Soils
Expansive soils are soils that contain large percentages of swelling clays that may experience volume
changes of up to 40% in the absence or presence of water. This type of plastic deformation is common in
Tarrant County. Homes built on expanding smectite clays without due precautions will likely will be
structurally damaged as the clay takes up water. Cracks will appear in walls and floors. Damage can be
minor, but it also can be severe enough for the home to be stru cturally unsafe. Expansive soil is considered
one of the most common causes of pavement distresses in roadways. Depending upon the moisture level,
expansive soils will experience changes in volume due to moisture fluctuations from seasonal variations.
Expansive soils may affect the entire Tarrant County planning area equally.
Expansive soils is a condition that is native to Texas soil
characteristics, and cannot be documented as a time-
specific event, except when it leads to structural and
infrastructure damage. The great increase in damages
in Texas caused by problems with expansive soils can
be traced to the rise in residential slab-on-grade
construction which began to accelerate in the 1960s.
Prior to that time, most residential construction in
Texas was pier and beam, with wood siding or other
non-masonry covering. Affected homes will be heavily
influenced by their proximity to a large body of water,
such as homes on Eagle Mountain Lake, whereas older
pier and beam foundations will behave in an entirely
different manner.
Western and Central Tarrant County consists of several different limestone formations (the Washita
group) made up of limestone and shale that produce a variety of clay-rich soils with rocky shallow soil
horizons. Eastern Tarrant County is supported by Woodbine sandstone, a picturesque rolling topography
dominated by sandy loams and clay-rich soils. These sandier soils allow for subsurface water movement
and require special consideration. This propensity for water movement can easily compromise the
foundations of homes in Tarrant County.11
11 Fort Worth Foundation Repair. Perma Pier Foundation Repair of Texas. 2018.
<https://www.permapier.com/service-areas/fort-worth-foundation-repair/>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϴ
3.3.4 Extreme Heat
Extreme heat is characterized by a combination of very high temperatures and exceptionally humid
conditions. When persisting over a period of time, it is called a heat wave. Extreme heat can also be a
factor that drastically impacts drought conditions, as high temperatures lead to an increased rate of
evaporation. Extreme heat can also lead to heat stroke and even death in vulnerable populations, such as
the elderly and the very young, if exposed to the high temperatures for an extended period of time.
Extreme heat may affect the entire Tarrant County planning area equally.
The following scale was used to determine the extent of extreme heat in Tarrant County and participating
jurisdictions. The Heat Index is a measure of how hot it really feels when relative humidity is factored in
with the actual air temperature. To find the Heat Index temperature, look at the Heat Index Chart below.
As an example, if the air temperature is 96°F and the relative humidity is 65%, the heat index-how hot it
feels-is 121°F. The red area without numbers indicates extreme danger. The National Weather Service
(NWS) will initiate alert procedures when the Heat Index is expected to exceed 105°-110°F (depending on
local climate) for at least 2 consecutive days.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϵ
NWS also offers a Heat Index chart, below, for areas with high heat but low relative humidity. Since heat
index values were devised for shady, light wind conditions, exposure to full sunshine can increase heat
index values by up to 15°F. Also, strong winds, particularly with very hot, dry air, can be extremely
hazardous.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϬ
The map below shows the average number of days per year locations can expect to exceed 100°F by the
end of this century, if greenhouse gas emissions continue to increase. Based on this information, parts of
Texas that experienced 10 to 20 days of 100°F weather per year in recent decades may experience more
than 100 days over 100°F by the end of the century. This includes Tarrant County.
Source: National Oceanic and Atmospheric Administration, United States Climate Resilience Toolkit.
Historical Events of Extreme Heat since 2015
Column Definitions: 'Dth': Deaths, 'Inj': Injuries, 'PrD': Property Damage, 'CrD': Crop Damage
Location Date Time Type Dth Inj PrD CrD
Tarrant (Zone) 06/23/2017 16:00 Heat 1 0 0.00K 0.00K
Totals: 1 0 0.00K 0.00K
Source: National Centers for Environmental Information.
Extreme heat impacts large areas and cross jurisdictional boundaries; therefore, all of Tarrant County is
exposed to this hazard.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϭ
3.3.5 Flooding
Flooding is defined as the accumulation of water within a water body and the overflow of excess water
onto adjacent floodplain lands. The floodplain is the land adjoining the channel of a river, stream, ocean,
lake, or other watercourse or water body that is susceptible to flooding. The statistical meaning of terms
like “100-year flood” can be confusing. Simply stated, a floodplain can be located anywhere; it just
depends on how large and how often a flood event occurs. Floodplains are those areas that are subject
to inundation from flooding. Floods and the floodplains associated with them are often described in terms
of the percent chance of a flood event happening in any given year. As a community management or
planning term, “floodplain” most often refers to an area that is subject to inundation by a flood that has
a 1% chance of occurring in any given year (commonly referred to as the 100-year floodplain).
Common flooding hazards within the planning area include flood hazards from flash flooding and new
development. Floodwater can disguise many dangerous obstacles, like uncovered manholes or debris that
can cause someone to fall over. Standing water, or water that isn't flowing, can also become a breeding
ground for bugs that can make people very ill. Another risk can be downed power lines which may still be
live.
On the following map, the floodway and 100-year floodplain are identified along the rivers and creeks in
Tarrant County.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϮ
Source: Property Shark dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϰϯ
A flash flood is a rapid flood that inundates low-lying areas in less than six hours. This is caused by intense
rainfall from a thunderstorm or several thunderstorms. Flash floods can also occur from the collapse of a
man-made structure or ice dam. Construction and development can change the natural drainage and
create brand new flood risks as the concrete that comes with ne w buildings, parking lots, and roads create
less land that can absorb excess precipitation from heavy rains. Flash floods are a high risk hazard since
they can tear out trees and destroy buildings and bridges.
Below is a map of low water crossings in Tarrant County as of 2012, identified by yellow circles. A low
water crossing provides a bridge or overpass when water flow is low. Under high-flow conditions, water
runs over the roadway and impedes vehicular traffic. Texas leads the nation in flash flood deaths and most
are due to people crossing these low areas in times of flooding . Additional details on flooding are provided
in the jurisdictional annexes.
Source: Texas Low Water Crossing Inventory_032312;
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϰ
There are 15 major river basins within Texas and eight coastal basins, each with varying hydrological
regimes and water supply capabilities. Each of the basins has several unique features, both climatic (such
as precipitation and evaporation), as well as physiographic (geology, slope, soil type, vegetation and land
use practices) which contribute to the nature of runoff from the basins. The West Fork Trinity River is the
only major river in Tarrant County and can affect some of the participating jurisdictions. There are a total
of four branches of the Trinity River: the West Fork, Clear Fork, Elm Fork, and East Fork. The Trinity is a
slow, meandering river with many twists and turns from its headwaters to its mouth. Dams have been
erected to create Lake Bridgeport, Eagle Mountain Lake and Lake Worth, the latter two being in or on the
outskirts of Fort Worth. The West Fork Trinity River has its headwaters in Archer County. From there it
flows southeast, through the man-made reservoirs Lake Bridgeport and Eagle Mountain Lake then flowing
eastward through Lake Worth and then the city of Fort Worth.
Features of Major River Basins in Tarrant County
River Basin Total Area
(square miles)
Area in Texas
(square miles)
River Length
(miles)
Length in
Texas (miles)
Average Flow
(acre-feet per
year)
Trinity 17,913 17,913 550 550 5,727,000
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϱ
Tarrant County has of a few major lakes that are used for surface water and recreation. Their current
water levels are listed below. Currently, these lakes have recovered from previous drought periods and
are close to or at capacity.
Recent Conditions of Lakes in Tarrant County
Reservoir Percent
Full
Water
Level
(feet)
Height Above
Conservation
Pool
(feet)
Reservoir
Storage
(acre-feet)
Conservation
Storage
(acre-feet)
Conservation
Capacity
(acre-feet)
Surface
Area
(acres)
Arlington 99.2 549.83 -0.17 39,862 39,862 40,188 1,919
Benbrook 100.0 694.48 0.48 87,439 85,648 85,648 N/A
Cedar
Creek
100.0 322.06 0.06 646,750 644,686 644,686 N/A
Eagle
Mountain
100.0 649.42 0.32 182,650 179,880 179,880 N/A
Grapevine 100.0 537.08 2.08 179,459 164,703 164,703 7,273
Richland-
Chambers
97.6 314.38 -0.62 1,086,376 1,061,452 1,087,839 42,287
Worth 99.2 593.92 -0.08 33,221 33,221 33,495 3,423
Source: Water Data for Texas, https://waterdatafortexas.org/reservoirs/statewide.
Dam Failure
A dam is defined as a barrier constructed across a watercourse for the purpose of storage, control, or
diversion of water. Dams typically are constructed of earth, rock, concrete, or mine tailings. A dam
failure is an accidental or unintentional collapse, breach, or other failure of an impoundment structure
that results in downstream flooding. Because dams are man-made structures, dam failures are usually
considered technological hazards.
The hazard extent rating scale for dam failure is based on the amount of potential damage that can be
caused by a failure. For the purposes of this hazard analysis, damage from dam failure only takes into
account areas where developed property is affected. Although dam failures can cause extensive
damage, there has been no recorded failures in Tarrant County as a wide array of measures, including
maintenance, are taken to ensure structural integrity. Ninety-five percent of dams in Tarrant County are
regulated by a state agency and 3% are regulated by a federal agency. The average age for the 63 dams
is 53 years old.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϲ
At the time this plan was written, specific inundation data for dams in Tarrant County was unavailable;
however, it can be said that all people, property, and environments located in an inundation area would
be affected by dam failure. One of the two high hazard federal dams shown in red on the following map
is in a participating jurisdiction. It is owned by the United States Army Corps of Engineers, Fort Worth
District (CESF).
Dam Name City Owner
Benbrook Lake Fort Worth U.S. Army Corps of Engineers, Fort Worth District (CESF)
According to the Texas Commission on Environmental Quality (TCEQ), there are 33 state regulated dams
in Tarrant County that are high hazard and there are 8 dams that are significant hazard. Twenty-five of
the high hazard dams have an emergency action plan (EAP), and all 8 of the significant hazard dams have
an EAP.
Below is a list of the dams in Tarrant County provided by the U.S. Army Corps of Engineers. Those
without a city name can be presumed to be located in the unincorporated Tarrant County. The list
reflects the most current 2018 National Inventory of Dams (NID) database. State and federal dam
regulators provided their data from May to November 2018 for inclusion in the 2018 database. Please
contact the respective state or federal regulatory authority for the most up-to-date information. The
NID consists of dams meeting at least one of the following criteria;
1. High hazard potential classification - loss of human life is likely if the dam fails.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϳ
2. Significant hazard potential classification - no probable loss of human life but can cause
economic loss, environmental damage, disruption of lifeline facilities, or impact other
concerns.
3. Height is equal to or exceeds 25 feet and storage exceeds 15 acre-feet.
4. Height exceeds 6 feet and storage is equal to or exceeds 50 acre-feet.
Dam Name Jurisdiction Owner EAP
Benbrook Lake Fort Worth U.S. Army Corps of Engineers, Fort Worth
District (CESF) Yes
Grapevine Lake Grapevine CESF Yes
Lake Arlington Dam Arlington City of Arlington Yes
Lake Como Dam Fort Worth City of Fort Worth Yes
Luther Lake Dam Fort Worth City of Fort Worth Yes
Eagle Mountain Dam Fort Worth Tarrant Regional Water District Yes
Haywire Lake Number 2
Dam Lake Worth David Leonard Not
Required
Haywire Lake Number 1
Dam Lake Worth David Leonard Not
Required
Knapp Lake Dam Haltom City Texas Department of Transportation No
White Lake Dam Fort Worth Catholic Diocese of Fort Worth, Nolan
High School Yes
Marine Creek Dam Fort Worth Tarrant Regional Water District Yes
Lake Worth Dam Fort Worth City of Fort Worth Yes
Loughridge Lake Dam City of Fort Worth Not
Required
Millbrook Addition Dam Fort Worth Millbrook Addition Homeowners
Association
Not
Required
Fosdic Lake Dam Fort Worth City of Fort Worth Yes
Echo Lake Dam Fort Worth Tarrant County Yes
Prestonwood Lake Dam Arlington Eddie Cheatham Not
Required
Cement Creek Dam Fort Worth Tarrant Regional Water District Yes
Willow Creek Lake Dam Fort Worth City of Fort Worth Yes
Nutt Dam Fort Worth Tarrant Regional Water District Not
Required
East Balancing Reservoir
Dam Bisbee Tarrant Regional Water District Yes
West Balancing Reservoir
Dam Bisbee Tarrant Regional Water District Yes
Western Training Lagoon
Dam Haltom City Western Company of North America Not
Required
Rush Creek Lake Dam Arlington Lake Interlochen Homeowners
Association
Not
Required
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϴ
Dam Name Jurisdiction Owner EAP
Meadows Lakes East Lake
Dam Richland Hills
Meadow Lakes Community Improvement
Association, Skylark Circle Community
Improvement Association
No
Trigg Lake Dam Irving Dallas-Fort Worth International Airport
Board Yes
Woodland West Lake Dam Pantego Woodland West Lake Association Yes
North Side Drive Dam
Number 3 Fort Worth City of Fort Worth Not
Required
Cityview Lakes Dam 2 Cityview Owners Association Not
Required
Cityview Lakes Dam 3 Cityview Owners Association Not
Required
Arbor Dam 1 Arbor Development Company Not
Required
Arbor Dam 2 Arbor Development Company Not
Required
Stoneglen Dam Number 1 Hunt Resources Inc. Not
Required
Stoneglen Dam Number 2 Hunt Resources Inc. Not
Required
Stoneglen Dam Number 8 Hunt Resources Inc. Not
Required
Lakewood Dams 1-3 Lakewood Addition Homeowners
Association
Not
Required
Capp Smith Park
Retention Lake Dam City of Watauga Yes
Fourth Street Low Water
Dam Fort Worth Tarrant Regional Water District Not
Required
Timarrow Lake Iv Dam Timarrow Land Corporation Not
Required
Glen Garden Golf and
Country Club Dam Glen Garden Golf and Country Club Yes
Lake Mb 3a Dam Hillwood Properties Corporation No
French Lake Dam Fort Worth City of Fort Worth Yes
Bal Lake Dam Fort Worth Jearl Walker Yes
Fidelity South Lake Dam Trophy Club FMR Texas Limited Partnership Yes
Fidelity North Lake Dam Trophy Club FMR Texas Limited Partnership Yes
Pd3 1 East Lake Dam 1 The Vaquero Club Inc. Yes
Eden Lake Dam Fort Worth The Landing at Eden Lake Homeowners
Association No
Dow Lake Dam Robert Dow Not
Required
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϰϵ
Dam Name Jurisdiction Owner EAP
Arlington Southwest
Nature Preserve Dam Arlington City of Arlington Yes
Elkins Lake Dam City of Dalworthington Gardens Yes
Boys Ranch Activity
Center Dam City of Bedford Parks Department Yes
Mansfield ISD Ron
Whitson Agricultural
Center Dam
Mansfield Independent School District
(ISD) No
Stone Lake Dam Stone Lake Homeowners Association Yes
Ridglea Country Club
Estates Dam David Smith, Mark Gerrick, Shawn Smith No
Timberlake Phase 5 Timber Lake Residential Association Inc,
City of Southlake Yes
Lake Mb3 Dam Hillwood Properties Corporation No
Lost Creek Golf Club Dam Benbrook Somerset Lost Creek Golf Limited Yes
McPherson Ranch Dam Fort Worth McPherson Ranch Owners Association Yes
Alan Saxe Pond Arlington City of Arlington Yes
Tehama Ridge Dam DR Horton-Texas Limited Yes
Meadows Lakes West
Lake Dam
North Richland
Hills
Meadow Lakes Community Improvement
Association, Skylark Circle Community
Improvement Association
No
Chisholm Park Lake Dam City of Hurst Yes
Greenbriar Dam City of Fort Worth Yes
Source: National Inventory of Dams, https://nid-test.sec.usace.army.mil/ords/f?p=105:1
Italicized dams are not in the participating jurisdictions of this plan.
The hazard classification of dams and inundation maps are not available to the public, per Homeland
Security regulations. If specific information is needed for a dam, please contact the dam owners or the
Dam Safety Section of the TCEQ via the Tarrant County Emergency Management Coordinator.
The extent of dam failure in the planning area has not yet been determined as a result of a lack of data
regarding inundation levels. It is believed that all census blocks within a 5-mile radius are at risk to
failure from the dams with the largest water capacity. The cities of Arlington, Fort Worth, Grapevine,
Haltom City, Lake Worth, North Richland Hills, Pantego, and the unincorporated county are the only
jurisdictions with dams listed in their area. Due to the lack of data, in the next five years these
jurisdictions will have a goal to work with the state to conduct a study to fill the data deficiency,
including inundation zones, vulnerability to, and potential impacts of a dam failure.
NFIP
As a participating member in the National Flood Insurance Program (NFIP), Tarrant County is required to
regulate any development in designated flood prone areas. All work within a Federal Emergency
Management Agency (FEMA) designated floodplain requires a floodplain permit. The floodplain permit is
free; however, it may require additional information indicating that adjacent property owners will not be
adversely impacted due to the development.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϬ
Additional information may include, but is not limited to, an elevation certificate, a flood study, a
topographical survey of before and after conditions, Conditional Letter of Map Revision (CLOMR), Letter
of Map Revision (LOMR), and Letter of Map Amendment (LOMA).
A property owner is required to obtain a floodplain permit prior to performing any type of work in the
floodplain, including the placement of fill. The finished floor elevation of new homes constructed in a
floodplain must be located at least one foot above the base flood elevation.
Prior to the submittal of any documents to FEMA, the county floodplain administrator will review the
documents to ensure they are in compliance with the county's floodplain regulations
A permit will only be issued after it is determined that the proposed work will not have an adverse impact
on adjacent property owners, will not decrease the flood carrying capacity of the watercourse and will
not create a situation that is dangerous during flooding events.
As development occurs along with growth, more property is exposed. In fact, due to the rapid
development in the area, the planners have experienced problems determining building footprints within
the floodplain and are working to accurately identify the number and types of buildings vulnerable to
flooding.
Among the NFIP’s policyholders are thousands whose properties have flooded multiple times. Called
“repetitive loss properties,” these are buildings and/or contents for which the NFIP has paid at least two
claims of more than $1,000 in any 10-year period since 1978. “Severe repetitive loss properties” are those
for which the program has either made at least four payments for buildings and/or contents of more than
$5,000 or at least two building-only payments that exceeded the value of the property.
These two kinds of properties are the biggest draw on the NFIP Fund. They not only increase the NFIP’s
annual losses and the need for borrowing; but they drain funds needed to prepare for catastrophic events.
Community leaders and residents are also concerned with the Repetitive Loss problem because residents'
lives are disrupted and may be threatened by the continual flooding.
The primary objective of identifying these properties is to eliminate or reduce the damage to property
and the disruption to life caused by repeated flooding of the same properties.
The following table reflects the loss statistics for repetitive loss properties in participating jurisdictions. In
summary, there was over $35,184,127.07 in payments made to the jurisdictions and over 2,000 losses.
Loss Statistics as of 05/31/2018
Loss Statistics: from January 1, 1978 through report "as of" date above
Jurisdiction Total
Losses
Closed
Losses
Open
Losses
Closed Without Payment
(CWOP) Losses Total Payments
Arlington 888 669 1 219 $18,679,502.23
Azle 53 39 0 14 $1,114,627.32
Bedford 59 33 0 26 $175,230.99
Blue Mound 3 2 0 1 $21,810.93
Colleyville 54 36 0 18 $652,382.45
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϭ
Loss Statistics as of 05/31/2018
Loss Statistics: from January 1, 1978 through report "as of" date above
Jurisdiction Total
Losses
Closed
Losses
Open
Losses
Closed Without Payment
(CWOP) Losses Total Payments
Crowley 2 2 0 0 $10,676,72
Dalworthington
Gardens 9 5 0 4 $38,738.70
Edgecliff Village 15 10 0 5 $72,918.51
Euless 109 91 0 18 $2,876,085.49
Everman 75 42 21 12 $646,802.08
Forest Hill 20 12 0 8 $145,600.40
Fort Worth 584 425 3 156 $4,651,310.81
Grapevine 50 39 0 11 $1,020,289.91
Haltom City 122 88 0 34 $3,349,909.45
Haslet 2 1 0 1 $2,645.94
Hurst 115 86 0 29 $1,235,231.11
Keller 52 42 0 10 $1,137,017.37
Kennedale 20 17 0 3 $118,404.88
Lake Worth 1 1 0 0 $3,951.81
Lakeside 1 0 0 1 $0
North Richland
Hills 111 87 0 24 $718,857.87
Pantego 12 8 0 4 $39,574.45
Richland Hills 100 79 0 21 $1,140,570.00
River Oaks 4 4 0 0 $67,027.56
Saginaw 7 7 0 0 $111,199.79
Southlake 24 19 1 4 $434,383.78
Tarrant County
(unincorporated) 242 192 1 49 $4,066,415.57
Watauga 85 68 0 17 $533,697.51
Total 2,029 1,537 2 491 $35,184,127.07
Total losses – All losses submitted regardless of the status.
Closed losses –Losses that have been paid.
Open losses – Losses that have not been paid in full.
CWOP losses – Losses that have been closed without payment.
Total Payments – Total amount paid on losses.
Source: Claim Information by State, https://bsa.nfipstat.fema.gov/reports/1040.htm#48.
The tables below provide information about the repetitive loss and severe repetitive loss properties
within the participating jurisdictions as of January 31, 2019. dŚĞƚLJƉĞƐŽĨƉƌŽƉĞƌƚŝĞƐĂƌĞŝĚĞŶƚŝĨŝĞĚŝŶƚŚĞ
ŝŶĚŝǀŝĚƵĂůĂŶŶĞdžĞƐ͕ĂƐĂƉƉůŝĐĂďůĞ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϮ
Repetitive Loss Properties
Community name CID Total Payments Avg. Payment Losses Properties
Arlington 485454 $3,889,452.43 $34,118.00 114 46
Azle 480584 $21,535.92 $10,767.96 2 1
Bedford 480585 $58,571.22 $5,857.12 10 5
Colleyville 480590 $599,369.37 $27,244.06 22 8
Crowley 480591 $220430.81 $55107.7 4 1
Dalworthington Gardens 481013 $36,535.65 $6,089.28 6 3
Edgecliff Village 480592 $41,616.15 $20,808.08 2 1
Euless 480593 $824,603.42 $24,253.04 34 14
Everman 480594 $59,488.23 $11,897.65 5 2
Forest Hill 480595 $94,672.35 $47,336.18 2 1
Fort Worth 480596 1,889,511.41 12,681.28 149 50
Grapevine 480598 479,318.89 22,824.71 21 10
Haltom City 480599 $2,769,530.21 $57,698.55 48 13
Keller 480602 $591,093.51 $23,643.74 25 8
Kennedale 480603 $24,266.13 $6,066.53 4 2
North Richland Hills 480607 $111,736.97 $11,173.70 10 4
Pantego 481116 $67,512.77 $13,502.55 5 2
Richland Hills 480608 $512,929.49 $15,543.32 33 9
Saginaw 480610 $10,825.99 $2,706.50 4 1
Southlake 480612 $142,182.06 $35,545.52 4 2
Tarrant County (unincorporated) 480582 $1,176,586.27 $21,392.48 55 16
Watauga 480613 $250,061.33 $8,622.80 29 12
Severe Repetitive Loss Properties
Community name CID Total Payments Avg. Payment Losses Properties
Arlington 485454 $102,089.39 $25,522.35 4 1
Euless 480593 $67,429.34 $16,857.33 4 1
Keller 480602 $297,060.09 $59,412.02 5 1
Tarrant County (unincorporated) 480582 $380,296.75 $27,164.05 14 2
The Community Rating System (CRS) is a voluntary program for communities that participate in the
National Flood Insurance Program (NFIP). The goals of the CRS are to reduce flood damages to insurable
property, strengthen and support the insurance aspects of the NFIP, and encourage a comprehensive
approach to floodplain management. The CRS has been developed to provide incentives in the form of
premium discounts for communities to go beyond the minimum floodplain management requirements to
develop extra measures to provide protection from flooding. For a community to be eligible, it must be in
full compliance with the NFIP.
All communities start out with a Class 10 rating, which provides no discount. There are 10 CRS classes:
Class 1 requires the most credit points and gives the greatest premium discount; Class 10 identifies a
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϯ
community that does not apply for the CRS or does not obtain a minimum number of credit points and
receives no discount. There are 18 activities recognized as measures for eliminating exposure to floods.
Credit points are assigned to each activity. The activities are organized under 4 main categories:
x Public Information
x Mapping and Regulation
x Flood Damage Reduction
x Flood Preparedness
Premium discounts ranging from 5% to a maximum of 45% are applied to eligible policies written in a
community as recognition of the floodplain management activities instituted.
All CRS communities must maintain completed FEMA elevation and floodproofing certificates for all new
and substantially improved construction in the Special Flood Hazard Area (SFHA) after the date of
application for CRS classification. These certificates must be available upon request. Therefore, in writing
a policy, an agent/producer should be able to get these certificates from any CRS community. In addition,
some CRS communities receive credit for having completed certif icates for Post-Flood Insurance Rate Map
(FIRM) buildings constructed prior to the CRS application date. If they do receive this credit, these
certificates should also be available to agents/producers writing flood insurance.
The following participating jurisdictions in Tarrant County have CRS ratings. All other participating
jurisdictions are not ranked.
Community Rating System Eligible Communities Effective May 1, 2018
Community
Number
Community
Name
CRS
Entry
Date
Current
Effective
Date
Current
Class
%
Discount
for SFHA*
%
Discount
for Non-
SFHA
Status**
485454 Arlington 10/1/91 05/1/18 6 20 10 C
480596 Fort Worth 10/1/12 10/1/12 8 10 5 C
480599 Haltom City 10/1/12 10/1/12 7 15 5 C
480601 Hurst 10/1/92 10/1/17 8 10 5 C
480607
North
Richland
Hills
10/1/91 10/1/16 7 15 5 C
480608 Richland
Hills 05/1/14 05/1/14 8 10 5 C
Source: October 2017 NFIP Flood Insurance Manual.
For the purpose of determining CRS discounts, all AR and A99 zones are treated as non-SFHAs.
*SFHA: Special Flood Hazard Area
**Status: C = Current, R = Rescinded
Participating jurisdictions describe details of their NFIP participation within their jurisdictional annex.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϰ
3.3.6 Thunderstorms
A thunderstorm is a storm that consists of rain-bearing clouds and has the potential to produce hail, high
winds, and lightning.
Hail
Hail occurs when, at the outgrowth of a severe thunderstorm, balls or irregularly shaped lumps of ice
greater than 0.75 inches in diameter fall with rain. Early in the developmental stages of a hailstorm, ice
crystals form within a low-pressure front due to warm air rising rapidly into the upper atmosphere and
the subsequent cooling of the air mass. Frozen droplets gradually accumulate on the ice crystals until,
having developed sufficient weight, they fall as precipitation.
The TORRO scale for hail extends from H0 to H10 with its increments of intensity or damage potential
related to hail size (distribution and maximum), texture, fall speed, speed of storm translation, and
strength of the accompanying wind.
An indication of equivalent hail kinetic energy ranges (in joules per square meter) has now been added to
the first six increments on the scale, and this may be derived from radar reflectivity or from hail pads. The
International Hailstorm Intensity Scale recognizes that hail size alone is insufficient to accurately
categorize the intensity and damage potential of a hailstorm, especially towards the lower end of the
scale. For example, without additional information, an event in which hail of up to walnut size is reported
(hail size code 3: hail diameter of 21-30 mm) would be graded as a hailstorm with a minimum intensity of
H2-H3. Additional information, such as the ground wind speed or the nature of the damage the hail
caused, would help to clarify the intensity of the event. For instance, a fall of walnut-sized hail with little
or no wind may scar fruit and sever the stems of crops but would not break vertical glass and so would be
ranked H2-H3. However, if accompanied by strong winds, the same hail may smash many windows in a
house and dent the bodywork of a car, and so be graded an intensity as high as H5.
However, evidence indicates maximum hailstone size is the most important parameter relating to
structural damage, especially towards the more severe end of the scale. It must be noted that hailstone
shapes are also an important feature, especially as the "effective" diameter of non-spheroidal specimens
should ideally be an average of the coordinates. Spiked or jagged hail can also increase some aspects of
damage.
Below is the TORRO Hailstorm Intensity Scale (H0 to H10) in relation to typical damage and hail size codes.
TORRO Hailstorm Intensity Scale
Size
Code
Intensity
Category
Typical Hail
Diameter
(mm)*
Probable
Kinetic
Energy,
J-m2
Typical Damage Impacts
H0 Hard Hail 5 0-20 No damage
H1 Potentially
Damaging 5-15 >20 Slight general damage to plants, crops
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϱ
TORRO Hailstorm Intensity Scale
Size
Code
Intensity
Category
Typical Hail
Diameter
(mm)*
Probable
Kinetic
Energy,
J-m2
Typical Damage Impacts
H2 Significant 10-20 >100 Significant damage to fruit, crops,
vegetation
H3 Severe 20-30 >300
Severe damage to fruit and crops,
damage to glass and plastic structures,
paint and wood scored
H4 Severe 25-40 >500 Widespread glass damage, vehicle
bodywork damage
H5 Destructive 30-50 >800
Wholesale destruction of glass,
damage to tiled roofs, significant risk of
injuries
H6 Destructive 40-60 Bodywork of grounded aircraft dented,
brick walls pitted
H7 Destructive 50-75 Severe roof damage, risk of serious
injuries
H8 Destructive 60-90 Severe damage to aircraft bodywork
H9 Super
Hailstorms 75-100
Extensive structural damage, risk of
severe or even fatal injuries to persons
caught in the open
H10 Super
Hailstorms >100
Extensive structural damage, risk of
severe or even fatal injuries to persons
caught in the open
*Approximate range (typical maximum size in bold), since other factors (e.g. number and density of
hailstones, hail fall speed, and surface wind speeds) affect severity.
Wind
Straight-line winds are often responsible for the wind damage associated with a thunderstorm. These
winds are often confused with tornadoes because of similar damage and wind speeds. However, the
strong and gusty winds associated with straight-line winds blow roughly in a straight line, unlike the
rotating winds of a tornado. Downbursts or micro-bursts are examples of damaging straight-line winds. A
downburst is a small area of rapidly descending rain and rain-cooled air beneath a thunderstorm that
produces a violent, localized downdraft covering 2.5 miles or less. Wind speeds in some of the stronger
downbursts can reach 100 to 150 miles per hour, which is similar to that of a strong tornado. The winds
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϲ
produced from a downburst often occur in one direction and the worst damage is usually on the forward
side of the downburst.
The following Beaufort Wind Chart shows the description and scale used to classify the wind intensity in
a thunderstorm. The scale is now rarely used by professional meteorologists, having been largely replaced
by more objective methods of determining wind speeds—such as using anemometers, tracking wind
echoes with Doppler radar, and monitoring the deflection of rising weather balloons and radiosondes
from their points of release. Nevertheless, it is still useful in estimating the wind characteristics over a
large area, and it may be used to estimate the wind where there are no wind instruments. The Beaufort
scale also can be used to measure and describe the effects of different wind velocities on objects on land
or at sea.
The Beaufort Scale of Wind (Nautical)
Beaufort
Number Name of Wind Wind Speed
knots kph
0 Calm <1 <1
1 Light air 1–3 1–5
2 Light breeze 4–6 6–11
3 Gentle breeze 7–10 12–19
4 Moderate breeze 11–16 20–28
5 Fresh breeze 17–21 29–38
6 Strong breeze 22–27 39–49
7 Moderate gale (or near gale) 28–33 50–61
8 Fresh gale (or gale) 34–40 62–74
9 Strong gale 41–47 75–88
10 Whole gale (or storm) 48–55 89–102
11 Storm (or violent storm) 56–63 103–114
12–17 Hurricane 64 and
above
117 and
above
Lightning
Lightning results from the buildup and discharge of electrical energy between positively and negatively
charged areas within thunderstorms. A “bolt” or brilliant flash of light is created when the buildup
becomes strong enough. These bolts of lightning can be seen in cloud-to-cloud or cloud-to-ground strikes.
Bolts of lightning can reach temperatures approaching 50,000°F. While lightning is mostly affiliated with
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϳ
thunderstorms, lightning often strikes outside of these storms, as far as 10 miles away from any rainfall.
FEMA states that an average of 300 people are injured and 80 people are killed in the United States each
year by lighting. Direct strikes have the power to cause significant damage to buildings, critical facilities,
infrastructure, and the ignition of wildfires which can result in widespread damages to property and
persons. Lightning is the most significant natural contributor to fires affecting the built environment.
The lightning activity level (LAL) is a common parameter that is part of fire weather forecasts nationwide.
LAL is a measure of the amount of lightning activity using values 1 to 6 where:
LAL Cloud and Storm Development
Lightning
Strikes Per
15 Minutes
1 No thunderstorms -
2
Cumulus clouds are common but only a few reach the towering cumulus
stage. A single thunderstorm must be confirmed in the observation area.
The clouds produce mainly virga, but light rain will occasionally reach the
ground. Lightning is very infrequent
1-8
3
Towering cumulus covers less than two-tenths of the sky. Thunderstorms
are few, but two to three must occur within the observation area. Light to
moderate rain will reach the ground and lightning is infrequent
9-15
4
Towering cumulus covers two to three-tenths of the sky. Thunderstorms
are scattered and more than three must occur within the observation area.
Moderate rain is common and lightning is frequent
16-25
5
Towering cumulus and thunderstorms are numerous. They cover more than
three-tenths and occasionally obscure the sky. Rain is moderate to heavy
and lightning is frequent and intense
>25
6 Similar to LAL 3 except thunderstorms are dry
According to the following map from the National Lightning Detection Network, jurisdictions in Tarrant
County experience a flash density of 12-20 flashes per square mile, per year.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϱϵ
The National Weather Service uses the following Storm Prediction Center (SPC) activity levels to represent
severe weather outlooks.
Tarrant County averages approximately 11 significant thunderstorm events (with hail and high winds) per
year, according to National Weather Service (NWS) records. Though most new homes and buildings in
participating jurisdictions are built to resist the effects of all but the strongest thunderstorms, a number
of mobile and manufactured home parks and vehicles remain vulne rable. Thousands of homes and
vehicles can be damaged in a single storm, causing millions of dollars in damages.12
12 State of Texas Mitigation Plan. 2013, page 72.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϬ
3.3.7 Tornadoes
A tornado is a violently rotating column of air that comes in contact with the ground. A tornado can either
be suspended from, or occur underneath, a cumuliform cloud. It is often, but not always, visible as a
condensation funnel.
The Enhanced Fujita Scale, or EF Scale, is the scale for rating the strength of tornadoes during the observed
time period via the damage they cause. Six categories from EF0 to EF5 represent increasing degrees of
damage. The scale takes into account how most structures are designed and is thought to be an accurate
representation of the surface wind speeds in the most violent tornadoes.
Enhanced Fujita Scale
Enhanced
Fujita
Category
Wind Speed
in Miles Per
Hour (MPH)
Potential Damage
EF0 65-85
Light damage. Peels surface off some roofs; some damage to gutters
or siding; branches broken off trees; shallow-rooted trees pushed
over.
EF1 86-110
Moderate damage. Roofs severely stripped; manufactured homes
overturned or badly damaged; loss of exterior doors; windows and
other glass broken.
EF2 111-135
Considerable damage. Roofs torn off well-constructed houses;
foundations of frame homes shifted; manufactured homes completely
destroyed; large trees snapped or uprooted; light object become
projectiles; cars lifted off ground.
EF3 136-165
Severe damage. Entire stories of well-constructed houses destroyed;
severe damage to large buildings such as shopping malls; trains
overturned; trees debarked; heavy cars lifted off the ground and
thrown; structures with weak foundations blown away some distance.
EF4 166-200
Devastating damage. Well-constructed houses and whole frame
houses completely leveled; cars thrown and small projectiles
generated.
EF5 >200
Incredible damage. Strong frame houses leveled off foundations and
swept away; automobile-sized projectiles fly through the air in excess
of 300 feet.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϭ
The highest likelihood of tornadoes can be expected in the spring season, from March-May. The previous
chart shows 58 tornadoes during the spring season over the 1950-2018 time period.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϮ
According to the charts above, most of the tornadoes in Tarrant County are classified as weak on the
intensity scale and are rated as an EF0, but could escalate to an EF3 or potentially stronger.
Most tornadoes occur in the afternoon to evening hours of the day, the chart above reflects a high
amount of tornado occurences between the hours of 1200-2000 (12PM-8PM).
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϯ
The picture above illustrates tornado tracks between 1950-2018. The strongest tornadoes in Tarrant
County have been an EF3.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϰ
Between 2015 and 2018, there have been 7 recorded tornadoes in Tarrant County, according to the chart
above. According to the National Climatic Data Center, there has been over $1 million dollars of property
damage from tornadoes in Tarrant County, with zero crop damage reported.
Historical Events of Tornadoes since 2015
Column Definitions: 'Mag': Magnitude, 'Dth': Deaths, 'Inj': Injuries, 'PrD': Property Damage, 'CrD': Crop
Damage
Location County Date Time Mag Dth Inj PrD CrD
Hodge (non-
participant) Tarrant 11/05/2015 16:08 EF0 0 0 120.00K 0.00K
Keller Tarrant 11/17/2015 03:28 EF0 0 0 210.00K 0.00K
Benbrook Lake
(non-participant) Tarrant 03/08/2016 08:03 EF0 0 0 330.00K 0.00K
Hicks (non-
participant) Tarrant 03/23/2016 20:08 EF0 0 0 90.00K 0.00K
Mansfield Tarrant 01/15/2017 20:13 EF0 0 0 75.00K 0.00K
Hicks (non-
participant) Tarrant 03/29/2017 01:08 EF0 0 0 300.00K 0.00K
Fort Worth Blue
Mound Airport Tarrant 03/29/2017 01:10 EF0 0 0 100.00K 0.00K
Totals: 0 0 1.225M 0.00K
Source: National Centers for Environmental Information.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϱ
3.3.8 Wildfire
Wildfire, or wildland fire, is any fire occurring on grassland, forest, or prairie, regardless of ignition source,
damages, or benefits. Wildfires are fueled almost exclusively by natural vegetation. Interface or intermix
fires are urban/wildland fires in which vegetation and the built environment provide fuel. Firestorms are
events of such extreme intensity that effective suppression is virtually impossible. Firestorms occur during
extreme weather and generally burn until conditions change or the available fuel is exhausted.
Note: Though there have been numerous ignitions, Tarrant County does not classify wildfires as a
hazard until they are 25 acres or larger. This is the point at which additional outside help may need to be
called in through the use of mutual aid agreements.
For the purposes of this hazard analysis, wildfires are assessed under what is known as the wildland-urban
interface (WUI). The WUI is an area of development that is susceptible to wildfires due to the amount of
structures located in an area with vegetation that can act a fuel for a wildfire. The WUI creates an
environment in which fire can move readily between structural and vegetation fuels. The expansion of
these areas has increased the likelihood that wildfires will threaten structures and people.
Wildland Urban Interface (WUI)
Source: Texas Wildfire Risk.
Wildfires can cause significant damage to property and threatens the lives of people who are unable
to evacuate WUI areas. All improved property, critical facilities, and critical structures and
infrastructure located in these wildfire-prone areas are considered vulnerable and can be exposed
to this hazard. Jurisdictions that are not at risk to wildfires include ĞĚĨŽƌĚ͕ ůƵĚ DŽƵŶĚ͕Forest
Hill, >ĂŬĞ tŽƌƚŚ͕ the North Central Texas Council of Governments, Pantego, Saginaw, Watauga, and
Westworth Village ĚƵĞƚŽƚŚĞŝƌƵƌďĂŶŝnjĞĚůĂŶĚƐĐĂƉĞĂŶĚƋƵŝĐŬĨŝƌĞĚĞƉĂƌƚŵĞŶƚƌĞƐƉŽŶƐĞƚŝŵĞ͘
No Data
1-LT 1 hs/40 ac
2-1 hs/40 to 1 hs/20 ac
3-1 hs/20 to 1 hs/10 ac
4-1 hs/10 to 1 hs/5 ac
5-1 hs/5 to 1 hs/2 ac
6-1 hs/2 to 3 hs/ac
7-GT 3 hs/ac
*hs- house
*ac- acre
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϲ
Wildfire Threat
Source: Texas Wildfire Risk.
There were no reports of a wildfire event in Tarrant County from February 1, 2015 to November 1, 2017,
according to the National Climatic Data Center. Data from the Texas Forest Service ends at 2015.
No Data
1-Low
2
3-Moderate
4
5-High
6
7-Very High
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϳ
3.3.9 Winter Storms
Winter storms originate as mid-latitude depressions or cyclonic weather systems, sometimes following
the path of the jet stream. A winter storm or blizzard combines heavy snowfall, high winds, extreme cold,
and ice storms. Many winter depressions give rise to exceptionally heavy rain and widespread flooding
and conditions worsen if the precipitation falls in the form of snow. The winter storm season varies widely,
depending on latitude, altitude, and proximity to moderating influences. The time period of most winter
weather is expected to be during the winter season, between Nov ember and March. Winter storms affect
the entire planning area equally.
During periods of extreme cold and freezing temperatures, water pipes can freeze and crack, and ice can
build up on power lines, causing them to break under the weight or causing tree limbs to fall on the lines.
These events can disrupt electric service for long periods of time.
An economic impact may occur due to increased consumption of heating fuel, which can lead to energy
shortages and higher prices. Schools often close when severe winter weather is forecasted, and it
becomes a logistics burden for parents who then have to miss work or find alternative child care. House
fires and resulting deaths tend to occur more frequently from increased and improper use of alternate
heating sources. Fires during winter storms also present a greater danger because water supplies may
freeze and impede firefighting efforts.
Cold snaps in which temperatures fall below the freezing point of 32°F do happen on an annual basis in
the Tarrant County and are highlighted in the table below.
Dallas/Fort Worth Freeze Data and Cold Season Temperatures
Season
First Occurrence
Equal or Less Than:
Low for
Winter
(°F)
Last Occurrence
Equal or Less Than:
Number
of
Freezes 32°F 20°F 10°F 10°F 20°F 32°F
2017-
2018
December
07
January
01 - 13 - January
18
February
12 25
2016-
2017
December
08
December
18 - 14 - January
08
January
08 11
2015-
2016
November
22 - - 27 - - February
26 17
2014-
2015
November
12
January
08 - 16 - January
08
March
07 40
Source: National Weather Service- Dallas/Fort Worth- Freeze Data and Cold Season Temperatures.
The following article highlights the severe impacts of winter weather in North Central Texas and Tarrant
County. Though this article is from the 2013 storm, it describes what Tarrant County could experience
again.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϴ
National Weather Service: North Texas Snowfall Events
December 5-6, 2013
A winter storm affected much of North and Central Texas for an extended period from December 5th
through the 10th. A combination of freezing rain, sleet, and a little snow began falling during the day
on the 5th and continued through the morning hours of the 6th. As the ice and sleet settled on the
6th, a thick layer of ice paralyzed most of the area north of a line from Goldthwaite to Cleburne to
Ennis to Sulphur Springs. In this area, accumulations of sleet and ice measured up to 5" with the
highest amounts from Denton to Sherman to Bonham.
Temperatures remained below freezing until the 9th and 10th resulting in a prolonged winter event.
Most residents were forced to remain at home for several days. A new term, coined "cobblestone
ice," was used to describe the condition of the ice on the interstates and highways due to the
compaction of ice and sleet.
NBC 5 News captured "cobblestone ice" on North Texas roads.
South of this area, lighter amounts of icing occurred producing mainly icy bridges, overpasses, and
elevated surfaces. As a result of the ice storm, significant tree damage occurred with thousands of
tree branches falling under the weight of the ice. Power lines were also brought down, and at the
peak of the storm, 275,000 customers were without power in the North Texas region. Most schools,
especially in the hardest hit areas, were closed for several days. Some businesses were forced to close
for a day or two also. Hundreds of injuries were reported due to falls on the ice but exact numbers
were not available. Seven fatalities occurred during this event; 4 in vehicles, 2 from exposure, and 1
from a fall on the ice. Early estimates from the insurance council estimated $30 million in residential
insured loses. The estimate did not include damage to vehicles or roads. Many roads and bridges were
damaged from the ice and/or from attempts by Texas Department of Transportation to remove the
ice using plows and graders. Hundreds of people and semi-trucks were stranded for long periods on
many of the main highways and interstates including I-35 from Fort Worth to the Oklahoma border
and Interstate 20 from Fort Worth going west in Tarrant County. The clean-up from this event took
weeks and even a few months is some places.13
13 North Texas Snowfall Events 2013-1879, National Weather Service.
<https://www.weather.gov/fwd/snowevents>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϲϵ
Though there has not been a major winter event recorded since this 2013 example, a severe winter storm
happening in the next five years cannot be ruled out, as weather patterns have been evolving along with
the change in climate, mentioned earlier.
The following scale was used to determine the extent of winter conditions:
Historical Events of Winter Weather since 2015
Column Definitions: 'Dth': Deaths, 'Inj': Injuries, 'PrD': Property Damage, 'CrD': Crop Damage
Location Date Time Type Dth Inj PrD CrD
Tarrant (Zone) 02/28/2015 21:30
Winter
Weather 0 0 15.00K 0.00K
Tarrant (Zone) 03/04/2015 20:26
Winter
Weather 0 0 0.00K 0.00K
Tarrant (Zone) 03/05/2015 00:30
Winter
Weather 0 0 0.00K 0.00K
Totals: 0 0 15.00K 0.00K
Source: National Centers for Environmental Information.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϬ
Historical Events of Winter Storm since 2015
Column Definitions: 'Dth': Deaths, 'Inj': Injuries, 'PrD': Property Damage, 'CrD': Crop Damage
Location Date Time Type Dth Inj PrD CrD
Tarrant (Zone) 02/22/2015 18:30 Winter
Storm 0 0 25.00K 0.00K
Totals: 0 0 25.00K 0.00K
Source: National Centers for Environmental Information.
Historical Events of Sleet since 2015
Column Definitions: 'Dth': Deaths, 'Inj': Injuries, 'PrD': Property Damage, 'CrD': Crop Damage
Location Date Time Type Dth Inj PrD CrD
Tarrant (Zone) 03/04/2015 19:00 Sleet 0 0 0.00K 0.00K
Tarrant (Zone) 03/04/2015 20:00 Sleet 0 0 10.00K 0.00K
Totals: 0 0 10.00K 0.00K
Source: National Centers for Environmental Information.
In total, property damage from the various hazards within a winter storm totals $50,000 since 2015.
3.4 Technological Hazards
Some participating jurisdictions have chosen to analyze technological hazards that impact them.
Technological hazards are an increasing source of risk to people and their environment. This is an effect
of the globalization of production, an increase of industrialization and a certain level of risk related
to accidents connected with production, processes, transportation, and waste management. These
risks are associated with the release of substances in accident conditions or with the production of
such substances under certain conditions as fire. These substances could affect human health or
the environment by contamination and their effects on animals and plants.14 Examples of technological
hazards include hazardous material events, infectious disease outbreaks, national security hazards,
nuclear accidents, power failure, and telecommunication failure.
The jurisdictions that chose to profile technological hazards identified and described technological
hazards within their individual annex.
14 Technological Hazard. American Red Cross. 2017. <https://www.preparecenter.org/topics/technological-hazard>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϭ
3.5 Vulnerabilities
Vulnerabilities can be social, environmental, economic, or political in nature. These vulnerabilities in turn
have various impacts. We know that, by definition, disasters are capable of causing death and injury. We
also know that housing and schools may be destroyed. These particular losses may be considered to be
social impacts, as they affect the ability of individuals and families to function. With regard to negative
environmental impacts, if a community contains important ecological sites (e.g., the site of a unique flora
or fauna habitat), then these areas may be extremely vulnerable to almost any sort of disaster. There is
monetary loss, or negative economic impact, whenever buildings, non-structural property, or
infrastructure is damaged or destroyed. These losses can also result in loss of jobs, loss of economic
stability, and loss of services (e.g., power). The more vulnerable the community is to these types of losses,
the greater the economic vulnerability to a disaster. The ability of the community to influence policy
makers to reduce vulnerabilities is critical. A disaster entails political impacts. After a disaster has struck,
a community often turns to its politicians when looking for guidance. Vulnerabilities may be considered
in terms of the individual, the location, the capacity to respond, and the time of day, week, or year.
The definition of vulnerability is “the susceptibility of people, property, industry, resources, ecosystems,
or historic buildings and artifacts to the negative impact of a disaster.” The Tarrant County Hazard
Mitigation Planning Team (HMPT) conducted a risk assessment to determine vulnerabilities in their
jurisdictions. Vulnerabilities within each participating jurisdiction are specified in the individual annexes.
Below is an overview of vulnerabilities within Tarrant County, including national critical facilities, federally
protected species, historic properties, and local critical facilities and infrastructure.
3.5.1 National Critical Facilities and Infrastructure
A critical facilities and infrastructure provides services and functions essential to a community, especially
during and after a disaster. For a critical facility to function, building systems and equipment must remain
operational. Furthermore, it must be supplied with essential utilities (typically power, water, waste
disposal, and communications, but occasionally natural gas and steam).
According to the Department of Homeland Security, there are 16 critical infrastructure sectors whose
assets, systems, and networks, whether physical or virtual, are considered so vital to the United States
that their incapacitation or destruction would have a debilitating effect on security, national economic
security, national public health or safety, or any combination thereof.
x Chemical Sector
x Commercial Facilities Sector
x Communication Sector
x Critical Manufacturing Sector
x Dams Sector
x Defense Industrial Base Sector
x Emergency Services Sector
x Energy Sector
x Financial Services Sector
x Food and Agriculture Sector
x Government Facilities Sector
x Healthcare and Public Health Sector
x Information Technology Sector
x Nuclear Reactors, Materials, and Waste
Sector
x Transportation Sector
x Water and Wastewater Systems Sector
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϮ
Critical facilities and infrastructure on a national scale impact the participating jurisdictions in Tarrant
County and the entire United States. While many of these facilities and infrastructure are documented in
the regional Threat and Hazard Identification and Risk Assessment (THIRA), the following sites are unique
national critical facilities located in a few of the participating jurisdictions.
EPA National Priorities List of Superfund Sites
The Environmental Protection Agency’s (EPA’s) Superfund program is responsible for cleaning up some of
the nation’s most contaminated land and responding to environmental emergencies, oil spills, and natural
disasters. To protect public health and the environment, the Superfund program focuses on making a
visible and lasting difference in communities, ensuring that people can live and work in healthy, vibrant
places. The EPA National Priorities List (NPL) is the list of sites of national priority among the known
releases or threatened releases of hazardous substances, pollutants, or contaminants throughout the
United States and its territories. The NPL is intended primarily to guide the EPA in determining which sites
warrant further investigation.15 According to the list, there are two superfund sites in Tarrant County.
They are identified by yellow diamonds in the map below:
The following pictures reflect the details of the two superfund sites in Tarrant County.
15 Superfund: National Priority List (NPL). United States Environmental Protection Agency.
<https://www.epa.gov/superfund/superfund-national-priorities-list-npl>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϯ
1. Sandy Beach Road Ground Water Plume, Azle, Texas
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϰ
2. Air Force Plant #4 (General Dynamics), Fort Worth, Texas
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϱ
3.5.2 Natural Environment- Federally Protected Species
Texas Parks & Wildlife established a list of federally and state protected species within Tarrant County. All
species on the county list are tracked in the Texas Natural Diversity Database (TXNDD). Species include
birds, fishes, mammals, mollusks, and reptiles.16 This list is provided in Appendix B.
Currently, there are no regional plans related to the future of North Texas’ natural assets of habitat, plants,
animals, open space areas and corridors, tree canopy or carbon footprint. This includes Tarrant County.
There are studies of particular topics that have been conducted for other purposes. For example, the
Environmental Impact Statement of an individual project considers the project’s impact on endangered
species. Also, there are studies underway on particular topics but for smaller areas within the North Texas
region.17
Under Section 12.0011 of the Texas Parks and Wildlife Code, Texas Parks and Wildlife Department (TPWD)
is charged with "providing recommendations that will protect fish and wildlife resources to local, state,
and federal agencies that approve, permit, license, or construct developmental projects" and "providing
information on fish and wildlife resources to any local, state, and federal agencies or private organizations
that make decisions affecting those resources." Project types reviewed by TPWD include reservoirs,
highway projects, pipelines, urban infrastructure, utility construction, renewable energy, and residential
and commercial construction, as well as many others.
3.5.3 Historic Buildings and Districts
Historic landmarks and districts are important to consider when evaluating vulnerabilities to hazards.
What is historic, and worth saving, varies with the beholder. “Historic” applies to a building that’s part of
a community’s tangible past. Creating and expanding historic districts can increase property values,
strengthen neighborhoods, provide an incentive for rehabilitating historic buildings, and promote a sense
of neighborhood and community pride.
According to the Texas Historic Sites Atlas, Tarrant County has 124 cemeteries, 32 museums, and 392
historical markers listed in the atlas. There are also 6 state antiquities landmarks, 115 national register
properties, and 6 courthouses on the list.18
There is a list of historic sites in Tarrant County from the National Register of Historic Places located in
Appendix B.
3.5.4 Local Critical Facilities and Infrastructure
This hazard mitigation action plan (HazMAP) provides enough information regarding critical facilities to
enable the jurisdiction to identify and prioritize appropriate mitigation actions. However, some
information may be deemed highly sensitive and should not be made available to the public. Information
jurisdictions consider sensitive should be treated as an addendum to the mitigation plan so that it is still
a part of the plan, but access can be controlled.
16 Texas Parks and Wildlife Department, Wildlife Division, Diversity and Habitat Assessment Programs. TPWD
County Lists of Protected Species and Species of Greatest Conservation Need. Tarrant County 30 December 2016.
17 North Texas to 2030: Extending the Trends. Vision North Texas.
18 Texas Historical Sites Atlas. 2015. Texas Historical Commission. <https://atlas.thc.state.tx.us/>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϲ
Jurisdictional annexes provide this information and/or instructions regarding how this information can be
obtained.
3.6 Extent
The scale used to determine the maximum probably extent of each hazard is described below. The extent
for each natural hazard, defined as the maximum strength of the hazard, in the jurisdictions is
documented within the individual annexes.
Extent Scale
Minor Medium Major
Drought PDSI -1.99 to 1.99+ PDSI -2.00 to -2.99 PDSI -3.00 to -5.00
Earthquake Mercalli Scale: I-V
Richter Scale: 0-4.8
Mercalli Scale: VI-VII
Richter Scale: 4.9-6.1
Mercalli Scale: VIII-XII
Richter Scale: 6.2-8.1+
Expansive
Soils
EI Expansion Potential: 21-
50 (Low)
EI Expansion Potential: 0-21
(Very Low)
EI Expansion Potential:
51-90 (Medium)
EI Expansion Potential:
91-130 (High)
EI Expansion Potential:
>130 (Very High)
Extreme Heat Heat Index 80F-105F Heat Index 105F-129F Heat Index >130F
Flooding Outside of 100yr and 500yr
Flood Zones, Zone A, AE, X
500yr Flood Zone, Zone
X
100yr Flood Zone, Zone
AE, A
Thunderstorm
Hail: H0-H4, 5-40mm
Wind Force: 0-3
Knots: <1-10
LAL: 1-2
Hail: H5-H6, 30-60mm
Wind Force: 4-6
Knots: 11-27
LAL: 3-4
Hail: H7-H10, 50-
>100mm
Wind Force: 8-12
Knots: 28-64+
LAL: 5-6
Tornado EF0 EF1-EF2 EF3-EF5
Wildfire KBDI 0-200 KBDI 200-400 KBDI 600-800
Winter Storms
Temperatures 40F to 35F
Wind chill 36F to 17F
Temperatures 30F to
20F
Wind chill 25F to -4F
Temperatures 15F to -
45F
Wind chill 7F to -98F
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϳ
Section 4: Mitigation Strategy
Requirement
§201.6(c)(3)
[The plan shall include the following:] A mitigation strategy that provides the
jurisdiction’s blueprint for reducing the potential losses identified in the risk
assessment, based on existing authorities, policies, programs, and resources,
and its ability to expand on and improve these existing tools.
§201.6(c)(3)(i)[The hazard mitigation strategy shall include a] description of mitigation goals
to reduce or avoid long-term vulnerabilities to the identified hazards.
§201.6(c)(3)(iii)[The hazard mitigation strategy shall include a] section that identifies and
analyzes a comprehensive range of specific mitigation actions and projects
being considered to reduce the effects of each hazard, with particular emphasis
on new and existing buildings and infrastructure. All plans approved by FEMA
[Federal Emergency Management Agency] after October 1, 2008, must also
address the jurisdiction’s participation in the NFIP [National Flood Insurance
Program], and continued compliance with NFIP requirements, as appropriate.
§201.6(c)(3)(iv)[The hazard mitigation strategy shall include an] action plan, describing how the
action identified in paragraph (c)(3)(ii) of this section will be prioritized,
implemented, and administered by the local jurisdiction. Prioritization shall
include a special emphasis on the extent to which benefits are maximized
according to a cost benefit review of the proposed projects and their associated
costs.
§201.6(c)(4)(ii)For multi-jurisdictional plans, there must be identifiable action items specific to
the jurisdiction requesting FEMA approval or credit of the plan.
[The plan shall include a] process by which local governments incorporate the
requirements of the mitigation plan into other planning mechanisms such as
comprehensive or capital improvements, when appropriate.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϴ
4.1 Mitigation Strategy
The mitigation strategy serves as the long-term blueprint for reducing the potential losses identified in
the risk assessment. The Stafford Act directs hazard mitigation plans to describe hazard mitigation actions
and establish a strategy to implement those actions. Therefore, all other requirements for a hazard
mitigation plan lead to and support the mitigation strategy.
Individual jurisdictions adopted specific goals and strategies based on the needs of the jurisdiction. The
following mitigation action items have been ranked by the Tarrant County Hazard Mitigation Planning
Team (HMPT). The HMPT went through a ranking process to determine which strategies they would
prioritize for completion. To identify priorities, jurisdictions considered the scope and impact of action
and completed a cost-benefit analysis for each action. Each participating jurisdiction recommended
strategies that would benefit either the jurisdiction or the county as a whole.
All project cost estimations are based on agency expertise by those submitting mitigation actions as well
as previous project costs; however, many projects provided have not yet undergone the official benefit-
cost analysis provided by FEMA. In these cases, jurisdictions derived the benefit cost per project based on
a study conducted by the National Institute of Building Science. This study estimates that past 23 years of
federally funded natural hazard mitigation has prevented approximately one million nonfatal injuries, 600
deaths, and 4,000 cases of post-traumatic stress disorder (PTSD), a total cost savings of $68 billion. The
key findings of the report included that $1 spent on mitigation saves society an average of $6, with positive
benefit-cost ratios for all hazard types studied.19 Therefore, to reflect the benefits of future projects, each
estimated project was multiplied by 6 to represent the benefit of each mitigation strategy. Utilizing this
information, in addition to their jurisdiction’s priorities, jurisdictions ranked their mitigation strategies and
submitted them to the HMPT.
4.2 Funding Priorities
As necessary, Tarrant County and participating jurisdictions will seek outside funding sources to
implement mitigation projects in both the pre-disaster and post-disaster environments. When applicable,
potential funding sources have been identified for proposed actions listed in the mitigation strategies.
Funding priority will go toward action items with the high positive impact on community resilience as
measured by the action’s scope and cost-benefit analysis.
4.3 Mitigation Goals
The Tarrant County Hazard Mitigation Planning Team reviewed the previous Tarrant County mitigation
goals and unanimously agreed to forego these goals and adopt the following hazard mitigation goals:
“Our goals are to protect life and reduce bodily harm from natural hazards, and to lessen the impacts of
natural hazards on property and the community through hazard mitigation.”
19 Multihazard Mitigation Council (2017) Natural Hazard Mitigation Saves 2017 Interim Report: An Independent
Study. Principal Investigator Porter, K.; Co-Principal Investigators Scawthorn, C.; Dash, N.; Santos, J.; Investigators:
Eguchi, M., Ghosh., S., Huyck, C., Isteita, M., Mickey, K., Rashed, T.;P. Schneider, Director, MMC. National Institute
of Building Sciences, Washington.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϳϵ
4.4 Action Items
A list of action items was identified by each jurisdictional Local Planning Team (LPT) and is located in the
jurisdiction’s annex. Priority will go towards projects with the highest positive impact on community
resilience, including life safety and property protection. Previous action items are also recorded in these
annexes.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϬ
Section 5: Jurisdictional Annexes
Section 5 contains the individual jurisdictional annexes. The annexes were developed by each individual
jurisdiction in order to provide a greater level of detail specific to the jurisdiction. Each annex contains
five chapters.
1.Chapter 1 provides a brief introduction to the jurisdiction and contents of the annex.
2.Chapter 2 covers the planning process and those involved. Elements included in this chapter
are the plan development and adoption process and the organization of the planning effort,
including Local Planning Team (LPT) members. This fulfills requirements §201.6(c)(1)),
§201.6(b)(2)), §201.6(b)(1)), §201.6(b)(3)), §201.6(c)(4)(iii)), and §201.6(c)(4)(i).
3.Chapter 3 provides the hazard identification and risk assessment. The assessment includes:
the geographic area effected; future probability of occurrence; maximum probable extent;
and vulnerability narratives, which identifies points of vulnerability in each jurisdiction for
each hazard. Additionally, chapter three includes the National Flood Insurance Program (NFIP)
compliance information. This fulfills requirements §201.6(c)(2)(i)), §201.6(c)(2)(ii)),
§201.6(c)(2)(ii)(A)), §201.6(c)(2)(ii)(B)), §201.6(c)(2)(ii)(C)), and §201.6(c)(2)(iii).
4.Chapter 4 provides a summary of jurisdictional capabilities. Elements in this chapter include:
legal and regulatory capabilities; administrative and technical capabilities; fiscal capabilities;
and implementation capabilities, which fulfill requirement §201.6(c)(3).
5.Chapter 5 provides the jurisdictional mitigation strategies and action items. The elements
included are mitigation goals and the action items associated with those goals, which fulfill
requirements §201.6(c)(3)(ii)), §201.6(c)(3)(i)), §201.6(c)(3)(iv)), and §201.6(c)(3)(iii).
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϭ
Jurisdictional annexes start on the following pages:
A-1 City of Arlington
B-1 City of Azle
C-1 City of Bedford
D-1 City of Blue Mound
E-1 City of Colleyville
F-1 City of Crowley
G-1 City of Dalworthington Gardens*
H-1 Town of Edgecliff Village*
I-1 City of Euless
J-1 City of Everman
K-1 City of Forest Hill
L-1 City of Fort Worth
M-1 City of Grapevine
N-1 City of Haltom City
O-1 City of Haslet
P-1 City of Hurst
Q-1 City of Keller
R-1 City of Kennedale
S-1 City of Lake Worth
T-1 Town of Lakeside
U-1 City of Mansfield*
V-1 North Central Texas Council of Governments
W-1 City of North Richland Hills
X-1 Town of Pantego*
Y-1 City of Richland Hills
Z-1 City of River Oaks*
AA-1 City of Saginaw
BB-1 City of Southlake
CC-1 Unincorporated Tarrant County
DD-1 University of North Texas Health and Science Center*
EE-1 City of Watauga
FF-1 Town of Westlake
GG-1 City of Westworth Village
*Jurisdictions that did not participate in the 2015 Tarrant County HazMAP.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϮ
ϮϬϮϬ
Town of Westlake
JURISDICTIONAL ANNEX WITHIN THE TARRANT COUNTY
HAZARD MITIGATION ACTION PLAN
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϭ
This page intentionally left blank.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮ
Contents
Chapter 1: Introduction ............................................................................................................................ - &&Ͳ5 -
1.1 Planning Process Point of Contact .................................................................................................. - &&Ͳ5 -
1.2 Annex Organization ......................................................................................................................... - &&Ͳ5 -
1.3 Hazard Mitigation Action Plan (HazMAP) Adoption ....................................................................... - &&Ͳ5 -
1.4 Supporting Maps ............................................................................................................................. - &&Ͳ5 -
Chapter 2: Planning Process ................................................................................................................... - &&Ͳ11 -
2.1 Development and Adoption Process ............................................................................................ - &&Ͳ11 -
2.2 Organizing the Planning Effort ...................................................................................................... - &&Ͳ11 -
Chapter 3: Hazard Identification and Risk Assessment .......................................................................... - &&Ͳ13 -
3.1 Changes in Development since 2015 ............................................................................................ - &&Ͳ13 -
3.2 Community Profile ........................................................................................................................ - &&Ͳ13 -
3.3 Natural Hazard Profiles ................................................................................................................. - &&Ͳ16 -
3.4 Historical Events ............................................................................................................................ - &&Ͳ32 -
3.5 Overall Vulnerability ..................................................................................................................... - &&Ͳ32 -
Chapter 4: Capabilities Assessment ........................................................................................................ - &&Ͳ33 -
Chapter 5: Mitigation Strategy ............................................................................................................... - &&Ͳ37 -
5.1 Mitigation Goals ............................................................................................................................ - &&Ͳ37 -
5.2 2015 Action Items ......................................................................................................................... - &&Ͳ37 -
5.3 New Action Items .......................................................................................................................... - &&Ͳ57 -
5.4 Plan Incorporation into Existing Planning Mechanisms ................................................................ - &&Ͳ64 -
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϯ
This page intentionally left blank.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϰ
Chapter 1: Introduction
1.1 Planning Process Point of Contact
The point of contact during the Tarrant County Hazard Mitigation Action Plan (HazMAP) planning process
for the Town of Westlake was the Emergency Management Coordinator.
1.2 Annex Organization
This annex has five chapters that satisfy mitigation requirements in 44 CFR Part 201:
Chapter 1: Introduction
Chapter 2: Planning Process
Chapter 3: Hazard Identification and Risk Assessment
Chapter 4: Capabilities Assessment
Chapter 5: Mitigation Strategy
The information provided in this annex is for the Town of Westlake alone. All pertinent information that
is not identified in this annex is identified in the other sections of this HazMAP or within the respective
appendices.
1.3 Hazard Mitigation Action Plan (HazMAP) Adoption
Once the Tarrant County HazMAP has received the designation “Approved Pending Local Adoption” from
the Federal Emergency Management Agency (FEMA), the Town of Westlake will take the HazMAP to Town
Council for final public comment and local adoption. A copy of the resolution will be inserted into the
HazMAP and held on file at the North Central Texas Council of Governments (NCTCOG).
1.4 Supporting Maps
The following maps provide an overview of the Town of Westlake:
x Development Activities Map
x Land Use Plan Map
x Parks and Open Space Plan Map
x Residential Subdivisions Map
x Planned Developments Map
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&ͲϭϬ
Chapter 2: Planning Process
(In compliance with 201.6(c)(1))
2.1 Development and Adoption Process
To apply for federal aid for technical assistance and post-disaster funding, local jurisdictions must comply
with Part 201.3 of the Disaster Mitigation Act of 2000 (DMA 2000) implemented in the Federal Code of
Regulations 44 CRF Part 201.6. While the Town of Westlake has historically implemented measures to
reduce vulnerability to some hazards, passage of DMA 2000 helped town officials recognize the benefits
of a long-term approach to hazard mitigation. This approach is achieved by a gradual decrease of hazard-
associated impacts through the implementation of a hazard mitigation action plan (HazMAP). The town’s
involvement in the Tarrant County HazMAP represents the collective efforts of the Hazard Mitigation
Planning Team (HMPT) members, all participating Local Planning Team (LPT) members, the public, and
stakeholders.
The town developed this annex in accordance with Part 201.6(c)(5) of DMA 2000. This HazMAP and annex
identifies hazards and mechanisms to minimize damages associated with these hazards.
2.2 Organizing the Planning Effort
A comprehensive approach was taken in developing the HazMAP. An open involvement process was
established for the public and all stakeholders, which provided an opportunity for everyone to be involved
in the planning process and make their views known. The public meeting was advertised with notices in
the local newsletter and on social media.
Two teams worked simultaneously on this Tarrant County HazMAP:
1.Hazard Mitigation Planning Team (HMPT): This team consisted of points of contact from each
participating jurisdiction. The HMPT met to discuss county-wide topics, including hazards and
mitigation strategies. The points of contact were the leads of their Local Planning Team (LPT).
2.Local Planning Team (LPT): Each jurisdiction had a LPT that consisted of the Emergency
Management Coordinator for that jurisdiction as well as designated representatives from
within the jurisdiction. This team met to assess capabilities, hazards, and mitigation strategies
within the jurisdiction.
2.2.1 Local Planning Team (LPT)
This annex within the Tarrant County HazMAP was developed by the Town of Westlake’s Local Planning
Team (LPT), with support from the North Central Texas Council of Governments (NCTCOG). The efforts of
the LPT were led by the town’s Emergency Management Coordinator.
The LPT was assembled in 2017 with representatives from the Town of Westlake. The town acted as the
plan development consultant, providing hazard mitigation planning services.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϭϭ
Town of Westlake Local Planning Team (LPT) Members for the ϮϬϮϬ,ĂnjDW
Jurisdiction Agency/Organization Position Role in LPT
Town of
Westlake
Fire/Emergency Medical
Services (EMS) Department
Emergency
Management
Coordinator
General oversight, hazard
identification, and plan
development
Town of
Westlake Fire/EMS Department Fire Chief Hazard identification and
plan development
Town of
Westlake Fire/EMS Department Deputy Fire Chief Hazard identification and
plan development
Town of
Westlake Fire/EMS Department
Assistant Emergency
Management
Coordinator
Hazard identification and
plan development
Town of
Westlake Public Works Department Public Works Director Hazard identification and
plan development
Town of
Westlake Economic Development Assistant to Town
Manager
Hazard identification and
plan development
In addition, NCTCOG’s Emergency Preparedness Department participated in the following activities
associated with development, approval, and adoption of the plan:
1.Prepared, based on community input and LPT direction, the first draft of the plan and
provided technical writing assistance for review, editing, and formatting.
2.Submitted proposed plan to the Texas Division of Emergency Management (TDEM) and the
Federal Emergency Management Agency (FEMA) for review and approval and completed
any edits requested by these organizations.
3.Coordinated plan adoption processes with the town, TDEM, and FEMA.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϭϮ
Chapter 3: Hazard Identification and Risk
Assessment
(In compliance with 201.6(c)(2)(i), 201.6(c)(2)(ii), 201.6(c)(2)(ii)(A), 201.6(c)(2)(ii)(B), 201.6(c)(2)(ii)(C),
201.6(c)(2)(iii), and 201.6(c)(3)(ii))
The following information serves to assist the town in determining and prioritizing appropriate mitigation
action items to reduce losses from identified hazards.
3.1 Changes in Development since 2015
(In compliance with 201.6(d)(3))
Increasing Vulnerability
New development in hazard-prone areas:
There has been no recorded change since 2015.
Decreasing Vulnerability
Mitigation actions implemented to reduce risk or adopted codes to protect future development:
Adopted the 2015 International Building and Fire Codes in January, 2017. A full list of completed
mitigation actions items are described in Chapter 5 of this annex.
3.2 Community Profile
The following tables reflect the community profile, vulnerable facilities in the jurisdiction, and the critical
facilities and infrastructure that are exposed to the identified hazards and have the potential to be
impacted. This information was gathered from the United States Census and from the Town of Westlake.
Community Profile from US Census Bureau Quick Facts (Source-www.census.gov)
Population Estimates (V2016) 1,483
Persons under 5 years (%) Data unavailable
Persons 65 years and over (%) Data unavailable
Language other than English spoken at home (%) Data unavailable
With a disability, under age 65 (%) Data unavailable
Persons without health insurance, under age 65 (%) 1.1
Persons in poverty (%) 5.6
Median household income $250,000+
Households, 2012-2016 382
Median value of owner-occupied housing units, 2012-2016 $1,604,900
The critical and vulnerable facilities listed below are in the hazard area for all or some of the hazards
identified in the Town of Westlake.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϭϯ
Town of Westlake Critical and Vulnerable Facility/Asset Inventory
Facility/Asset Name
or Description and
Address
Type of Asset Capacity Square
Feet
Structure
Value
Content
Value
Solana Business
Complex
Government /
Commercial
1,100
people 2,128,001 $259,959,403 $129,979,500
Westlake Water
Pump /Storage
Station
Utility 2 people N/A $4,000,000 $4,800,000
Fidelity Investments Commercial 4,500
people 3,054,288 $141,135,543 $70,567,500
Deloitte University Commercial 3,000
people 765,000 $139,130,626 $68,000,000
Westlake Fire Station
(Temporary
Structures)
Fire Rescue 20
people 4,500 $300,000 $4,500,000
Westlake Academy
Primary /
Secondary
Charter School
660
people 55,704 $6,662,849 $3,386,520
Additional critical facilities and assets are shown on the following map. Capacity, square feet, structure
value, and content value were not available for most locations on this map.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϭϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϭϱ
3.3 Natural Hazard Profiles
The Town of Westlake’s Local Planning Team (LPT) ranked potential hazards in order of risk, with 1 being
the highest. Risk, for the purposes of hazard mitigation planning, is the potential for damage or loss
created by the interaction of natural hazards with community assets. If a natural hazard does not and
could not impact the Town of Westlake in any way, not applicable (N/A) is used as its rank and its
reasoning is noted in the hazard profile section of this chapter.
Rank of Risk Natural Hazard
1 Thunderstorm (includes hail, wind, lightning)
2 Tornado
3 Wildfire
4 Winter Storms
5 Flooding
6 Extreme Heat
7 Drought
8 Earthquake
9 Expansive Soils
The following terms are used to describe the geographic area affected, probability of future occurrence,
and the maximum probable extent.
Geographic Area Affected
Negligible: Less than 10 percent of planning area.
Limited: 10 to 25 percent of planning area.
Significant: 25 to 75 percent of planning area.
Extensive: 75 to 100 percent of planning area.
o Planning area refers to the entire Town of Westlake.
Probability of Future Occurrence
Unlikely: Event possible in next 10 years.
Occasional: Event possible in next 5 years.
Likely: Event probable in next 3 years.
Highly Likely: Event probable in next year.
Maximum Probable Extent (Magnitude/Strength of Hazard using the following extent scale)
Minor: Limited classification on scientific scale, slow speed of onset or short duration of event.
Medium: Moderate classification on scientific scale, moderate speed of onset or moderate
duration of event.
Major: Severe classification on scientific scale, fast speed of/immediate onset or long duration
of event.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϭϲ
Extent Scale
Minor Medium Major
Drought PDSI -1.99 to 1.99+ PDSI -2.00 to -2.99 PDSI -3.00 to -5.00
Earthquake Mercalli Scale: I-V
Richter Scale: 0-4.8
Mercalli Scale: VI-VII
Richter Scale: 4.9-6.1
Mercalli Scale: VIII-XII
Richter Scale: 6.2-8.1+
Expansive
Soils
EI Expansion Potential: 21-
50 (Low)
EI Expansion Potential: 0-21
(Very Low)
EI Expansion Potential:
51-90 (Medium)
EI Expansion Potential:
91-130 (High)
EI Expansion Potential:
>130 (Very High)
Extreme Heat Heat Index 80F-105F Heat Index 105F-129F Heat Index >130F
Flooding Outside of 100yr and 500yr
Flood Zones, Zone A, AE, X
500yr Flood Zone, Zone
X
100yr Flood Zone, Zone
AE, A
Thunderstorm
Hail: H0-H4, 5-40mm
Wind Force: 0-3
Knots: <1-10
LAL: 1-2
Hail: H5-H6, 30-60mm
Wind Force: 4-6
Knots: 11-27
LAL: 3-4
Hail: H7-H10, 50-
>100mm
Wind Force: 8-12
Knots: 28-64+
LAL: 5-6
Tornado EF0 EF1-EF2 EF3-EF5
Wildfire KBDI 0-200 KBDI 200-400 KBDI 600-800
Winter Storms
Temperatures 40F to 35F
Wind chill 36F to 17F
Temperatures 30F to
20F
Wind chill 25F to -4F
Temperatures 15F to -
45F
Wind chill 7F to -98F
The full description of each hazard identified is provided in Section 3 of this HazMAP.
Location: Drought, earthquakes, expansive soils, extreme heat, thunderstorms, tornadoes, and winter
storms do not have geographic boundaries and can impact the entire county equally, which includes all
participating jurisdictions. Wildfires can be expected to threaten rural and urban jurisdictions with
undeveloped land. Flooding is a severe threat to jurisdictions containing 100-year floodplains or bodies of
water.
The following hazards are listed in alphabetical order and describe the location and extent of each hazard,
details of previous occurrences, probability data on future events, and vulnerability to each hazard.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϭϳ
3.3.1 Drought
Hazard Profile: Drought
Category Response
Risk Ranking 7
Geographic Area Affected Negligible
Probability of Future Occurrence Occasional
Maximum Probable Extent Minor
Potential Impact Property damage
Loss of water supply
Increases grassfire potential and intensity
Negative impact on citizens, to include water
restrictions and lack of drinkable water supply
Vulnerabilities All populations, economy, structures, improved
property, critical facilities and infrastructure, and
natural environments are exposed to this hazard.
Jurisdiction’s ground-water supply: City of Fort Worth.
Any zoning districts which allow for agricultural uses such as commercial stables and barns, farms, and
animal lots, which could be impacted by drought: No.
Describe any water restrictions used in your jurisdiction: There is voluntary compliance in conjunction
with the “Eye on Water” software.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϭϴ
3.3.2 Earthquake
Hazard Profile: Earthquake
Category Response
Risk Ranking 8
Geographic Area Affected Negligible
Probability of Future Occurrence Unlikely
Maximum Probable Extent Minor
Potential Impact Injury or death
Property and infrastructure damage
Water contamination or loss via broken pipes
Transportation and communication disruption or
damage
Increase in traffic accidents
Building collapse
Natural gas leak
Misplaced residents
Power outages
Natural environments damage, to include
protected species and critical habitats
Vulnerabilities All populations, economy, structures, improved
property, critical facilities and infrastructure, and
natural environments are exposed to this hazard,
though impacts are undetermined due the lack of
historical data.
Past damage done to jurisdictional roads and critical infrastructure due to earthquakes, including where
the damage occurred and how much it cost to fix: No prior earthquakes reported.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϭϵ
3.3.3 Expansive Soils
Hazard Profile: Expansive Soils
Category Response
Risk Ranking 9
Geographic Area Affected Negligible
Probability of Future Occurrence Unlikely
Maximum Probable Extent Minor
Potential Impact Property damage due to foundation damage
Water contamination or loss via broken pipes
Building and infrastructure damage
Road damage
Transportation delays due to road condition
Damage to utility lines
Vulnerabilities Because of the manner in which data for
expansive soils is collected, the amount of
damages in the town was unavailable. Expansive
soils are a major consideration to all existing and
future structures.
Past damage done to jurisdictional roads and critical infrastructure due to expansive soils, including in
what part of your jurisdiction the damage occurred: No historical data was found of any damage to
critical infrastructure or roads due to expansive soils.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϬ
3.3.4. Extreme Heat
Hazard Profile: Extreme Heat
Category Response
Risk Ranking 6
Geographic Area Affected Extensive
Probability of Future Occurrence Highly Likely
Maximum Probable Extent Minor
Potential Impact Heatstroke or death. People should stay indoors
to prevent heatstroke; elderly people who cannot
afford air conditioning are at greatest risk
Property damage
Loss of water supply
Increases grassfire potential and intensity
Impact on logistics
Power outages
Road buckling
Disruption in critical infrastructure operations
Vehicle engine failure
Vulnerabilities All populations, economy, structures, improved
property, critical facilities and infrastructure, and
natural environments are exposed to this hazard.
Most vulnerable populations to extreme heat in your jurisdiction and their location within your
jurisdiction: Westlake is an affluent community, and does not have resident populations who are
vulnerable to extreme heat. The vulnerable populations would only include daytime outdoor laborers (e.g.
construction and landscape laborers).
Are there cases of extreme heat exposure resulting from special events held in your jurisdiction? There
have been few special events in Westlake and rare incidents of heat exposure.
Have any critical facilities in your jurisdiction experienced any impacts from extreme heat (e.g., power
failure due to heat)? No.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϭ
3.3.5 Flooding
Hazard Profile: Flooding
Category Response
Risk Ranking 5
Geographic Area Affected Negligible
Probability of Future Occurrence Unlikely
Maximum Probable Extent Minor
Potential Impact Loss of electricity
Loss of, or contamination of, water supply
Loss of property
Structure and infrastructure damage – flooded
structures and eroded roads
Misplaced residents
Snakes migrate and mosquitoes increase
Fire – as a result of loss of water supply
Debris in transportation paths
Emergency response delays
Disruption of traffic can lead to impacts to the
economy
Natural environments damage, to include
protected species and critical habitats
Vulnerabilities Based on historical data, flooding has caused zero
injuries and fatalities per year and is expected to
have the same results in the future. All
populations, economy, structures, improved
property, critical facilities and infrastructure, and
natural environments are exposed to this hazard.
Past damage done to jurisdictional roads and critical infrastructure due to flooding, including where in
your jurisdiction the damage occurred: No damage has been reported since 2015.
Does your jurisdiction require a permit for foundation repairs? If so, approximately how much money
has been spent by citizens to repair properties damaged by flooding? Yes, though there is no historical
data indicating this expense.
Intersections or traffic routes impacted by flooding: Roanoke Road at Marshall Branch, J.T. Ottinger Road
at Marshall Branch, and Dove Road at Kirkwood Branch and Higgins Branch. See low water crossings
below. These roads have the potential to flood.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϮ
Names of any creeks or rivers that flood: Marshall Branch, Higgins Branch, and Kirkwood Branch.
Low Water Crossings: A low water crossing provides a type of bridge when water flow is low. Under high-
flow conditions, water runs over the roadway and precludes vehicular and pedestrian traffic. These
crossings can be dangerous when flooded. Crossings are identified with a yellow dot.
Road Flooding Source Low Water Crossing Type
2200 Highway 377 Marshall Branch Vented Ford
2000 Highway 377 Marshall Branch Vented Ford
1800 Highway 377 Marshall Branch Vented Ford
2400 Roanoke Road Marshall Branch Vented Ford
3600 Highway 170 Marshall Branch Vented Ford
2200 Roanoke Road Marshall Branch Vented Ford
2000 Roanoke Road Marshall Branch Vented Ford
1800 Roanoke Road Marshall Branch Vented Ford
3700 Thornton Drive Marshall Branch Non-vented Ford
3200 J. T. Ottinger Road Marshall Branch Vented Ford
3100 J. T. Ottinger Road Marshall Branch Vented Ford
2300 J. T. Ottinger Road Marshall Branch Vented Ford
2800 Highway 114 Marshall Branch Bridge
2900 Dove Road Marshall Branch Vented Ford
2400 Dove Road Marshall Branch Vented Ford
2400 King Fisher Drive Marshall Branch Bridge
2100 Highway 114 Marshall Branch Vented Ford
2200 Capital Parkway Marshall Branch Vented Ford
2200 Destiny Way Marshall Branch Vented Ford
1300 Davis Boulevard Marshall Branch Vented Ford
1300 Post Oak Place Marshall Branch Bridge
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϯ
Road Flooding Source Low Water Crossing Type
1800 Placid Oaks Place Marshall Branch Vented Ford
1500 Meandering Drive Marshall Branch Vented Ford
1800 Lakeshore Drive Marshall Branch Bridge
1800 Dove Road Marshall Branch Vented Ford
1700 Dove Road Marshall Branch Vented Ford
1400 Solana Boulevard Kirkwood Branch Vented Ford
2000 Sam School Road Kirkwood Branch Vented Ford
1900 Sam School Road Kirkwood Branch Vented Ford
1400 Dove Road Higgins Branch Vented Ford
2000 Highway 114 Kirkwood Branch Vented Ford
Low Water Crossing Types Defined:
Bridges are open-bottom structures with elevated decks. They may be designed with one or several
piers. Low water bridges generally have greater capacity and are able to pass higher flows underneath
the driving surface than most vented and unvented fords.
Vented fords have a driving surface elevated some distance above the streambed with culverts
(vents) that enable low flows to pass beneath the roadbed. The vents can be one or more pipes, box
culverts, or open-bottom arches. In streams carrying large amounts of debris, the driving surface over
the vent may be removable, permitting debris to be cleared after a large flow event.
National Flood Insurance Program Compliance
Participation in the National Flood Insurance Program (NFIP) is based on a voluntary agreement between
a community and the Federal Emergency Management Agency (FEMA). For communities that adopt a
floodplain management ordinance to reduce flood risks to new construction, federally backed flood
insurance is made available to property owners in the community. Compliance with the NFIP, however,
extends beyond mere participation in the program. The three basic components of the NFIP include: 1)
floodplain identification and mapping risk, 2) responsible floodplain management, and 3) flood insurance.
The Town of Westlake is a participant in the NFIP and provides details about the community and their
participation below. The following information was requested:
CID 480614#
Community Name Town of Westlake
Counties Tarrant and Denton Counties
Initial FHBM Identified 12/10/76
Initial FIRM Identified 6/02/93
Current Effective Map Date 4/18/11
Reg-Emer Date 6/2/93
Tribal No
Source: http://www.fema.gov/cis/TX.html.
Who acts as your floodplain administrator/manager? Graham Associates, Inc. is the town's engineer and
floodplain administrator.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϰ
What specific flooding ordinances and plans does your jurisdiction have? Chapter 42-Floods, which
includes mitigation efforts.
What are the building requirements for properties located in a Special Flood Hazard Area (SFHA)? Must
comply with Chapter 42, Article XI: Drainage, and FEMA.
What building restrictions, in regards to floodplains, does your jurisdiction enforce? All town ordinances
and 2015 International Building and Residential Codes.
Repetitive and Severe Repetitive Loss Properties: There are no repetitive loss properties and severe
repetitive loss properties within the Town of Westlake. Repetitive loss properties are those for which two
or more losses of at least $1,000 each have been paid under the National Flood Insurance Program (NFIP)
within any 10-year period since 1978. Severe repetitive loss properties are residential properties that
have at least four NFIP payments over $5,000 each and the cumulative amount of such claims exceeds
$20,000, or at least two separate claims payments with the cumulative amount exceeding the market
value of the building.
There are 2 dams and 12 residential parcels located in the 100-year floodplain, according to the Public
Works Department and Geographic Information Systems (GIS) Department.
The following National Flood Insurance Program (NFIP) questions were answered to the best of the Town
of Westlake’s ability.
Insurance Summary
NFIP Topic Source of Information Comments
How many NFIP policies
are in the community?
What is the total
premium and coverage?
State NFIP Coordinator
or FEMA NFIP Specialist
Policies in-force: 19
Insurance in-force: $7,740,000
Written premium in-force: $12,820
How many claims have
been paid in the
community? What is the
total amount of paid
claims? How many of the
claims were for
substantial damage?
FEMA NFIP or
Insurance Specialist
7 losses, $111,200, none substantial
NFIP Topic Source of Information Comments
How many structures are
exposed to flood risk
within the community?
Community Floodplain
Administrator (FPA)
None based on FIRM.
Describe any areas of
flood risk with limited
NFIP policy coverage
Community FPA and
FEMA Insurance
Specialist
N/A
Staff Resources
NFIP Topic Source of Information Comments
Is the Community FPA or
NFIP Coordinator
certified?
Community FPA No.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϱ
Is floodplain management
an auxiliary function?
Community FPA Yes.
Provide an explanation of
NFIP administration
services (e.g. permit
review, GIS, education or
outreach, inspections,
engineering capability)
Community FPA Floodplain permit required and development
in floodplain restricted by town ordinance.
What are the barriers to
running an effective NFIP
program in the
community, if any?
Community FPA Town ordinances restrict development in
floodplain.
Compliance History
NFIP Topic Source of Information Comments
Is the community in good
standing with the NFIP?
State NFIP Coordinator,
FEMA NFIP Specialist,
community records
Yes.
Are there any outstanding
compliance issues (i.e.
current violations)?
No.
When was the most
recent Community
Assistance Visit (CAV) or
Community Assistance
Contact (CAC)?
Unknown.
Is a CAV or CAC scheduled
or needed?
No.
Regulation
NFIP Topic Source of Information Comments
When did the community
enter the NFIP?
Community Status
Book
https://www.fema.gov/
national-flood-
insurance-program-
community-status-book
12/10/76
Are the FIRMs digital or
paper?
Community FPA Digital.
Do floodplain
development regulations
meet or exceed FEMA or
state minimum
requirements? If so, in
what ways?
Community FPA Yes .
Provide an explanation of
the permitting process.
Community FPA, State,
FEMA NFIP
Unknown.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϲ
Flood Insurance
Manual:
https://www.fema.gov/
flood-insurance-
manual.
Community FPA, FEMA
CRS Coordinator, ISO
representative
CRS Manual:
https://www.fema.gov/
media-
library/assets/documen
ts/8768?id=2434
Community Rating System (CRS)
NFIP Topic Source of Information Comments
Does the community
participate in CRS?
Community FPA, State,
FEMA NFIP
No.
The Town of Westlake will continue to address the gaps in data over the next five years and expand the
capabilities of the NFIP program by implementing NFIP-related mitigation actions identified in Chapter 5
of this annex.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϳ
3.3.6 Thunderstorm
Hazard Profile: Thunderstorm
Category Response
Risk Ranking 1
Geographic Area Affected Extensive
Probability of Future Occurrence Likely
Maximum Probable Extent Major
Potential Impact Property damage to fences, vehicles, equipment,
and roofs
Transportation delays
Injuries and deaths
Debris from trees and damaged property
Electrical grid problems
Communication problems – phone and internet
lines down
Natural environments damage, to include
protected species and critical habitats
Vulnerabilities All populations, economy, structures, improved
property, critical facilities and infrastructure, and
natural environments are exposed to this hazard.
Westlake is a predominantly newer construction
community, built to modern building standards
that provide high levels of protection to the
population. The vulnerable populations would
only include daytime outdoor laborers (e.g.
construction and landscape laborers).
Past damage due to thunderstorms, and specifically, which hazard within the thunderstorm (hail, high
wind, and lightning): No recorded damage has occurred since 2015.
Number of homes lost due to lightning-induced fires: None.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϴ
3.3.7 Tornado
Hazard Profile: Tornado
Category Response
Risk Ranking 2
Geographic Area Affected Limited
Probability of Future Occurrence Occasional
Maximum Probable Extent Major
Potential Impact Injury or death
Power outage
Blocked roadways from trees and damaged
property
Natural gas pipeline breaks – fire injuries,
possible deaths
Transportation disruption
Rerouting traffic
Loss of property
Structure and infrastructure damage
Misplaced residents
Natural environments damage, to include
protected species and critical habitats
Vulnerabilities All populations, economy, structures, improved
property, critical facilities and infrastructure, and
natural environments are exposed to this hazard.
There are several corporate campuses with high
occupancies. There is one educational campus of
800 students.
Past damage done to your jurisdiction’s roads and critical infrastructure due to tornadoes, including
where the damage occurred and how much it cost to repair: There have been no reports of a tornado
since 2015.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϮϵ
3.3.8 Wildfire
Hazard Profile: Wildfire
Category Response
Risk Ranking 3
Geographic Area Affected Significant
Probability of Future Occurrence Occasional
Maximum Probable Extent Medium
Potential Impact Injury or death
Property and fence damage
Road closure
Traffic accidents
Loss of power – burning utility poles
Loss of property
Structure and infrastructure damage
Misplaced residents
Loss of resources
Natural environments damage, to include
protected species and critical habitats
Vulnerabilities All populations, economy, structures, improved
property, critical facilities and infrastructure, and
natural environments in the town are exposed to
this hazard, though the majority of the
population lives in affluent neighborhoods
separated from the vulnerable areas.
Most vulnerable location (North, East, South, West) of your jurisdiction? Westlake has approximately
70% of undeveloped land that is primarily grazing pasture. The areas of most concern are the fields
throughout the town that are along the roadways and have the greatest chance of being in contact with
an ignition source.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϯϬ
3.3.9 Winter Storm
Hazard Profile: Winter Storm
Category Response
Risk Ranking 4
Geographic Area Affected Extensive
Probability of Future Occurrence Occasional
Maximum Probable Extent Minor
Potential Impact Structural damage
Injuries or death
Power outages
Loss of ability to use roads for driving
Increased traffic accidents
Loss of heat
Stranded travelers / motels at full capacity
Tree debris create fuel load for fire hazard
Delayed emergency response time
Frozen/ busted pipes leading to loss of water
Disruption of traffic
Impacts to the economy
Communication capabilities decrease
Vulnerabilities Given the dynamic nature of winter storms, all
populations, economy, structures, improved
property, critical facilities and infrastructure, and
natural environments in the town are exposed to
this hazard.
Bridges and overpasses that can be impacted by a winter storm, including street names and their
location within your jurisdiction: Highways 114, 170, and 377 overpasses.
What impacts are caused when these bridges and/or overpasses are impacted by winter storms? Minor
traffic issues due to having to slow down to navigate iced over bridges, potential traffic accidents.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϯϭ
3.4 Historical Events
According to the National Centers for Environmental Information, there have been no natural hazards
that have occurred in the Town of Westlake since 2015, though neighboring cities of Keller and Southlake
have experienced a variety of events, including thunderstorms, flash flooding, and tornadoes.
3.5 Overall Vulnerability
The Town of Westlake identified their greatest vulnerabilities and concerns:
Commuters and outside laborers are the most vulnerable to the damaging effects of all the
identified hazards. Westlake has current building standards; therefore, existing or future
structures experience minimal risk from thunderstorms, severe weather, and other natural
hazards. In addition, the majority of current homes and facilities have installed lightning rods.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϯϮ
Chapter 4: Capabilities Assessment
(In compliance with 201.6(c)(3))
The following capability assessment examines the ability of the town to implement and manage a
comprehensive mitigation strategy. Strengths, weaknesses, and resources of the jurisdiction are identified
as a means to develop an effective Hazard Mitigation Action Plan (HazMAP). The capabilities identified in
this assessment were evaluated collectively to develop feasible recommendations, which support the
implementation of effective mitigation activities.
A questionnaire was distributed to the Town of Westlake’s Local Planning Team (LPT) to initiate this
assessment. The survey included questions regarding existing plans, policies, and regulations that
contribute to or hinder the ability to implement hazard mitigation activities, including: legal and regulatory
capabilities; administrative and technical capabilities; and fiscal capabilities.
Planning and Regulatory Assessment
Type of Plans Have
capability?
Does the plan address hazards?
Does the plan identify projects to include in
the mitigation strategy?
Can the plan be used to implement mitigation
actions?
Comprehensive/Master Plan Yes Yes; Yes; Yes
Capital Improvement Plan Yes Yes; Yes; Yes
Economic Development Plan Yes Yes; Yes; Yes
Local Emergency Operations Plan Yes Yes; Yes; Yes
Continuity of Operations Plan No
Transportation Plan Yes Yes; Yes; Yes
Stormwater Management Plan Yes Yes; Yes; Yes
Community Wildfire Protection
Plan No
Other Plans (e.g., disaster recovery,
climate change adaptation) No
Land Use Planning and Ordinances Have
capability?
Is the ordinance an effective measure for
reducing hazard impacts?
Is the ordinance adequately administered and
enforced?
Zoning Ordinance Yes Yes; Yes
Subdivision Ordinance Yes Yes; Yes
Floodplain Ordinance Yes Yes; Yes
Flood Insurance Rate Maps Yes Yes; Yes
Natural Hazard Specific Ordinance
(e.g., stormwater, wildfire) Yes Yes; Yes
Acquisition of land for open space
and public recreation uses Yes Yes; Yes
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϯϯ
Building Code, Permitting, and
Inspections
Have
capability?
Building Code Yes Version/Year: 2015 International Building Code
Building Code Effectiveness
Grading Schedule (BGEGS) Score No
Fire Department ISO Rating Yes Rating: 2
Site Plan Review Requirements Yes Type(s) of requirement: With all new
development
Administrative and Technical Assessment
Administration Have
capability?
Describe capability.
Is coordination effective?
Planning Commission Yes Planning and Zoning Commission; Yes
Mitigation Planning Committee Yes Planning and hazard assessment; Yes
Maintenance programs to reduce
risk (e.g., tree trimming, clearing
drainage systems)
Yes Progressive landscape development standards
and ordinance; Yes
Mutual Aid Agreements Yes All neighboring communities; Yes
Staff
Have
capability?
FT/PT*
Is staffing adequate to enforce regulations?
Is staff trained on hazards and mitigation?
Is coordination between agencies and staff
effective?
Chief Building Official FT Yes; Yes; Yes
Floodplain Administrator PT Third Party: Yes; Yes; Yes
Emergency Manager FT Yes; Yes; Yes
Community Planner FT Yes; Yes; Yes
Civil Engineer PT Third Party: Yes; Yes; Yes
GIS Coordinator FT Yes; Yes; Yes
Other: FT Public Works Director, Fire Marshal: Yes; Yes;
Yes
*Full-time (FT) or part-time (PT) position
Technical Have
capability?
Describe capability.
Has capability been used to assess or mitigate
risk in the past?
Warning Systems/Services
(e.g., Reverse 911, outdoor
warning signals)
Yes CodeRed, Outdoor Warning System, Reverse
911; Yes
Hazard data and information Yes Tier II Reporting; Threat and Hazard
Identification and Risk Assessment (THIRA); No
Grant writing Yes Fire Chief; Yes
HaZUS analysis No
Other N/A
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϯϰ
Education and Outreach Assessment
Program or Organization Have
capability?
Describe program or organization and how it
relates to disaster resilience and mitigation.
Could the program or organization help
implement future mitigation activities?
Local citizen groups or non-profit
organizations focused on
environmental protection,
emergency preparedness, access
and functional needs
populations, etc.
Yes A corporate campus partners group hosts
quarterly meetings; Yes
Ongoing public education or
information program (e.g.,
responsible water use, fire
safety, household preparedness,
environmental education)
Yes Website, water bill mailings, public education
activities, and social media; Yes
Natural disaster or safety related
school programs Yes Website, social media, and public education
activities; Yes
StormReady certification No
Firewise Communities
Certification No
Public/private partnership
initiatives addressing disaster-
related issues
No
Other No
Financial Assessment
Funding Resources Have
capability?
Has the funding resource been used in past? If
yes, for what type of activities?
Could the resource be used to fund future
mitigation actions?
Capital Improvements project
funding Yes
Yes, street and culvert improvements, outdoor
warning siren installation, and new fire station;
Yes
Authority to levy taxes for specific
purposes Yes Yes, property tax implementation; Yes
Fees for water, sewer, gas, and/or
electric services Yes Yes, improved water, sewer, stormwater
mitigation; Yes
Impact fees for new development Yes Yes, new development; Yes
Stormwater utility fee No
Incurrence of debt through
general obligation bonds and/or
special tax bonds
Yes Yes, new fire station; Yes
Incur debt through private
activities No
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϯϱ
Community Development Block
Grant No
Other federal funding programs No
State funding programs No
Other
How can any of these capabilities be expanded and improved to reduce risk?
Actions that can expand and improve existing authorities, plans, polices, and resources for mitigation
include: budgeting for mitigation actions; passing policies and procedures for mitigation actions;
adopting and implementing stricter mitigation regulations; approving mitigation updates; and additions
to existing plans as new needs are recognized.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϯϲ
Chapter 5: Mitigation Strategy
(In compliance with 201.6(c)(3)(i), 201.6(c)(3)(i), 201.6(c)(3)(ii), 201.6(c)(3)(iv), 201.6(c)(3)(iii), and
201.6(c)(4)(ii))
The mitigation strategy serves as the long-term blueprint for reducing the potential losses identified in
the risk assessment. The Stafford Act directs local mitigation plans to describe hazard mitigation action
and establish a strategy to implement those actions.1 Therefore, all other requirements for a local
mitigation plan (or hazard mitigation action plan) lead to and support the mitigation strategy.
5.1 Mitigation Goals
The Tarrant County Hazard Mitigation Planning Team (HMPT) collectively reviewed the extensive list of
mitigation goals of the 2015 Hazard Mitigation Action Plan (HazMAP) and unanimously chose to
streamline the mitigation goals for this update. Therefore, the new goals are to protect life and reduce
bodily harm from natural hazards, and to lessen the impacts of natural hazards on property and the
community through hazard mitigation.
5.2 2015 Action Items
The Town of Westlake’s action items in the 2015 Tarrant County HazMAP were determined by the 2015
Local Planning Team (LPT). Below are the action items from the 2015 plan and the status of each action.
1 Section 322(b), Robert T. Stafford Disaster Relief and Emergency Assistance Act (Stafford Act), as amended, 42
U.S.C. 5165.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϯϳ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources Severe Thunderstorms and High Winds, Tornadoes Ensure effective communications are in place for emergency situations in the Town of Westlake. Purchase and install town-wide outdoor warning sirens for severe weather events. 24 months Westlake Fire Department, Office of Emergency Management $90,000 $5,000,000 Town funds, state and federal grant programs, donor funding STATUS: Completed Purchase and install town-wide voice, e-mail, and smart device “all-hazard” warning system. 6 months Westlake Fire Department $3,000/ year $5,000,000 Town funds, state and federal grant programs, donor funding STATUS: Completed Severe Thunderstorms and High Winds, Tornadoes, Hail, Lightning, Winter Storms, Flooding, Dam Failure, Wildfires Construct and equip permanent structure to serve as Fire Department/ Training Facility/ Emergency Operations Center (EOC) in the Town of Westlake. Perform design and financial study to determine facility requirements. 6 months Westlake Fire Department, Office of Emergency Management, Planning and Development Department $2,500 in staff time $10,000 Town funds STATUS: Completed Contract for engineering and design of facility. 3 months Outside Contractor $20,000 $80,000 Town funds, donor funds STATUS: Completed Construct and equip permanent 2 years Various Contractors $6,000,000 $24,000,000 Town funds, bonds, hazard dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϯϴ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources fire station/ training/ Emergency Operations Center facility. mitigation grants, state funds STATUS: In progress Severe Thunderstorms and High Winds, Tornadoes, Hail, Lightning, Winter Storms, Flooding, Dam Failure, Wildfires Implement a multi-jurisdictional Automatic Vehicle Location (AVL) system for both police and fire from Colleyville, Keller, Southlake, and Westlake (NETCOM). Survey the eight departments and ascertain need and want as well as determine the number of users needed. 7 months North East Tarrant County Communications (NETCOM) Unknown Unknown Unknown STATUS: Deleted- no longer an objective Determine vendor for purchase. 1 year NETCOM with a representative from all cities Unknown Unknown Unknown STATUS: Deleted- no longer an objective Purchase hardware for all jurisdictions. 16 months NETCOM $90,000 $360,000 Individual town budgets STATUS: Deleted- no longer an objective Purchase software for dispatch center and each unit. 2 years NETCOM $10,000 $40,000 Individual town budgets STATUS: Deleted- no longer an objective Severe Thunderstorms Ensure effective communications Provide Westlake homeowners with 12 months Town leadership, Westlake Fire $8,000 $5,000,000 Hazard mitigation dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϯϵ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources and High Winds, Tornadoes, Hail, Lightning, Winter Storms, Flooding, Dam Failure, Wildfires are in place for emergency situations in the Town of Westlake. weather alert radios. Department, Office of Emergency Management. matching grants, donor funds STATUS: Deleted due to alternative communications medium Severe Thunderstorms and High Winds, Tornadoes Reduce property loss/damage due to high winds in the Town of Westlake. Mandate “storm hardened” construction guidelines in Westlake. 2 years Planning and Zoning Department, Planning Department, Permitting Office $5,000 $1,000,000/ year Internal STATUS: Deferred to ϮϬϮϬ,ĂnjDW Install wind resistant window shutters at Westlake Academy. 3 years Westlake Fire Department, management, school board $50,000 $100,000 Hazard mitigation grants STATUS: Deleted due to costs Dam Failure Mitigate flooding from dam failure in the Town of Westlake. Conduct inundation studies and develop Emergency Action Plans for all high 18 months Westlake Fire Department, Fort Worth Office of Emergency Management, Tarrant County $200,000 $500,000 Hazard Mitigation Grant Program (HMGP), private dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&ͲϰϬ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources hazard dams in Westlake. Office of Emergency Management (support) foundations, dam owner STATUS: Deleted due to reallocation of resources Conduct a search for previously unidentified high hazard dams in Westlake. 9 months Westlake Fire Department, Fort Worth Office of Emergency Management, Tarrant County Office of Emergency Management (support) $20,000 $80,000 The cost of this project is low compared to the potential benefits of locating previously unknown high hazard dams. STATUS: Deleted due to reallocation of resources Hail Ensure Town of Westlake citizens have information regarding hail resilience. Evaluate town buildings to determine feasibility of installing hail-resistant roofing and window coverings with a focus on critical infrastructure. 1 year Westlake Town Engineer $25,000 $100,000 Hazard mitigation grant sources, insurance industry partnerships, town funds STATUS: Deleted due to reallocation of resources dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϰϭ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources Hail Ensure Westlake citizens have information regarding hail resilience. Develop and implement a public education campaign to encourage “hail-resistant” roofing in new construction and roof replacements. 9 months Westlake Planning and Development Department, Westlake Fire Department $1,000 $250,000 HMGP, insurance industry partnerships STATUS: Completed Drought Mitigate drought in the Town of Westlake. Develop a contingency plan to identify potential impacts of drought on the community to include utilities such as power generation and drinking water; health and safety including pre-existing health conditions and special needs; and emergency response such as 1 year Westlake Fire Department, Office of Emergency Management, Fort Worth Office of Emergency Management , Tarrant County Office of Emergency Management (support) $10,000 $40,000 HMGP, private foundations, water suppliers dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&ͲϰϮ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources fire suppression operations. STATUS: Deferred to ϮϬϮϬ,ĂnjDW Drought Mitigate drought in the Town of Westlake. Participate in the design and implementation of the Tarrant County-specific water conservation public education efforts to complement existing programs. 1 year Westlake Fire Department, Office of Emergency Management, Fort Worth Office of Emergency Management , Tarrant County Office of Emergency Management (support) $1,000 $4,000 HMGP, private foundations, water suppliers STATUS: Deleted due to lack of resources Drought Upgrade water and irrigation systems to conserve water in Town of Westlake facilities. Install efficient irrigation systems in new and existing town facilities. Annually Public Works Department $50,000 $250,000 Town budget, grant opportunities STATUS: Deleted due to lack of funding and resources Extreme Temperatures Reduce the loss of life and property Conduct a study to determine the feasibility of 1 year Tarrant County Public Health Department, $5,000 $20,000 HMGP, other state or dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϰϯ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources damage resulting from extreme heat in Westlake. expanding monitoring of populations at risk from extreme heat. Westlake Fire Department, Office of Emergency Management federal public health grants STATUS: Deferred to ϮϬϮϬ,ĂnjDW Extreme Temperatures Reduce the loss of life and property damage resulting from extreme heat in Westlake. Enhance public education concerning extreme heat/severe weather preparedness. 6 months Westlake Fire Department, Office of Emergency Management $2,000 $8,000 HMGP, town funds STATUS: Deferred to ϮϬϮϬ,ĂnjDW Expansive Soils Mitigate expansive soils in Westlake. Continue to improve construction techniques through building code enhancements. Previously implemented/ ongoing Planning and Development Department $1,000/ year $50,000/ year Internal funding sources STATUS: Deferred to ϮϬϮϬ,ĂnjDW Continue to educate construction contractors, homeowners, and business owners Previously implemented/ ongoing Planning and Development Department, Office of Emergency Management $1,000/ year $50,000/ year Internal funding sources dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϰϰ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources about mitigation techniques. STATUS: Deferred to ϮϬϮϬ,ĂnjDW Tornadoes Reduce loss of life/injury resulting from tornadic weather events. Develop and adopt an outreach program promoting the construction and use of safe rooms by: ඵEncouraging theconstruction and use of safe rooms in homes, critical infrastructure, and other vulnerable public structures. ඵEncouragingbuilders and homeowners to locate tornado safe rooms inside or directly adjacent to houses to prevent injuries due to flying debris or hail. 2 years/ continuous Westlake Fire Department, Office of Emergency Management, Engineering Department $5,000 $2,000,000 Staff time, grants, donors STATUS: Deferred to ϮϬϮϬ,ĂnjDW dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϰϱ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources Update Westlake building and construction codes and ensure that they require or encourage wind engineering measures and construction techniques. 2 years/ continuous Westlake Facilities Department, Engineering Department $5,000 $5,000,000 Staff time STATUS: Deferred to ϮϬϮϬ,ĂnjDW Purchase and activate town-wide outdoor warning sirens and emergency warning notification system with the ability to contact each resident phone, email, and smart devices. 6 months Westlake Fire Department, Westlake Office of Emergency Management $130,000 $5,000,000 Town budget STATUS: Completed Flooding Reduce potential for property loss due to flooding. Perform relocation and protection for all critical facilities and infrastructure 12 months/ continuous Westlake Facilities Department, Engineering Department $20,000 $1,500,000 Staff time, town budget, grants dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϰϲ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources that may lie within known or designated floodplain areas. STATUS: Deferred to ϮϬϮϬ,ĂnjDW Replace existing Ottinger Road bridge, located between Westlake Cemetery and State Highway 170. This bridge lies below historic flood levels and is regularly inundated. 48 months Westlake Facilities Department, Engineering Department $350,000 $1,000,000 Town budget STATUS: Deferred to ϮϬϮϬ,ĂnjDW Severe Thunderstorms and High Winds Mitigate loss of life and damage from severe thunderstorm or high wind events. Retrofit (where necessary) town-owned buildings and critical facilities to reduce future wind damage. 4 years Office of Emergency Management, Facilities Department, Engineering Department $10,000 $100,000 Grants, donor funding, insurance industry partnerships STATUS: Deleted due to cost and resources Update (where necessary) Westlake construction 5 years Planning and Permitting Department, Facilities $20,000 $1,000,000 Grants, insurance, industry partnerships dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϰϳ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources guidelines requiring that storm hardened and wind resistant materials and techniques are utilized. Department, Maintenance Department STATUS: Deferred to ϮϬϮϬ,ĂnjDW Hail Protect against property loss and loss of life or injury from hail events. Install hail-resistant roofing and siding, structural bracing, shutters, laminated glass window panes, and hail-resistant roof coverings where needed on town-owned buildings and critical infrastructure to minimize damage. 4 years Facilities Department, Engineering Department, Office of Emergency Management, Fire Department, Planning Department $30,000 $1,000,000 HMGP, donor, sources STATUS: Delete due to cost and resources Develop and adopt an outreach program to increase public awareness of hail 24 months/ continuous Office of Emergency Management, Facilities Department, Engineering $5,000 $20,000 HMGP, donor, sources dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϰϴ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources dangers, including: Mailing safetybrochureswith monthlywater bills.Post warningsignage atlocal parksand otheroutdoorvenues.Teachingschoolchildrenabout thedangers ofhail and howto take safetyprecautions.Department, Utilities Department STATUS: Deleted due to lack of resources dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϰϵ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources Lightning Protect against property loss and injury or death form lightning strikes. Protect critical facilities and infrastructure from lighting damage with the following measures: Installinglightning protection devices such as lightning rods and grounding, on communications infrastructure and other critical facilities. 36 months/ continuous Maintenance Department, Facilities Department, Engineering Department, Fire Department, Information Technology Department $5,000 $1,000,000 HMGP, insurance partnerships STATUS: Deferred to ϮϬϮϬ,ĂnjDW Installing and maintaining surge protection on critical electronic equipment. 36 months/ continuous Maintenance Department, Facilities Department, Engineering Department, Fire Department, Information $5,000 $1,000,000 HMGP, insurance partnerships dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&ͲϱϬ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources Technology Department STATUS: Completed Adopt new standards for hardening existing lightning protection materials and systems. 36 months/ continuous Maintenance Department, Facilities Department, Engineering Department, Fire Department, Information Technology Department $5,000 $1,000,000 HMGP, insurance partnerships STATUS: Deferred to ϮϬϮϬ,ĂnjDW Conduct outreach programs to promote awareness of lightning dangers Developlightning “KnoWhat2Do” brochure for distribution through classroom. Mailing safetybrochures 24 months Office of Emergency Management, Fire Department, Utility Department $5,000 $20,000 Town budget, staff time dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϱϭ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources with monthly water bills. Postingwarning signage at local parks. Teachingschool children about the dangers of lightning and how to take safety precautions. STATUS: Deferred to ϮϬϮϬ,ĂnjDW Winter Storms Reduce potential for property loss, damage, injury, or loss of life due to winter storms. Reduce impacts to roadways by: Plan foradequate roads and debris clearing capabilities. Partner withcounty and state agencies for co-utilization of snow and Ice hazard 12 months Office of Emergency Management, Fire Department, Utility Department $5,000 $250,000 HMGP, local business donation, foundation grants dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&ͲϱϮ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources removal assets. STATUS: Completed Assist vulnerable populations by identifying specific residents who may be exceptionally vulnerable in the event of protracted winter storm events or power outages. 12 months Office of Emergency Management Staff Time Unknown Staff time STATUS: Deferred to ϮϬϮϬ,ĂnjDW Winter Storms Develop a winter weather awareness mitigation program for Town of Westlake residents. Develop a winter weather outreach program that provides tips and pertinent information to mitigate against hypothermia and icy conditions. Annually Office of Emergency Management $10,000 Unknown Budget STATUS: Deferred to ϮϬϮϬ,ĂnjDW Wildfire Reduce potential for property loss, damage, injury, Increase public education on how to reduce the risks to wildfires 6 months/ continuous Office of Emergency Management, Westlake Fire Department $1,000 $200,000 HMGP, town budget dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϱϯ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources or loss of life due to wildfire. (construction, landscaping, etc.). STATUS: DeleteĚͲŶŽůŽŶŐĞƌĂƉƌŝŽƌŝƚLJ Wildfire Reduce potential for property loss, damage, injury, or loss of life due to wildfire. Enact building permit codes that include wildfire resistant construction. 1 year Westlake Fire Marshal, Planning and Permitting Department $1,000 $200,000 HMGP, town budget STATUS: Completed Wildfire Reduce potential for property loss, damage, injury, or loss of life due to wildfire. Identify wildfire hazard areas and assess overall community vulnerability. Regulate development in wildfire hazard areas. 3 years Planning and Zoning Department $1,000 $200,000 HMGP, town budget STATUS: Deferred to ϮϬϮϬ,ĂnjDW Extreme Temperatures Reduce potential for property loss, damage, injury, or loss of life due to temperature extremes. Increase awareness of extreme temperature risk and safety by educating citizens regarding the dangers of 3 years/ continuous Office of Emergency Management, Westlake Fire Department $2,000 $100,000 HMGP, insurance partnerships, donor funds dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϱϰ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources extreme heat and cold and the steps they can take to protect themselves when extreme temperatures occur. STATUS: Deferred to ϮϬϮϬ,ĂnjDW Dam Failure Participate in the Federal Emergency Management Agency’s (FEMA) Community Rating System (CRS) program. Work with the town officials to become a member of the CRS program. March 2014 Town Planner $1,000 $2,000 Town Planner budget STATUS: Deleted due to lack of resources Dam Failure Develop a buyout program for properties in the floodplain. Develop a buyout program for properties in the floodplain. As funding is available Public Works Department To be determined To be determined Local funds, HMGP, Pre-Disaster Mitigation (PDM), Flood Mitigation Assistance (FMA) STATUS: Deleted due to lack of resources dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϱϱ
Hazard Addressed Objective Action/Project Description Projected Time to Completion Department or Agency Responsible Estimated Cost Estimated Benefit Funding Sources Dam Failure Reduce potential for property loss, damage, injury, or loss of life due to dam failure. Conduct inundation studies and develop Emergency Action Plans for all high hazard dams in Westlake. 5 years Engineering Department $40,000 $1,000,000 HMGP, dam owners STATUS: Deleted due to lack of resources Conduct a search for previously unidentified high hazard dams in Westlake. 5 years Engineering $40,000 $1,000,000 HMGP, dam owners STATUS: Deleted due to lack of resources dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶdŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž&&Ͳϱϲ
5.3 New Action Items
The Town of Westlake’s action items were determined by the Local Planning Team for the ϮϬϮϬ
,ĂnjĂƌĚ DŝƚŝŐĂƚŝŽŶ ĐƚŝŽŶ WůĂŶ (HazMAP). These actions include mitigation actions that qualify for
mitigation funding as well as enforcement, maintenance, and response actions that the city has
identified as opportunities to increase their resiliency to hazards.
During the capabilities assessment and hazard analysis, previously impacted assets and populations were
analyzed to determine the highest probability of damage and potential of loss of life per hazard. As $1
spent in mitigation saves a community an average of $6 in recovery 2, we used this data to develop a cost-
benefit analysis: Estimated Cost x 6 = Estimated Benefit.
Priority will go towards projects with the highest positive impact on community resilience, including life
safety and property protection. Below are the action items for this HazMAP.
Hazard(s) Addressed Earthquake, Thunderstorm, Tornadoes
Ensure the structure to serve as Fire Department/Training Facility/Emergency Operations Center in
the Town of Westlake is tornado-resistant and hail-resistant, to include but not limited to, the
installation of a safe room.
Participating Jurisdiction Town of Westlake
Priority: 1
Estimated Cost: $9,000,000
Estimated Benefit: $54,000,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Fire Department
Implementation Schedule: 24 months
Hazard(s) Addressed
Drought, Earthquakes, Expansive Soils, Extreme
Heat, Flooding, Thunderstorms, Tornadoes,
Wildfire, Winter Storms
Provide the Public Works Department with a hardened facility/workshop for housing critical
equipment to mitigate the damages from the identified hazards.
Participating Jurisdiction Town of Westlake
Priority: 2
Estimated Cost: $2,000,000
Estimated Benefit: $12,000,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Public Works Department
Implementation Schedule: 24 months
2 Natural Hazard Mitigation Saves: 2017 Interim Report. National Institute of Building Science.
< https://www.nibs.org/page/mitigationsaves>
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϱϳ
Hazard(s) Addressed Winter Storms
Enhance sanding and de-icing capabilities with more equipment to mitigate the impact of winter
storms.
Participating Jurisdiction Town of Westlake
Priority: 3
Estimated Cost: $6,000
Estimated Benefit: $36,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Public Works Department
Implementation Schedule: 6 months
Hazard(s) Addressed Thunderstorms
Implement lightning protection device standards (e.g., lightning rods) within building
codes/standards.
Participating Jurisdiction Town of Westlake
Priority: 4
Estimated Cost: $5,000
Estimated Benefit: $30,000
Potential Funding Source(s): Property owners, hazard mitigation grants
Lead Agency/Department Responsible: Building Department
Implementation Schedule: 24 months
Hazard(s) Addressed Earthquakes, Thunderstorms, Tornadoes
Implement standards for storm hardened construction or safe rooms into building codes/standards
for new and existing critical and vulnerable facilities.
Participating Jurisdiction Town of Westlake
Priority: 5
Estimated Cost: $6,000
Estimated Benefit: $36,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Building Department
Implementation Schedule: 24 months
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϱϴ
Hazard(s) Addressed Flooding
Review and enhance the Town of Westlake’s floodplain mitigation ordinances and policies as
needed.
Participating Jurisdiction Town of Westlake
Priority: 6
Estimated Cost: $4,500
Estimated Benefit: $27,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Public Works Department
Implementation Schedule: 24 months
Hazard(s) Addressed Drought
Review Town of Westlake’s water conservation/drought contingency plan and update as necessary
to mitigate the effects of drought.
Participating Jurisdiction Town of Westlake
Priority: 7
Estimated Cost: $1,500
Estimated Benefit: $9,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Public Works Department
Implementation Schedule: 24 months
Hazard(s) Addressed Extreme Heat
Conduct a study to determine the feasibility of expanding monitoring of populations at risk from
extreme heat.
Participating Jurisdiction Town of Westlake
Priority: 8
Estimated Cost: $1,5000
Estimated Benefit: $9,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 12 months
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϱϵ
Hazard(s) Addressed Flooding
Replace existing bridge at Ottinger Road, located between Westlake Cemetery and State Highway
170. This bridge lies below historic flood levels and is regularly inundated.
Participating Jurisdiction Town of Westlake
Priority: 9
Estimated Cost: $350,000
Estimated Benefit: $2,100,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Public Works Department
Implementation Schedule: 12 months
Hazard(s) Addressed
Drought, Earthquakes, Expansive Soils, Extreme Heat,
Flooding, Thunderstorms, Tornadoes, Wildfire, Winter
Storms
Enforce latest edition of buildings codes.
Participating Jurisdiction Town of Westlake
Priority: 10
Estimated Cost: $1,500
Estimated Benefit: $9,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Building Department, Office of Emergency Management
Implementation Schedule: 36 months
Hazard(s) Addressed Earthquakes
Conduct an earthquake risk assessment within the community using HaZUS data and geographic
information system (GIS) mapping.
Participating Jurisdiction Town of Westlake
Priority: 11
Estimated Cost: $3,000
Estimated Benefit: $18,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 12 months
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϲϬ
Hazard(s) Addressed
Drought, Earthquakes, Expansive Soils, Extreme Heat,
Flooding, Thunderstorms, Tornadoes, Wildfire, Winter
Storms
Enhance existing public integrated outreach program, informing residents on hazard mitigation
measures related to the identified hazards.
Participating Jurisdiction Town of Westlake
Priority: 12
Estimated Cost: $1,500
Estimated Benefit: $9,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 12 months
Hazard(s) Addressed
Drought, Earthquakes, Expansive Soils, Extreme Heat,
Flooding, Thunderstorms, Tornadoes, Wildfire, Winter
Storms
Implement an education program, separate from the public education for residents, to educate
construction contractors, homeowners, and business owners about mitigation techniques.
Participating Jurisdiction Town of Westlake
Priority: 13
Estimated Cost: $3,000
Estimated Benefit: $18,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Building Department, Office of Emergency Management
Implementation Schedule: 12 months
Hazard(s) Addressed Wildfire
Identify wildfire hazard areas, assess overall community vulnerability, and regulate development in
wildfire hazard areas.
Participating Jurisdiction Town of Westlake
Priority: 14
Estimated Cost: $3,000
Estimated Benefit: $18,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Fire Department, Office of Emergency Management
Implementation Schedule: 12 months
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϲϭ
Hazard(s) Addressed
Drought, Earthquakes, Expansive Soils, Extreme Heat,
Flooding, Thunderstorms, Tornadoes, Wildfire, Winter
Storms
Provide alternative power solutions to new and existing critical facilities and infrastructure, to
include the purchase and installation of generators.
Participating Jurisdiction Town of Westlake
Priority: 15
Estimated Cost: $20,000
Estimated Benefit: $120,000
Potential Funding Source(s): Town funds, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 24 months
Hazard(s) Addressed Flooding
Schedule a Community Assistance Visit (CAV) by FEMA or a State agency on behalf of FEMA to
assure that the city is adequately enforcing its floodplain management regulations.
Participating Jurisdiction: Town of Westlake
Priority: 16
Estimated Cost: $1,000
Estimated Benefit: $6,000
Potential Funding Source(s): City general fund, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 24 months
Hazard(s) Addressed Flooding
ZĞƋƵŝƌĞƚŚĂƚƚŚĞĨůŽŽĚƉůĂŝŶĂĚŵŝŶŝƐƚƌĂƚŽƌďĞĐĞƌƚŝĨŝĞĚ͘
Participating Jurisdiction: Town of Westlake
Priority: 17
Estimated Cost: $Ϯ͕ϬϬϬ
Estimated Benefit: $ϭϮ͕ϬϬϬ
Potential Funding Source(s): City general fund, hazard mitigation grants
Lead Agency/Department Responsible: WƵďůŝĐtŽƌŬƐĞƉĂƌƚŵĞŶƚ
Implementation Schedule: 24 months
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&ͲϲϮ
Hazard(s) Addressed Flooding
Conduct NFIP community workshops to provide information and incentives for property owners to
acquire flood insurance.
Participating Jurisdiction: Town of Westlake
Priority: 18
Estimated Cost: $500
Estimated Benefit: $3,000
Potential Funding Source(s): City general fund, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 24 months
Hazard(s) Addressed Flooding
Remove existing structures from flood-prone areas to minimize future flood losses by acquiring and
demolishing or relocating structures from voluntary property owners and preserving land subject to
repetitive flooding.
Participating Jurisdiction: Town of Westlake
Priority: 19
Estimated Cost: $1,000,000
Estimated Benefit: $6,000,000
Potential Funding Source(s): City general fund, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 24 months
Hazard(s) Addressed Flooding
Use bioengineered bank stabilization techniques and revetments to protect against flooding.
Participating Jurisdiction: Town of Westlake
Priority: 20
Estimated Cost: $1,000,000
Estimated Benefit: $6,000,000
Potential Funding Source(s): City general fund, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 24 months
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϲϯ
Hazard(s) Addressed Earthquakes, Thunderstorms, Tornadoes
Require construction of safe rooms in new schools, daycares, and nursing homes.
Participating Jurisdiction: Town of Westlake
Priority: 21
Estimated Cost: $1,000,000
Estimated Benefit: $6,000,000
Potential Funding Source(s): City general fund, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 24 months
Hazard(s) Addressed Wildfire
Promote conservation of open space or wildland-urban interface boundary zones to separate
developed areas from high-hazard areas.
Participating Jurisdiction: Town of Westlake
Priority: 22
Estimated Cost: $100
Estimated Benefit: $600
Potential Funding Source(s): City general fund, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 24 months
Hazard(s) Addressed Flooding, Thunderstorms, Tornadoes, Wildfire, Winter
Storms
To protect power lines, either bury overhead power lines, ensure ordinances for proper vegetation
management practices, replace wood poles with steel or composite ones, or reinforce utility poles
with guy wires.
Participating Jurisdiction: Town of Westlake
Priority: 23
Estimated Cost: $300,000,000
Estimated Benefit: $1,200,000,000
Potential Funding Source(s): City general fund, hazard mitigation grants
Lead Agency/Department Responsible: Office of Emergency Management
Implementation Schedule: 24 months
5.4 Plan Incorporation into Existing Planning Mechanisms
Based on Requirement 201.6(c)(4(ii) and the State of Texas Mitigation Plan, the vulnerability and
capabilities assessment for the town were carefully reviewed and considered when developing the
mitigation actions for this plan. The Local Planning Team (LPT) will establish a process in which the
mitigation strategy, goals, objectives, and actions outlined in this plan will be incorporated into the
existing local planning strategies.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϲϰ
Once the plan is adopted, the LPT will coordinate implementation with the responsible parties in the town,
as well as external stakeholders as needed.
The following steps will be taken in implementing this HazMAP into local plans:
1. Change is proposed by an elected official or other interested party.
2. Proposal is placed on the local agenda of the governing body.
3. Agenda is published at least 10 days in advance of the meeting at which it will be discussed, so
members of the public have an opportunity to attend the discussion meeting. Publication may be
made by posting the agenda on the city’s website, in the city newsletter, or on a public bulletin
board.
4. Proposal is discussed at the public meeting, including any comments by members of the public
attendance.
5. Proposal is voted on by the governing body.
6. If the proposal is passed, the change is implemented by the appropriate local authority.
Existing planning mechanisms in which the HazMAP will be integrated are listed below.
Type of Plan or
Activity
Department
Responsible
Update
Schedule
Actions to be
Integrated Integration Method
Capital
Improvement
Plan
Public Works
Department Annually
Drainage
improvement
project;
Roanoke Road
When reviewing the Capital
Improvement Plan, the
leadership team will review this
HazMAP to see which action
items can be addressed with
the fiscal and administrative
capabilities of the town.
Comprehensive
Plan
Town
Administration
As
needed
Development
guidelines
The town staff will review
development plans for
alignment with the
Comprehensive Plan.
Flood Hazard
Prevention
Ordinance
Public Works
Department
As
needed
Flood hazard
prevention
activities and
processes
Town staff will review identified
mitigation action items and
consider plan revision as
necessary.
Although it is recognized that there are many possible benefits to integrating components of this Hazard
Mitigation Action Plan (HazMAP) into other planning mechanisms, the LPT considers this HazMAP,
including development and maintenance, to be the primary vehicle to ensure implementation of local
hazard mitigation actions.
This completes the annex for the Town of Westlake. For additional information, see Appendices A and B.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϲϱ
This page intentionally left blank.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
dŽǁŶŽĨtĞƐƚůĂŬĞŶŶĞdž &&Ͳϲϲ
Section 6: Executing the Plan
Requirement
§201.6(c)(4)(i)
[The plan maintenance process shall include a] section describing the
method and schedule of monitoring, evaluating, and updating the
mitigation plan within a five-year cycle.
6.1 Plan Implementation
The Tarrant County Hazard Mitigation Action Planning process was overseen by the North Central Texas
Council of Governments (NCTCOG). The plan was submitted to the Texas Division of Emergency
Management (TDEM) and the Federal Emergency Management Agency (FEMA) for approval. It is expected
that all participating jurisdictions will formally adopt the plan by resolution once the “Approved Pending
Adoption” designation is received by FEMA, in accordance with the Disaster Mitigation Act of 2000.
Each jurisdiction participating in this plan is responsible for implementing specific mitigation actions as
prescribed in the mitigation strategies. In each mitigation strategy, every proposed action is assigned to a
specific local department or agency in order to assign responsibility and accountability and increase the
likelihood of subsequent implementation. This approach enables individual jurisdictions to update their
unique mitigation strategy as needed without altering the broader focus of the county-wide plan. The
separate adoption of locally-specific actions also ensures that each jurisdiction is not held responsible for
monitoring and implementing the actions of other jurisdictions involved in the planning process.
The Tarrant County Emergency Management Coordinator or their designee is the lead position for plan
implementation and will work with the Tarrant County Hazard Mitigation Planning Team (HMPT) to ensure
mitigation actions are implemented into jurisdictional planning procedures. Each participating jurisdiction
will implement the plan and their individual mitigation actions in the timeframe appropriate for their
planning processes. As necessary, the HMPT will seek outside funding sources to implement mitigation
projects in both the pre-disaster and post-disaster environments. When applicable, potential funding
sources have been identified for proposed actions listed in the mitigation strategies.
6.2 Evaluation
All members of the Tarrant County Hazard Mitigation Planning Team (HMPT) will be responsible for
ensuring that the Tarrant County Hazard Mitigation Action Plan (HazMAP) is evaluated as required.
Specifically, the Tarrant County Emergency Management Coordinator, or their designee, will convene the
HMPT and ensure an evaluation is conducted in a thorough manner. This evaluation will include analysis
of current mitigation projects, evaluation of success, reevaluation of future mitigation needs, and
prioritization based upon changes in needs and/or capabilities of Tarrant County.
The HMPT will reconvene annually to ensure that projects are on track and to reevaluate the mitigation
goals, objectives, and action items. The mitigation plan shall be viewed as an evolving, dynamic document.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϯ
6.3 Multijurisdictional Strategy and Considerations
Tarrant County will lead activities for mitigation planning county-wide. Although Tarrant County will be
responsible for maintaining this plan, including the documentation of in-progress and completed action
items, each participating jurisdiction is responsible for reporting hazards, their costs, and a status report
on mitigation actions to the North Central Texas Council of Governments (NCTCOG) for recording in the
plan.
Each jurisdiction is responsible for completing mitigation activities by providing the capabilities and
authorities needed to carry out activities. Participating jurisdictions completed an analysis of their current
legal, staffing, and fiscal capabilities as they relate to hazard mitigation planning. Jurisdictional capabilities
and authorities identified to ensure successful mitigation planning are located within the jurisdictional
annexes.
6.4 Plan Update
The Disaster Mitigation Act of 2000 requires that the Tarrant County Hazard Mitigation Action Plan be
updated at least once every five years. During this process, all sections of the plan will be updated with
current information, and analyses and new and/or modified mitigation actions will be developed. The
revised plan will be submitted for state and federal review and approval and presented for approval to
the Tarrant County Commissioners Court and the respective councils of incorporated cities included in
this HazMAP. Likewise, each participating jurisdiction will undergo the same process for reviewing,
revising and updating their respective plans and submitting them for approval by state, federal, and the
local jurisdiction’s governing body. The plan will be updated every five years in accordance with federal
requirements. Tarrant County’s Emergency Management Coordinator or their designee will be
responsible for ensuring that this requirement is met. Tarrant County and the Hazard Mitigation Planning
Team will review the HazMAP annually for needed updates. The HMPT will be involved in this process to
ensure all jurisdictions provide input into the planning process. The public will be invited to participate in
this process through public hearings.
6.5 Plan Maintenance
It is the intention of all documented plan participants to formally adopt the Tarrant County Hazard
Mitigation Action Plan after each maintenance revision. Once all participants adopt the changes, the
revised HazMAP and proof of adoption will be submitted to the Texas Division of Emergency Management
and the Federal Emergency Management Agency. The plan will be revised and maintained as required
under the guidance of the HazMAP and formally adopted by Tarrant County and jurisdiction elected
officials after each revision.
Following formal adoption Tarrant County’s Commissioners Court, and formal adoption of the plan by the
governing council of each participating jurisdiction, the actions outlined in the HazMAP will be
implemented by the county and participating jurisdictions as described throughout this document.
The Tarrant County Emergency Management Coordinator (EMC), or their designee, is responsible for
ensuring the HazMAP and its components are monitored, evaluated, and reviewed semiannually by the
responsible personnel. The EMC will use email to request the monitoring activities noted below be
implemented and changes documented. The progress of action items will be tracked electronically as
“in progress,” “deferred,” or “completed.”
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϰ
These and other changes affecting the plan will be documented within the Tarrant County HazMAP file
and identified as updates. Updates will be shared between participants by email or in a meeting (if
deemed appropriate) twice a year, and included in annual evaluations and reviews, and five-year update
of the plan.
The lead of each Local Planning Team (LPT) is responsible for e nsuring their mitigation annex is monitored,
evaluated, and reviewed on an annual basis. This will be accomplished by calling an annual meeting of the
LPT and HMPT, whose members will provide assistance and expertise for plan review, evaluation, updates,
and monitoring. This meeting will be open to the public and public notices will encourage community
participation.
During this annual meeting, the LPT point of contact will provide information and updates on the
implementation status of each action item included in the plan. As part of the evaluation, the LPT will
assess whether goals and objectives address current and expected conditions, whether the nature and/or
magnitude of the risks have changed, if current resources are appropriate for implementing the HazMAP,
whether outcomes have occurred as expected, and if agencies and other partners participated as
originally proposed. These activities will take place according to the following timetable:
Responsible Personnel Activity Update Schedule
LPT Point of Contact
Monitoring Plan: track implementation and action
items, changes to risk assessment, changes to Local
Planning Team (LPT), changes to capabilities, and
plan integrations.
Twice a year
Evaluate Plan: assess effectiveness by evaluating
completed actions, implementation processes,
responsible personnel, and lessons learned.
Annually
Update Plan Once every five
years
At least once every five years, or more frequently if such a need is determined by the participants, the
HazMAP will undergo a major update. During this process, all sections of the plan will be updated with
current information and analyses and new and/or modified mitigation action plans will be developed. The
revised plan will be submitted for review and approval to the Texas Division of Emergency Management
and the Federal Emergency Management Agency and presented to the governing council for approval and
adoption. The plan will be updated every five years in accordance with regulations.
6.6 Continued Public Involvement
As stated in Requirement 201.6(c)(4)(iii), the plan maintenance process shall include a discussion on how
the community will continue public participation in the plan maintenance process.
Ongoing public participation will be encouraged throughout the entire planning and implementation
process. A copy of the plan will be provided on the jurisdiction’s websites and/or in the office of the LPT
point of contact. Annual meetings held for monitoring, evaluating, and updating the HazMAP will be open
to the public and public notices will encourage community participation.
Public participation will be sought throughout the implementation, evaluation, and maintenance of the
HazMAP. This participation will be sought in a multitude of ways, including but not limited to periodic
presentations on the plan’s progress to elected officials, schools, or other community groups; annual
questionnaires or surveys; public meetings; and postings on social media and interactive websites.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϱ
6.7 Incorporation into Existing Planning Mechanisms
The primary means for integrating mitigation strategies into other local planning mechanisms will be
through the revision, update, and implementation of each jurisdiction’s individual plans that require
specific planning and administrative tasks (for example, plan amendments, ordinance revisions, and
capital improvement projects).
The members of the HMPT will remain charged with ensuring that the goals and strategies of new and
updated local planning documents for their jurisdictions are consistent with the goals and actions of the
Tarrant County HazMAP and will not contribute to increased hazard vulnerability in Tarrant County or its
participating jurisdictions.
During the planning process for new and updated local planning documents, such as a comprehensive
plan, capital improvement plan, or emergency management plan, Tarrant County and its participating
jurisdictions will provide a copy of the Tarrant County HazMAP to the appropriate parties and recommend
that all goals and strategies of new and updated local planning documents are consistent with and support
the goals of the Tarrant County HazMAP and will not contribute to increased hazards in the affected
jurisdiction(s).
The following steps will be taken in implementing this HazMAP into local plans:
1. Change is proposed by an elected official or other interested party.
2. Proposal is placed on the local agenda of the governing body.
3. Agenda is published at least 10 days in advance of the meeting at which it will be discussed, so
members of the public have an opportunity to attend the discussion meeting. Publication may be
made by posting the agenda on the city’s website, in the city newsletter, or on a public bulletin
board.
4. Proposal is discussed at the public meeting, including any comments by members of the public
attendance.
5. Proposal is voted on by the governing body.
6. If the proposal is passed, the change is implemented by the appropriate local authority.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϲ
Section 7: Conclusion
Through the development of this plan, Tarrant County has developed a thorough hazard history, an
inventory of critical facilities, and an updated contact list for emergency contacts at critical facilities. This
data, when used in conjunction with the updated information about hazard threats and vulnerabilities,
will prove to be invaluable to Tarrant County and its participating jurisdictions.
Natural hazards have been identified county-wide and technological hazards have been listed for selected
jurisdictions that opted to include these hazards. Mitigation projects that could reduce the risk of lives
and property due to the identified threats have been compiled and prioritized.
The creation of the Tarrant County Hazard Mitigation Planning Team (HMPT) brought together
stakeholders from communities and organizations onto one planning team. This group has been able to
work together effectively and efficiently to produce this document and establish a greater awareness of
risks and mitigation strategies.
In addition to the HMPT, the creation of the Local Planning Team (LPT) in each jurisdiction brought
together stakeholders and departments within the jurisdiction onto one planning team. This group was
able to work together effectively and efficiently to produce jurisdictional data for this document and
establish a greater awareness of risks and mitigation strategies.
This plan will continue to evolve as necessary to properly represent the threats and vulnerabilities
affecting Tarrant County. Continued public participation is encouraged and will continue through the
ongoing multijurisdictional hazard mitigation process.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϳ
This page intentionally left blank.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϴ
Appendix A: Meeting Documentation
The following pages in Appendix A include the public meeting announcements and attendance records
from the participating jurisdictions.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϴϵ
Public Announcements
City of Arlington
Arlington city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϬ
City of Azle
The City of Azle hosted a public meeting on September 18, 2018 at the Azle Fire Department. The
meeting was advertised on the city website and public bulletin. No public comment was received.
Azle city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϭ
Azle press release.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϮ
City of Bedford
Bedford Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϯ
Bedford city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϰ
City of Blue Mound
Blue Mound Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϱ
Blue Mound city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϲ
City of Colleyville
Colleyvile city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϳ
City of Crowley
Crowley Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϴ
Crowley Twitter page
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϵϵ
Crowley electronic city newsletter.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϬ
City of Dalworthington Gardens
Dalworthington Gardens’ Nextdoor app.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϭ
Town of Edgecliff Village
Edgecliff Village town website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϮ
City of Euless
The mitigation plan was discussed at the public City Council me eting on February 13, 2018. Meetings are
announced on the city website. No public comment was recorded.
Euless City Council agenda.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϯ
City of Everman
A public hearing was scheduled as part of the regularly scheduled City Council meeting on December 11,
2018 at 6:30 pm at the City Hall located at 212 North Race Street, Everman, Texas 76140. The meeting
was posted to the bulletin board outside City Hall on November 19th. The City Council meeting was later
rescheduled for December 18. There was no public comment recorded.
Everman City Hall bulletin.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϰ
City of Forest Hill
Forest Hill public building.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϱ
City of Fort Worth
The City of Fort Worth published the Fort Worth Annex on their Office of Emergency Management
website. There was no public comment received.
Fort Worth Office of Emergency Management website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϲ
City of Grapevine
Grapevine City Hall bulletin.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϳ
Grapevine City Hall bulletin.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϴ
Grapevine Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϬϵ
City of Haltom City
Public bulletin board at Haltom City fire station.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϬ
City of Haslet
Haslet Facebook page.
Haslet city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϭ
City of Hurst
Hurst city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϮ
City of Keller
Keller city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϯ
Keller electronic city newsletter.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϰ
City of Kennedale
Kennedale Nextdoor app.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϱ
Kennedale Facebook page.
Kennedale Twitter page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϲ
Kennedale city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϳ
City of Lake Worth
Lake Worth city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϴ
City of Lakeside
Lakeside public announcement.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϭϵ
Lakeside public announcement.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϬ
Lakeside council minutes.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϭ
City of Mansfield
Mansfield Twitter page.
Mansfield Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϮ
North Central Texas Council of Governments (NCTCOG)
NCTCOG public bulletin.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϯ
City of North Richland Hills
North Richland Hills city website.
North Richland Hills Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϰ
Town of Pantego
Pantego Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϱ
Pantego town website.
Pantego town website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϲ
City of Richland Hills
A public hearing was held as part of the regularly scheduled City Council meeting on November 13,2017 at 7pm
in the City Council chambers located at 3200 Diana Dr. Richland Hills, TX 76118. The meeting was posted to the
bulletin board outside City Hall on October 30
th and published to the City website on the same date.
Richland Hills’ city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϳ
Richland Hills public bulletin board.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϴ
City of River Oaks
River Oaks’ city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϮϵ
City of Saginaw
Saginaw city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϬ
Saginaw public building.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϭ
City of Southlake
Southlake Department of Public Safety Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϮ
Southlake city website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϯ
Unincorporated Tarrant County
Tarrant County Public Health Nextdoor app.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϰ
Tarrant County public bulletin.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϱ
University of North Texas Health Science Center (UNTHSC)
UNTHSC online newsletter.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϲ
UNTHSC online newsletter.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϳ
UNTHSC university website.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϴ
City of Watauga
Watauga Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϯϵ
Town of Westlake
Westlake Facebook page.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϬ
City of Westworth Village
Westworth Village passed out citizen surveys at a local citizen’s meeting. The survey was four pages long
and asked questions regarding local hazards, community assets, trusted resources, and mitigation
activities that would be taken into consideration when developing the city’s annex in the Tarrant County
Hazard Mitigation Action Plan.
The following pages are the results of these surveys.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϰϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϱϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϲϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϳϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϴϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϭϵϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϬϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϭϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϭϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϭϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϮϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϯϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϯϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϯϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϰϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϰϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϰϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϱϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϱϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϱϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϲϬ
Attendance Records
The following pages are the various attendance sheets from a majority of the meetings
conducted during the planning process of this Tarrant County Hazard Mitigation Action Plan.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϲϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϲϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϲϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϲϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϲϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϲϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϲϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϲϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϲϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϲ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϳ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϴ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϳϵ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϴϬ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϴϭ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϴϮ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϴϯ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϴϰ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϴϱ
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϮϴϲ
Appendix B: Supporting Documents
Appendix B provides various information that support the mitigation actions and risk assessment
identified in this hazard mitigation action plan.
Information includes:
x Annotated list of rare species in Tarrant County.
x Historic sites in Tarrant County.
x Natural Cooperative Soil Survey for dwellings on concrete slabs in Tarrant County.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϴϳ
Annotated List of Rare Species in Tarrant County
Under Section 12.0011 of the Texas Parks and Wildlife Code, the Texas Parks and Wildlife Department
(TPWD) is charged with "providing recommendations that will protect fish and wildlife resources to local,
state, and federal agencies that approve, permit, license, or construct developmental projects" and
"providing information on fish and wildlife resources to any local, state, and federal agencies or private
organizations that make decisions affecting those resources." Project types reviewed by TPWD include
reservoirs, highway projects, pipelines, urban infrastructure, utility construction, renewable energy, and
residential and commercial construction, as well as many others.
During project planning, and prior to construction, project areas should be surveyed for potential habitat
for rare species as described on the following list. If potential habitat for a rare species is found,
construction impacts to these areas should be avoided to the greatest extent practicable. If a rare species
is found on a project, TPWD recommends contacting the Wildlife Habitat Assessment Program (WHAB) for
additional guidance.
Rare species are those native Texas species considered to be imperiled throughout a significant part of
their range. Rare species are not protected by state or federal law. However, TPWD actively promotes
their conservation in an effort to prevent future endangerment and need to propose for listing. Identifying
the potential for adverse impacts to rare species and taking steps to avoid or minimize them on projects
helps to further this goal.
Below is the TPWD Annotated County Lists of Rare Species in Tarrant County.
TARRANT COUNTY
Last Updated: 12/30/2016
BIRDS Federal Status State Status
American Peregrine Falcon Falco peregrinus anatum DL T
Year-round resident and local breeder in west Texas, nests in tall cliff eyries; also, migrant across state
from more northern breeding areas in US and Canada, winters along coast and farther south;
occupies wide range of habitats during migration, including urban, concentrations along coast and
barrier islands; low-altitude migrant, stopovers at leading landscape edges such as lake shores,
coastlines, and barrier islands.
Arctic Peregrine Falcon Falco peregrinus tundrius DL
Migrant throughout state from subspecies’ far northern breeding range, winters along coast and
farther south; occupies wide range of habitats during migration, including urban, concentrations
along coast and barrier islands; low-altitude migrant, stopovers at leading landscape edges such as
lake shores, coastlines, and barrier islands.
BIRDS Federal Status State Status
Bald Eagle Haliaeetus leucocephalus DL T
Found primarily near rivers and large lakes; nests in tall trees or on cliffs near water; communally
roosts, especially in winter; hunts live prey, scavenges, and pirates food from other birds.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϴϴ
BIRDS Federal Status State Status
Henslow's Sparrow Ammodramus henslowii
Wintering individuals (not flocks) found in weedy fields or cut-over areas where lots of bunch grasses
occur along with vines and brambles; a key component is bare ground for running/walking.
Interior Least Tern Sterna antillarum athalassos LE E
Subspecies is listed only when inland (more than 50 miles from a coastline); nests along sand and
gravel bars within braided streams, rivers; also know to nest on man-made structures (inland
beaches, wastewater treatment plants, gravel mines, etc); eats small fish and crustaceans, when
breeding forages within a few hundred feet of colony.
Peregrine Falcon Falco peregrinus DL T
Both subspecies migrate across the state from more northern breeding areas in US and Canada to
winter along coast and farther south; subspecies (F. p. anatum) is also a resident breeder in west
Texas; the two subspecies’ listing statuses differ, F.p. tundrius is no longer listed in Texas; but because
the subspecies are not easily distinguishable at a distance, reference is generally made only to the
species level; see subspecies for habitat.
Red Knot Calidris canutus rufa T
Red knots migrate long distances in flocks northward through the contiguous United States mainly
April-June, southward July-October. A small plump-bodied, short-necked shorebird that in breeding
plumage, typically held from May through August, is a distinctive and unique pottery orange color. Its
bill is dark, straight and, relative to other shorebirds, short-to-medium in length. After molting in late
summer, this species is in a drab gray-and-white non-breeding plumage, typically held from
September through April. In the non-breeding plumage, the knot might be confused with the
omnipresent Sanderling. During this plumage, look for the knot’s prominent pale eyebrow and
whitish flanks with dark barring. The Red Knot prefers the shoreline of coast and bays and also uses
mudflats during rare inland encounters. Primary prey items include coquina clam (Donax spp.) on
beaches and dwarf surf clam (Mulinia lateralis) in bays, at least in the Laguna Madre. Wintering
Range includes- Aransas, Brazoria, Calhoun, Cameron, Chambers, Galveston, Jefferson, Kennedy,
Kleberg, Matagorda, Nueces, San Patricio, and Willacy. Habitat: Primarily seacoasts on tidal flats and
beaches, herbaceous wetland, and Tidal flat/shore.
Sprague's Pipit Anthus spragueii
Only in Texas during migration and winter, mid-September to early April; short to medium distance,
diurnal migrant; strongly tied to native upland prairie, can be locally common in coastal grasslands,
uncommon to rare further west; sensitive to patch size and avoids edges.
Western Burrowing Owl Athene cunicularia hypugaea
Open grasslands, especially prairie, plains, and savanna, sometimes in open areas such as vacant lots
near human habitation or airports; nests and roosts in abandoned burrows.
Whooping Crane Grus americana LE E
Potential migrant via plains throughout most of state to coast; winters in coastal marshes of Aransas,
Calhoun, and Refugio counties.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϴϵ
FISHES Federal Status State Status
Shovelnose sturgeon Scaphirhynchus platorynchus T
Open, flowing channels with bottoms of sand or gravel; spawns over gravel or rocks in an area with a
fast current; Red River below reservoir and rare occurrence in Rio Grande.
MAMMALS Federal Status State Status
Gray wolf Canis lupus LE E
Extirpated; formerly known throughout the western two-thirds of the state in forests, brushlands, or
grasslands.
Plains spotted skunk Spilogale putorius interrupta
Catholic; open fields, prairies, croplands, fence rows, farmyards, forest edges, and woodlands; prefers
wooded, brushy areas and tallgrass prairie.
Red wolf Canis rufus LE E
Extirpated; formerly known throughout eastern half of Texas in brushy and forested areas, as well as
coastal prairies.
MOLLUSKS Federal Status State Status
Louisiana pigtoe Pleurobema riddellii T
Streams and moderate-size rivers, usually flowing water on substrates of mud, sand, and gravel; not
generally known from impoundments; Sabine, Neches, and Trinity (historic) River basins.
Sandbank pocketbook Lampsilis satura T
Small to large rivers with moderate flows and swift current on gravel, gravel-sand, and sand bottoms;
east Texas, Sulfur south through San Jacinto River basins; Neches River.
Texas heelsplitter Potamilus amphichaenus T
Quiet waters in mud or sand and also in reservoirs. Sabine, Neches, and Trinity River basins.
Texas pigtoe Fusconaia askewi T
Rivers with mixed mud, sand, and fine gravel in protected areas associated with fallen trees or other
structures; east Texas River basins, Sulphur River, Cypress Creek, Sabine through Trinity rivers as well
as San Jacinto River.
REPTILES Federal Status State Status
Texas garter snake Thamnophis sirtalis annectens
Wet or moist microhabitats are conducive to the species occurrence, but is not necessarily restricted
to them; hibernates underground or in or under surface cover; breeds March-August.
Texas horned lizard Phrynosoma cornutum T
Open, arid and semi-arid regions with sparse vegetation, including grass, cactus, scattered brush or
scrubby trees; soil may vary in texture from sandy to rocky; burrows into soil, enters rodent burrows,
or hides under rock when inactive; breeds March-September.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϵϬ
REPTILES Federal Status State Status
Timber rattlesnake Crotalus horridus T
Swamps, floodplains, upland pine and deciduous woodlands, riparian zones, abandoned farmland;
limestone bluffs, sandy soil or black clay; prefers dense ground cover, i.e. grapevines or palmetto.
PLANTS Federal Status State Status
Auriculate false foxglove Agalinis auriculata
Known in Texas from one late nineteenth century specimen record labeled -Benbrook-; in Oklahoma,
degraded prairies, floodplains, fallow fields, and borders of upland sterile woods; in Arkansas,
blackland prairie; annual; flowering August – October.
Glen Rose yucca Yucca necopina
Texas endemic; grasslands on sandy soils and limestone outcrops; flowering April-June.
Hall's prairie clover Dalea hallii
Global Rank: G3; In grasslands on eroded limestone or chalk and in oak scrub on rocky hillsides;
perennial; flowering May-September; fruiting June-September.
Osage Plains false foxglove Agalinis densiflora
Global Rank: G3; Most records are from grasslands on shallow, gravelly, well drained, calcareous soils;
prairies, dry limestone soils; annual; flowering August-October.
Reverchon's curfpea Pediomelum reverchonii
Global Rank: G3; Mostly in prairies on shallow rocky calcareous substrates and limestone outcrops;
perennial; flowering June-September; fruiting June-July.
Texas milk vetch Astragalus reflexus
Global Rank: G3; In grasslands, prairies, and roadsides on calcareous and clay substrates; annual;
flowering February-June; fruiting April-June.
Topeka purple-coneflower Echinacea atrorubens
Global Rank: G3; Occurring mostly in tallgrass prairie of the southern Great Plains, in blackland
prairies but also in a variety of other sites like limestone hillsides; perennial; flowering January-June;
fruiting January-May.
*Globe Rank: NatureServe global conservation status ranks (G-ranks) reflect an assessment of the
condition of the species or ecological community across its entire range. G3 is vulnerable: at moderate
risk of extinction due to a restricted range, relatively few populations (often 80 or fewer), recent and
widespread declines, or other factors.
Definitions for The Terms Used Above
Federal Status and State Status Description
LE or LT Federally listed endangered or threatened
DL or PDL Federally delisted or proposed for delisting
E or T State listed endangered or threatened
“blank” Species of greatest conservation need (SGCN) but with
no regulatory listing status
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϵϭ
Historic Sites in Tarrant County
The importance of integrating historic property and cultural resource considerations into mitigation
planning has been made all too apparent in losses that have occurred in recent disasters. Whether a
disaster impacts a major community museum, a historic "main street," or collections of family
photographs, the sudden loss of historic properties and cultural resources can negatively impact a
community's character and economy, and can affect the overall ability of the community to recover from
a disaster.
According to the Texas Historic Sites Atlas, Tarrant County has 124 cemeteries, 32 museums, and 392
historical markers. There are also 6 state antiquities landmarks, 115 national register properties, and 6
courthouses.
The following sites, from the National Register of Historic Places, are located within Tarrant County, are
exposed to the identified hazards, and could potentially experience severe damage if directly impacted.
These sites keep the history of the community alive. They are reminders of a jurisdiction’s culture and
complexity. Once a piece of history is destroyed, it is lost forever.
¾Allen Chapel AME Church (added 1984 - - #84000169)
116 Elm Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Reed, William & Sons, Pittman, William Sidney
Architectural Style: Other, Late Gothic Revival
Area of Significance: Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Religion
Historic Sub-function: Religious Structure
Current Function: Religion
Current Sub-function: Religious Structure
¾American Airways Hanger and Administration Building (added 2008 - - #08000317)
201 Aviation Way, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Epstein, A., Byrne, Thomas S. Inc.
Architectural Style: Moderne
Area of Significance: Transportation, Architecture
Period of Significance: 1950-1974, 1925-1949
Owner: Local
Historic Function: Transportation
Historic Sub-function: Air-Related
Current Function: Transportation
Current Sub-function: Air-Related
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϮϵϮ
¾Anderson, Neil P., Building (added 1978 - - #78002981)
411 West 7th Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Hedrick, W.C., Construction, Sanguinett & Staats
Architectural Style: Chicago
Area of Significance: Architecture, Commerce
Period of Significance: 1900-1924
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Business
Current Function: Commerce/Trade
¾Arlington Post Office (added 2000 - - #00000188); also known as Old Post Office
200 West Main Street, Arlington
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Public Building Administration, Federal Works Agency
Architectural Style: Colonial Revival
Area of Significance: Art, Architecture
Period of Significance: 1950-1974
Owner: Local
Historic Function: Government
Historic Sub-function: Post Office
Current Function: Government
Current Sub-function: Government Office
¾Atelier Building (added 1984 - - #84003976); also known as Edrington Bank; Cameron Alread
Architect, Inc.
209 West 8th Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Smith & Schenk
Architectural Style: Other, Late 19th and Early 20th Century American Movements
Area of Significance: Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Commerce/Trade
Current Function: Commerce/Trade
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϵϯ
¾Austin, Stephen F., Elementary School (added 1983 - - #83003160)
319 Lipscomb Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Sanguinet & Staats, Messer, Sanguinet & Messer
Architectural Style: Romanesque
Area of Significance: Education, Architecture
Period of Significance: 1950-1974, 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Education
Historic Sub-function: School
Current Function: Commerce/Trade
Current Sub-function: Business
¾Bedford School (added 1997 - - #97000851)
2400 School Lane, Bedford
Historic Significance: Event
Area of Significance: Community Planning and Development, Education
Period of Significance: 1925-1949, 1900-1924
Owner: Local
Historic Function: Education
Historic Sub-function: School
Current Function: Recreation and Culture
Current Sub-function: Museum
¾Benton, M. A., House (added 1978 - - #78002982)
1730 6th Avenue, Fort Worth
Historic Significance: Person, Architecture/Engineering
Architect, builder, or engineer: Unknown
Architectural Style: Late Victorian
Historic Person: Benton, Ella Belle
Significant Year: 1898
Area of Significance: Education, Architecture, Landscape Architecture, Religion
Period of Significance: 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϵϰ
¾Blackstone Hotel (added 1984 - - #84001961)
601 Main Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Mauran, Russell & Crowell
Architectural Style: Modern Movement
Area of Significance: Architecture, Commerce
Period of Significance: 1925-1949
Owner: Private
Historic Function: Domestic
Historic Sub-function: Hotel
Current Function: Vacant/Not In Use
¾Botts--Fowler House (added 1999 - - #99000723)
115 North Fourth Avenue, Mansfield
Historic Significance: Event
Area of Significance: Community Planning and Development
Period of Significance: 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Bratton, Andrew "Cap" and Emma Doughty, House (added 2003 - - #03000432)
310 East Broad Street, Mansfield
Historic Significance: Event
Area of Significance: Community Planning and Development, Architecture
Period of Significance: 1950-1974, 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Commerce/Trade, Domestic
Historic Sub-function: Single Dwelling, Specialty Store
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Bryce Building (added 1984 - - #84001963)
909 Throckmorton Street, Fort Worth
Historic Significance: Person, Architecture/Engineering
Architect, builder, or engineer: Bryce, William J.
Architectural Style: Renaissance
Historic Person: Bryce, William J.
Significant Year: 1910
Area of Significance: Architecture, Commerce
Period of Significance: 1900-1924
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Business
Current Function: Vacant/Not In Use
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϵϱ
¾Bryce, William J., House (added 1984 - - #84001965); also known as Fairview
4900 Bryce Avenue, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Bryce, William J., Sanguinet, Marshall
Architectural Style: Other, Renaissance
Area of Significance: Architecture
Period of Significance: 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Buchanan-Hayter-Witherspoon House (added 2003 - - #03000433)
306 E. Broad Street, Mansfield
Historic Significance: Event
Area of Significance: Architecture, Community Planning and Development
Period of Significance: 1950-1974, 1925-1949, 1900-1924, 1875-1899, 1850-1874
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Buck Oaks Farm (added 2004 - - #87000995); also known as Raymond and Katherine Buck House
6312 White Settlement Road, Westworth
Historic Significance: Person, Event, Architecture/Engineering
Architect, builder, or engineer: Glasgow, Earl T.
Architectural Style: Colonial Revival
Historic Person: Buck, Raymond E.
Significant Year: 1933, 1932
Area of Significance: Commerce, Architecture
Period of Significance: 1925-1949
Owner: Federal
Historic Function: Domestic
Historic Sub-function: Secondary Structure, Single Dwelling
Current Function: Defense, Domestic
Current Sub-function: Secondary Structure, Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϵϲ
¾Burnett, Burk, Building (added 1980 - - #80004151)
500--502 Main Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Buchanan & Gilder, Sanguinet & Staats
Architectural Style: Other, Classical Revival
Area of Significance: Architecture, Commerce
Period of Significance: 1900-1924
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Financial Institution
Current Function: Commerce/Trade
¾Central Handley Historic District (added 2002 - - #01001472)
Roughly bounded by East Lancaster Avenue, Forest Avenue, Kerr Street, and Handley Drive, Fort
Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: et.al., Adams, B.B.
Architectural Style: Late Victorian, Early Commercial
Area of Significance: Commerce, Community Planning and Development, Architecture
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Private
Historic Function: Commerce/Trade, Domestic, Government
Historic Sub-function: Business, Post Office, Professional, Restaurant, Single Dwelling,
Specialty Store
Current Function: Commerce/Trade, Vacant/Not In Use
Current Sub-function: Business, Restaurant, Specialty Store
¾Chorn, Lester H. and Mabel Bryant, House (added 2003 - - #03000434)
303 East Broad Street, Mansfield
Historic Significance: Event
Area of Significance: Community Planning and Development
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϵϳ
¾Cotton Belt Railroad Industrial Historic District (added 1997 - - #97001109)
Along railroad tracks, roughly bounded by Hudgins, Dooley, and Dallas Streets, Grapevine
Historic Significance: Architecture/Engineering, Event
Architectural Style: No Style Listed
Area of Significance: Industry, Transportation, Architecture
Period of Significance: 1950-1974, 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Industry/Processing/Extraction, Transportation
Historic Sub-function: Manufacturing Facility, Rail-Related
Current Function: Industry/Processing/Extraction, Recreation and Culture, Vacant/Not In
Use
Current Sub-function: Manufacturing Facility, Museum
¾Eddleman-McFarland House (added 1979 - - #79003009) ; also known as McFarland Home
1110 Penn Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Messer, Howard
Architectural Style: Other, Late Victorian
Area of Significance: Architecture, Commerce
Period of Significance: 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Social
Current Sub-function: Civic
¾Eighth Avenue Historic District (added 2006 - - #06001065)
Bounded by 8th Avenue, Pennsylvania Avenue, 9th Avenue, and Pruitt Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Koeppe, Paul, Sanguinet & Staats
Architectural Style: Late 19th and Early 20th Century American Movements, Late 19th and
20th Century Revivals
Area of Significance: Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Commerce/Trade
Current Sub-function: Professional
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϵϴ
¾Electric Building (added 1995 - - #95000048); also known as Fort Worth Power and Light Building;
Texas Electric Service C
410 West 7th Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: et al., Hedrick, Wyatt C.
Architectural Style: Other, Art Deco
Area of Significance: Commerce, Architecture
Period of Significance: 1925-1949
Owner: Private
Historic Function: Commerce/Trade, Recreation and Culture
Historic Sub-function: Business, Theater
Current Function: Vacant/Not In Use
¾Elizabeth Boulevard Historic District (added 1979 - - #79003010)
1001--1616 Elizabeth Boulevard, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Ryan, John C.
Architectural Style: Mission/Spanish Revival, Colonial Revival, Prairie School
Area of Significance: Architecture, Landscape Architecture, Commerce
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Fairmount--Southside Historic District (added 1990 - - #90000490); also known as See Also: South
Side Masonic Lodge; Benton, Meredith, House; J
Roughly bounded by Magnolia, Hemphill, Eighth, and Jessamine, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Unknown
Architectural Style: Late 19th and Early 20th Century American Movements, Late 19th and
20th Century Revivals, Late Victorian
Area of Significance: Architecture, Community Planning and Development
Period of Significance: 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Commerce/Trade, Domestic, Social
Historic Sub-function: Business, Multiple Dwelling, Single Dwelling
Current Function: Commerce/Trade, Domestic, Social
Current Sub-function: Business, Multiple Dwelling, Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
Ϯϵϵ
¾Fairmount--Southside Historic District (Boundary Increase) (added 1998 - - #98001375); also
known as See Also: Fairmount--Southside Historic District
Roughly bounded by Magnolia, Hemphill, Allen, Travis and Murphy, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Davies, J.B.
Architectural Style: Other, Classical Revival
Area of Significance: Architecture, Community Planning and Development
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Commerce/Trade, Education
Historic Sub-function: School, Specialty Store
Current Function: Commerce/Trade, Education
Current Sub-function: School, Specialty Store
¾Fairmount--Southside Historic District (Boundary Increase) (added 1999 - - #99000565)
Roughly bounded by Magnolia, Hemphill, Allen, Travis and Morphy Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Davies, J.B.
Architectural Style: Other, Classical Revival
Area of Significance: Community Planning and Development, Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Commerce/Trade, Education
Historic Sub-function: School, Specialty Store
Current Function: Commerce/Trade, Education
Current Sub-function: School, Specialty Store
¾First Christian Church (added 1983 - - #83003812)
612 Throckorton Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Van Slyke & Woodruff
Architectural Style: Beaux Arts, Renaissance
Area of Significance: Architecture, Religion
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Religion
Historic Sub-function: Religious Structure
Current Function: Religion, Social
Current Sub-function: Civic, Religious Structure
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϬ
¾First National Bank Building (added 2009 - - #09000981); also known as Baker Building
711 Houston Street, Fort Worth
Historic Significance: Event, Person, Architecture/Engineering
Architect, builder, or engineer: Hedrick, Wyatt C., Sanguinet & Staats
Architectural Style: Skyscraper
Historic Person: Loyd, Cpt. Martin B.
Area of Significance: Architecture, Commerce
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Business
Current Function: Commerce/Trade
Current Sub-function: Business
¾Flatiron Building (added 1971 - - #71000964)
1000 Houston Street, Fort Worth
Historic Significance: Person, Architecture/Engineering
Architect, builder, or engineer: Sanguinet & Staats
Architectural Style: Chicago
Historic Person: Saunders, Bacon
Significant Year: 1907
Area of Significance: Architecture, Health/Medicine
Period of Significance: 1900-1924
Owner: Private
Historic Function: Commerce/Trade, Health Care
Historic Sub-function: Medical Business/Office
Current Function: Commerce/Trade
¾Fort Worth Botanic Garden (added 2009 - - #08001400); also known as Harry J. Adams Memorial
Garden
3220 Botanic Garden Boulevard, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Hare and Hare, et al.
Architectural Style: Renaissance
Area of Significance: Landscape Architecture, Entertainment/Recreation
Period of Significance: 1950-1974, 1925-1949
Owner: Local
Historic Function: Agriculture/Subsistence, Education, Landscape, Recreation and Culture,
Social
Historic Sub-function: Clubhouse, Horticulture Facility, Outdoor Recreation, Park, Research
Facility
Current Function: Agriculture/Subsistence, Education, Landscape, Recreation and Culture,
Social
Current Sub-function: Clubhouse, Horticulture Facility, Outdoor Recreation, Park, Research
Facility
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϭ
¾Fort Worth Club Building--1916 (added 1998 - - #98000102); also known as Holmes Building;
Winfree Building; Midcontinent Building; Ken
608-610 Main Street, Fort Worth
Historic Significance: Event
Area of Significance: Commerce, Social History
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Commerce/Trade, Social
Historic Sub-function: Business, Clubhouse, Organizational, Professional
Current Function: Vacant/Not In Use
¾Fort Worth Elks Lodge 124 (added 1984 - - #84001969); also known as Benevolent and Protective
Order of Elks; YWCA of Fort Worth a
512 West 4th Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Burne, Thomas C., Inc., Hedrick, Wyatt C.
Architectural Style: Other, Colonial Revival
Area of Significance: Architecture
Period of Significance: 1925-1949
Owner: Private
Historic Function: Social
Historic Sub-function: Clubhouse
Current Function: Social
Current Sub-function: Civic
¾Fort Worth High School (added 2002 - - #02001515); also known as Central No.19, Junior High;
Jennings Avenue No. 40;
1015 South Jennings Avenue, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Waller and Field, Innis--Graham builder
Architectural Style: Classical Revival
Area of Significance: Education, Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Education
Historic Sub-function: School
Current Function: Domestic
Current Sub-function: Multiple Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϮ
¾Fort Worth Public Market (added 1984 - - #84001981); also known as Cadillac Plastics
1400 Henderson Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Quisle & Andrews, Noftsger, B. Gaylord
Architectural Style: Mission/Spanish Revival, Other
Area of Significance: Architecture, Commerce
Period of Significance: 1925-1949
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Specialty Store
Current Function: Commerce/Trade
Current Sub-function: Specialty Store
¾Fort Worth Stockyards Historic District (added 1976 - - #76002067)
Roughly bounded by 23rd, Houston, and 28th Streets, and railroad, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Unknown
Architectural Style: Mission/Spanish Revival
Area of Significance: Agriculture, Architecture, Commerce, Industry
Period of Significance: 1900-1924
Owner: Private
Historic Function: Agriculture/Subsistence, Commerce/Trade,
Industry/Processing/Extraction, Recreation and Culture
Historic Sub-function: Animal Facility, Manufacturing Facility, Processing, Sport Facility
Current Function: Agriculture/Subsistence, Commerce/Trade,
Industry/Processing/Extraction, Recreation and Culture
Current Sub-function: Animal Facility, Manufacturing Facility, Processing, Sport Facility
¾Fort Worth United States Courthouse (added 2001 - - #01000437)
501 West 10th Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Cret, Paul Phillippe, Clarkson, Wiley G., et al.
Architectural Style: Moderne, Modern Movement
Area of Significance: Art, Politics/Government, Architecture
Period of Significance: 1950-1974, 1925-1949
Owner: Federal
Historic Function: Government
Historic Sub-function: Courthouse, Government Office
Current Function: Government
Current Sub-function: Courthouse, Government Office
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϯ
¾Grand Avenue Historic District (added 1990 - - #90000337)
Roughly Grand Avenue from Northside to Park, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Unknown
Architectural Style: Prairie School, Bungalow/Craftsman, Tudor Revival
Area of Significance: Architecture, Community Planning and Development
Period of Significance: 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Multiple Dwelling, Secondary Structure, Single Dwelling
Current Function: Domestic
Current Sub-function: Multiple Dwelling, Secondary Structure, Single Dwelling
¾Grapevine Commercial Historic District (added 1992 - - #92000097)
404--432 South Main Street, Grapevine
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Unknown
Architectural Style: Other
Area of Significance: Commerce, Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Commerce/Trade, Government
Historic Sub-function: Business, Department Store, Financial Institution, Post Office
Current Function: Commerce/Trade
Current Sub-function: Business, Restaurant, Specialty Store
¾Grapevine Commercial Historic District (Boundary Increase II) (added 2002 - - #02001569)
500-530 South Main Street, Grapevine
Historic Significance: Event, Architecture/Engineering
Architectural Style: Early Commercial
Area of Significance: Architecture, Commerce
Period of Significance: 1950-1974, 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Specialty Store
Current Function: Commerce/Trade
Current Sub-function: Specialty Store
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϰ
¾Grapevine Commercial Historic District (Boundary Increase) (added 1997 - - #97000444)
300 and 400 blocks of South Main Street, Grapevine
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Unknown
Architectural Style: No Style Listed
Area of Significance: Architecture, Commerce
Period of Significance: 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Specialty Store
Current Function: Commerce/Trade
Current Sub-function: Specialty Store
¾Guinn, James E., School (added 1998 - - #98000429)
1200 South Freeway, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Multiple
Architectural Style: Classical Revival
Area of Significance: Architecture, Education
Period of Significance: 1950-1974, 1925-1949
Owner: Local
Historic Function: Education
Historic Sub-function: School
Current Function: Vacant/Not In Use
¾Gulf, Colorado, and Santa Fe Railroad Passenger Station (added 1970 - - #70000760)
1601 Jones Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Unknown
Architectural Style: Beaux Arts
Area of Significance: Transportation, Architecture
Period of Significance: 1875-1899
Owner: Private
Historic Function: Transportation
Historic Sub-function: Rail-Related
Current Function: Transportation
Current Sub-function: Rail-Related
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϱ
¾Heritage Park Plaza (added 2010 - - #10000253); also known as Upper Heritage Park
West Bluff Street at Main Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Halprin, Lawrence
Area of Significance: Landscape Architecture
Period of Significance: 1975-2000
Owner: Local
Historic Function: Landscape
Historic Sub-function: Park
Current Function: Landscape
Current Sub-function: Park
¾Hogg, Alexander, School (added 2002 - - #02001512); also known as District 11 School No. 11;
Homes of Parker Commons
900 Saint Louis Avenue, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Innis--Graham Construction Company, Waller, M.L.
Architectural Style: Beaux Arts
Area of Significance: Education, Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Education
Historic Sub-function: School
Current Function: Domestic
Current Sub-function: Multiple Dwelling
¾Hotel Texas (added 1979 - - #79003011); also known as Fort Worth-Sheraton
815 Main Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Marvan, Russell & Clowell, Sanguinet & Staats
Architectural Style: Other, Chicago, Renaissance
Area of Significance: Architecture, Commerce, Industry
Period of Significance: 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Hotel
Current Function: Domestic
Current Sub-function: Hotel
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϲ
¾Hutcheson-Smith House (added 1984 - - #84001993)
312 North Oak Street, Arlington
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Unknown
Architectural Style: Queen Anne, Stick/Eastlake
Area of Significance: Architecture
Period of Significance: 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Johnson-Elliott House (added 1984 - - #84001996); also known as Dr. Clay Johnson House
3 Chase Court, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Waller & Field
Architectural Style: Prairie School, Beaux Arts
Area of Significance: Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Secondary Structure, Single Dwelling
Current Function: Domestic
Current Sub-function: Secondary Structure, Single Dwelling
¾Knights of Pythias Building (added 1970 - - #70000761); also known as Knights of Pythias Castle
Hall
315 Main Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Sanguinet & Staats
Architectural Style: Other
Area of Significance: Architecture, Social History
Period of Significance: 1900-1924
Owner: Private
Historic Function: Social
Historic Sub-function: Clubhouse
Current Function: Social
Current Sub-function: Clubhouse
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϳ
¾Kress Building (added 2007 - - #07000266); also known as Kress, S.H. and Co. Building
604 Main Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Sibbert, Edward F.
Architectural Style: Moderne
Area of Significance: Commerce, Architecture
Period of Significance: 1950-1974, 1925-1949
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Department Store
Current Function: Commerce/Trade, Work In Progress
Current Sub-function: Restaurant
¾Leuda--May Historic District (added 2005 - - #05000240)
301-311 West Leuda and 805-807 May Streets, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architectural Style: Prairie School, Colonial Revival
Area of Significance: Community Planning and Development, Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Multiple Dwelling, Single Dwelling
Current Function: Domestic
Current Sub-function: Multiple Dwelling, Single Dwelling
¾M. G. Ellis School (1914) (added 1986 - - #83003161); also known as North Fort Worth Public
School (1905)
213 Northeast 14th Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Waller, Marion L.
Architectural Style: Colonial, Renaissance
Area of Significance: Education, Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Education
Historic Sub-function: School
Current Function: Vacant/Not In Use
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϴ
¾Man, Ralph Sandiford and Julia Boisseau, House (added 2003 - - #03000435); also known as Ralph
Sandiford Mann Homestead
604 West Broad Street, Mansfield
Historic Significance: Person, Event
Historic Person: Man, Ralph Sandiford
Significant Year: 1865, 1868, 1880
Area of Significance: Community Planning and Development
Period of Significance: 1900-1924, 1875-1899, 1850-1874
Owner: Private
Historic Function: Agriculture/Subsistence, Domestic
Historic Sub-function: Animal Facility, Secondary Structure, Single Dwelling
Current Function: Agriculture/Subsistence, Domestic
Current Sub-function: Animal Facility, Secondary Structure, Single Dwelling
¾Marine Commercial Historic District (added 2001 - - #01000102); also known as The Mercado
Roughly defined by North Main Street, between North Side Drive and North 14th Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Singleton, Frank J., et.al.
Architectural Style: Early Commercial, Mission/Spanish Revival
Area of Significance: Architecture, Commerce, Community Planning and Development
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Private, Local
Historic Function: Commerce/Trade, Domestic, Health Care,
Industry/Processing/Extraction, Recreation and Culture, Social
Historic Sub-function: Clubhouse, Department Store, Medical Business/Office, Processing Site,
Single Dwelling, Specialty Store, Theater
Current Function: Commerce/Trade, Industry/Processing/Extraction, Vacant/Not In Use,
Work In Progress
Current Sub-function: Organizational, Processing Site, Restaurant, Specialty Store, Warehouse,
Water Works
¾Markeen Apartments (added 2001 - - #01000470)
210--14 Saint Louis Avenue and 406--10 West Daggett Avenue, Fort Worth
Historic Significance: Architecture/Engineering
Architectural Style: Prairie School
Area of Significance: Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Multiple Dwelling
Current Function: Work In Progress
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϬϵ
¾Marrow Bone Spring Archeological Site (added 1978 - - #78002980)
Address Restricted, Arlington
Historic Significance: Information Potential
Area of Significance: Historic - Non-Aboriginal, Prehistoric
Cultural Affiliation: NATIVE AMERICAN, AMERICAN
Period of Significance: 5000-6999 BC, 1850-1874, 1000-2999 BC, 1000 AD-999 BC
Owner: Local
Historic Function: Domestic, Industry/Processing/Extraction
Historic Sub-function: Manufacturing Facility, Village Site
Current Function: Landscape
Current Sub-function: Park
¾Masonic Widows and Orphans Home Historic District (added 1992 - - #91002022); also known as
Masonic Home and School of Texas
Roughly bounded by East Berry Street, Mitchell Boulevard, Vaughn Street, Wichita Street and Glen
Garden Drive, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Greene, Herbert M., Clarkson, Wiley G.
Architectural Style: Late Gothic Revival
Area of Significance: Architecture, Social History
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Institutional Housing
Current Function: Domestic, Education
Current Sub-function: Institutional Housing, School
¾Montgomery Ward and Company Building (added 1998 - - #98001415); also known as Tindall
Storage Warehouse
801 Grove Street, Fort Worth
Historic Significance: Event
Area of Significance: Commerce
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Warehouse
Current Function: Commerce/Trade
Current Sub-function: Warehouse
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϬ
¾Morning Chapel Colored Methodist Episcopal Church (added 1999 - - #99001049); also known as
Morning Chapel Christian Methodist Episcopal Church
901 East 3rd Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Meador, W.C.
Architectural Style: Late Gothic Revival
Area of Significance: Architecture
Period of Significance: 1925-1949
Owner: Private
Historic Function: Religion
Historic Sub-function: Religious Structure
Current Function: Religion
Current Sub-function: Religious Structure
¾Near Southeast Historic District (added 2002 - - #02000405)
Roughly bounded by New York Avenue, East Terrell Avenue, former I&GN Railway, Verbena Street,
and north side of East Terrell Avenue, Fort Worth
Historic Significance: Event
Area of Significance: Black, Commerce
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Local, Private
Historic Function: Commerce/Trade, Domestic, Religion
Historic Sub-function: Multiple Dwelling, Religious Structure, Restaurant, Single Dwelling,
Specialty Store
Current Function: Commerce/Trade, Domestic, Religion, Vacant/Not In Use
Current Sub-function: Multiple Dwelling, Religious Structure, Restaurant, Single Dwelling,
Specialty Store
¾North Fort Worth High School (added 1995 - - #94001627); also known as North Side High School;
Fort Worth Technical High School
600 Park Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Buchanan, J.C., Sanguinet & Staats
Architectural Style: Prairie School
Area of Significance: Education, Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Local
Historic Function: Education
Historic Sub-function: School
Current Function: Vacant/Not In Use
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϭ
¾Oakhurst Historic District (added 2010 - - #10000051)
Roughly bounded by Yucca Avenue, Sylvania Avenue, Watauga Avenue, and Oakhurst Scenic Drive,
Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Oakhurst Land Co., Hare & Hare
Architectural Style: Bungalow/Craftsman, Late 19th and 20th Century Revivals
Area of Significance: Landscape Architecture, Architecture, Community Planning and
Development
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Private, Local
Historic Function: Domestic
Historic Sub-function: Multiple Dwelling, Single Dwelling
Current Function: Domestic
Current Sub-function: Multiple Dwelling, Single Dwelling
¾Old Town Historic District (added 2000 - - #00000247)
Roughly bounded by Sanford, Elm, North, Prairie and Oak Streets, Arlington
Historic Significance: Event, Architecture/Engineering
Architectural Style: Queen Anne, Colonial Revival
Area of Significance: Community Planning and Development, Architecture
Period of Significance: 1950-1974, 1925-1949, 1900-1924, 1875-1899
Owner: Local, Private
Historic Function: Domestic, Education, Landscape
Historic Sub-function: Multiple Dwelling, School, Secondary Structure, Single Dwelling, Street
Furniture/Object
Current Function: Domestic, Education, Landscape
Current Sub-function: Multiple Dwelling, School, Secondary Structure, Single Dwelling, Street
Furniture/Object
¾Original Town Residential Historic District (added 1998 - - #98000736); also known as College
Heights Neighborhood
Roughly bounded by Texas, Austin, Hudgins and Jenkins Streets, Grapevine
Historic Significance: Event, Architecture/Engineering
Architectural Style: Colonial Revival, Queen Anne, Other
Area of Significance: Architecture, Community Planning and Development
Period of Significance: 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Multiple Dwelling, Secondary Structure, Single Dwelling
Current Function: Domestic
Current Sub-function: Multiple Dwelling, Secondary Structure, Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϮ
¾Our Lady of Victory Academy (added 2004 - - #04000886); also known as Victory Arts Center
801 West Shaw Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Sanguinet & Staats, et.al.
Architectural Style: Late Gothic Revival
Area of Significance: Education, Architecture
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Private
Historic Function: Religion
Historic Sub-function: Church Related Residence, Church School
Current Function: Commerce/Trade, Domestic
Current Sub-function: Business, Multiple Dwelling, Professional
¾Our Mother of Mercy Catholic Church and Parsonage (added 1999 - - #99000882); also known as
Sunshine Cumberland Presbyterian Church and Manse
1100 and 1104 Evans Avenue, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Denis, N.P.
Architectural Style: Tudor Revival, Queen Anne
Area of Significance: Architecture, Social History, Black
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic, Religion
Historic Sub-function: Religious Structure, Single Dwelling
Current Function: Religion
Current Sub-function: Religious Structure
¾Our Mother of Mercy School (added 2006 - - #06000510); also known as Our Lady of Mercy School
801 Verbena Street, Fort Worth
Historic Significance: Event
Area of Significance: Education, Black
Period of Significance: 1950-1974, 1925-1949
Owner: Local
Historic Function: Religion
Historic Sub-function: Church School
Current Function: Vacant/Not In Use
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϯ
¾Paddock Viaduct (added 1976 - - #76002068); also known as Main Street Bridge
Main Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Hannan-Heckley Bros., Brennke & Fay
Architectural Style: No Style Listed
Area of Significance: Transportation, Commerce, Engineering
Period of Significance: 1900-1924
Owner: Local
Historic Function: Transportation
Historic Sub-function: Road-Related
Current Function: Transportation
Current Sub-function: Road-Related
¾Petroleum Building (added 2009 - - #09000982); also known as Life of America Building; Schick
Building
210 West 6th Street, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Hedrick, Wyatt C.
Architectural Style: Skyscraper
Area of Significance: Commerce, Architecture
Period of Significance: 1950-1974, 1925-1949
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Business
Current Function: Commerce/Trade
Current Sub-function: Business
¾Pollock-Capps House (added 1972 - - #72001372)
1120 Penn Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Messer, Howard
Architectural Style: Queen Anne
Area of Significance: Architecture
Period of Significance: 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Commerce/Trade
Current Sub-function: Professional
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϰ
¾Ponton, Dr. Arvel and Faye, House (added 2006 - - #06001085)
1208 Mistletoe Drive, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Hull Historical Restoration, Pelich, Joseph R.
Architectural Style: Mission/Spanish Revival
Area of Significance: Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Riverside Public School (added 1999 - - #99001624); also known as Corinth Baptist Youth Center
2629 LaSalle Street, Fort Worth
Historic Significance: Event
Area of Significance: Black, Education
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Education
Historic Sub-function: School
Current Function: Religion
Current Sub-function: Religious Structure
¾Rogers-O'Daniel House (added 1985 - - #85001484); also known as Pappy O'Daniel House
2230 Warner Road, Fort Worth
Historic Significance: Person
Historic Person: O'Daniel, Wilburt L.
Area of Significance: Politics/Government
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϱ
¾Saint James Second Street Baptist Church (added 1999 - - #99000883); also known as Greater Saint
James Missionary Baptist Church
210 Harding Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Singleton, Frank J., Powell, George R., et al.
Architectural Style: Late Victorian
Area of Significance: Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Religion
Historic Sub-function: Religious Structure
Current Function: Religion
Current Sub-function: Religious Structure
¾Sanger Brothers Building (added 1994 - - #94000542); also known as Sanger Brothers; J.C. Penney
Building
410--412 Houston Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Wohlfield and Witt, Hedrick, Wyatt C.
Architectural Style: No Style Listed
Area of Significance: Architecture, Commerce
Period of Significance: 1925-1949
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Department Store
Current Function: Commerce/Trade
Current Sub-function: Department Store
¾Sanguinet, Marshall R., House (added 1983 - - #83003162)
4729 Collinwood Avenue, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Sanguinet, Marshall R.
Architectural Style: Bungalow/Craftsman
Area of Significance: Architecture
Period of Significance: 1900-1924, 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϲ
¾Shaw, Thomas and Marjorie, House (added 1995 - - #95001029); also known as Site No. W-26, Fort
Worth Southside
2404 Medford Court East, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Adams, Bert B.
Architectural Style: Other
Area of Significance: Architecture
Period of Significance: 1925-1949
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Sinclair Building (added 1992 - - #91001913)
512 Main Street, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Friedman, Harry B., Clarkson, Wiley Gulick
Architectural Style: Art Deco, Modern Movement
Area of Significance: Architecture
Period of Significance: 1925-1949
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Business
Current Function: Commerce/Trade
Current Sub-function: Business
¾South Center Street Historic District (added 2003 - - #03000334)
500-600 blocks of South Center Street, Arlington
Historic Significance: Event, Architecture/Engineering
Architectural Style: Bungalow/Craftsman
Area of Significance: Architecture, Community Planning and Development
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϳ
¾South Main Street Historic District (added 2009 - - #09000984)
104, 108, 126 & 200 blocks South Main Street, Fort Worth
Historic Significance: Architecture/Engineering
Architectural Style: Other, Early Commercial
Area of Significance: Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Commerce/Trade, Domestic, Industry/Processing/Extraction, Landscape
Historic Sub-function: Hotel, Manufacturing Facility, Multiple Dwelling, Restaurant, Specialty
Store, Street Furniture/Object
Current Function: Commerce/Trade, Domestic, Industry/Processing/Extraction,
Landscape, Vacant/Not In Use, Work In Progress
Current Sub-function: Business, Manufacturing Facility, Multiple Dwelling, Professional, Street
Furniture/Object
¾South Side Masonic Lodge No. 1114 (added 1985 - - #85000048)
1301 West Magnolia, Fort Worth
Historic Significance: Architecture/Engineering
Architectural Style: Classical Revival
Area of Significance: Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Commerce/Trade, Social
Historic Sub-function: Clubhouse, Specialty Store
Current Function: Recreation and Culture
Current Sub-function: Music Facility
¾Saint Mary of the Assumption Church (added 1984 - - #84001998)
501 West Magnolia Avenue, Fort Worth
Historic Significance: Architecture/Engineering, Event
Architect, builder, or engineer: Sanguinet, Staats & Hedrick
Architectural Style: Romanesque, Other
Area of Significance: Architecture, Religion
Period of Significance: 1900-1924
Owner: Private
Historic Function: Religion
Historic Sub-function: Religious Structure
Current Function: Religion
Current Sub-function: Religious Structure
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϴ
¾Saint Patrick Cathedral Complex (added 1985 - - #85000074); also known as Saint Patrick Church,
Saint Ignatius Academy, and Saint Patrick Chur
1206 Throckmorton, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Kane, James J.
Architectural Style: Gothic Revival, Other, Second Empire
Area of Significance: Education, Architecture
Period of Significance: 1900-1924, 1875-1899
Owner: Private
Historic Function: Religion
Historic Sub-function: Church Related Residence, Church School, Religious Structure
Current Function: Religion
Current Sub-function: Church Related Residence, Religious Structure
¾Tabernacle Baptist Church (added 1999 - - #99001451); also known as Mount Pisgah Baptist
Church
1801 Evans Avenue, Fort Worth
Historic Significance: Architecture/Engineering
Architectural Style: Classical Revival
Area of Significance: Architecture
Period of Significance: 1925-1949, 1900-1924
Owner: Private
Historic Function: Religion
Historic Sub-function: Religious Structure
Current Function: Religion
Current Sub-function: Religious Structure
¾Tarrant County Courthouse (added 1970 - - #70000762)
Bounded by Houston, Belknap, Weatherford, and Commerce Streets, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Gunn & Curtis
Architectural Style: Late 19th and 20th Century Revivals, Renaissance
Area of Significance: Politics/Government, Architecture
Period of Significance: 1875-1899
Owner: Local
Historic Function: Government
Historic Sub-function: Courthouse
Current Function: Government
Current Sub-function: Courthouse
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϭϵ
¾Texas & Pacific Steam Locomotive No. 610 (added 1977 - - #77001477)
Felix and Hemphill Streets, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Lima Locomotive Works
Architectural Style: Other
Area of Significance: Engineering, Transportation, Invention
Period of Significance: 1925-1949
Owner: Private
Historic Function: Transportation
Historic Sub-function: Rail-Related
Current Function: Transportation
Current Sub-function: Rail-Related
¾Texas and Pacific Terminal Complex (added 1978 - - #78002983)
Lancaster and Throckmorton Streets, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Hedrick, Wyatt C.
Architectural Style: Art Deco, Skyscraper
Area of Significance: Art, Transportation, Architecture
Period of Significance: 1925-1949
Owner: Private
Historic Function: Commerce/Trade, Transportation
Historic Sub-function: Rail-Related
Current Function: Commerce/Trade, Transportation
Current Sub-function: Rail-Related
¾US Post Office (added 1985 - - #85000855); also known as Fort Worth Main Post Office
Lancaster and Jennings Avenue, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Hedrick, Wyatt C.
Architectural Style: Classical Revival, Beaux Arts
Area of Significance: Architecture
Period of Significance: 1925-1949
Owner: Federal
Historic Function: Government
Historic Sub-function: Post Office
Current Function: Government
Current Sub-function: Post Office
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϬ
¾Vandergriff Building (added 2010 - - #10000500); also known as Thannisch Chevrolet Building
100 East Division Street, Arlington
Historic Significance: Event
Area of Significance: Commerce
Period of Significance: 1950-1974, 1925-1949
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Specialty Store
Current Function: Commerce/Trade
Current Sub-function: Business
¾Vaught House (added 2005 - - #05000864)
718 West Abram Street, Arlington
Historic Significance: Event
Area of Significance: Community Planning and Development
Period of Significance: 1950-1974, 1925-1949, 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Commerce/Trade
Current Sub-function: Specialty Store
¾Waggoner, W. T. Building (added 1979 - - #79003012)
810 Houston Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Sanguinet & Staats
Architectural Style: Chicago, Skyscraper
Area of Significance: Architecture, Commerce, Industry
Period of Significance: 1900-1924
Owner: Private
Historic Function: Commerce/Trade
Current Function: Commerce/Trade
¾Wallace--Hall House (added 2003 - - #03000436)
210 South Main Street, Mansfield
Historic Significance: Event
Area of Significance: Community Planning and Development
Period of Significance: 1950-1974, 1925-1949, 1900-1924, 1875-1899
Owner: Private
Historic Function: Domestic
Historic Sub-function: Secondary Structure, Single Dwelling
Current Function: Domestic
Current Sub-function: Secondary Structure, Single Dwelling
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϭ
¾Westbrook, Roy A. and Gladys, House (added 2009 - - #08001300)
2232 Winton Terrace West, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Pelich, Joseph R.
Architectural Style: Tudor Revival
Area of Significance: Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Domestic, Landscape, Recreation and Culture
Historic Sub-function: Garden, Secondary Structure, Single Dwelling, Sport Facility
Current Function: Domestic, Landscape, Recreation and Culture
Current Sub-function: Garden, Secondary Structure, Single Dwelling, Sport Facility
¾Westover Manor (added 1988 - - #88002709); also known as Fort Worth Star Telegram 1930 Home
Beautiful
8 Westover Road, Westover Hills
Historic Significance: Event, Person, Architecture/Engineering
Architect, builder, or engineer: Et al., Curtis, Victor Marr
Architectural Style: Other, Tudor Revival
Historic Person: Farrell, John E.
Significant Year: 1930, 1936, 1929
Area of Significance: Architecture, Community Planning and Development, Industry
Period of Significance: 1925-1949
Owner: Private
Historic Function: Domestic
Historic Sub-function: Secondary Structure, Single Dwelling
Current Function: Domestic
Current Sub-function: Single Dwelling
¾Wharton-Scott House (added 1975 - - #75002003)
1509 Pennsylvania Avenue, Fort Worth
Historic Significance: Architecture/Engineering
Architect, builder, or engineer: Sanguinet & Staats
Architectural Style: Other, Colonial Revival, Beaux Arts
Area of Significance: Architecture, Landscape Architecture
Period of Significance: 1900-1924
Owner: Private
Historic Function: Domestic
Historic Sub-function: Single Dwelling
Current Function: Vacant/Not In Use
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϮ
¾Woolworth, F. W., Building (added 1994 - - #94001359)
501 Houston Street, Fort Worth
Historic Significance: Event, Architecture/Engineering
Architect, builder, or engineer: Taylor, James T., Clarkson, Wiley G.
Architectural Style: Classical Revival
Area of Significance: Commerce, Architecture
Period of Significance: 1925-1949
Owner: Private
Historic Function: Commerce/Trade
Historic Sub-function: Department Store
Current Function: Commerce/Trade
Current Sub-function: Specialty Store
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϯ
Natural Cooperative Soil Survey
The following soil survey identifies the dwellings on concrete slabs in Tarrant County. These dwellings
have the potential to be impacted by the identified hazards; particularly, expansive soils.
Dwellings are single-family houses of three stories or less. For dwellings without basements, the
foundation is assumed to consist of spread footings of reinforced concrete built on undisturbed soil at a
depth of 2 to 3 feet.
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϰ
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
1
:
1
:
1
:
1
:1
0DSSURMHFWLRQ:HE0HUFDWRU&RUQHUFRRUGLQDWHV:*6(GJHWLFV870=RQH1:*6
)HHW
0HWHUV
0DS6FDOHLISULQWHGRQ$SRUWUDLW[VKHHW
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϱ
0$3/(*(1' 0$3,1)250$7,21$UHDRI,QWHUHVW$2,$UHDRI,QWHUHVW$2,6RLOV6RLO5DWLQJ3RO\JRQV9HU\OLPLWHG6RPHZKDWOLPLWHG1RWOLPLWHG1RWUDWHGRUQRWDYDLODEOH6RLO5DWLQJ/LQHV9HU\OLPLWHG6RPHZKDWOLPLWHG1RWOLPLWHG1RWUDWHGRUQRWDYDLODEOH6RLO5DWLQJ3RLQWV9HU\OLPLWHG6RPHZKDWOLPLWHG1RWOLPLWHG1RWUDWHGRUQRWDYDLODEOH3ROLWLFDO)HDWXUHV&LWLHV:DWHU)HDWXUHV6WUHDPVDQG&DQDOV7UDQVSRUWDWLRQ5DLOV,QWHUVWDWH+LJKZD\V865RXWHV0DMRU5RDGV/RFDO5RDGV%DFNJURXQG$HULDO3KRWRJUDSK\7KHVRLOVXUYH\VWKDWFRPSULVH\RXU$2,ZHUHPDSSHGDW3OHDVHUHO\RQWKHEDUVFDOHRQHDFKPDSVKHHWIRUPDSPHDVXUHPHQWV6RXUFHRI0DS 1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH:HE6RLO6XUYH\85/&RRUGLQDWH6\VWHP :HE0HUFDWRU(36*0DSVIURPWKH:HE6RLO6XUYH\DUHEDVHGRQWKH:HE0HUFDWRUSURMHFWLRQZKLFKSUHVHUYHVGLUHFWLRQDQGVKDSHEXWGLVWRUWVGLVWDQFHDQGDUHD$SURMHFWLRQWKDWSUHVHUYHVDUHDVXFKDVWKH$OEHUVHTXDODUHDFRQLFSURMHFWLRQVKRXOGEHXVHGLIPRUHDFFXUDWHFDOFXODWLRQVRIGLVWDQFHRUDUHDDUHUHTXLUHG7KLVSURGXFWLVJHQHUDWHGIURPWKH86'$15&6FHUWLILHGGDWDDVRIWKHYHUVLRQGDWHVOLVWHGEHORZ6RLO6XUYH\$UHD 7DUUDQW&RXQW\7H[DV6XUYH\$UHD'DWD 9HUVLRQ1RY6RLOPDSXQLWVDUHODEHOHGDVVSDFHDOORZVIRUPDSVFDOHVRUODUJHU'DWHVDHULDOLPDJHVZHUHSKRWRJUDSKHG -DQ²'HF7KHRUWKRSKRWRRURWKHUEDVHPDSRQZKLFKWKHVRLOOLQHVZHUHFRPSLOHGDQGGLJLWL]HGSUREDEO\GLIIHUVIURPWKHEDFNJURXQGLPDJHU\GLVSOD\HGRQWKHVHPDSV$VDUHVXOWVRPHPLQRUVKLIWLQJRIPDSXQLWERXQGDULHVPD\EHHYLGHQW'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH:HE6RLO6XUYH\1DWLRQDO&RRSHUDWLYH6RLO6XUYH\3DJHRIdĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶϯϮϲ
'ZHOOLQJV2Q&RQFUHWH6ODE7;
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
$OHGRJUDYHOO\
FOD\ORDPWR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
$OHGR 'HSWKWRKDUG
EHGURFN
%RODU$OHGR
FRPSOH[WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
%RODU 'HSWKWRKDUG
EHGURFN
$OHGR 6ORSHVVSULQNOHU
LUULJDWLRQ
'HSWKWRKDUG
EHGURFN
$OHGR%RODU
8UEDQODQG
FRPSOH[WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
$OHGR 6ORSHVVSULQNOHU
LUULJDWLRQ
+LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
%RODU 'HSWKWRKDUG
EHGURFN
+LJKVKULQNVZHOO
6ORSHVVSULQNOHU
LUULJDWLRQ
$OHGR8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
$OHGR +LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
$OWRJDVLOW\FOD\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
$OWRJD 6ORSHVVSULQNOHU
LUULJDWLRQ
+LJKVKULQNVZHOO
$TXLOODORDP\
ILQHVDQGWR
SHUFHQW
VORSHV
1RWOLPLWHG $TXLOOD
$UHQWV
IUHTXHQWO\
IORRGHG
1RWUDWHG $UHQWV
8QQDPHGK\GULF
$UHQWVORDP\ 6RPHZKDW
OLPLWHG
$UHQWV +LJKVKULQNVZHOO
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϳ
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
%DVWVLOILQH
VDQG\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
%DVWVLO +LJKVKULQNVZHOO
%DVWVLO8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
%DVWVLO +LJKVKULQNVZHOO
%LURPHILQH
VDQG\ORDP
WRSHUFHQW
VORSHV
9HU\OLPLWHG %LURPH 7RRDFLG
+LJKVKULQNVZHOO
%LURPH$XEUH\
5D\H[
FRPSOH[WR
SHUFHQW
VORSHV
9HU\OLPLWHG %LURPH 7RRDFLG
6ORSHVVSULQNOHU
LUULJDWLRQ
+LJKVKULQNVZHOO
$XEUH\ 7RRDFLG
6ORSHVVSULQNOHU
LUULJDWLRQ
+LJKVKULQNVZHOO
%LURPH$XEUH\
8UEDQODQG
FRPSOH[WR
SHUFHQW
VORSHV
9HU\OLPLWHG %LURPH 7RRDFLG
6ORSHVVSULQNOHU
LUULJDWLRQ
+LJKVKULQNVZHOO
$XEUH\ 7RRDFLG
6ORSHVVSULQNOHU
LUULJDWLRQ
+LJKVKULQNVZHOO
%RODUFOD\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
%RODU 'HSWKWRKDUG
EHGURFN
%RODUFOD\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
%RODU 'HSWKWRKDUG
EHGURFN
%RODU8UEDQODQG
FRPSOH[WR
SHUFHQW
VORSHV
1RWUDWHG 8UEDQODQG
8QQDPHG
%UDFNHWWFOD\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
%UDFNHWW 'HSWKWRVRIW
EHGURFN
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϴ
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
%UDQ\RQFOD\
WRSHUFHQW
VORSHV
9HU\OLPLWHG %UDQ\RQ +LJKVKULQNVZHOO
%XUOHVRQFOD\
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
%XUOHVRQ +LJKVKULQNVZHOO
&KDWWVLOW\FOD\
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
&KDWW +LJKVKULQNVZHOO
&URVVWHOOILQH
VDQG\ORDP
WRSHUFHQW
VORSHV
9HU\OLPLWHG &URVVWHOO +LJKVKULQNVZHOO
7RRDFLG
&URVVWHOOILQH
VDQG\ORDP
WRSHUFHQW
VORSHV
9HU\OLPLWHG &URVVWHOO +LJKVKULQNVZHOO
7RRDFLG
&URVVWHOO8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
9HU\OLPLWHG &URVVWHOO +LJKVKULQNVZHOO
7RRDFLG
)HUULVFOD\WR
SHUFHQW
VORSHVHURGHG
9HU\OLPLWHG )HUULV
PRGHUDWHO\
HURGHG
+LJKVKULQNVZHOO
6ORSHVVSULQNOHU
LUULJDWLRQ
)HUULV+HLGHQ
FRPSOH[WR
SHUFHQW
VORSHV
9HU\OLPLWHG )HUULV +LJKVKULQNVZHOO
+HLGHQ +LJKVKULQNVZHOO
)ULRVLOW\FOD\
WRSHUFHQW
VORSHV
RFFDVLRQDOO\
IORRGHG
9HU\OLPLWHG )ULR )ORRGLQJ
+LJKVKULQNVZHOO
)ULRVLOW\FOD\
IUHTXHQWO\
IORRGHG
9HU\OLPLWHG )ULR )ORRGLQJ
+LJKVKULQNVZHOO
)ULR8UEDQODQG
FRPSOH[
RFFDVLRQDOO\
IORRGHG
9HU\OLPLWHG )ULR )ORRGLQJ
+LJKVKULQNVZHOO
*DVLOILQHVDQG\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
*DVLO 7RRDFLG
*DVLOILQHVDQG\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
*DVLO 7RRDFLG
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϮϵ
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
*DVLOVDQG\FOD\
ORDPJUDGHG
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
*DVLO 7RRDFLG
*DVLO8UEDQODQG
FRPSOH[WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
*DVLO 7RRDFLG
+HLGHQFOD\WR
SHUFHQW
VORSHV
9HU\OLPLWHG +HLGHQ +LJKVKULQNVZHOO
+RXVWRQ%ODFN
FOD\WR
SHUFHQWVORSHV
9HU\OLPLWHG +RXVWRQ%ODFN
+LJKVKULQNVZHOO
+RXVWRQ%ODFN
8UEDQODQG
FRPSOH[WR
SHUFHQW
VORSHV
9HU\OLPLWHG +RXVWRQ%ODFN
+LJKVKULQNVZHOO
-XVWLQORDPWR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
-XVWLQ +LJKVKULQNVZHOO
.RQVLOILQHVDQG\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
.RQVLO +LJKVKULQNVZHOO
7RRDFLG
/HVRQFOD\WR
SHUFHQW
VORSHV
9HU\OLPLWHG /HVRQ +LJKVKULQNVZHOO
/LQGDOHFOD\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
/LQGDOH +LJKVKULQNVZHOO
/LQGDOH8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
/LQGDOH +LJKVKULQNVZHOO
/RWWVLOW\FOD\
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
/RWW +LJKVKULQNVZHOO
/RWW8UEDQODQG
FRPSOH[WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
/RWW +LJKVKULQNVZHOO
/XFNHQEDFKFOD\
ORDPPRLVW
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
/XFNHQEDFK
PRLVW
+LJKVKULQNVZHOO
/XFNHQEDFK
8UEDQODQG
FRPSOH[WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
/XFNHQEDFK
+LJKVKULQNVZHOO
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯϬ
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
0DEDQNILQH
VDQG\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
0DEDQN +LJKVKULQNVZHOO
0DORWHUUH$OHGR
DQG%UDFNHWW
VRLOVWR
SHUFHQWVO
RSHV
6RPHZKDW
OLPLWHG
0DORWHUUH 6ORSHVVSULQNOHU
LUULJDWLRQ
$OHGR 6ORSHVVSULQNOHU
LUULJDWLRQ
+LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
%UDFNHWW 6ORSHVVSULQNOHU
LUULJDWLRQ
'HSWKWRVRIW
EHGURFN
0HGOLQFOD\WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
0HGOLQ +LJKVKULQNVZHOO
6ORSHVVSULQNOHU
LUULJDWLRQ
0LQJRFOD\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
0LQJR +LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
0LQJR8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
0LQJR +LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
1DYRFOD\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
1DYR +LJKVKULQNVZHOO
1DYR8UEDQODQG
FRPSOH[WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
1DYR +LJKVKULQNVZHOO
1LPURGILQH
VDQGWR
SHUFHQWVORSHV
1RWOLPLWHG 1LPURG
2YDQFOD\
RFFDVLRQDOO\
IORRGHG
9HU\OLPLWHG 2YDQ )ORRGLQJ
+LJKVKULQNVZHOO
2YDQFOD\
IUHTXHQWO\
IORRGHG
9HU\OLPLWHG 2YDQ )ORRGLQJ
+LJKVKULQNVZHOO
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯϭ
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
2YDQ8UEDQODQG
FRPSOH[
RFFDVLRQDOO\
IORRGHG
9HU\OLPLWHG 2YDQ )ORRGLQJ
+LJKVKULQNVZHOO
3LWVTXDUULHV 1RWUDWHG 3LWV
3RQGHUFOD\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
3RQGHU +LJKVKULQNVZHOO
3RQGHU8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
3RQGHU +LJKVKULQNVZHOO
3XOH[DVILQH
VDQG\ORDP
IUHTXHQWO\
IORRGHG
9HU\OLPLWHG 3XOH[DV )ORRGLQJ
3XOH[DV8UEDQ
ODQGFRPSOH[
RFFDVLRQDOO\
IORRGHG
9HU\OLPLWHG 3XOH[DV )ORRGLQJ
3XUYHVFOD\WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
3XUYHV +LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
3XUYHV8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
3XUYHV +LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
5DGHUILQHVDQG\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
5DGHU +LJKVKULQNVZHOO
7RRDFLG
5DGHU8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
1RWUDWHG 8UEDQODQG
8QQDPHG
6DQJHUFOD\WR
SHUFHQW
VORSHV
9HU\OLPLWHG 6DQJHU +LJKVKULQNVZHOO
6DQJHUFOD\WR
SHUFHQW
VORSHV
9HU\OLPLWHG 6DQJHU +LJKVKULQNVZHOO
6DQJHU8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
9HU\OLPLWHG 6DQJHU +LJKVKULQNVZHOO
6DQ6DEDFOD\
WRSHUFHQW
VORSHV
9HU\OLPLWHG 6DQ6DED +LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯϮ
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
6HOGHQORDP\
ILQHVDQGWR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
6HOGHQ 7RRDFLG
6LODZDILQH
VDQG\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
6LODZD 7RRDFLG
6LOVWLGORDP\ILQH
VDQGWR
SHUFHQWVORSHV
1RWOLPLWHG 6LOVWLG
6LOVWLG8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
1RWOLPLWHG 6LOVWLG
6OLGHOOFOD\WR
SHUFHQW
VORSHV
9HU\OLPLWHG 6OLGHOO +LJKVKULQNVZHOO
6OLGHOOFOD\WR
SHUFHQW
VORSHV
9HU\OLPLWHG 6OLGHOO +LJKVKULQNVZHOO
6SHFNFOD\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
6SHFN +LJKVKULQNVZHOO
'HSWKWRKDUG
EHGURFN
6WHSKHQYLOOHILQH
VDQG\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
6WHSKHQYLOOH
7RRDFLG
6ORSHVVSULQNOHU
LUULJDWLRQ
6XQHYFOD\ORDP
FRROWR
SHUFHQWVORSHV
1RWOLPLWHG 6XQHYFRRO
6XQHYFOD\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
6XQHY +LJKVKULQNVZHOO
6XQHY8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
6XQHY +LJKVKULQNVZHOO
7ULQLW\FOD\WR
SHUFHQW
VORSHV
IUHTXHQWO\
IORRGHG
9HU\OLPLWHG 7ULQLW\ )ORRGLQJ
+LJKVKULQNVZHOO
8UEDQODQG 1RWUDWHG 8UEDQODQG
'XIIDX
:HDWKHUIRUG
FRPSOH[WR
SHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
'XIIDX +LJKVKULQNVZHOO
:HDWKHUIRUG
7RRDFLG
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯϯ
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
6ORSHVVSULQNOHU
LUULJDWLRQ
+LJKVKULQNVZHOO
:LVH 6ORSHVVSULQNOHU
LUULJDWLRQ
:LQGWKRUVW +LJKVKULQNVZHOO
.HHWHU +LJKVKULQNVZHOO
7RRDFLG
:KLWHVERUR
ORDP
IUHTXHQWO\
IORRGHG
9HU\OLPLWHG :KLWHVERUR
)ORRGLQJ
+LJKVKULQNVZHOO
:LOVRQFOD\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
:LOVRQ +LJKVKULQNVZHOO
:LOVRQ8UEDQ
ODQGFRPSOH[
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
:LOVRQ +LJKVKULQNVZHOO
:LQGWKRUVWYHU\
ILQHVDQG\
ORDPWR
SHUFHQWVORSHV
6RPHZKDW
OLPLWHG
:LQGWKRUVW
+LJKVKULQNVZHOO
:LQGWKRUVWILQH
VDQG\ORDP
WRSHUFHQW
VORSHV
6RPHZKDW
OLPLWHG
:LQGWKRUVW
+LJKVKULQNVZHOO
:LQGWKRUVWILQH
VDQG\ORDP
WRSHUFHQW
VORSHVHURGHG
6RPHZKDW
OLPLWHG
:LQGWKRUVW
HURGHG
+LJKVKULQNVZHOO
'XIIDX
:LQGWKRUVW
FRPSOH[WR
SHUFHQW
VORSHV
PRGHUDWHO\
HURGHG
6RPHZKDW
OLPLWHG
'XIIDX
PRGHUDWHO\
HURGHG
+LJKVKULQNVZHOO
:LQGWKRUVW
PRGHUDWHO\
HURGHG
+LJKVKULQNVZHOO
&KDQH\ +LJKVKULQNVZHOO
:HDWKHUIRUG
PRGHUDWHO\
HURGHG
7RRDFLG
+LJKVKULQNVZHOO
'$0 'DPV 1RWUDWHG 'DPV
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯϰ
0DSXQLW
V\PERO
0DSXQLWQDPH 5DWLQJ &RPSRQHQW
QDPHSHUFHQW
5DWLQJUHDVRQV
QXPHULF
YDOXHV
$FUHVLQ$2, 3HUFHQWRI$2,
0: 0LVFHOODQHRXV
ZDWHU
1RWUDWHG :DWHU
PLVFHOODQHRXV
: :DWHU 1RWUDWHG :DWHU
7RWDOVIRU$UHDRI,QWHUHVW
5DWLQJ $FUHVLQ$2, 3HUFHQWRI$2,
6RPHZKDWOLPLWHG
9HU\OLPLWHG
1RWOLPLWHG
1XOORU1RW5DWHG
7RWDOVIRU$UHDRI,QWHUHVW
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯϱ
'HVFULSWLRQ
'ZHOOLQJVDUHVLQJOHIDPLO\KRXVHVRIWKUHHVWRULHVRUOHVV)RUGZHOOLQJVZLWKRXW
EDVHPHQWVWKHIRXQGDWLRQLVDVVXPHGWRFRQVLVWRIVSUHDGIRRWLQJVRIUHLQIRUFHG
FRQFUHWHEXLOWRQXQGLVWXUEHGVRLODWDGHSWKRIWRIHHW
7KHUDWLQJVIRUGZHOOLQJVDUHEDVHGRQWKHVRLOSURSHUWLHVWKDWDIIHFWWKHFDSDFLW\
RIWKHVRLOWRVXSSRUWDORDGZLWKRXWPRYHPHQWDQGRQWKHSURSHUWLHVWKDWDIIHFW
H[FDYDWLRQDQGFRQVWUXFWLRQFRVWV7KHSURSHUWLHVWKDWDIIHFWWKHORDGVXSSRUWLQJ
FDSDFLW\LQFOXGHGHSWKWRDZDWHUWDEOHSRQGLQJIORRGLQJVXEVLGHQFHOLQHDU
H[WHQVLELOLW\VKULQNVZHOOSRWHQWLDODQGFRPSUHVVLELOLW\&RPSUHVVLELOLW\LV
LQIHUUHGIURPWKH8QLILHGFODVVLILFDWLRQRIWKHVRLO7KHSURSHUWLHVWKDWDIIHFWWKH
HDVHDQGDPRXQWRIH[FDYDWLRQLQFOXGHGHSWKWRDZDWHUWDEOHSRQGLQJIORRGLQJ
VORSHGHSWKWREHGURFNRUDFHPHQWHGSDQKDUGQHVVRIEHGURFNRUDFHPHQWHG
SDQDQGWKHDPRXQWDQGVL]HRIURFNIUDJPHQWVLQWKHVRLO
7KHUDWLQJVDUHERWKYHUEDODQGQXPHULFDO5DWLQJFODVVWHUPVLQGLFDWHWKHH[WHQW
WRZKLFKWKHVRLOVDUHOLPLWHGE\DOORIWKHVRLOIHDWXUHVWKDWDIIHFWWKHVSHFLILHG
XVH1RWOLPLWHGLQGLFDWHVWKDWWKHVRLOKDVIHDWXUHVWKDWDUHYHU\IDYRUDEOHIRU
WKHVSHFLILHGXVH*RRGSHUIRUPDQFHDQGYHU\ORZPDLQWHQDQFHFDQEH
H[SHFWHG6RPHZKDWOLPLWHGLQGLFDWHVWKDWWKHVRLOKDVIHDWXUHVWKDWDUH
PRGHUDWHO\IDYRUDEOHIRUWKHVSHFLILHGXVH7KHOLPLWDWLRQVFDQEHRYHUFRPHRU
PLQLPL]HGE\VSHFLDOSODQQLQJGHVLJQRULQVWDOODWLRQ)DLUSHUIRUPDQFHDQG
PRGHUDWHPDLQWHQDQFHFDQEHH[SHFWHG9HU\OLPLWHGLQGLFDWHVWKDWWKHVRLOKDV
RQHRUPRUHIHDWXUHVWKDWDUHXQIDYRUDEOHIRUWKHVSHFLILHGXVH7KHOLPLWDWLRQV
JHQHUDOO\FDQQRWEHRYHUFRPHZLWKRXWPDMRUVRLOUHFODPDWLRQVSHFLDOGHVLJQRU
H[SHQVLYHLQVWDOODWLRQSURFHGXUHV3RRUSHUIRUPDQFHDQGKLJKPDLQWHQDQFHFDQ
EHH[SHFWHG
1XPHULFDOUDWLQJVLQGLFDWHWKHVHYHULW\RILQGLYLGXDOOLPLWDWLRQV7KHUDWLQJVDUH
VKRZQDVGHFLPDOIUDFWLRQVUDQJLQJIURPWR7KH\LQGLFDWHJUDGDWLRQV
EHWZHHQWKHSRLQWDWZKLFKDVRLOIHDWXUHKDVWKHJUHDWHVWQHJDWLYHLPSDFWRQWKH
XVHDQGWKHSRLQWDWZKLFKWKHVRLOIHDWXUHLVQRWDOLPLWDWLRQ
7KHPDSXQLWFRPSRQHQWVOLVWHGIRUHDFKPDSXQLWLQWKHDFFRPSDQ\LQJ
6XPPDU\E\0DS8QLWWDEOHLQ:HE6RLO6XUYH\RUWKH$JJUHJDWLRQ5HSRUWLQ6RLO
'DWD9LHZHUDUHGHWHUPLQHGE\WKHDJJUHJDWLRQPHWKRGFKRVHQ$QDJJUHJDWHG
UDWLQJFODVVLVVKRZQIRUHDFKPDSXQLW7KHFRPSRQHQWVOLVWHGIRUHDFKPDSXQLW
DUHRQO\WKRVHWKDWKDYHWKHVDPHUDWLQJFODVVDVOLVWHGIRUWKHPDSXQLW7KH
SHUFHQWFRPSRVLWLRQRIHDFKFRPSRQHQWLQDSDUWLFXODUPDSXQLWLVSUHVHQWHGWR
KHOSWKHXVHUEHWWHUXQGHUVWDQGWKHSHUFHQWDJHRIHDFKPDSXQLWWKDWKDVWKH
UDWLQJSUHVHQWHG
2WKHUFRPSRQHQWVZLWKGLIIHUHQWUDWLQJVPD\EHSUHVHQWLQHDFKPDSXQLW7KH
UDWLQJVIRUDOOFRPSRQHQWVUHJDUGOHVVRIWKHPDSXQLWDJJUHJDWHGUDWLQJFDQEH
YLHZHGE\JHQHUDWLQJWKHHTXLYDOHQWUHSRUWIURPWKH6RLO5HSRUWVWDELQ:HE6RLO
6XUYH\RUIURPWKH6RLO'DWD0DUWVLWH2QVLWHLQYHVWLJDWLRQPD\EHQHHGHGWR
YDOLGDWHWKHVHLQWHUSUHWDWLRQVDQGWRFRQILUPWKHLGHQWLW\RIWKHVRLORQDJLYHQ
VLWH
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯϲ
5DWLQJ2SWLRQV
$JJUHJDWLRQ0HWKRG'RPLQDQW&RQGLWLRQ
&RPSRQHQW3HUFHQW&XWRII1RQH6SHFLILHG
7LHEUHDN5XOH+LJKHU
'ZHOOLQJV2Q&RQFUHWH6ODE7;²7DUUDQW&RXQW\7H[DV
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
dĂƌƌĂŶƚŽƵŶƚLJ,ĂnjĂƌĚDŝƚŝŐĂƚŝŽŶĐƚŝŽŶWůĂŶ
ϯϯϳ