HomeMy WebLinkAboutRes 09-50 Entering into an Agreement with RJN GroupRESOLI ! i i i •
ENTERING r AN '' RJN GROUP, INC., FOR
ENGINEERING ANALYSIS, INSPECTION, AND TESTING OF SANITARY SEWER
LINE AT A COST OF APPROXIMATELY $60,000; AND AUTHORIZING THE TOWN
MANAGER TO EXECUTE THE AGREEMENT OF • OF
WESTLAKE, TEXAS.
WHEREAS, the Town of
WHEREAS,line� and
desires to work with the City of i to transfer ownership of
the N-1 sewer line to the Trinity RiverAuthority;
WHEREAS, the transfer to TRA is contingent•• iry repair of
defects within Westlake's collection system contributing to increased groundwater intrusion; and
WHEREAS, the Town Council• •- • • and subsequent
repairspublic and is in the best interestof the i and
WHEREAS, the Town Council finds that funding for the sewer line inspection and testing
is necessary for the transfer; and
WHEREAS, the s:..t for the testing ani inspection is included in thFY
e adopted
i budget,
NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF
TEXAS:
SECTION 1. All matters stated in the Recitals above are found to be true and correct
and
attachedSECTION 2. The Town Council of the Town of Westlake hereby approves the
contract with RJN Group, Inc., for the testing and inspection sanitary sewer line located in the
Basin WL -2, and further authorizes th- Town Managerto execute the
,?greement on behalf of the Town
Town Secretary
Laura Wheat, Mayor
Tom Brym&-,T6 Moager
OEM
EXHIBIT "A"
3, ,Z ffinak5WA
WJftT&4XUi r
THIS AGREEMENT is made this day of -U-ACbU?
,200 Ci by and between the
Town of Westlake, Texas (hereinafter referred to as "TOWN") and RJN Group, Inc. (hereinafter
ed to s
WHEREAS, TOWN contemplates"# to make improvements
collection system. This project is to be known as "Wastewater Collection System Assessment
Project - Basin WL 2" and hereinafter referred to as the "Project".
WHEREAS, qualified, able, and desirous of performing thenecessary
forthengineering work upon which the Project is based and is willing and able to work with TOWN
staff to organize and coordinate the professional services necessary to complete the Project as
described in the Attachment I which is attached hereto and incorporated by reference as if fully
set forth herein.
NOW, THEREFORE, TOWN engages ENGINEER to perform, and ENGINEER agrees
to perform, the engineering work for the Project, as more fully described herein below, and
TOWN agrees to pay as compensation, and ENGINEER agrees to accept as compensation, the
payments in the amounts herein specified, all in accordance with the terms more fully set out
below and as provided in Attachment 11 which is attached hereto and incorporated by reference
as if fully set
1. ARTICLE
ENGINEER will provide the supervision, direction, personnel and equipment to perform
r engineering
ra1! aY. outlined
r Attachment
rdance with a avrms r forth
Agreement t in Attachment
Services refer to the professional services performed by ENGINEER pursuant to this
Agreement.
TOWN, without invalidating the Agreement, may order changes within the general scope
of the work required by the Agreement by altering, adding to and/or deducting from the work to
be performed. If any change causes an increase or decrease in ENGINEER's cost of, or the
time required for, the performance of any part of the Services under the Agreement, an
writingequitable adjustment will be made by mutual agreement and this Agreement shall be modified in
accordingly.
The TOWN shall make available to ENGINEER for use in performing Services
hereunder all existing plans, maps, field notes, statistics computations and other data in the
TOWN's possession relative to existing facilities and to the Project.
ERGINEER has the right to examine the site in order to become acquainted with local
conditions at accepts # # otherwise noted • to the
employeesAny coordination or scheduling of work by the TOWN shall not relieve ENGINEER from its
responsibilities specified hereunder. Necessary arrangement for access to any site by
be i, with TOWN.
rightsF. Assignment and Subcontractors/Third Party Rights.
The and obligations c# --.herein -. personal each party hereto and not to
any third party and for this reason neither this Agreement nor any contract hereunder shall be
assigned by either party in whole or in part; nor shall ENGINEER subcontract any of its
obligations under this Agreement without the prior consent of the TOWN.
ENGINEER covenants and agrees that it will perform the work hereunder as an
independentcontractor,!€ not as an officer,#*` is employee of ON
controlENGINEER shall have exclusive of # exclusive right to control the details of the work
performed hereunder, and all persons performing same, and shall be solely responsible for the
acts and omissions of its officers, agents, employees, contractors, subcontractors, and
consultants; that the doctrine of respondent superior shall not apply as between the TOWN and
ENGINEER, its officers, agents, employees, contractors, subcontractors, and consultants, and
nothing herein shall be construed as creating a partnership or joint enterprise between the
TOWN and ENGINEER.
signature
of # to
the TOWN that it has made full
disclosure in writing of any existing conflictsinterest or potential of - - including
personal financial interests, direct or indirect, in property abutting the proposed Project and
business !propertyowners.a further
disclosure in writing of M of - develop • to the signing of
contract and prior to final payment under the contract.
MIGME
SM011MMIMIN
Approval by the TOWN of this Agreement shall not constitute or be deemed to be a
release of the responsibility .r of officers,#-nts, employees, and
subcontractors for the accuracy and competency of the Services performed under this
Agreement, including but not limited to surveys, designs, working drawings and specifications
r other engineering
Such approval # be deemedto bean assumption •
liabilitynegligent error,r • performances'general design concept of the Improvements to be constructed.
ENGINEER's professional services or in the conduct or preparation of the subsurfa
investigations, surveys, designs, working drawings and specifications or other engineerin
documents by ENGINEER, its officers, agents, employees and subcontractors, it being t
intent of the parties that approval by the TOWN signifies the TOWN's approval of only
fflvmmmm• i!' ,
ENGINEER SHALL AND DOES HEREBY AGREE TO INDEMNIFY AND HOL
HARMLESS TOWN, ITS OFFICERS, AGENTS, AND EMPLOYEES FROM ANY AND A
DAMAGES, LOSS OR LIABILITY OF ANY KIND WHATSOEVER, BY REASON OF DEATH 0
INJURY TO PROPERTY OR PERSON CAUSED BY ANY OMISSION OR NEGLIGENT A
OF ENGINEER, ITS OFFICERS, AGENTS, EMPLOYEES, INVITEES, OR OTHER PERSON
FOR WHOM IT IS LEGALLY LIABLE, WITH REGARD TO THE PERFORMANCE OF THI
CONTRACT, AND ENGINEER WILL, AT ITS COST AND EXPENSE, DEFEND, PAY 0
BEHALF OF, AND PROTECT CITY AND ITS OFFICERS, AGENTS, AND EMPLOYEE
AGAINST t AND CLAIMSt DEMANDS.
thirdFor purposes of this Agreement, including its intended operation and effect, the parties
specifically agree and contract that: (1) this Agreement only affects matters/disputes between
the parties to this Agreement, and is in no way intended by the parties to benefit or otherwise
affect any person • • the fact that such third person or entities
Agreementbe in a contractual relationship with TOWN and ENGINEER, or both; and (2) the terms of this
.. not #'# to release, either b contract or operation of law, any third person
or entity from obligations they owe to either TOWN or ENGINEER.
L. Successors • Assigns.
_ TOWN each r themselves and theirsuccessors,
2dministrators and assigns to the other party to this Agreement and to the successors,
administrators and assigns of other party with respectto all covenantsof
Agreement. Neither the TOWN nor ENGINEER shall assign or transfer its interest in this
r-1�1
Agreement without prior written consent of the other,
MEN
11. ARTICLE
Mb
Provide full information as to TOWN's requirements for the ProjeA
2. Assist ENGINEER by placing at ENGINEER's disposal all information in TOWN's
control or knowledge which is pertinent to the Project, including executed right-of-
way easements and final field survey data;
3. Examine all work presented by ENGINEER and respond within reasonable time
and in writing to the material submitted by ENGINEER;
Pay all costs incident to advertising for obtaining bids or proposals from
Contractors;
5. Give prompt written notice to ENGINEER whenever TOWN observes or
otherwise becomes aware of any defect in ENGINEER's work or in Contractor's
work;
6. Designate in writing a person to act as its representative with respect to this
Agreement, such person having complete authority to transmit instructions,
receive information, and make or interpret the TOWN's decisions;
7, Provide all information and criteria as to the TOWN's requirements, objectives,
and expectations for the Project including all numerical criteria that are to be met
and all standards of development, design, or construction.
Provide to the ENGINEER all previous studies, plans, or other documentg-
pertaining to the Project and all new data reasonably necessary in the
ENGINEER's opinion, such as site survey and engineering data, environmental
impact assessments or statements, zoning or other land use regulations,
upon all of which the ENGINEER may rely; and
9. Arrange for access to the site and other private or public property as required for
the ENGINEER to provide its services.
M Provide any other information or assistance as outlined in Attachment I hereto.
M=111�...
Ill. ARTICLE
COMPENSATION FOR ENGINEERING SERVICE!
The TOWN shall compensate ENGINEER for services rendered under this Agreement,
in accordance with the following:
iiii 1111111m Ill I I � 11 1111111
The ENGINEER shall bill the TOWN monthly for costs incurred in accordance with the
work performed provided the limits set out in Article Ill hereof have not been exceeded.
Payment shall be due within thirty (30) days of receipt by TOWN of a properly prepared and
correct invoice from ENGINEER, Remittances shall be made to ENGINEER's office at 12160
Abrams Road, Suite 400, Dallas, Texas 75243.
V. ARTICLE
ADDITI
In addition to performing the engineering services set out in Article 1, hereof, ENGINEER
agrees to perform additional services as requested by TOWN from time to time and TOWN
agrees to compensate ENGINEER for such services in accordance with ENGINEER's standard
hourly fee as determined by the actual costs incurred and by actual time expended, such
Qervices to be one or more of the following:
If -lake or prepare detailed description of sites, maps, or drawings related there
anM outside the scope of the Project; I
2 Appearances before courts or boards on matters of litigation or hearings related
to the Project;
3. Miscellaneous engineering work for TOWN not related to the Project;.
4, Other services agreed to by the parties in writing attached hereto as
Aftachment If and incorporated herein.
In performing its professional services, the ENGINEER will use that degree of care and
skill ordinarily exercised, under similar circumstances, by reputable members of its profession in
the same locality at the time the services are provided. No warranty, express or implied, is made
liIR
'M
i
-JQ-JWARJ-WA
or intended by the ENGINEER's undertaking herein or its performance of services, and it is
agreed that the ENGINEER is not a fiduciary with respect to the TOWN.
This Agreement shall be effective upon execution by the TOWN and ENGINEER, ant
shall remain in force until work is completed on the Project or until terminated under thet
provisions hereinafter provided in Article IX.
The TOWN may terminate this Agreement at any time for convenience or for any cau
upon ten (10) days written notice to the ENGINEER. Upon receipt of such notice t
ENGINEER shall immediately discontinue all services and work and the placing of all orders
i
the entering into contracts for supplies, assistance, facilities, and materials in connection w
211
insofar as they are chargeable to this Agreement.
The ENGINEER, upon termination, shall be paid for all services rendered through the
date of termination together with any additional reimbursable expense then due.
IX. ARTICLE
All completed or partially completed reports prepared under this Agreement,
including the original drawings in both paper and electronic formats, shal;-�
become the property of the TOWN if this Agreement is terminated. Upon
completion and payment of the contract, the final design, drawings, specifications
and documents in both paper and electronic formats shall be owned by TOWN.
2 Reuse, change or alteration by the TOWN or others acting by or on behalf of
TOWN of such documents without the permission of ENGINEER shall be at
TOWN's sole risk,
X. ARTICLE INSURANCE
ENGINEER shall carry and maintain at all times relevant hereto, at ENGINEER's
expense, insurance of the type and of minimum coverage limits as follows:
T,Vorkers Compensation - Statutory Employer's Liability - Limits as required by th"t
State of Arkansas,
2. Comprehensive General Liability, Bodily Injury and Property Damage includirl
is �
3, Comprehensive Automotive Liability, Bodily Injury and Property Damage in
combined single limit - $1,000,000 per accident.
Certificates of insurance for the above coverage in a form acceptable to TOWN,
evidencing the coverage required above, shall be provided to the TOWN upon execution of this
Agreement, Such certificates shall provide that the insurer will give the TOWN not less than
thirty (30) days notice of any material changes in or cancellation of coverage. In the event any
subcontractor of ENGINEER, with or without TOWN's consent, provides or renders services
under this Agreement, ENGINEER shall ensure that the subcontractor's services are covered by
the same insurance limits as set forth above.
ENGINEER shall not commence work under this Agreement until it has obtained
Professional Liability (Errors and Omissions) Insurance as required hereunder. Such insurance
shall be in the minimum amount of $1,000,000, In this connection, upon the signing and return
of this Agreement by ENGINEER, a Certificate of Insurance shall be furnished to the TOWN as
evidence that the insurance coverage required herein has been obtained by ENGINEER, and
such certificate shall contain the provision that such insurance shall not be cancelled or modified
without thirty (30) days prior written notice to the TOWN.
AUTHORIZATIOU�- XI. ARTICLE I
M, )QUSS-4-110 -CQUMjURIkJ
TOWN and ENGINEER agree that the Project is planned to be completed by July 30,
2010. ENGINEER shall employ manpower and other resources, and use professional skill and
diligence to meet the schedule; however, ENGINEER shall not be responsible for schedule
delays resulting from conditions beyond its control. By mutual agreement, TOWN and
ENGINEER may modify the Project schedule during the course of the Project and if such
modifications affect ENGINEER's compensation, it shall be modified accordingly, subject to
TOWN's approval.
It is understood that this Agreement contemplates full and complete engineering
services for this Project, including any and all Services necessary to complete the work. For
additional Engineering Services, the authorization by the TOWN shall be in writing and shall
include the definition of the services to be provided, the schedule for commencing and
completing the services, and the basis for compensation as agreed upon by TOWN and
ENGINEER.
XII. ARTICLE
NOTICE
Any notice required under this Agreement will be in writing and given either personally,
by registered or certified mail, return receipt requested, or by a nationally recognized overnight
courier service, addressed to the parties as follows:
9-910MM
i�*MVA
If to TOWN: Town of Westlake
3 Village Circle, Ste, 202
Westlake, TX 76262
SHE MI.-
If to ENGINEER: RJN Group, Inc.
12160 Abrams Road, Suite 400
Dallas, Texas 75243
Phone: 972-437-4300
Fax: 972-437-2707
LMMMMM
In the event that any provision of this Agreement shall be found to be void or
unenforceable, such finding shall not be construed to render any other provisions of this
Agreement either void or unenforceable. All provisions, which are void or unenforceable, shall
not substantially affect the rights or obligations granted to or undertaken by either party.
.-�#
al==.
Mw
UMMM
90 M
Venue of any suit or cause of action under this Agreement shall lie exclusively in Tarrant
County, Texas, This Agreement shall be construed in accordance with the laws of the State of
Texas.
IN WITNESS WHEREOF the parties have caused this Agreement to be executed in two
equal originals on the date w4»<,: above mentioned.
TOWN OF EST KE:
By:
— /\ «\� .
;' z
Tom Bryn4r-,-T4A nnage/
ATTEST:
d'
Kelly
war , Tow Secretary_
Kelso, Vice President
ATTACHMENT I
kk#_ffdAA1]lI9l3;=
1. PROJECT DESCRIPTION
The scope of services to be provided by RJN includes all necessary professional and field
services for the following:
RJN Group, Inc.'s responsibilities include field services, analysis, reporting and
assistance to the TOWN in developing an I&I reduction program. The study area
is comprised of approximately 36.000 linear feet in Basins WL - 2 identified as
having the highest levels of inflow in the 2009 flow monitoring program.
Meet with TOWN staff on a periodic basis, to update previous investigative work, to
coordinate upcoming work, and to receive any input from staff. Meetings will be held at
significant project milestones with written documentation of each meeting provided.
Perform general consultation with appointed TOWN representative on an as -needed
basis. Provide general overview opportunities for TOWN personnel for observing
regularly scheduled field inspection and testing activities.
Perform ENGINEER's internal project control procedures on a monthly basis including
schedule and budget control, quality control review, and monthly progress reports.
Collect and review existing information including maps, flow records, and other pertine
information. TOWN will provide maps of the wastewater system.
Number all manholes and cleanouts found during the investigation not shown on the
maps provided, Update the maps and provide them to the TOWN. Updates shall inclu
new lines, manholes and cleanouts, and hydraulic network changes.
Prepare preliminary field maps for project use from existing maps provided by the
TOWN. All drainage areas, sewers, manhole numbers will be shown on the maps,
Establish a data management system and maintain collected data throughout project
duration. Prepare data for use in analysis and report generation.
ENGINEER will prepare and deliver notices necessary for the performance of smoke
testing. Every reasonable effort will be made to distribute notices two (2) days prior to
smoke testing; however, the TOWN will allow the ENGINEER to distribute notices up to
a minimum of one day in advance of smoke testing.
ENGINEER may distribute notices up to a maximum of fourteen (14) days prior to smoki;
testing. If conditions do not allow smoke testing to be performed during this period,
ENGINEER will redistribute notices. If redistribution of smoke notices is required, testing
may be performed within one (1) day of noticing.
RJN shall review all information collected by the TOWN to ensure a thorough
understanding of the project background. A kick-off meeting with the TOWN shall be
conducted to develop a thorough understanding of the project, goals and to coordinate
the routine and timely exchange of information.
0 NDITIONS ASSESSMENT
Manhole Inspection:
Utilizing industry standard safety procedures and appropriate traffic control, all
subsurface manhole components will be inspected. All subsurface manhole
components including the frame seal, walls, manhole bench and trough will be
inspected. Potential maintenance problems are also recorded and provisions to repair
the problems are included in the recommendations.
Depth and velocity measurements will be estimated at each line segment to identify any
possible restrictions in the lines. All pipes entering or exiting the manhole structures that
are descended will be inspected for defects and restrictions. The manhole rim to invert
dimension will be recorded for all connecting lines.
Flow rates are estimated for major sources of 1/1 in each of the manholes inspected. Any
major 1/1 sources or defects will be immediately reported to the TOWN.
The recorded data includes the following:
Location and identification number
Potential for surface water ponding on manhole cover
Cover type, fit, distance above or below grade, evidence of inflow
Frame adjustment, type and condition of seal, evidence of inflow
Corbel construction, condition, evidence of inflow
Wall construction, condition, evidence in infiltration
Bench/trough construction, condition, deposition, evidence of infiltration
Pipe seal condition, evidence of infiltration
Step and rung condition
Inside diameter
Surcharging or evidence of surcharging
Indication of groundwater level at time of inspection
Maintenance problems
• Line segment diameter and direction
a DI U&INIM41
NOW -
ins e,
at no additional cost to the TOWN.
Once the TOWN has located or provided access to these manholes within 30 days of
notification, the ENGINEER will complete all necessary inspection$ at no additional cost
to the TOWN. The data management/computer model will be used to process and
analyze the inspection data,
Z Smoke Testing:
This task will specifically identify sections of sewer lines and sources where excessive
infiltration and inflow may be expected to occur during wet -weather periods including
locations of stormwater transfer into the sanitary sewer system,
A dual blower intensified smoke testing technique will be utilized to test sewer lines in
the selected study areas. This enhanced method uses two smoke blowers for each test
segment instead of the conventional technique of one blower, and partial plugging of the
segment. The objective is to provide the maximum amount of smoke pressure to identify
connections from sources such as catch basins, roof leaders, yard drains, area drains,
and detectable main line and lateral defects. Smoke testing will be performed only
during dry periods to maximize the effectiveness of the smoke testing program.
3Dyed Water Flooding. -
Inflow sources will also be identified by means of dyed water flooding of storm sewer
sections and suspected overflows, stream sections, ditch sections, and ponding areas
that may be contributing to inflow. Positive dye tests are quantified for leakage rate.
Field inspection data are input to the computerized data management system and
analyzed. A water meter and water for dyed water flooding will be provided by the
TOWN at no charge to the ENGINEER.
Dyed water flooding shall be conducted prior to television inspection to verify the
existence of inflow and infiltration sources. Dyed water flooding will also be conducted
in conjunction with televised inspection to quantify the magnitude of 1/1 sources and to
identify the specific nature of the defect.
4Interim ReportlCleaning and Internal Television (TV) Inspection:
A, Perform analysis of field investigations for TV inspection recommendations.
Prepare a letter report summarizing the justification and location of sewers to b
TV inspected with concurrent dyed water flooding. Submit and discuss the rep
with the TOWN, I
At the option of the Owner, perform cleaning and internal TV inspection of
selected sewer lines and record findings. Sanitary sewer lines will be lightly
cleaned in order to view the condition of the pipe. Heavy cleaning and root
cutting is not a part of this contract. During cleaning operations, all sludge,
debris, etc. shall be removed from the sewer and disposed of properly.
CObserve Television Inspection activities and perform Concurrent Dyed Water
Flooding with TV inspection to verify locations of inflow defects. Review
television inspection data and enter into project database.
5 Defect Analysis and Report:
X Develop rehabilitation and improvement costs for various types of
infiltration/inflow defect repairs and sewer improvements for line and manhole
improvement.
BPerform priority analysis for infiltration rehabilitation plan based on applicable
rehabilitation method, mater4, and costs.
C, Perform analysis for inflow rehabilitation plan based on applicable rehabilitation
method, material and costs.
DDevelop recommendations for rehabilitation of both public and private 1/1 sources
in priority order, cost estimates by individual rehabilitation type, and estimated 1/1
reduction as a result of the recommendations.
EPrepare and submit three (3) copies of a draft report, which includes results of
the 1/1 investigations, findings, cost estimates, recommended plan to reduce 1/1
and a preliminary schedule of implementation for sewer rehabilitation (CIP
Program recommendations). 'The draft report will be presented and discussed
with TOWN staff. After comments are received, a final report will be prepared
and submitted to the TOWN. ENGINEER will provide five (5) copies of the fina'
report. Recommendations for the improvements will consider the following
methods.
allam
1, sMw
Main Replacement
Point Repair
Inversion Lining
Expansion Lining
Access Structure Rehabilitation
Access Structure Replacement
The ENGINEER shall compile all findings, reports and field cataloging into a hard copy
form and on CD-ROM. The ENGINEER shall deliver to the TOWN, as outlined in the
Scope of Work, all information pertaining to the investigation and final analysis of the
SSES project.
All documentation and reports shall be delivered as outlined above and herein to be
access with MS Windows XP Word 2003 and Excel 2003 and Access 2003.
Final •• • findings and recommended .• plan,
All data collected during the investigation will be provided in Microsoft Access
and/or Excel. Data includes manhole inventory and condition information, line
segment inventory and condition information, and private sector defect
identification and location. Hard copies of the field inspection forms will also be
•"
ATTACHMENT 11
COMPENSATION SCHEDULE
Town of Westlake - Sanitai Sewer Assessment: Basin WL -2
In consideration of the services to be performed under this Agreement, ENGINEER Shall
'#,e paid as per the following compensation schedule:
- - - ----F-
1 -
Adihinistration
1
- LS
$3,500.00
$3,500.00
2.
Data Mani!
1
LS
$2,255.00
$2,250.00
3 .
14.
I Manhole Inspection (above
A
ground)
142
EA
$66.00
$9,372.00
ublic Relations
1
LS
$750.00
$750.00
5.
Smoke Te§I!N
i
—
Street
32,000 LF
$0.41
$13,120.00
Off -
Street
4,000
I LF
$0.45
$1,800.00
6.
._Pye
6
EA
$325.00
$1,950.00
7.
Cleaning/CCTVlns action
3,600
LF
$2.50
$9,000.00
8
9.
CCTV S i ape Review
y�e_rvisionj
Analysis
3,600
1
LF
I LS
$1.60
$4,500.00
$5,760.00
$4,500.00
10
F Re art
1
LS
$2,500.00
—$2,500.00
11
Contin enc
------------
1
'
' L�*'
LS
1$5,450.20
4*U'2u
$5,450.20
7
I fLO T �AL
$�595�220
'9
OUR=
W -..-
Mw