HomeMy WebLinkAboutRes 09-40 Authorizing a Contract with Building Code Consulting Services TOWN OF WESTLAKE
RESOLUTION 09-40
AUTHORIZING THE TOWN MANAGER TO ENTER INTO A CONTRACT
WITH "BUILDING CODE CONSULTING SERVICES, LLC" FOR THIRD-
PARTY PLAN REVIEW AND INSPECTION SERVICES FOR THE DELOITTE
EDUCATION AND CONFERENCE CENTER PROJECT.
NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE
TO1VNOF WESTLAKE, TEXAS:
SECTION 1: That the ToNvn Council of the Town of Westlake, Texas, does
hereby authorize the Town Manager to enter into a contract with Building Code
Consulting Services, LLC for third-party plan review and inspection services for the
Deloitte Education and Conference Center project. The contract amount is $53,030.
PASSED AND APPROVED ON THIS 10 DAY OF AUGUST 2009.
Laurd'Wheat, Mayor
ATTEST,,
/Ki Sutter, TRMLC, Town Secretary Ahomas E. 0
ft�yfflr 7n anagen
APPROYED AS TC?
SiainIoNvry,{161`n,. 60,rney
Dallas Fart Orth Austin San Antonlo Houston El Pasta
1� !d'. Da www.bccscode.com
Q
onsulti
ervices ng . . . .Service you can build carr!
July 24, 2009
PROPOSAL
Proposal to:Town of Westlake Proposal#: P08-34R
2650 JT Offinger Rd, Phone: 817-490-5726
Westlake, TX 76262 Fax: 817-430-1812
Attn: Mr. Eddie Edwards
Project: Deloitte Hotel/Conference Center and accessory structures, including a
Data Center and a Social Venue.
Addressed:
Conference -Center 2501 Westlake Parkway
Social Venue -2526 Westlake Parkway
Data Center-2100 JT Ottinger.
Approximately 760,000 square feet
Dear Mr. Edwards:
Building Code Consulting Services proposes to provide Third Party Commercial
Plan Review and Inspection Services for the buildings at the above referenced
addresses, subject to the terms and conditions listed herein.
The total cost herein is contingent upon BCCS' work commencing on or before
August 31, 2008 and concluding by December 31, 2011. Work performed beyond the
conclusion date, or beyond the scope of this Proposal, may be subject to re-
negotiation.
Attachment"A" included herein shall be made a part of this Proposal in its entirety.
PRICE (S): (Taxes not included)
DESCRIPTION: PRICE
1. Building, Mechanical, Electrical & Plumbing
Plan Review and consultation.
2. Building, Mechanical, Electrical & Plumbing
inspections.
TOTAL COST= $53,030
Building Code Consulting Services, LLC Toll Free 1.877.683.16'17 (972)680-2121 Fax(972)234-0895
1701 N Greenville Ave#1002 Richardson, TX 75489 EMAIL: 1od.fbx@bccscode.co1n
Town of Westlake, P08-34R
July 24, 2009
Page 2 of.?
PAYMENTTEFL MS:
Terms of payment shall be Net (30) thirty days from receipt of Progress Billing
Invoice.
Submitted by:
Lori Fox
--office Manager
ACCEPTANCE: The above Proposal, including all documents therein, shall constitute a Contract when
executed by each party below,or when Buyer gives written or oral notice to proceed,whichever occurs first,
Town of Westlake BGCS
BY
BY:
TITLE: A of&I e V- +4-)'
TITLE-
C
DATE- DATE:
Town of Westlake, P00-34R
July 24, 2009
Page 3 of 3
Attachment"A"
SCOPE OF WORK
• BCCS and it's representatives are charged as the enforcement agency for the provisions of the
City's Building Code,Mechanical Code, Electrical Code,Fuel Gas Code,and Plumbing Code.
• Plan Review shall be conducted required by the City's Building Code. Pian Review services
are Intended to replicate the services offered by the City's Building Inspection Department.
• Pricing is an all Inclusive negotiated fee for the services detailed in the Scope of Work
PLAN REVIEW. CCS Plan Review will be performed to confirm that provided construction
documents have been prepared so as to comply with the requirements of:
• 2006 International Building Code
— • 2006 International Plumbing Code
• 2006 International Fuel Gas Code
• 2006 International Mechanical Code
2006 National Electric Code
• Provisions of the Town of Westlake Municipal Code which amend or augment these codes
The Plan Review provided by BCCS on documents prepared by, and which bear the Seal of, a
Professional Engineer is only a confirmation that the design professional utilized the correct Edition
and provisions of the code in preparing the design.
THIRD PARTY INSPECTIONS: BCCS Inspections shall be performed at the intervals and in a manner
to emulate the inspection process of the jurisdiction. The inspection process proposed Is for the
Inspection of improvements wholly contained within the property boundaries and does not Include
Inspections of infrastructure improvements In Easements or Public Rights-of-Way. The inspections
will be performed prior to cover of work and the scheduling of these inspections is the responsibility
of the Contractor. BCCS will perform the Inspections, Indicated below to assure compliance with the
Plan Reviewed documents and the requirements of.,
• 2006 International Building Code
• 2006 International Plumbing Code
• 2006 International Fuel Gas Code
• 2006 International Mechanical Code
• 2006 International Fire Cade(this review does not include review of system shop drawings)
b 2006 National Electric Code
• Provisions of the Town of Westlake Municipal Code which amend or augment these codes
EXCLUSIONS
• Energy Code Plan Review&Inspections.
• BCCS will not be responsible for any fees due to the Town of Westlake,TX or any other entity.
• All reviews and inspections exclude State, Federal, County, Health, T.E.A., Civil, Landscape,
Irrigation and Zoning regulations.
• All items not specifically listed in the SCOPE OF WORK.
• All taxes, payment and performance bonds and liquidated damages.