HomeMy WebLinkAboutRes 09-37 Amending the Fee and Use Schedule TOWN OF WESTLAKE
RESOLUTION 09-37
APPROVING THE AMENDED "FEES AND USE SCHEDULE" DATED
AUGUST 10,2009.
NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE
TOWN OF WESTLAKE,TEXAS:
SECTION 1: That the Town Council of the Town of Westlake, Texas, does
hereby approve the Fees and Use Schedule dated August 10, 2009, an example of which
is attached and labeled Exhibit "A':
PASSED AND APPROVED ON THIS 10 DAY OF AUGUST 2009.
A/7,LLA-1k, lk,117-44-'-�
Laura Wheat, Mayor
ATTEST:
4dim'Sutter, 'FRMC. Town Secretary Tom Brvmer, 4:o
wanag
APPROVE'D--.AS TO FORM:
11M
(Highlights indicate changes from last approved schedule, Highlights are for Town
Council presentation only and will not be shown on actual exhibit A.)
FEES AND USE SCHEDULE
Revised
August 10, 2009
1) The fees and use charges listed in this section are in addition to any other fees and use
charges which may exist in ordinances of the town, including, but not limited to the Uniform
Fire Code. Uniform Building Code, National Electrical. Code, Uniform Plumbing Code and
Uniform Mechanical Code. To the extent there is a conflict in the fees and use charges
contained in this section with other stated fees and uses, the fees and use charges in this
section shall prevail. Fees calculations based on the number of acres involved shall be
calculated by rounding up to the next whole acre.
2) ZONING CHANGE APPLICATIONS
Pre-tipplicatioiil'pre-desi,izti con,/c rence.° This is intended to provide the applicant with a
verbal interpretation of ordinances and processes, and to respond to any questions they may
have. Such meetings may involve the town consultants at the request of the town manager.
Fee' - $400.00 This con.terence is only required, and thefice charged, at the discretion of the
Touw,lvlanager.
Straight zoning change: This includes review of the application, site visits, meetings with
the applicant and recommendations to the planning and zoning commission as well as
published notifications and public hearings.
Fee: $1,800.00 plus $90.00 per acre; $40,000.00 maximum (less fee paid for pre -application
conference).
Planned development district: This includes review of the application, site visits, meetings
with the applicant and recommendations to the planning and zoning commission as well as
published notifications and public hearings.
Fee.- $1.800.00 plus $90.00 per acre (less fee paid for pre -application conference).
S17ecffle use Permit: This includes review of the application, site visits, meeting with the
applicant and recommendations to the planning and zoning commission and all public
notifications.
Fee: $1,800.00.
Ainendnients to al2proved site plans: This includes review and approval of the town manager
and/or his designee(s). If the request exceeds the legal authority of the town manager and/or
his designee(s) to grant the site plan revision, the application may be converted to a full
zoning application with payment of the balance of a full application fee.
Fee: $900.00 plus $20.00 per acre (less fee paid for pre -application conference).
(Highlights indicate changes from last approved schedule. Highlights are for Town
Council presentation only and will not be shown on actual exhibit A.)
T'ariance of UDC Requlations.� This includes review of the application, site visits, meetings
with the applicant and associated town staff and recommendations to the board of
adjustment, and all public notifications and public hearings.
Fee: $900.00.
W I I Is i I — a
Pre -application or pre -resign coin'erence: Ten percent of the projected total fee for the
activity being applied for. This fee shall be credited toward the next ongoing fee, if any,
when due.
(Minimum $1,800.00)
Any subdivision plat or re -subdivision plat:
Prelitninaryplats: $1,800.00 plus $90.00 per acre, maximum of $36,000.00.
Final plats' - $900.00 plus $90.00 per acre, maximum of $18,000.00.
Minor Plats.- $900.00 plus $90.00 per acre, maximum of $18,000.00.
Engineeringplans: $1,800.00 plus $90.00 per acre.
Replat: $1,800.00 plus $90.00 per acre, maximum of $36,000.00.
Site plans:
Comprehensive (final) site plans: $1,800.00 plus $90.00 per acre.
P'acation qfplat: $720.00.
11 11111 '51
Construction inspections: The inspection fee will be six percent (6%) of certified
construction costs of the land development (including, but not limited to, public and private
improvements such as streets and roads, drainage, parking lots, fire water systems, walls,
fences. site grading, water features, parks, open space corridors, required landscaping,
irrigation, sidewalks, trails, etc., but not including building construction) for subdivisions or
re -subdivision. Estimated Inspection fees are to be paid prior to permitting and or
commencement of work on the proposed improvements and the balance based upon certified
construction costs prior to acceptance of improvements or issuance of building permits. The
construction inspection fee is in addition to any other fees listed herein..
Total Valuation
Fee
$1.00 to $500.00
$50.00
$501.00 to $2000.00
$50.00 for the first $500.00 plus $6.60 for each additional $ 100.00
or fraction thereof, up to and including $2,000.00.
0
INV
(Highlights indicate changes from last approved schedule. Highlights are for 7 -own
Council presentation only and will not be shown on actual exhibit
$2,001.00 to
--------- 7
$150.00 for the first $2,000.00 plus $30.00 for each additiojal
$215,000.00
$1.000,00 or fraction thereof, up to and including $25.000.00.
$25,001.00 to
$840,00 for the first $25,000.00 plus $21.60 for each ac"Jitional
$50,000.00
$1,000.00 or fraction thereof, to and including $50,000.00.
$50.001.00 to
$1,380.00 for the first $50.000.00 plus $15.00 for eoch addi4,ional
$100,000,00
$1,000.00, or fraction thereof, to and including $100,000.00.
$100,001.00 to
$2,130.00 for the first $100,000.00 plus $12,00 for each additional
$500,000.00
$1,000,00 or fraction thereof, to and including $500,000.00.
$500,001.00 to
$6,930.00 for the first $500,000.00 plus $10.20 for each additional
$1,000,000.00
$1,000,00 or fraction thereof. to and including $ 1.000,000-00.
1,000,001.00 and up
$12,030.75 for the first $ 1,000,000.00 Plus $6.60 for each
additional $1,000.00 or fraction thereof.
(1)
Inspections outside of non -nal business hours
$75.00 per hour*
(Minimum charge --two hours)
(2 hour minimutri)
(2)
Reinspection fees assessed under provisions of the adopted
$75.00 per hour*
codes.
(I hour minimum)
(3)
Inspections for which no fee is specifically indicated.
$75.00 per hour*
(Minimum charge --one-half hour)
(I hour minimum)
(4)
Electrical, Plumbing, and Mechanical inspections.
$75.00 per hour*
( I hour minimum)
(5)
Consultants for inspections or plan review utilized for specific
Actual cost
specialized projects.
I incurred.
*Or the total hourly cost to the town, whichever is the9 reater. This cost includes
supervision, overhead, equipment, hourly wages and benefits, and mileage.
"Actual cost includes administrative and overhead costs.
ITSU
(Highlights indicate changes from last approved schedule. Highlights are for Town
Council presentation • and will not be shown • actual exhibit A.)
NO Mrldm-mffwltffffq�� ITIIFMG��Ffimmg
M
vim
(Highlights indicate changes from lost approved schedule. Highlights are for Town
Council presentation only and will not be shown on actual exhibit A.)
7) SPECIAL BUILDING PERMIT FEES
1.
Swimming pools
$500.00
Z..
Fence if not included in building pen -nit application
$165.00
3.
Fence repair and barbed wire fencing excluded
No fee, no
$75.00
Political signs
permit
pe
4.
Demolition
$250.00
5.
Sprinkler system for yards
$300.00
6.
Any antenna
$400.00
7.
Sidewalk, curb cuts, . drivewaysconcrete work in Right-of-way
driveways,
$200.00
8.
Moving permit for buildings moved on any town street: Permanent
house relocation (plus all direct and indirect costs incurred by the
$450.00
Town of Westlake due to such relocation)
9.
Construction in the public -right-of-way (other than a certificated
$600.00
telecommunications provider)
10.
Trenching or Excavating not within the public right-of-way (other
$600.00
than a certificated telecommunications provider)
11. Water well — for private use.
1 $1,000.00
Sign Permits
Construction signs
$150.00
Temporary signs
$80.00
Signs or display cases within the commercial district
$200.00
Home occupation signs
$75.00
Political signs
No Permit
Signs within residential district (,Except for home occupation signs)
No Permit
All newly -constructed residential structures shall pay a $3,100.00 residential lot development
fee per lot where the town's duct bank is or is planned to be located, in addition to the
9
(Highlights indicate changes from lost approved schedule. Highlights r-• Town
Council presentation only and will not be shown on actual exhibit A.)
building permit fees. The residential lot development fee shall be payable in conjunction with
the building permit fee.
Special event permit - includes all tents, fireworks, and
$250.00
temporary electrical poles.
$ 75.00**
Temporary electrical poles. For other than construction
$35.00
projects.
$250.00
Subdivision name change.
$250.00
i 6. Bum Permit - Resident
$250.00 + cost c,,f new street
Street name change.
$ 50.00
8. Carnivals and Fairs
name blades
Zoning verification letter
$500.00
1. Aboveground Storage Tanks (AGST)
$150.00
2. After hour inspections
$ 75.00**
3. Asbestos removal
$100.00
4. Battery Systems
$250.00
5. Bum Permit - Non-resident
$ 50.00
i 6. Bum Permit - Resident
No Charge
7. Candles and open flame in assembly areas
$ 50.00
8. Carnivals and Fairs
$ 50.00*
9. Changing UST or AGST contents
$100.00
10. Compressed Gas
$100.00
11. Cryogens
$250.00
12. Dry Cleaning Operations - flammable/combustible liquids
$ 75.00
13. Dry Cleaning Operations - non-flammable liquids
$ 50.00
14. Einer enc y Medical Services - services and expendables
#
15. Explosives or Blasting Agents - Use
$150.00*
16. Fire Alarm System Review
#
17. Fire S ririkler S stem Review
#
18. Fireworks (certified events only)
$150.00*
19. Fumigation or thermal insecticidal fogging
$250.00
20. Hazardous Materials - Stora
1 2L Hazardous Materials Mitigation
A#
E 22. Highly Toxic Pesticides - Storage, use of
$ 50.00
Exhibit A
(Highlights indicate changes from lost approved schedule. Highlights are for Town
Council presentation only and will not be shown on actual exhibit A.)
23. High -Piled Combustible Storage
$
50.00
24. Hot works operations
25. LPG 25-199 WGC
$
$
50.00
25.00
26. LPG 200-1,999 WGC
$
75M
27. LPG 2,000 < WGC
$100.00
28. LPG fueled vehicles or equipment in assembly building's
$
50.00
29. Malls - covered
$
75.00*
30. Motor vehicle fueling dispensing station
$
50.00
31. Personnel stand-by - Fire Watch
$
35.00^
32. Personnel stand-by - Special Event
_35.00-'
33. Private Agency License Inspection/Certification
$
50.00
34. Pyrotechnic - Special events material
$500.00*
35, Radioactive Materials
$500.00
36. Re -inspection for fire alarm systems
$
75.00*
7. Re -inspection for new construction
$
75.00*
38. Re -inspection for sprinkler systems
$
75.00*
Trench Burning - Clearing Land or Rubbish
$150.00
40. Tjnderground Storage Tanks (UST)
$150.00
41. UST and AGST removal or teixaporary out of service
$
50.00
42. Water System Analysis/Test for Fire Suppression Systems
$
25.00_
*If required, addition cost for personnel may be charged. Additional cost for expendable
equipment and necessary apparatus may be incurred.
**Two (2) hour minimum. If required, addition cost for personnel may be charged.
I t�
Additional cost for expendable equipment and necessary apparatus may be incurred.
`Cost is per hour per persormel utilized. Additional cost for expendable equi,nn-lent and
necessary apparatus may be incurred.
111 1 ! !I I H I lip 1 1 1
0_100.000 squarefeet $0.015/square foot
100,001--3)00,000 square feet $1.500.00 for the first 100,000 square feet plus $0.014 for
each additional square foot of area.
300,001 + square feet $4.200.00 for the first 300,000 square feet plus $0.009 for
each additional square foot of area or fraction thereof.
N
ILJ
Highlights indicate changes from lost approved schedule. Highlights are for Town
Council presentation only and will not be shown on actual exhibit A.)
BLS Emergency
$400.00
ALS 1
$500.00
ALS 11
$700.00
Mileage
$.10 per mile
Gas Well Perm plication Fee linit )erm t per well)
$30,000
Gas Well Permit Amendment Application & Review Fee
5,000
Gas Well Certificate of Completion & Completion Inspection Fee
ME=
1,000 11
Annual Approved Gas Well Permit Review, Inspection, & Permit Renewal Fee
Gas Well Perm plication Fee linit )erm t per well)
$10,000
Gas Well Permit Amendment Application & Review Fee
2500 1
Gas Well Certificate of Completion & Completion Inspection Fee
Tank BatteEy Completion & Annual Permit/Inspection Fee
1,000 11
Annual Approved Gas Well Permit Review, Inspection, & Permit Renewal Fee
1,500
Initial/Annual Insurance & Surety Review Fee (per approved aas well permit)
1.000
Annual Fire Fit..ell ermit
2,000
Annual Safety/Hazardous Materials Plans & Reports Compliance Review Fee
1,000**
Well Re -working Permit Fee
5A0**
Gas Well Permit Transference Processing Fee
5,000**
Gas Well Permit Extension Processina Fee
5,000**
Well Abandonment Permit Application & Inspection Fee
F 2,500
Road Maintenance Agreement Review & Inspection Fee
**this is per approved gas well permit - I
New Pipeline Construction Permit & Inspection Fee $5,000 1
I New Pipeline Certificate of Completion & Inspection Fee 1 1-5001
FOMIM
(Highlights indicate changes from lost approved schedule. Highlights are for Town
Council presentation only and will not be shown on actual exhibit A.)
New Pipeline ROW/Street/Road,/Easement Crossing License (license is per
crossing)
-'-)'000
Initial/Annual Insurance & Surety Review Fee (per approved pipeline permit)
1,000
Annual Safety Report Compliance Review Fee (per approved pipeline permit)
1,000
Annual Pipeline Pen -nit & License Renewal Fee (per new pipeline permit)
2,000
Inactive Pipeline Permit Application & Inspection Fee
2,500
Idled Pipeline Permit Application & Inspection Fee
2,500
Idled Pipeline Permit Reactivation Inspection Fee
2 �,500
***all permits, fees, and/or licenses in this section are for initial installation
of a new pipeline. Any extensions of this pipeline will be considered a new
pipeline and subject to all applicable permits
Miscellaneous Gas & Oil Related Fees
Seismic Testing Pen -nit Fee $500
Technical Advisor Fees
Based on Actual Cost plus 10% Administrative Fee
W