HomeMy WebLinkAboutOrd 891 Approving a Negotiated Settlement Between the ATMOS Cities Steering Committee and ATMOS Energy Corp Mid-Tex DivisionORDINANCE NO. 891
AN ORDINANCE OF THE TOWN COUNCIL OF THE TOWN OF WESTLAKE, TEXAS,
APPROVING A NEGOTIATED SETTLEMENT BETWEEN THE ATMOS CITIES
STEERING COMMITTEE ("ACSC") AND ATMOS ENERGY CORP., MID-TEX
DIVISION REGARDING THE COMPANY'S 2019 RATE REVIEW MECHANISM
FILING; DECLARING EXISTING RATES TO BE UNREASONABLE; ADOPTING
TARIFFS THAT REFLECT RATE ADJUSTMENTS CONSISTENT WITH THE
NEGOTIATED SETTLEMENT; FINDING THE RATES TO BE SET BY THE
ATTACHED SETTLEMENT TARIFFS TO BE JUST AND REASONABLE AND IN THE
PUBLIC INTEREST; APPROVING AN ATTACHED EXHIBIT ESTABLISHING A
BENCHMARK FOR PENSIONS AND RETIREE MEDICAL BENEFITS; APPROVING
AN ATTACHED EXHIBIT REGARDING AMORTIZATION OF REGULATORY
LIABILITY; REQUIRING THE COMPANY TO REIMBURSE ACSC'S REASONABLE
RATEMAKING EXPENSES; DETERMINING THAT THIS ORDINANCE WAS PASSED
IN ACCORDANCE WITH THE REQUIREMENTS OF THE TEXAS OPEN MEETINGS
ACT; ADOPTING A SAVINGS CLAUSE; DECLARING AN EFFECTIVE DATE; AND
REQUIRING DELIVERY OF THIS ORDINANCE TO THE COMPANY AND THE
ACSC'S LEGAL COUNSEL.
WHEREAS, the Town of Westlake, Texas ("Town") is a gas utility customer of Atmos
Energy Corp., Mid -Tex Division ("Atmos Mid -Tex" or "Company"), and a regulatory authority
with an interest in the rates and charges of Atmos Mid -Tex; and
WHEREAS, the Town is a member of the Atmos Cities Steering Committee ("ACSC"),
a coalition of similarly -situated cities served by Atmos Mid -Tex ("ACSC Cities") that have joined
together to facilitate the review of, and response to, natural gas issues affecting rates charged in
the Atmos Mid -Tex service area; and
WHEREAS, ACSC and the Company worked collaboratively to develop a new Rate
Review Mechanism ("RRM") tariff that allows for an expedited rate review process by ACSC
Cities as a substitute to the Gas Reliability Infrastructure Program ("GRIP") process instituted by
the Legislature, and that will establish rates for the ACSC Cities based on the system -wide cost of
serving the Atmos Mid -Tex Division; and
WHEREAS, the current RRM tariff was adopted by the Town in a rate ordinance in
2018; and
WHEREAS, on about April 1, 2019, Atmos Mid -Tex filed its 2019 RRM rate request with
ACSC Cities based on a test year ending December 31, 2018; and
WHEREAS, ACSC coordinated its review of the Atmos Mid -Tex 2019 RRM filing
through its Executive Committee, assisted by ACSC's attorneys and consultants, to resolve issues
identified in the Company's RRM filing; and
Ordinance 891
Pagel of 3
WHEREAS, the Executive Committee, as well as ACSC's counsel and consultants,
recommend that ACSC Cities approve an increase in base rates for Atmos Mid -Tex of $35.4
million applicable to ACSC Cities; and
WHEREAS, the attached tariffs (Exhibit A) implementing new rates are consistent with
the recommendation of the ACSC Executive Committee, are agreed to by the Company, and are
just, reasonable, and in the public interest; and
WHEREAS, the settlement agreement sets a new benchmark for pensions and retiree
medical benefits (Exhibit B); and
WHEREAS, the settlement agreement establishes an amortization schedule for regulatory
liability (Exhibit C); and
WHEREAS, the RRM Tariff contemplates reimbursement of ACSC's reasonable
expenses associated with RRM applications;
NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE
TOWN OF WESTLAKE, TEXAS:
Section 1. That the findings set forth in this Ordinance are hereby in all things approved.
Section 2. That, without prejudice to future litigation of any issue identified by ACSC,
the Town Council finds that the settled amount of an increase in revenues of $35.4 million for
ACSC Cities represents a comprehensive settlement of gas utility rate issues affecting the rates,
operations, and services offered by Atmos Mid -Tex within the municipal limits arising from
Atmos Mid-Tex's 2019 RRM filing, is in the public interest, and is consistent with the Town's
authority under Section 103.001 of the Texas Utilities Code.
Section 3. That the existing rates for natural gas service provided by Atmos Mid -Tex are
unreasonable. The new tariffs attached hereto and incorporated herein as Exhibit A, are just and
reasonable, and are designed to allow Atmos Mid -Tex to recover annually an additional $35.4
million from customers in ACSC Cities, over the amount allowed under currently approved rates.
Such tariffs are hereby adopted.
Section 4. That the ratemaking treatment for pensions and retiree medical benefits in
Atmos Mid-Tex's next RRM filing shall be as set forth on Exhibit B, attached hereto and
incorporated herein.
Section 5. That amortization of regulatory liability shall be consistent with the schedule
found in attached Exhibit C attached hereto and incorporated herein.
Section 6. That Atmos Mid -Tex shall reimburse the reasonable ratemaking expenses of
the ACSC in processing the Company's 2019 RRM filing.
Ordinance 891
Page 2 of 3
Section 7. That to the extent any resolution or ordinance previously adopted by the Council
is inconsistent with this Ordinance, it is hereby repealed.
Section 8. That the meeting at which this Ordinance was approved was in all things
conducted in strict compliance with the Texas Open Meetings Act, Texas Government Code,
Chapter 551.
Section 9. That if any one or more sections or clauses of this Ordinance is adjudged to be
unconstitutional or invalid, such judgment shall not affect, impair, or invalidate the remaining
provisions of this Ordinance, and the remaining provisions of the Ordinance shall be interpreted
as if the offending section or clause never existed.
Section 10. That consistent with the Town Ordinance that established the RRM process,
this Ordinance shall become effective from and after its passage with rates authorized by attached
tariffs to be effective for bills rendered on or after October 1, 2019.
Section 11. That a copy of this Ordinance shall be sent to Atmos Mid -Tex, care of Chris
Felan, Vice President of Rates and Regulatory Affairs Mid -Tex Division, Atmos Energy
Corporation, 5420 LJB Freeway, Suite 1862, Dallas, Texas 75240, and to Geoffrey Gay, General
Counsel to ACSC, at Lloyd Gosselink Rochelle & Townsend, P.C., 816 Congress Avenue,
Suite 1900, Austin, Texas 78701.
PASSED AND APPROVED ON THIS 9TH DAY OF SEPTEMBER 2019.
ATTEST:
Laura L. Wheat, Mayor
APPROVE AS FORM:
KellEdwaHs, Town Secretary;
OF WEST
L St o r wn Attorney
Ordinance 891
Page 3 of 3
Exhibit A
Rate Tariffs Effective October 1,2019
Ordinance 891
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RRC Tariff No:
RATE SCHEDULE:R -RESIDENTIAL SALES
APPLICABLE TO:ALL CUSTOMERS IN THE MID-TEX DIVISION UNDER THE RRM TARIFF
EFFECTIVE DATE:Bills Rendered on or after 10/01/2019 PAGE:
Application
Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured
through one meter.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery,additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the
amounts due under the riders listed below:
Charge Amount
Customer Charge per Bill $19.55 per month
Rider CEE Surcharge $ 0.05 per month'
Total Customer Charge $19.60 per month
Commodity Charge - AllCcf $0.17423 per Ccf
Gas Cost Recovery:Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part (a)and Part (b),respectively,of Rider GCR.
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization
calculated in accordance with Rider WNA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment:Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges:Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
'Reference Rider CEE -Conservation and Energy Efficiency as approved in GUD 10170.Surcharge billingeffective July 1, 2019.
Ordinance 891
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RRC Tariff No:
RATE SCHEDULE:C -COMMERCIAL SALES
APPLICABLE TO:ALL CUSTOMERS IN THE MID-TEX DIVISION UNDER THE RRM TARIFF
EFFECTIVE DATE:Bills Rendered on or after 10/01/2019 PAGE:
Application
Applicable to Commercial Customers for all natural gas provided at one Point of Delivery and measured
through one meter and to Industrial Customers with an average annual usage of less than 30,000 Ccf.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the
amounts due under the riders listed below:
Charge Amount
Customer Charge per Bill $46.50 per month
Rider CEE Surcharge $0.02 permonth^
Total Customer Charge $46.52 per month
Commodity Charge -All Ccf $0.09924 per Ccf
Gas Cost Recovery;Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part (a)and Part (b),respectively,of Rider GCR.
Weather Normalization Adjustment:Plus or Minus an amount for weather normalization
calculated in accordance with Rider WNA.
Franchise Fee Adjustment:Plus an amount for franchise fees calculated in accordance with Rider
FF,Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment:Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges:Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
'Reference Rider CEE -Conservation and Energy Efficiency as approved in GUD 10170.Surcliarge billingeffective July 1, 2019.
Ordinance 891
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RRC Tariff No:
RATE SCHEDULE:1-INDUSTRIAL SALES
APPLICABLE TO:ALL CUSTOMERS IN THE MID-TEX DIVISION UNDER THE RRM TARIFF
EFFECTIVE DATE:Bills Rendered on or after 10/01/2019 PAGE:
Application
Applicable to Industrial Custonners with a maximum daily usage (MDU)of less than 3,500 MMBtu per day
for all natural gas provided at one Point of Delivery and measured through one meter.Service for
Industrial Customers with an MDU equal to or greater than 3,500 MMBtu per day will be provided at
Company's sole option and will require special contract arrangements between Company and Customer.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and MMBtu charges to the
amounts due under the riders listed below:
Charge Amount
Customer Charge per Meter $845.50 per month
First 0 MMBtu to 1,500 MMBtu $0.3572 per MMBtu
Next 3,500 MMBtu $0.2616 per MMBtu
All MMBtu over 5,000 MMBtu $0.0561 per MMBtu
Gas Cost Recovery:Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part (a)and Part (b),respectively,of Rider GCR.
Franchise Fee Adjustment:Plus an amount for franchise fees calculated in accordance with Rider
FF.Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment:Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges:Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer's deliveries.
Customer will, for each MMBtu delivered in excess of the stated level of curtailment or internjption,pay
Company 200%of the midpoint price for the Katy point listed in Platts Gas Daily published for the
applicable Gas Day in the table entitled "Daily Price Survey."
Replacement Index
In the event the "midpoint" or "common" price for the Katy point listed in Platts Gas Daily in the table
entitled "Daily Price Survey"is no longer published,Company will calculate the applicable imbalance fees
utilizing a daily price index recognized as authoritative by the natural gas industry and most closely
approximating the applicable index.
Ordinance 891
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RRC Tariff No:
RATE SCHEDULE:1-INDUSTRIAL SALES
APPLICABLE TO:ALL CUSTOMERS IN THE MID-TEX DIVISION UNDER THE RRM TARIFF
EFFECTIVE DATE:Bills Rendered on or after 10/01/2019 PAGE:
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tarifffor Gas Service.
Special Conditions
In order to receive service under Rate I,Customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
Ordinance 891
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RRC Tariff No:
RATE SCHEDULE:T-TRANSPORTATION
APPLICABLE TO:ALL CUSTOMERS IN THE MID-TEX DIVISION UNDER THE RRM TARIFF
EFFECTIVE DATE:Bills Rendered on or after 10/01/2019 PAGE:
Application
Applicable,in the event that Company has entered into a Transportation Agreement,to a customer
directly connected to the Atmos Energy Corp., Mid-Tex Division Distribution System (Customer)for the
transportation of all natural gas supplied by Customer or Customer's agent at one Point of Delivery for
use in Customer's facility.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery,additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's bill will be calculated by adding the following Customer and MMBtu charges to the amounts
and quantities due under the riders listed below:
Charge Amount
Customer Charge per Meter $845.50 per month
First 0 MMBtu to 1,500 MMBtu $0.3572 per MMBtu
Next 3,500 MMBtu $0.2616 per MMBtu
All MMBtu over 5,000 MMBtu $0.0561 per MMBtu
Upstream Transportation Cost Recovery:Plus an amount for upstream transportation costs in
accordance with Part (b) of Rider GCR.
Retention Adjustment:Plus a quantity of gas as calculated in accordance with Rider RA.
Franchise Fee Adjustment:Plus an amount for franchise fees calculated in accordance with Rider
FF.Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment:Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges:Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Imbalance Fees
All fees charged to Customer under this Rate Schedule will be charged based on the quantities
determined under the applicable Transportation Agreement and quantities will not be aggregated for any
Customer with multiple Transportation Agreements for the purposes of such fees.
Monthly Imbalance Fees
Customer shall pay Company the greater of (i)$0.10 per MMBtu,or (ii)150% of the difference per MMBtu
between the highest and lowest "midpoint" price for the Katy point listed in Platts Gas Daily in the table
entitled "Daily Price Survey" during such month, for the MMBtu of Customer's monthly Cumulative
Imbalance,as defined in the applicable Transportation Agreement,at the end of each month that exceeds
10%of Customer's receipt quantities for the month.
Ordinance 891
MID-TEX DIVISION RRC Tariff No:
ATMOS ENERGY CORPORATION
RATE SCHEDULE:T -TRANSPORTATION
APPLICABLE TO:ALL CUSTOMERS IN THE MID-TEX DIVISION UNDER THE RRM TARIFF
EFFECTIVE DATE:Bills Rendered on or after 10/01/2019 PAGE:
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer's deliveries,
Customer will, for each MMBtu delivered in excess of the stated level of curtailment or Interruption,pay
Company 200%of the midpoint price for the Katy point listed in Platts Gas Daily published for the
applicable Gas Day in the table entitled "Daily Price Survey."
Replacement Index
In the event the "midpoint" or "common" price for the Katy point listed in Platts Gas Dally in the table
entitled "Daily Price Survey"is no longer published,Company will calculate the applicable imbalance fees
utilizing a daily price index recognized as authoritative by the natural gas industry and most closely
approximating the applicable Index.
Agreement
A transportation agreement is required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Special Conditions
In order to receive service under Rate T,customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
Ordinance 891
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RIDER:WNA-WEATHER NORMALIZATION ADJUSTMENT
APPLICABLE TO:ALL CUSTOMERS IN THE MID-TEX DIVISION UNDER THE RRM TARIFF
EFFECTIVE DATE:Bills Rendered on or after 11/01/2019 PAGE:
Provisions for Adjustment
The Commodity Charge per Ccf (100 cubic feet) for gas service set forth in any Rate Schedules utilized
by the cities of the Mid-Tex Division service area for determining normalized winter period revenues shall
be adjusted by an amount hereinafter described,which amount is referred to as the "Weather
Normalization Adjustment."The Weather Normalization Adjustment shall apply to all temperature
sensitive residential and commercial bills based on meters read during the revenue months of November
through April.The five regional weather stations are Abilene,Austin,Dallas,Waco,and Wichita Falls.
Computation of Weather Normalization Adjustment
The Weather Normalization Adjustment Factor shall be computed to the nearest one-hundredth cent
per Ccf by the following fomiula:
WNAF
Where
WNAF1
Ri =
HSFj =
NDD =
ADD
Bli
Ri
(HSFj (NDD-ADD))
(BLj (HSFj X ADD))
any particular Rate Schedule or billing classification within any such
particular Rate Schedule that contains more than one billing classification
Weather Normalization Adjustment Factor for the i*'^rate schedule or
classification expressed in cents per Ccf
Commodity Charge rate oftemperature sensitive sales for the i^l^schedule or
classification.
heat sensitive factor for the i^^schedule or classification divided by the
average bill count in that class
billingcycle normal heating degree days calculated as the simple ten-year
average of actual heating degree days.
billing cycle actual heating degree days.
base load sales for the i^*^schedule or classification divided by the average
bill count in that class
The Weather Normalization Adjustment for the jth customer in ith rate schedule is computed as:
WNAi = WNAFi x qij
Where qy is the relevant sales quantity for the jth customer in ith rate schedule.
Ordinance 891
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RIDER:WNA -WEATHER NORMALIZATION ADJUSTMENT
APPLICABLE TO:ALL CUSTOMERS IN THE MID-TEX DIVISION UNDER THE RRM TARIFF
EFFECTIVE DATE:Bills Rendered on or after 11/01/2019 PAGE:
Base Use/Heat Use Factors
Residential Commercial
Weather Station
Abilene
Base use
Ccf
9.77
Heat use
Ccf/HDD
0.1487
Base use
Ccf
88.49
Heat use
Ccf/HDD
0.7036
Austin 9.04 0.1537 201.48 1.0000
Dallas 13.07 0.2202 184.64 1.1385
Waco 8.77 0.1470 135.70 0.7744
Wichita
Falls
11.40 0.1468 117.90 0.5943
Weather Normalization Adiustment (WNA)Report
On or before June 1 of each year,the company posts on its website at atmosenergy.com/mtx-wna,in
Excel format, a Weather Normalization Adjustment (WNA)Report to show how the company calculated
its WNAs factor during the preceding winter season.Additionally, on or before June 1 of each year, the
company files one hard copy and an Excel version of the WNA Report with the Railroad Commission of
Texas'Gas Services Division,addressed to the Director of thatDivision.
Ordinance 891
Exhibit B
2019 Benchmark for Pensions and Retiree Medical Benefits
Ordinance 891
ATMOS ENERGY CORP.,MID-TEX DIVISION
PENSIONS AND RETIREE MEDICAL BENEFITS FOR CITIES APPROVAL
TEST YEAR ENDING DECEMBER 31,2018
Shared Services Mid-Tex Direct
Post-Supplemental Post-
Line Pension Employment Pension Executive Benefit Employment Adjustment
No.Description Account Plan Benefit Plan Account Plan Plan Benefit Plan Total
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
(a)(b)(c)(d)(e)(f)
Proposed Benefits Benchmark - Fiscal Year 2019 Willis Towers
Watson Report as adjusted (1) (2) (3)$2.744.088 $2,267.927 $4,724,119 $193,211 $2,621,842
Allocation to Mid-Tex 43.48%43.48%73.88%100.00%73.88%
Proposed Benefits Benchmark Costs Allocated to Mid-Tex (Ln1 x Ln2)
$1,193,029 $
100.00%
986,012 $3,490,241 $193,211 $1,937,051
100.00%100.00%100.00% 100.00%
(g)
O&M and Capital Allocation Factor
Proposed Benefits Benchmark Costs to Approve (Ln 3 x Ln 4) (3)$1,193,029 $986,012 $3,490,241 $193,211 $1,937,051 $7,799,544
Summary of Costs to Approve (1):
O&M Expense Factor (WP_F-2.3, Ln2)
Total Pension Account Plan
Total Post-Employment Benefit Plan
Total Supplemental Executive Benefit Plan
Total (Ln 13 + Ln 14 + Ln 15)$
81.35%
970,514
970,514 $
81.35%38.28%16.24%
$1,336,038
802,108
$31,377
802,108 $1,336,038 $31,377 $
Notes;
1.Studies not applicable to Mid-Tex or Shared Services are omitted.
2.The Company is requesting that the benchmark amount approved by the RRM Cities for future periods include only the expense amount.
The amount attributable to capital would continue to be recorded to utility plant through the overhead process as described in the CAM.
3.SSU amounts exclude cost centers which do not allocate to Mid-Tex for rate making purposes.
38.28%
741,489
2,306,553
1,543,597
31,377
741,489 $3,881,527
Ordinance 891
Exhibit C
2019 Amortization Schedule for Regulatory Liability
Ordinance 891
Line
No.
ATMOS ENERGY CORP.,MID-TEX DIVISION
RATE BASE ADJUSTMENTS
TEST YEAR ENDING DECEMBER 31,2018
AMORTIZATION OF REGULATORY LIABILITY
Year Ended
Dec.31
Beginning of Year
Rate Base
Adjustment
Amount (1)
Annual
Amortization (2)
End of Year
Rate Base
Adjustment
Amount
(a)(b)(c)(d)
1 2018 $290,043,948 $-290,043,948
2 2019 290,043,948 12,085,165 277,958,784
3 2020 277,958,784 12,085,165 265.873,619
4 2021 265,873,619 12,085,165 253,788,455
5 2022 253,788,455 12,085,165 241,703,290
6 2023 241,703,290 12,085,165 229,618,126
7 2024 229,618,126 12,085,165 217,532,961
8 2025 217,532,961 12,085,165 205,447,797
9 2026 205,447,797 12,085,165 193,362,632
10 2027 193,362,632 12,085,165 181,277,468
11 2028 181,277,468 12,085,165 169,192,303
12 2029 169,192,303 12,085,165 157,107,139
13 2030 157,107,139 12,085,165 145,021,974
14 2031 145,021,974 12,085,165 132,936.810
15 2032 132,936,810 12,085,165 120.851,645
16 2033 120,851,645 12,085,165 108.766.481
17 2034 108,766,481 12,085,165 96.681.316
18 2035 96,681,316 12,085,165 84.596.152
19 2036 84,596,152 12,085,165 72.510.987
20 2037 72,510.987 12,085,165 60.425,823
21 2038 60,425,823 12,085,165 48,340,658
22 2039 48,340,658 12,085,165 36.255,494
23 2040 36,255,494 12,085,165 24,170,329
24 2041 24,170,329 12,085,165 12,085,165
Ordinance 891
25
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
2042 12,085,165
Revenue Related Tax Factor
Revenue Related Taxes on Annual
Amortization (see WP_B-6.3)
Related Taxes (see WP_B-6.3)
$
12,085,165 (0)
6.71%SeeWP_F-5.1
Amortization *Tax
810,653 Factor
$12,905,421 Amortization +Taxes
Notes:
1.The beginning 2018 balance is the September,2018 balance.The regulatory
liabilityfor excess deferred taxes is an estimate.This estimate will be
finalized when the Company files its federal tax return in July,2019.To the
extent that this estimate changes with the filing of the Company's tax return,
the Company will 'true-up'the amount in the 2020 RRM filing.
2.The annual amortization of a 24 year recovery period is based on the
Reverse South Georgia Method.
3.The Regulatory Liability is recorded to FERC Account 253,Sub Account 27909.
Ordinance 891