Loading...
HomeMy WebLinkAboutRes 09-03 Amending the Fee and Use Schedule TOWN OF WESTLAKE RESOLUTION 09-03 APPROVING THE AMENDED "FEES AND USE SCHEDULE" DATED JANIJARY 12, 2049, NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF WESTLAKE, TEXAS: SECTION 1: That the Town Council of the Town of Westlake, Texas, does hereby approve the Fees and Use Schedule dated January 12 2009, an example of which. is attached and labeled E.vhibit "A' PASSED AND APPROVED ON THIS 12 DAY OF JANUARY 122009. Laura Wheat, Mayor ATTEST: /Kini Sutter, TRMC, Town Secretary Thomas E. NN 'T -,wiiValnager APPROVP AS T0.T0,12M: v X Sian-towry, Town t tt ori,iev PROPOSED FEES AND USE SCHEDULE Revised January 12, 2009 1) The fees and use charges listed in this section are in addition to any other fees and use charges which may exist in ordinances of the town, including, but not limited to the Uniform Fire Code, Uniform Building, Code,National Electrical Code,Uniform Plumbing Code and Uniform Mechanical Code.To the extent there is a conflict in the fees and use charges contained in this section with other stated fees and uses,the fees and use charges in this section shall prevail. 2) ZONING C14ANGE APPLICATIONS Pre-application/pre-design conference.- This is intended to provide the applicant with a verbal interpretation of ordinances and processes, and to respond to any questions they may have. Such meetings may involve the town consultants at the request of the town manager. Fee: $400.00 This conierence is only required, and the fee charged, at the discretion of the Town Manager. Straight zoning change: This includes review of the application, site visits,meetings with the applicant and recommendations to the planning and zoning commission as well as published notifications and public hearings. Fee: $1,800.00 plus $90.00 per acre; $40,000.00 maximum (less fee paid for pre-application conference), Planned development district: This includes review of the application, site visits, meetings with the applicant and recommendations to the planning and zoning commission as well as published notifications and public hearings. Fee: $1,800.00 plus$90.00 per acre(less fee paid for pre-application conference). Specfftc usepertnit: This includes review of the application, site visits,meeting with the applicant and recommendations to the planning and zoning commission and all public notifications. Fee: $1,800.00. Amendments to approved site plans: This includes review and approval of the town manager and/or his designee(s). If the request exceeds the legal authority of the town manager and/or his designee(s)to grant the site plan revision,the application may be converted to a full zoning application with payment of the balance of a full application fee. Fee: $900.00 plus $20.00 per acre(less fee paid for pre-application conference). Variance of UDC Regulations: This includes review of the application, site visits, meetings with the applicant and associated town staff and recommendations to the board of adjustment, and all public notifications and public hearings. Fee: $900.00. 3) SUBDIVISION PLAT, ENGINEERING PLAN AND SITE PLAN APPLICATIONS Pre-application orpre-ziesign conference: Ten percent of the projected total fee for the activity being applied for. This fee shall be credited toward the next ongoing fee, if any,when due. (Minimum $1,800.00) AnY subdivision plat or re-sub&vision plat: Preliminary plats: $1,800.00 plus $90.00 per acre, maximum of$36,000.00. Fina.1plats: $900.00 plus$90.00 per acre, maximum of$18,000.00. Alinor Plats: $900.00 plus $90.00 per acre, maximum of$18,000,00. Engineeringplans: $1,800.00 plus$90.00 per acre. Replat.- $1,800.00 plus$90.00 per acre, maximum of$36,000.00. Site plans: Comprehensive (final)site plans: $1,800.00 plus$90.00 per acre. Vacation qfplat: $720.00. 4) CONSTRUCTION INSPECTION FEE FOR SUBDIVISION IMPROVEMENTS Construction inspections: The inspection fee will be six percent(6%)of certified construction costs of the land development(including, but not limited to, public and private improvements such as streets and roads, drainage, parking lots, fire water systems, walls, fences, site grading, water features, parks, open space corridors,required landscaping, irrigation, sidewalks,trails, etc., but not including building construction) for subdivisions or re-subdivision. Estimated Inspection fees are to be paid prior to permitting and or commencement of work-on the proposed improvements and the balance based upon certified construction costs prior to acceptance of improvements or issuance of building permits. The construction inspection fee is in addition to any other fees listed herein. 5) Commercial and Remodel - Building Permit Fees Total Valuation Fee $1.00 to $500.00 $50.00 $501.00 to$2000.00 $50.00 for the first$500.00 plus $6.60 for each additional $100.00 or fraction thereof, up to and including$2,000.00, $2,001.00 to $150.00 for the first$2,000.00 plus $30.00 for each additional $25,000.00 $1,000-00 or fraction thereof up to and including$25,000.00. $215,001.00 to $840.00 for the first$25,000.00 plus$21.60 for each additional $50,000.00 $1,000.00 or fraction thereof,to and including$50,000.00. $50,001.00 t$1.380. 00 for the first$50.000.00 plus $15.00 for each additional $100,000.00 $1,000.00, or fraction thereof,to and including $100,000,00. 2 $100.001.00u'130. 00 for the first$100,000.00 plus$12.00 for each additional $500,000.00 $1,000.00 or fraction thereof,to and including$500,000.00. $500,001.00 to $6,930.00 for the first$500,000.00 plus$10.20 for each additional $1,000,000.00 $1,000.00 or fraction thereof,to and including $1,000,000.00. 1,000,00 1.00 and up $12,030.75 for the first$1,000,000.00 Plus $6.60 for each additional $1,000.00 or fraction thereof. Plan review fee: Add 65 percent to permit fee. Other inspections and fees: 'TABLE INSET: Inspections outside of normal business hours $75.00 per hour* (Minimum charge--two hours) (2 hour minimum) _ ?TTReinspection fees assessed under provisions of the adopted $75.00 per hour* codes. (I hour minimum) (3) 3 Inspections for which no fee is specifically indicated. $75.00 per hour* Minimum charge--one-half hour) (I hour minimum) (4) Electrical, Plumbing, and Mechanical inspections. $75.00 per hour* 1 (1 hour minimum) (5) Consultants for inspections or plan review utilized for specific Actual cost specialized projects. incurred. *Or the total hourly cost to the town,whichever is the greater.This cost includes supervision, overhead, equipment, hourly wages and benefits, and mileage. "Actual cost includes administrative and overhead costs. 6) Residential New Construction and additions pernift fees: Residential building permit fees shall be the amounts calculated in accordance with the addendum attached to Ordinance No.470 titled Residential Building Permit Fee Formula. 7) SPECIAL BUILDING PERMIT FEES Swimming pools $500.00 1) Fence if not included in building permit application $165.00 2) Fence repair and barbed wire fencing excluded No fee, no I permit 3 3) Demolition $250.00 4) Sprinkler system for yards $300.00 5) Any antenna $400.00 6) Sidewalk. curly cats, driveways, concrete work in Right-of-way $200.00 7) Moving permit for buildings moved on any town street: Permanent house relocation (plus all direct and indirect costs incurred by the $450.00 Town of Westlake due to such relocation) 8) Construction in the public-right-of-way(other than a certificated $600.00 telecommunications provider) 9) Trenching or Excavating not within the public right-of-ways (other than $600.00 a certificated telecommunications provider) ) SIGN PERMITS AND OTHER INSPECTIONS Sign Permits Construction signs $150.00 Temporary signs $80.00 Signs or display cases within the commercial district $200.00 Dome occupation signs $75.00 Political signs No Permit Signs within residential district(Except for home occupation signs) No Permit 9) RESIDENTIAL,DEVELOPMENT FEE All newly-constructed residential structures shall pay a$3,100.00 residential lot development fee per lot where the town's duct bank is or is planned to be located, in addition to the building permit fees.The residential lot development fee shall be payable in conjunction with the building permit fee. io) MISCELLANEOUS FEES AND USES Special event permit—includes all tents, fireworks, and $250000 temporary electrical poles. Temporary electrical poles. For other than construction $35 00 projects, Subdivision name change. $250.00 4 Street name change. $250.00+cost of new street name blades Zoning verification letter $500.00 11) FIRE DIVISION penuit fees: I. Aboveground Storage Tanks(AGST) $150,00 2. After hour inspections $ 75.00** 3. Asbestos removal $100.00 4. Battery Systems $250.00 5. Burn Permit-Non-resident $ 50.00 6. Burn Permit-Resident No Charge 7. Candles and o en flame in assemblyy areas $ 50.00 8. Carnivals and Fairs $ 50.00* 9. Changing UST or AGST contents $100.00 10. Compressed Gas $100.00 11. Cryogens $250.00 12. Dry Cleanina Q erations-flammable/combustible li uids $ 75.00 13. Dry Cleanin (3 erations-non-flammable liquids $ 50.00 14, Emeraenc Medical Services-services and ex endables # 15. Explosives or Blastimz Agents-Use $150.00* 16. Fire Alarm System Review # 17. Fire Sprinkler System Review # 18. Fireworks certified events only) $150.00* 19.fumi anon or th -mal insecticidal fogging $250,00 20. Hazardous Materials-Stora e, dis ease use of $ 50,00 21.Hazardous Materials Mitigation ^# 22. Highly Toxic Pesticides-Storage, use of $ 50.00 23. Hi h-Piled Combustible Storaae $ 50.00 24. Hot works operations $ 50,00 25. EPG 25-199 WGC $ 25.00 26. LPG 200-1_999 WGC $ 75.00 -27, LPG 2.,000<WGC $100.00 28. LPG fiicled vehicles or equipment in assembly buildings $ 50.00 29. Malls-covered $ 75.00* 30, Motor vehicle fiielin dis ensin station $ 50.00 31. Personnel stand-by-Fire Watch $ 35.00^ 32.Personnel stand-by-Special Event $ 35.00^ 33. Private Agency License Inspection/Certification $ 50.00 �34. Pvrotechnic-Special events material $500.00* 35.Radioactive Materials $500.00 36. Re-inspection for fire alarms stems $ 75.00* 37.Re-ins ection for new construction $ 75.00* 5 38. Re-inspection for sprinkler systems $ 75.00* 39. Trench Burning—Clearing Land or Rubbish $150.00 40. Underground Storage Tanks (UST) $150.00 41. UST and AGST removal or temporary out of service $ 50.00 42. Water Svstem Analysisjest for Fire Suppression Systems $ 25.00 *If required, addition cost for personnel may be charged. Additional cost for expendable equipment and necessary apparatus may be incurred. **Two(2)hour minimum. If required, addition cost for personnel may be charged. Additional cost for expendable equipment and necessary apparatus may be incurred. 'Cost is per hour per personnel utilized. Additional cost for expendable equipment and necessary apparatus may be incurred. #Cost based on third party or contracted services provider fees. Based on agreement with the Town, fees may be paid directly to the third party or contracted services provider. 12)FIRE PLAN CHECK FEE 0-100,000 square feet $0.015/square foot 100,001-300,000 $1,500.00 for the first 100,000 square feet square feet 100,001 square feet $0.014 for each additional square foot of area plus 300,001 +square $4,200.00 for the first 300,000 square feet plus 0.009 for each feet additional square foot of area or fraction thereof 13) AMBULANCE AND EMS FEES BLS Emergency $400.00 ALS 1 $500.00 ALS 11 $700.00 Mileage $30 per mile 6