Loading...
HomeMy WebLinkAboutAM increase funding for the 20"Elevated Storage Waterline Town of Westlake Memo To: Honorable Mayor and Members of the Board of Aldermen From: Trent Petty, Town Manager Subject: Agenda Memo December 8, 2003 Date: December 3, 2003 ITEM Consider a Resolution to increase funding for the 20"Elevated Storage Waterline and SCADA system improvements. RJECOMMENDATIONS Staff recommends approval. BACKGROUND 20" Waterline to the elevated storage tank The installation of the 20"waterline, connecting the elevated storage tank, has been completed. The final pay request from the contractor has been submitted and Change Order#1, in the amount of $36,430.40, has been proposed for the 20" Waterline. The Change Order includes additional work and increases in contract quantities. The increase in cost is as follows: Increases in unit cost and contract quantity to install a section of waterline, by boring, were necessary in order for the Town's contractor to comply with the Tree Preservation Ordinance. The location and size of the trees made it necessary to deviate from the original engineering design by combining several short bores into one long bore. The combining of the bores, station 13+75 to station 18-11-00, created the need to augment a pulling method with the standard pushing of the waterline. The plan deviation was approved in the field by the project engineer for Cheatham & Associates. After construction had begun, Hillwood required additional silt fence to be installed along the the limits of project. The contract quantities included silt fence for only one side of the trench. However, Hillwood desired silt fence on both sides of the trenched areas. This quantity overrun is sufficient enough to warrant a change order adding the quantity to the contract. Nii alternate construction entrance was needed M order to access the project site. Thc plans identified the elevated storage tart-k- site as the construction entrance. This route proved to be impractical after several discussions between the contractor, engineer, and City of Keller. Construction traffic would have raised security issues and property restoration concerns. The contractor obtained permission from Hillwood,to access the project site via a temporary construction entrance off Knox Road. The contractor is requesting reimbursement for costs he incurred as a result of requirements set forth by Hillwood. Affected Contract Quantities IA) Furnish and Install 20"Ductile Iron Pipe - this item DECREASED by 140 LF, reducing the contract amount of the item $8450.4. The quantity reduction is the same amount increasing the bore quantity. 2A) Furnish and Install 20" Ductile Iron Pipe by Boring -this item was INCREASED by 140 LF, increasing the contract amount of the item $24,970.40 This unit was increased to "protect"the trees in the easement. 6) Provide and Implement Trench Safety Plan- this item was DECREASED by 140 LF, reducing the contract amount of the item $159.60. This item was reduced the same quantity as the "open-cut" quantity. No trench protection needed for a bore. IB) Change Order to Furnish Labor and Materials to complete 4')0' continuous bore -this proposed item will INCREASE the total contract amount $8,250.00. The fact that the bore was continuous created conflicts with the pipe manufacturer's installation recommendation. 7A) Change Order Erosion Control -this proposed item will INCREASE the total contract amount$4,500.00. The erosion control on the plans did not indicate fence on both side of the construction area. However, Joe Schneider(Hillwood) instructed the contractor to install erosion control on both side of the construction area. I OA) Change Order Hillwood Right-of-Way Compliance -this proposed item will INCREASE the total contract amount $7,')20.00. This item includes the temporary access easement and the temporary gate across Hillwood property, as directed by Joe Schneider. Total Increase of 20" Waterline Contract $36,430.40 Original Contract Amount $298,100.98 Change Order#1 Amount (increase) + $ 36.430.40 Total Adjusted 20" Waterline Contract Amount $334.531 .38 SCADA system An increase in the SCADA system contract, in the amount.of$6,973.00, is requested for changes and additions as follows; The SCADA system originally designed for the Town consisted of a stand-alone computer and software. The industry standard is to have a computer dedicated solely to the SCADA operations and not integrated into a network. However, in order to be consistent with the standing IT/Computer policy, a SCADA system that integrated completely with the Town's application needed to be acquired. The SCADA system upgrade will allow staff to access and control pumping operations remotely via the Internet. The costs associated with this upgrade is $6,000. The substantial price is comparable to the difference between MS Windows 2000 vs. Microsoft NT. The software licenses for the Town is $4,000. The additional $2,000 is for profit and overhead burden associated with the upgrade. A pump station generator status module will allow the documentation of the generator status at all times and notification of maintenance necessary due to accumulated hours of runtime. This will provide the Town with the ability to record all the generator"run- times" and identify scheduled maintenance. This option will also provide the Town with the ability to verify that emergency power is available in the event of disruption of Tri- County power supply. This item includes all software, material, installation, and training necessary to automate the documentation of the Pump Station Generator activities. This proposed item costs $973. Original Contract Amount $57,617 Change Order 41 Amount(increase) + S 6,973 Total Adjusted SCADA Contract Amount 564.590 SENT BY: SOUTHWEST PLANNING AND DESIGN; 817 265 8532; NOV-10-00 2:53PM; PAGE 2 CI- AAGE ORDER Dated: Seplember 30, 2003 OWNER'S Project No. 1056-404 _ EN(ANFER's Project No. 7056-404 Project dYafer.S lstm Itn ravenaents SAIa 4 SY5'lcrn jar tJeratia czr�d Moni6urinx i4'ater Si,eiett:, 8"PRY Valve 16"Control Valve Modiliculivn v OWNER Town of'Westlake _ r Contract for 8"PRY Valve& 76."., ntr !,Ycttv_e Modification Contract Datr:: August 1 2t�.03 To:_ WNECO Electric, Inc. _ mm Cnntracme You are directed to make the changes noted below in the subject contract.; ;Nature;ofthc changes: Webb Based Access $6,000.00 Punq) Station Generator Strams S 973.00 These changes result in the following adjustment of contract price and contract tune: •,Contract Price Prior to this Change Order $ 57,617.00 Net(increase)(l r-ea )Resulting from this Change Order � 6,973.00 Current Contract Price including this Change Order $ 64,590,00 NSPE-ASCE 1910_8-S(1978 Edition) Page 1 of 2 SENT BY: SOUTHWEST PLANNING AND DESIGN; 817 285 8532; NO1/-10-03 2:53PM; PAGE 8/6 Contract Tithe Prior to this Change 125 Consecutive Calenclur Days (Days or Date) Net(Increase)( )Resulting from this Change Order 14 L) Es v (rrnys} Current Contract Time tnoluding this Change Order Contract Ends 139 Cowecutive Calena jgr Dq�1.5, 12-31-03 (Days:or Dge) The above cha ges are recommended: Cheatham unrl Associal s Y Engineer A Date, 2003 The above changes ary recommended: Town of Westlake city By: Title; Date; t2003 € HECO E,lec4c, Inc, All �tGinr / By: ,r Date: t`�i -7 21003 ifaup�zU,wr�ri,,�K�:_�nse;aoatr.«lti.�xrC Page 2 of 2 SENT BY: SOUTHWEST PLANNING AND DESIGN; 817 265 9532; NOV-10-03 2e53PM; PAGE 4r16 CHANGE ORDER No. 7 Dated: November 6,2003 OWNER'S Project No, 1056-404-404 ENGINFFR's Project No. _10SG-404 Project 20" 6Yczter I ine 1tn�r uverr�ents,. OWNER _ Lown vI Yesilake. m Contract for tfater Line lmnravetnerzts —Contract Date:_Fsbruars,25.2003 To-, Wdsinr2 COvItMetor iS01 yiyes Cuntractur You are directed to mace the changes noted below in the subject contract: Nature of the changes, :Adjust bid item quantities acid add additional items as noted,ren=-ted on the artached Final Pay Request. These changes result in the following adjustment of contract price and contract time: Contract Price Prior to this Change Order ,b 298, 00 998 :Net(Increase)(Dec-tea: )Resulting from this Change Order $ 36,430.40_ tun-ent Contract Price including this trhange Order 3 _...-_334,531.38 NSPE-ASCE 1910-8-13(1978 J ditioo) pagc .l of 2 SENT BY: SOUTNti1EST PLANNING AND DESIGN; 817 265 8502- 2:59PM; PAGE 5/6 r- q: ® MONTHLY PAS UQUEST elntr: Town of Wostlake Pay AUquest Isla. Additiopal Work Pay Rtqucst Project- wa#tr System Impioymmuts Contract Dam, February 7,2003 20"Water Tratussission Linn from Elevated Taa Site on Knox R94d w ExisOng 20"Wt Lint Original Contract Amount- $ 298,100.9£i Fiore. 5-Inlay-03 "Ton 7-Sep-03 Revised Contract Auiaant: Project StArt Date: 5-May-2003 Contractor Wilson Contractor Scrvice;s,T-LC Campletiun hate: 7-Sep-2003 Cat.Days 107 Bell,Suitt 1 nmtoti,Texas 76201 Allotted; Used: Quattity Qtiarttity Complete Total FNo. Ill Rcyisc t TW WO& Convw �'xtencl d Dzsttiptim Uptt Proposal Qwmity Requert Completed Fake Amounct Furnish&Instait 20"Ductile Pepe ly 2,860 2,720 2,720 2,r20 $60.36 $ 164,179.20 2A Furnish&Install 20"Ductile Pipe by Boring LF 370 510 510 510 $178.36 $ 90,963.60 3A Furnish&InsW120"Butterfly Valve EA 2 2 2 2 $6,993,97 13,987.94 4 t umj,,zh&Install 1"Ait Rcleast;Valve. EA 2 2 2 2 $3,950.87 $ 7,901.74 5 Furnish.&Install Blow Of Assambty EPA 2 2 2 2 $3,342.61 $ 6,685,22 6 Provide&Imprlemeut Trench Safecy Plan LF 2,860 2,720 2,720 2,720 $1.14 $ 3,100180 7 Erosion Control LS I I 1 1 $6,54235 $ 6,54235 8 CaTineci to Existinz 20'Water Linn RICO EA 2 2 2 2 $3,400,29 $ 6,800.58 9 Comphapee with Westlakes Tree Preservation !-IN I 1 1 1 $5,720.26 $ 5,720,26 10 furaisb,Install&Comply with Exhibit B LS 1 1 1 I $6,579.69 $ 8,579.64 l 1 1 1 R C/O Fumish labor and materi;als to complete: LF 0 X36 $8,250.00 $ 8,250M 43U continous bore. Includes 3 siccvcs and ' ' .—°6I —-tv 2 P#u days than power and machinery. 7A C/o Erosion Control LF 0 3,000 3,000 3,000 $1.50 $ 4,500.00 10A C/O 1-Iiilwotxl RiSht-of Way C.omplia ncn $7,320.00 $ 7.320,40 Pmpated and Submitted by: —--° Total Amount 1 334,S31.31i 13y: 1_{ _ (� � • Less Amount R,ot4net3 i? f Total Amount N-,-4blc $ 334,$3131? Approvcd w Less Prcvious Payments 2 O,i9?3.Go ?y: tkd.t; �+- Amowi(Duc Tbis Request 54,527.72 I I SEND" BY: SOUTHkNEST PLANNING AND DESIGN; 817 265 5532; NOV-10-03 2:54PM; PAGE 6/6 Contract Time Prior to this Change N/�t (Days or Date) Net(Increase)(Decrease)Resulting ti om this Change order NIA _ (Days) Curreat Contract Time Including this Change Order (Days or Date) The above changes are recotnrnended: Cheatham uratl 4ssvciutcs Bngitteer By: m Date: Navernher 6 43 The above changes are recoin wended: City By: , Title: Date: 2003 The above changes are accepted: Wilson Conlractur°Services LLC Contractor Q 1A By: 1 , o X r to w t adz Date: ? 2003 4-,AWURDMESTLAKE-10S6,40QiCO1tl-70INCftv;L,DOC Pagc 2 of 2