Loading...
HomeMy WebLinkAbout04-22-19 TC Agenda packet ' �'I I I / / / I /'I '/ . / / I I I / / / / / / I / I / ' I/ '/ � � � Vision Statement An oasis of natura/beauty that maintains our open spaces in balance with distinctive deve%pment, trai/s, and qua/ity of/ife amenities amidst an ever ex,nanding urban/andscape. � • . � . . � � � 11 • ' . . . • . � : � . 11 • • • . � - . . . • • • ' 1 1 � � • 1 � ' . . • . 1 � Mission Statement West/ake is a unique community b/ending preservation of our natura/environment and viewscapes, while ser�ing our residents and businesses with superior municipa/and academic services that are accessib/e, e�cient, cost-effective, and transparent. West/ake Texas- "One-of-a-kind community; natura/oasis-,nro�iding an exceptional level of service." ..- . ]oint Work Session with the Plannina and Zoninu Commission 1. CALL TO ORDER—TOWN COUNCIL 2. CALL TO ORDER— PLANNING AND ZONING COMMISSION 3. PLEDGE OF ALLEGIANCE 4. PRESENTATION AND DISCUSSION REGARDING THE 2015 FORGING WESTLAKE COMPREHENSIVE PLAN. 5. AD]OURNMENT OF THE JOINT WORK SESSION. Work Session 1. CALL TO ORDER 2. REVIEW OF CONSENT AGENDA ITEMS FOR THE TOWN COUNCIL REGULAR MEETING AGENDA. 3. REPORTS Reports are prepared for informational purposes and will be accepted as presented. (There will no presentations associated with the report items) There will be no separate discussion unless a Council Member requests that report be removed and considered separately. a. Report of Quarterly Financial Dashboard and Analysis including Capital Projects for the Quarter ended March 31, 2019. 4. DISCUSSION ITEMS a. Presentation and discussion regarding State Highway 170/Roanoke Road intersection and TxDOT speed studies. b. Standing Item: Presentation and discussion of development projects per Staff Report March 2019 including an Entrada report from the Developer and projects in Planned Development PD 3-5. 5. EXECUTIVE SESSION The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: a. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 b. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that Page 2 of 5 the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the offer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana - Waterside Land Company LLC 6. RECONVENE MEETING 7. COUNCIL RECAP / STAFF DIRECTION 8. AD70URNMENT Reqular Session 1. CALL TO ORDER 2. ITEMS OF COMMUNITY INTEREST: Mayor and Council Reports on Items of Community Interest pursuant to Texas Government Code Section 551.0415 the Town Council may report on the following items: (1) expression of thanks, congratulations or condolences; (2) information about holiday schedules; (3) recognition of individuals; (4) reminders about upcoming Town Council events; (5) information about community events; and (6) announcements involving imminent threat to public health and safety. 3. CITIZEN COMMENTS: This is an opportunity for citizens to address the Council on any matter whether or not it is posted on the agenda. The Council cannot by law take action nor have any discussion or deliberations on any presentation made to the Council at this time concerning an item not listed on the agenda. The Council will receive the information, ask staff to review the matter, or an item may be noticed on a future agenda for deliberation or action. 4. CONSENT AGENDA: All items listed below are considered routine by the Town Council and will be enacted with one motion. There will be no separate discussion of items unless a Council Member or citizen so requests, in which event the item will be removed from the general order of business and considered in its normal sequence. a. Consider approval of the revised minutes from the meeting on January 7, 2019. b. Consider approval of the revised minutes from the meeting on February 25, 2019. c. Consider approval of Resolution 19-17, Authorizing the Town Manager to execute a contract with Jerry Hodge &Associates, LLC for project management services related to TxDOT construction of State Highway 114 services roads and other improvements and amending the adopted budget to provide funding. d. Consider approval of the minutes from the meeting on March 25, 2019. Page 3 of 5 5. PRESENTATION AND DISCUSSION REGARDING THE PROJECT SUMMARY OF THE WESTLAKE FIRE-EMS STATION NO. 1. 6. EXECUTIVE SESSION The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: a. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 b. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the offer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana - Waterside Land Company LLC 7. RECONVENE MEETING 8. TAKE ANY ACTION, IF NEEDED, FROM EXECUTIVE SESSION ITEMS. 9. FUTURE AGENDA ITEMS: Any Council member may request at a workshop and / or Council meeting, under��Future Agenda Item Requests", an agenda item for a future Council meeting. The Council Member making the request will contact the Town Manager with the requested item and the Town Manager will list it on the agenda. At the meeting, the requesting Council Member will explain the item, the need for Council discussion of the item, the item's relationship to the Council's strategic priorities, and the amount of estimated staff time necessary to prepare for Council discussion. If the requesting Council Member receives a second, the Town Manager will place the item on the Council agenda calendar allowing for adequate time for staff preparation on the agenda item. Page 4 of 5 10. AD]OURNMENT ANY ITEM ON THIS POSTED AGENDA COULD BE DISCUSSED IN EXECUTIVE SESSION AS LONG AS IT IS WITHIN ONE OF THE PERMITTED CATEGORIES UNDER SECTIONS 551.071 THROUGH 551.076 AND SECTION 551.087 OF THE TEXAS GOVERNMENT CODE. CERTIFICATION I certify that the above notice was posted at the Town Hall of the Town of Westlake, 1500 Solana Blvd., Building 7, Suite 7100, Westlake, TX 76262, April 17, 2019, by 5:00 p.m. under the Open Meetings Act, Chapter 551 of the Texas Government Code. Kelly Edwards, Town Secretary If you plan to attend this public meeting and have a disability that requires special needs, please advise the Town Secretary 48 hours in advance at 817-490-5710 and reasonable accommodations will be made to assist you. Page 5 of 5 �oi nt Session Town Council and Planning & Zoning Item # 3 — Pledge of Allegiance Texas Pledge: "Honor the Texas flag; I pledge allegiance to thee, Texas, one state under God, one and indi�isible. " Westlake Town Council Planning and Zoning Commission T N E , o w N o F WESTLAKE TYPE OF ACTION DISTINCTIVE B4 UESIGN Workshop - Discussion Item Westlake Town Council/Planning and Zoning Commission joint Work Session Monday, Apri122, 2019 ToPrc: Presentation and discussion regarding the 2015 Forging Westlake Comprehensive Plan STAFF Co1vTACT: Ron Ruthven, Planning and Development Directar Strategic Alignment i i � . � . . , ; . . � � - 1 � High Quality Planning,Design& Development-We are a desirable Planned/Responsible People,Facilities, & Preserve Desirability Development Technology Well planned,high-quality &Quality of Life community that is distinguished by exemplary design standards. . , Outside the Scope of Identified Strategic Initiatives Time Line - Start Date: Apri122, 2019 Completion Date: Apri122, 2019 Funding Amount: N/A Status - � Unfunded Source - N/A EXECUTIVE SUMMARY(iNCLUDING APPLICABLE ORGANIZATIONAL HISTORY) This item provides an opportunity for staff to present an overview and a more in depth discussion with both the Planning and Zoning Commission and the Town Council regarding the 2015 For�ing Westlake Comprehensive Plan. Town staff along with Robin McCaffrey, of Mesa Planning, will provide a presentation at the meeting and will respond to any questions that may arise during the discussion. Page 1 of 2 RECOMMENDATION Review and discussion of the material presented. ATTACHMENTS To be given at the meeting. Page 2 of 2 �oi nt Session Town Council and Planning & Zoning Item # 5 — Adjournment Town Cou nci I Item # 2 — Review of Consent Items REVIEW OF CONSENT AGENDA ITEMS FOR THE TOWN COUNCIL REGULAR MEETING AGENDA. a. Consider approval of the revised minutes from the meeting on January 7, 2019. b. Consider approval of the revised minutes from the meeting on Feburary 25, 2019. c. Consider approval of Resolution 19-17, Authorizing the Town Manager to execute a contract with Jerry Hodge &Associates, LLC for project management services related to TxDOT construction of State Highway 114 services roads and other improvements and amending the adopted budget to provide funding. d. Consider approval of the minutes from the meeting on March 25, 2019. Town Cou nci I Item # 3 — Reports REPORTS Reports are prepared for informational purposes and will be accepted as presented. (there will no presentations associated with the report items) There wlll be no separate disCussion unless a Council Member requests that report be removed and considered separately. a. Report of Quarterly Financial Dashboard and Analysis including Capital Projects for the Quarter ended March 31, 2019. Westlake Town Council TYPE OF ACTION T x E T o w H a F WESTLAKE Workshop - Report oisriNcrivE sv oEsi�N Westlake Town Council Meeting Monday, Apri122, 2019 ToP�c': Report of Quarterly Financial Dashboard and Analysis including Capital Projects for the Quarter ended March 31, 2019 STaFF CoNTacT: Debbie Piper, Finance Director Strategic Alignment � � � . , . . , � . . � � - � � Exemplary Service&Governance Increase -We set the standard by delivering Transparency, Fiscal Responsibility Fiscal Stewardship unparalleled municipal and Accessibility& educational services at the lowest cost. Communications . , Maintain Receipt of Various Financial Awards for both Municipal and Academic Scrvices Time Line - Start Date: October 1, 2018 Completion Date: March 31, 2019 Funding Amount: N/A Status - � N/A Source- N/A EXECUTIVE SUMMARY (INCLUDING APPLICABLE ORGANIZATiONAL HISTORY) The 2nd quarter "Dashboard" reports and "Analysis" for the FY 2018-2019 are attached. Our goal is to have a concise and easy to understand document regarding the financials of our three main (3) operating funds: General Fund,Visitors Association Fund and the Utility Fund. The remaining funds are a function of transfers in, related expenditures and transfers out; therefore, we have not prepared quarterly reports for these funds. We have also included an additional report related to the capital projects year-to-date expenditures and an update of the projects. Please note a change in the year-to-date budget calculations. On each individual fund's financial report, you may see an "M" or "%", beside several revenue line items. The "M" indicates the calculation for "Estimated Allocation of the YTD Budget" is based on the actual number of months of revenue received Page 1 of 2 vs. the number of months into the fiscal year (6 months). This is a more apples to apples comparison and my hope is that this new snapshot avoids confusion with our comparisons of the accrued revenue accounts, i.e. sales tax revenue, franchise fees, hotel occupancy taxes, etc. The "%" symbol, which was used previously with the Utility Fund only, represents the use of the percentage of actual dollars received in the prior year during the same period compared to budgeted dollars in the current year. The "Estimated Allocation of the YTD Budget" column is based on this percentage rather than the number of months to-date in the current fiscal year since they are not received equally throughout the year. Examples of this would be property tax revenues which are primarily received in the first two quarters of the fiscal year vs. water revenues, of which a major portion is received in the spring and summer(hotter, dryer months). These quarterly reports contain a "dashboard" display complete with major revenue and expenditure categories. Because we are further into the year and aware of various line items that will need adjustments, we have added an"Estimated"column which includes these changes. The"Dashboard Variance"amounts are based on the "Estimated" vs. the "Actual" columns. The color green obviously means that we are good in those specific line items when comparing "YTD Budget" to "YTD Actuals". Any concerns between these two areas show up as yellow (cautionary) or red(critical). A summary is presented at the bottom of each funds' financial page indicating the net revenues over (under) expenditures along with the projected ending fund balances for the PY Actuals, Adopted Budget, Estimated Budget,Allocation of YTD Estimated Budget, as well as the YTD Actuals. The operating days remaining in Unrestricted Fund Balance have been calculated using total operating expenditures. Our updated Fiscal and Budgetary Policies state that we will strive to maintain 180 days of operations. Note the "Analysis" is color coded and corresponds to the specific line-item on the "Dashboard" report. All "cautionary" and "critical" items are detailed with explanations of the variances. I have explained several of the line-items that were greater(green)in revenue than we anticipated,helping you understand what specifically happened with that revenue line-item. I have also included explanations for several expenditures that were considerably under budget so you may see why these funds have not been expended. In addition to the above, each section of the "Analysis" contains the "Estimated Budget" and "Change in Budget"totals with an explanation,if needed. To help in reading this report, each eXplanation ties directly back to the"Dashboard"report. RECOMMENDATION The Council review the current quarterly financial reports. ATTACHMENTS Quarterly Financial Dashboard and Analysis for the Quarter Ended 3/31/19 for the following funds: • General Fund • Visitors Association Fund • Utility Fund Capital Improvements Update Page 2 of 2 General Fund Quarterly Financial Dashboard Quarter Ended 3/31/2019 � : � • REVENUES AND OTHER SOURCES PY Actuals ADOPTED ESTIMATED Allocation YTD Actuals Percent of Over (M)eased on number ojmonths ojreceipts through Annual Annual of Estimated through YTD Estimated (Under) (%J Based on same%as prior year 2nd Quarter Budget Budget YTD Budget 2nd Quarter Budget Budget M General Sales Tax 5 months $ 1,763,973 $ 3,900,000 $ 3,900,000 $ 1,400,000 $ 2,273,131 162% $ 873,131 % Property Tax 96% 1,282,247 1,733,356 1,733,356 1,684,232 1,638,462 97% (45,770) % Franchise Fees 28% 214,895 983,815 983,815 253,877 254,783 100% 905 Permits and Fees Misc 113,938 263,303 263,303 111,580 59,534 53% (52,047) Permits and Fees Bldg (inc100%Schwab) 1,054,707 4,357,571 4,357,571 4,623,180 4,847,568 105% 224,389 Fines&Forfeitures 333,818 715,545 715,545 357,773 266,033 74% (91,739) Misc Income 133,719 293,480 293,480 131,641 124,882 95% (6,758) Total Revenues 4,897,297 12,247,070 12,247,070 8,562,283 9,464,393 111% 902,111 Transfer In - 66,539 66,539 - - - Total Revenues and Other Sources $ 4,897,297 $ 12,313,609 $ 12,313,609 $ 8,562,283 $ 9,464,393 111% $ 902,111 RevenueLegend sitive Cautious Negative •greaterthan •between •lessthan 90% 70%-90% 70% � : � • EXPENDITURES AND OTHER USES PY Actuals ADOPTED ESTIMATED Allocation YTD Actuals Percent of Over through Annual Annual of Estimated through YTD Estimated (Under) 2nd Quarter Budget Budget YTD Budget 2nd Quarter Budget Budget Payroll,Taxes,Insurance,Retirement $ 1,942,763 $ 4,495,731 $ 4,495,731 $ 2,236,325 $ 2,237,182 100% $ 857 Operations&Maintenance 3,157,554 5,083,195 5,083,277 3,183,180 3,090,591 97% (92,588) Total Expenditures(Inc.TO to Debt) 5,100,317 9,578,926 9,579,008 5,419,504 5,327,773 98% (91,731) Transfer Out 295,605 2,486,065 3,167,065 3,167,065 3,167,065 100% - Total Expenditures and Other Uses $ 5,395,922 $ 12,064,992 $ 12,746,074 $ 8,586,570 $ 8,494,839 99% $ 91,731 Expenditure Legend itrve Cautious Negative •lessthan •between •greaterthan ExEMPLARY 100% 101%-110% 110% GOVERNANCE Tcwrn Officials,both Elected and Appointed,exhibit Respect, � : � , Stewardship, Vision, and SUMMARY PYActuals ADOPTED ESTIMATED Allocation YTDActuals Transparency through Annual Annual of Estimated through 2nd Quarter Budget Budget YTD Budget 2nd Quarter Total Revenues&Other Sources $ 4,897,297 $ 12,313,609 $ 12,313,609 $ 8,562,283 $ 9,464,393 $ERVICE EXCELLENCE Total Expenditures&Other Uses 5,395,922 12,064,992 12,746,074 8,586,570 8,494,839 '-alic Service that is Net Change to Fund Balance $ (498,626) $ 248,618 $ (432,464) $ (24,287) $ 969,555 ='esponsive and �rofessional,while Beginning Fund Balance 10,242,277 9,761,849 9,761,849 9,761,849 9,761,849 ;�.ancing Efficiency, Ending Fund Balance 9,743,652 10,010,467 9,329,385 9,737,562 10,731,404 _:=fectiveness and Restricted Funds 520,158 304,504 304,504 304,504 287,295 Financial Unrestricted Fund Balance $ 9,223,494 $ 9,705,964 $ 9,024,882 $ 9,433,058 $ 30,444,309 �te�ards'r�ip Total Operating Expenditures $9,255,998 $9,578,926 $9,579,008 $5,419,504 $5,327,773 Daily Operating Cost $25,359 $26,238 $26,244 $26,146 $26,146 #of Operating Days Unrestricted 365 322 344 361 399 1 Town of Westlake Dashboard Analysis for Quarter Ended 03/312019 GENERAL FUND TOTAL REVENUES AND OTHER SOURCES $ 12,313,609 Adopted Budget $ 8,562,283 YTD Budget $ 9,464,393 YTD Actual 111% YTD Budget % $ 902,111 Over (Under) Budget GENERAL SALES TAX $ 3,900,000 Adopted Budget $ 1,400,000 YTD Budget $ 2,273,131 YTD Actual 162% YTD Budget % $ 873,131 Over(Under) Budget • Sales tax revenues are received from the State two months after paid. Because the Town is on a modified accrual basis, we can recognize these revenues when earned. • Current year budget includes $1.2M in revenue projected from the Schwab Phase 1 Situs agreement. YTD = $500K; received $705K—variance of$205K • One-time funds related to renovation/new equipment are approximately$450K • Staff has talked with Lewis McClain who helps various cities with their sales tax analysis regarding breaking down sales vs use tax; he was unaware that this would be possible • No response has been received from the State regarding a request as to whether this separation would be possible; staff will follow-up. PERMITS AND FEES - MISCELLANEOUS $ 263,303 Adopted Budget $ 111,580 YTD Budget $ 59,534 YTD Actual 53% YTD Budget % $ (52,047) Over(Under) Budget • The Miscellaneous permit and fees category is comprised of revenues from four different departments; General Services, Planning and Development, the Fire Department and the Municipal Court. Income in these departments/categories will not be distributed evenly over the fiscal year. • The largest items that make up this category are the following: o Development Fees ($28,937) o Engineer Review/Civil Fees ($10,400) o Gas Well Fees ($5,200) o Contractor Registration ($4,183) 2 Town of Westlake Dashboard Analysis for Quarter Ended 03/312019 GENERAL FUND PERMITS AND FEES - BUILDING $ 4,357,571 Adopted Budget $ 4,623,180 YTD Budget $ 4,847,568 YTD Actual 105% YTD Budget % $ 224,389 Over(Under) Budget • The YTD Budget was calculated using 100% of the Schwab Phase 2 budgeted revenue which totaled 56% of the total budget and 50%of the remaining budget. • Total budgeted for Schwab was $2,444,394—received $3,533,787; $1,089,393 more than anticipated due to the following: o Budgeted Phase 2 to have similar revenues (slightly more) than Phase 1 o Fee schedule FY 17-18 was used for budgeting; new fees were adopted for FY 18-19 which increased commercial fees o Valuation was higher than anticipated • See attached for detail of commercial and residential activity FINES AND FORFEITURES $ 715,545 Adopted Budget $ 357,773 YTD Budget $ 266,033 YTD Actual 74% YTD Budget % $ (91,739) Over(Under) Budget • Income will not be distributed evenly over the fiscal year • Other revenues (technology, security, warrant fees, collection fees) under budget $5,695 • Citation Revenue (net of state fees) under budget $86,044. • Below is an explanation received from Chief Wilson of Keller PD: Multiple factors have impacted the decrease from last fiscal year to date; however, I am very confident that you will see year end totals exceed lasts years. Below are factors that have resulted in the lower performance for the first 6 months of FY 18-19: o Training of new motor officers: Three new motor officers attended police motorcycle training and required accident investigation training during the first half of FY 18-19. o A Traffic Officer was deployed with his military unit in September of 2018 for a 1-year deployment to Cuba. In response to this we re-allocated a designated traffic officer from Keller to Westlake. As a result, if a major accident occurs in Keller requiring Traffic unit investigation an officer is dispatched. o Implemented Directed patrols in recognized high crime areas (construction sites) in Westlake to reduce Part 1 Crime. In the first quarter of 2019, we saw a reduction in Part 1 Crime of 43 % as compared to the fourth quarter of 2018. 3 Town of Westlake Dashboard Analysis for Quarter Ended 03/312019 GENERAL FUND o Changes to the State of Texas Step Grant from 2018 to 2019: In 2018, the STEP Program operated off a system requiring the officer to generate 4 points per hour. These points were derived from the issuance of citations. In 2019, the program was modified to reflect the DDACTS Model (Data Driven Policing). Under this model, citations are not required to be issued. Officers are only required to stop 2.5 vehicles per hour. The program is focusing on crime and crash reduction through high visibility traffic enforcement. This change was to bring the program in line with the 215t Century Policing model. What to expect the remainder of the Fiscal Year: o We will be experimenting with a new policing strategy for the next 6 months in Keller and Westlake as it relates to the allocation of officers. The program designates an officer for each patrol shift in the role of Crime and Crash Abatement. The officer will be deployed in accordance with identified high crash and crime areas in Keller and Westlake based upon the prediction module within our Crime Analysis system. The officer's sole role will be to perform high visibility traffic enforcement in the areas in which he/she are assigned. This program will not take away from the traditional role of the Traffic Unit nor the staffing of the unit, but as a result the program will increase targeted traffic enforcement in the Town. o The new traffic officers will attend Accident Reconstruction training in June. After this training is completed the only other training required of them would be that which is required by the department and/or TCOLE. o Consistent performance month to month. o Enforcement strategies and outcomes will be monitored weekly, rather than monthly. TRANSFERS IN $ 66,539 Adopted Budget $ 0 YTD Budget $ 0 YTD Actual 0% YTD Budget % $ 0 Over(Under) Budget • This category is comprised of a transfer in from the Utility Fund based on the forecasted Fort Worth Impact Fees on new home construction starts. This amount will be transferred at year end based on actuals receipts. 4 Town of Westlake Dashboard Analysis for Quarter Ended 03/312019 GENERAL FUND TOTAL EXPENDITURES AND OTHER USES $ 12,064,992 Adopted Budget 12,746,074 Amended Budget $ 8,586,570 YTD Budget (based on Amended) $ 8,494,839 YTD Actual 99% YTD Budget % $ (91,731) Over (Under) Budget PAYROLL AND RELATED $ 4,495,731 Adopted Budget $ 2,236,325 YTD Budget $ 2,237,182 YTD Actual 100% YTD Budget % $ 857 Over(Under) Budget • This cost is affected by employee taxes and insurances costs and will fluctuate as policies change; medical, dental, life, workers comp, unemployment. OPERATIONS & MAINTENANCE $ 5,083,277 Adopted Budget $ 3,183,180 YTD Budget $ 3,090,591 YTD Actual 99% YTD Budget % $ (92,588) Over(Under) Budget • The Operations and Maintenance category is comprised of several different departments and expenditure classifications. Many of the accounts are event driven and therefore will not be distributed evenly over the fiscal year. TRANSFERS OUT $ 2,486,065 Adopted Budget $ 3,167,065 Amended Budget $ 3,167,065 YTD Budget based on Amended $ 31,67,065 YTD Actual 100% YTD Budget % $ 0 Over(Under) Budget • Due to the funds received in excess of the adopted budget for Development Fees during the 15t quarter, additional funds were budgeted and 100% has been transferred to the GM&R and VM&R funds. • Capital Projects—The budgeted transfer of$1,025,000 has been completed 5 BUILDING PERMITS AND FEES 2ND Quarter Ended 03-31-2019 SINGLE FAMILY RESIDENTIAL PERMITS $ 1,245,263 Total Budget $ 622,632 YTD Budget $ 599,899 YTD Actual 1. GRANADA $ 150,750 YTD Budget $ 27,050 Per Unit Budget $ 114,560 P&D Actual $ 28,640 Per Unit Actual • Budgeted to start 10 homes for the year • 4 building permit have been issued o Granada is a prime neighborhood for development. Lot availability and variation is still relatively high with about 20 remaining lots to develop. 2. ENTRADA $ 266,850 YTD Budget $ 14,690 Per Unit Budget $ -0- P&D Actual $ -0- Per Unit Actual • Budgeted to start 30 homes for the year • 0 single-family building permits have been issued o All permit revenues are budgeted to be transferred to Capital Project Fund o -0- building permits are currently under review o -0- building permits on hold due to reaching residential level cap o Entrada has started to receive more attention for residential now that infrastructure is in place. 30 building permits for Block E (Crescent Custom Homes), Block J (Calais Custom Homes) and Block I (Pentavia Custom Homes) were issued in the last fiscal year. With 150 condominium units approved in the Entrada Plaza Mayor by Town Council, these numbers should exceed the budget. However, fees for the condominium buildings are calculated under commercial fees instead of residential fees, as they are under one permit per building. 3. VAQUERO $ 26,640 YTD Budget $ 156,144 P&D Actual $ 23,540 Per Calculation • Budgeted to start 2 homes for the year • 4 building permits have been issued o Although lot availability in Vaquero is decreasing, permits are still being issued and is performing better than expected (budgeted). 6 BUILDING PERMITS AND FEES 2ND Quarter Ended 03-31-2019 4. QUAIL HOLLOW $ 74,175 YTD Budget $ 46,350 Per Unit Budget $ 293,115 P&D Actual $ 41,873 Per Unit Actual • Budgeted to start 3 homes for the year • 7 building permits have been issued o Quail Hollow is performing better than expected (budgeted) with 7 homes issued. 5. CARLYLE COURT $ 17,585 YTD Budget $ 32,071 Per Unit Budget $ 33,967 P&D Actual $ 33,967 Per Unit Actual • Budgeted to start 1 home for the year • 1 building permit has been issued o There are no more lots available to develop in Carlyle Court after the issuance of this permit 6. TERRA BELLA $ 15,897 YTD Budget $ 28,964 Per Unit Budget $ -0- P&D Actual $ -0- Per Unit Actual • Budgeted to start 1 home for the year • 0 building permit has been issued o Terra Bella has slowed down for new construction. There are very few lots remaining to develop; therefore, the interest in this area is not as high as the newer subdivisions. 7. THE KNOLLS AT SOLANA $ 87,892 YTD Budget $ 31,850 Per Unit Budget $ -0- P&D Actual $ -0- Per Unit Actual • Budgeted to start 4 homes for the year • 0 building permits have been issued o With subdivision improvements underway, completion is anticipated to be the end of 2019. As such, building permits may not be issued within this fiscal year. However, interest is high to develop in the neighborhood and builders are anxious to begin construction. � BUILDING PERMITS AND FEES 2ND Quarter Ended 03-31-2019 8. OTHER SUBDIVISIONS $ 34,950 YTD Budget $ 31,850 Per Unit Budget $ -0- P&D Actual $ -0- Per Unit Actual • Budgeted 2 miscellaneous permits for the year • 0 building permit have been issued s BUILDING PERMITS AND FEES 2ND Quarter Ended 03-31-2019 COMMERCIAL PERMITS & FEES $ 3,276,608 Adopted Budget $ 1,638,304 YTD Budget $ 4,355,894 YTD Actual 1. ENTRADA $ 665,464 Adopted Budget $ 332,732 YTD Budget $ 237,667 YTD Actual • All of"Restaurant Row" including the Chapel & Reception Hall building permits have been issued along with the parking garage to service those areas (located by the gas well pad). • Staff has seen interest in the smaller commercial sites located near CVS and Primrose and the retail portion next to the gas well pad site. The developer has also conveyed the gas well pad may be reconfigured as the new site for an event center. 2. CHARLES SCHWAB/ FRONT 44 $ 2,444,644 Adopted Budget $ 2,444,644 YTD Budget (100%) $ 3,895,435 YTD Actual • The building permits for Charles Schwab Phase 2 have been issued and groundwork for the area has been mobilized. The Phase 2 campus is expected to be completed by early 2021. • The building permit fee came in significantly higher than expected by town staff for the three buildings in Phase 2 due to the following: o Budgeted Phase 2 to have similar revenues (slightly more) than Phase 1 o Fee schedule for FY 17-18 was used for budgeting; new fees were adopted for FY 18-19 which increased commercial fees o Valuation and square footage was higher than anticipated 3. OTHER COMMERCIAL(SOLANA/DELOITTE/FIDELITY/MISC.) $ 166,500 Adopted Budget $ 83,250 YTD Budget $ 222,791 YTD Actual • The Solana Plaza/Terrace continues to receive remodels for new tenants or expanding tenants. • Fidelity is remodeling portions of their campus as well as adding shade structures and signage around the campus • In addition to expanding the Spec's Spirits and Wine store by double, they are remodeling the existing interior as well. 9 Visitors Association Fund Quarterly Financial Dashboard Quarter Ended 03/31/19 � � REVENUES AND OTHER SOURCES PY Actuals ADOPTED Allocation YTD Actuals Percent Over (MJ eased on number of months of receipts thrOugh Annual Of the thrOUgh of YTD (Under) 2nd Quarter Budget YTD Budget 2nd Quarter Budget Budget M Hotel Occupancy Tax 5 months $ 308,406 $ 816,702 $ 340,293 $ 349,859 103% $ 9,567 Misc Income 16,399 27,193 14,559 14,836 102% 277 Total Revenues and Other Sources $ 324,805 $ 843,895 $ 354,852 $ 364,695 103% $ 9,843 RevenueLegend Positive Cautious Negative •greater than •between •less than 90% 70%-90% 70% 1 1 EXPENDITURES AND OTHER USES PY Actuals ADOPTED Allocation YTD Actuals Percent Over through Annual of the through of YTD (Under) 2nd Quarter Budget YTD Budget 2nd Quarter Budget Budget Operations& Maintenance $ 160,235 $ 427,811 $ 213,906 $ 179,933 84% $ (33,973) Operating Transfers for Payroll 214,611 555,167 277,584 246,101 89% (31,483) Total Ex enditures and Other Uses $ 374,845 $ 982,978 $ 491,489 $ 426,034 87% $ (65,455) Expenditure Legend ositive Cautious Negative •lessthan •between •greaterthan Z���o 100�-ZZ��o 110� EXEMPLARY GOVERNANCE ' � ' ' -f�,��ru Officials,both SUMMARY PY Actuals ADOPTED Allocation YTD Actuals =lected and through Annual of the through ,r,��;��inted, exhibit 2nd Quarter Budget YTD Budget 2nd Quarter Respect, Total Revenues&Other Sources $ 144,433 $ 843,895 $ 354,852 $ 364,695 ��zwardship,Vision, Total Expenditures&Other Uses 374,845 982,978 491,489 426,034 �,nd Transparency Net Change to Fund Balance $ (230,412) $ (139,083) $ (136,638) $ (61,339) Beginning Fund Balance 799,168 755,091 755,091 755,091 Ending Fund Balance 568,755 616,008 618,453 693,752 SERVICE Restricted Funds - - - - EXCELLENCE Unrestricted Fund Balance $ 568,755 $ 616,009 $ 618,453 $ 693,752 �ublic Service that u� Responsive and Total Operating Expenditures $374,845 $982,978 $426,034 �rrofessional,while Daily Operating Cost $2,494 $2,693 $2,693 �,;�lancing Efficiency, #of Operating Days Unrestricted 228 229 258 =ff��tiveness and �inancial 10 �tewardship Town of Westlake Dashboard Analysis for Quarter Ended 03/31/2019 VISITORS ASSOCIATION FUND TOTAL REVENUES AND OTHER SOURCES $ 843,895 Adopted Budget $ 354,852 YTD Budget $ 364,695 YTD Actual 103% YTD Budget % $ 9,843 Over (Under) Budget HOTEL OCCUPANCY TAX $ 816,702 Adopted Budget $ 340,293 YTD Budget $ 349,859 YTD Actual 103% YTD Budget % $ 9,567 Over(Under) Budget • YTD budget calculation is based on the number of months of receipts received • The Town has only received 5 months of tax to-date; therefore, the YTD Budget only reflects 5 months. MISCELLANEOUS INCOME $ 27,193 Adopted Budget $ 14,836 YTD Budget $ 14,836 YTD Actual 102% YTD Budget % $ 277 Over(Under) Budget • This income includes revenues from interest income and insurance refunds. It also includes other types of revenues that will be event driven (i.e.) sponsorships, donations and special events from the Westlake Historical Board, and the Community Tree Lighting. Therefore, the income will not be received evenly over the year. o Dept 10 General Services— under budget $2,774 (Tree Lighting) o Dept 24 Historical Board—over budget $3,051 (car show registration/sponsors) 11 Town of Westlake Dashboard Analysis for Quarter Ended 03/31/2019 VISITORS ASSOCIATION FUND TOTAL EXPENDITURES AND OTHER USES $ 982,978 Adopted Budget $ 491,489 YTD Budget $ 426,034 YTD Actual 87% YTD Budget % $ (65,455) Over (Under) Budget OPERATIONS AND MAINTENANCE $ 427,811 Adopted Budget $ 213,906 YTD Budget $ 179,933 YTD Actual 84% YTD Budget % $ (33,973) Over(Under) Budget • The Operations and Maintenance category is comprised of expenditures for the following departments; General Services, Communications, Historical Board and the Public Arts Board. Some expenditures will be event driven and therefore, the costs will not be reflected evenly over the year. PAYROLL TRANSFERS $ 555,167 Adopted Budget $ 277,584 YTD Budget $ 246,101 YTD Actual 89% YTD Budget % $ (31,483) Over(Under) Budget • This cost is also affected by employee taxes and insurances costs and will fluctuate as policies change; (medical, dental, life, workers comp, unemployment) • Finance is in the process of analyzing this variance 12 Utility Fund - 500 Quarterly Financial Dashboard QuarterEnded 3/31/2019 � : REVENUES AND OTHER SOURCES PY Attuals ADOPTED ESTIMATED Allocation YTD Actuals Percent Over (%J eased on same% as prior year through Annual Annual of the through of YTD (Under) lst Quarter Budget Budget YTD Budget lst Quarter Budget Budget % Water Revenues 37% 1,438,046 $ 3,302,156 $ 3,302,156 $ 1,197,321 $ 1,103,747 92% $ (93,574) % Sewer/Waste Revenues 46% 634,163 1,144,953 1,144,953 526,835 661,774 126% 134,939 Tap/Impact Fee Revenues 50,539 117,816 117,816 58,908 70,302 119% 11,394 Permit&Fee Revenues 86,800 274,441 274,441 82,150 65,100 79% (17,050) Misc Revenues 47,289 83,135 83,135 41,568 43,769 105% 2,202 Other Sources-Bond Revenue - 2,600,000 - - - - - Total Revenues and Other Sources $ 2 256 837 $ 7 522 501 $ 4 922 501 $ 1 906 781 $ 1 944 693 302% $ 37 911 � RevenueLegend Cautious Negative •greaterthan •between •lessthan 90% 70%-90% 70% � i EXPENSES AND OTHER USES PY Actuals ADOPTED ESTIMATED Allocation YTD Actuals Percent Over through Annual Annual ofthe through ofYTD (Under) lst Quarter Budget Budget YTD Budget lst Quarter Budget Budget Water Purchases 32% $ 501,527 $ 1,344,600 $ 1,344,600 $ 443,976 $ 312,749 70% $ (131,226) Operations&Maintenance 932,949 2,650,240 2,650,240 1,278,321 1,248,867 98% (29,454) Operating Transfers for Payroll 120,119 559,024 559,024 279,512 238,046 85% (41,466) Debt Service-Fort Worth Water 900,560 1,711,840 - - - 0% - Transfers Out - 81,539 81,539 - - 0% - Total Ex enses and Other Uses $ 2 455 156 $ 6 347 244 $ 4 635 404 $ 2 001 808 $ 1 799 662 90% $ 202 146 Expenditure Legend Cautious Negative •lessthan •between •greaterthan EXEMPLARY iooi ia1� i-Zioi , ZZoi GOVERNANCE �� Town Officials,both Elected and Appointed,exhibit Respect, ' � ' ' Stewardship,Vision, SUMMARY PY Actuals ADOPTED ESTIMATED Allocation YTD Actuals �=i� �f��'�spel'2►lty through Annual Annual ofthe through 1st Quarter Budget Budget YTD Budget 1st Quarter Total Revenues&Other Sources $2,256,837 $ 7,522,501 $ 4,922,501 $ 1,906,781 $ 1,944,693 $ERVICE Total Expenses 2,455,156 6,347,244 4,635,404 2,001,808 1,799,662 EXCELLENCE Net Change to Fund Balance (198,318) 1,175,257 287,097 (95,027) 145,031 � ,�lit$el'VIC2 thdt IS Beginning Fund Balance 779,124 424,904 424,904 424,904 424,904 �esponsive and Endinging Fund Balance 580,805 1,600,162 712,002 329,878 569,935 �'y�fe551onal,Whlle Restricted Funds 216,430 1,074,130 200,830 200,830 200,830 a�1811C111g EffIC1211Cy, Unrestricted Fund Balance $ 364 375 $ 526 032 $ 511 172 $ 129 048 $ 369 105 -7fE'CtIV211255 811d Financial Total Operating Expenses $2,335,037 $4,553,865 $4,553,865 $1,561,616 SteWaYdShlp Daily Operating Cost $11,387 $12,476 $12,476 $12,476 #of Unrestricted Operating Days 32 42 41 30 13 Town of Westlake Dashboard Analysis for Quarter Ending 03/31/2019 UTILITY FUND TOTAL REVENUES AND OTHER SOURCES $ 7,522,501 Adopted Budget $ 4,922,501 Estimated Budget $ 1,906,781 YTD Budget $ 1,944,693 YTD Actual 102% YTD Budget % $ 37,911 Over (Under) Budget WATER REVENUES $ 3,302,156 Adopted Budget $ 1,197,321 YTD Budget $ 1,103,747 YTD Actual 92% YTD Budget % $ (93,574) Over(Under) Budget • YTD budget calculation is based on the percentage of revenues received for the same period in the prior year (37%) • Variance is primarily caused by the wetter winter this year SEWER/WASTE REVENUES $ 1,144,953 Adopted Budget $ 526,835 YTD Budget $ 661,774 YTD Actual 126% YTD Budget % $ 134,939 Over(Under) Budget • YTD budget calculation is based on the percentage of revenues received for the same period in the prior year (46%) • Residential sewer averages work in correlation with water usage based on the prior year winter quarter average months of December, January, and February consumption • Commercial is based on the actual consumption TAP AND IMPACT FEE REVENUES $ 117,816 Adopted Budget $ 58,908 YTD Budget $ 70,302 YTD Actual 119% YTD Budget % $ 11,394 Over(Under) Budget • These revenues are a direct reflection of new home starts and commercial building. 14 Town of Westlake Dashboard Analysis for Quarter Ending 03/31/2019 UTILITY FUND PERMIT AND FEE REVENUES $ 274,441 Adopted Budget $ 82,150 YTD Budget $ 65,100 YTD Actual 79% YTD Budget % $ (17,050) Over(Under) Budget • Permit and Fee revenues are comprised of 3 different revenue types; o Duct Bank Permit Fees - are a direct reflection of new home starts and are calculated using the Planning and Development forecast. Revenue is recorded as new home permits are processed; The total annual budget is $164,300; YTD budget is $82,150; actual received YTD is $65,100 o Deferred Duct Bank Revenue -from multi-year Duct Bank Fees received in prior years and allocated over length of the lease; Total annual budget is $40,391; will be recorded at year end o TRA Wastewater Settle-up Fees -Total annual budget is $69,750; will be received/recorded at year end MISCELLANEOUS REVENUES $ 83,135 Adopted Budget $ 41,568 YTD Budget $ 43,769 YTD Actual 105% YTD Budget % $ 2,202 Over(Under) Budget • Miscellaneous budgeted revenues are comprised of several different revenue types, the majority (67%) being interest income at $55,300; other revenue types include, meter repair and replacement, insurance refunds, and credit card administrative fees. OTHER SOURCES - BOND REVENUES $ 2,600,000 Adopted Budget $ 0 Estimated Budget $ 0 YTD Budget $ 0 YTD Actual 0% YTD Budget % $ 0 Over(Under) Budget • Bond revenues of$2.6M for the Fort Worth Water Line project have been transferred to the Utility Construction Fund #515 • This fund will be reviewed in the Capital Project Section of the quarterly reports 15 Town of Westlake Dashboard Analysis for Quarter Ending 03/31/2019 UTILITY FUND TOTAL EXPENDITURES AND OTHER USES $ 6,347,244 Adopted Budget $ 4,635,404 Estimated Budget $ 2,001,808 YTD Budget $ 1,799,662 YTD Actual 90% YTD Budget % $ (202,146) Over (Under) Budget WATER PURCHASES $ 1,344,600 Adopted Budget $ 443,976 YTD Budget $ 312,749 YTD Actual 70% YTD Budget % $ (131,226) Over(Under) Budget • YTD budget calculation is based on the percentage of invoices paid for the same period in the prior year (32%). Much like the revenue which is impacted by the wetter winter as compared to last year. OPERATIONS AND MAINTENANCE $ 2,650,240 Adopted Budget $ 1,278,321 YTD Budget $ 1,248,867 YTD Actual 98% YTD Budget % $ (29,454) Over(Under) Budget • Operations and Maintenance is comprised of several different expense types, and as the year progresses, these expenses should balance out. • Capital Outlay—under budget $(11,783) o This category is comprised of water taps, water meters and equipment, miscellaneous mechanical equipment, and computer software and hardware. • Repair& Maintenance—over budget $22,161 o This category is comprised of several different account numbers for repair and maintenance of water mains, sewer mains, pump stations and lift stations vehicles, storage tank, etc. Some expenditures will be event driven and therefore, the costs will not be reflected evenly over the year. • Rent & Utilities—under budget $(20,106) o This includes a portion of the rent/lease payments for the current municipal office space that is on a 10-year tiered schedule; It also includes costs for telephone, internet, water and electric 16 Town of Westlake Dashboard Analysis for Quarter Ending 03/31/2019 UTILITY FUND • Services—over budget $3,790 o This includes costs of attorney fees, auditors, bank charges, engineering fees, auto insurance, property insurance, water testing, software maintenance, utility billing fees, etc. As the year progresses, these expenses should balance out. • Supplies—under budget $(1,318) o This includes costs for safety supplies, miscellaneous hand tools, chemical supplies, office supplies, vehicle fuel, uniforms, etc. As the year progresses, these expenses should balance out • Travel &Training—under budget $(3,042) o Includes Airfare, care rental, parking fees, meals mileage, training, books, and registrations; As the year progresses, these expenses should balance out. OPERATING TRANSFERS FOR PAYROLL COSTS $ 559,024 Adopted Budget $ 279,512 YTD Budget $ 238,046 YTD Actual 85% YTD Budget % $ (41,466) Over(Under) Budget • This cost is affected by employee taxes and insurance costs and will fluctuate as policies change; medical, dental, life, workers comp, and unemployment. • Finance is in the process of evaluating this variance DEBT SERVICE— FW WATER LINE $ 1,711,840 Adopted Budget $ 0 Estimated Budget $ 0 YTD Budget $ 0 YTD Actual 0% YTD Budget % $ 0 Over(Under) Budget • Debt Service of$1.7M for the Fort Worth Water Line project has been transferred to the Utility Construction Fund #515 • This fund will be reviewed in the Capital Project Section of the quarterly reports 17 Town of Westlake Dashboard Analysis for Quarter Ending 03/31/2019 UTILITY FUND TRANSFERS OUT $ 81,539 Adopted Budget $ 0 YTD Budget $ 0 YTD Actual 0% YTD Budget % $ 0 Over(Under) Budget • This category is comprised of a transfer out to the General Fund based on the forecasted Fort Worth Impact Fees on new home construction starts. This amount will be transferred at year end based on actuals receipts. 18 Town of Westlake Updated through 4/10/2019 CAPITAL PROJ ECTS U PDATE PROJECT DIRECTOR: TROY MEYER FIRE STATION COMPLEX This project is completed! Staff is working with contractor on all closing documents and final billing. There are a few landscaping punch-list items which will be completed by April 26tn TOTAL Over�Under) Acct Description BUDGET Budget Anticipated Use ofFund Balance $ - $ 319,674 $ (319,674) Misc Contribution 2016 CO 246,750 246,750 - Bond Issuance Tax Note 2017 1,530,000 1,530,000 - Bond Proceeds 2016 CO 9,180,000 9,180,000 - Contributions Private 1,200,000 1,200,000 - TotalRevenues 12,156,750 12,476,424 (319,674) Engineering 62,229 578,032 (515,804) Construction Expense 7,892,376 7,987,281 (94,905) Land Value Exterior Expense 1,750,000 1,750,000 - Design Fees 933,862 802,000 131,862 Furniture&Fixtures 158,422 275,000 (116,578) Security5ervice 2,692 317,500 (314,808) Contingency 16,054 182,700 (166,646) Misc/Land/Foundation 262,325 (262,325) Appraisal Fees 10,885 13,000 (2,115) Misc Legal 12,853 16,000 (3,147) Boyle&Lowry 28,638 35,000 (6,363) Advertisiing 3,500 (3,500) Bond Issuance Tax Note 2017 29,232 29,232 - Bond Issua nce 2016 CO 222,454 222,454 - Printing 1,330 2,400 (1,070) Irrigation R&M 11,203 - 11,203 Network/Server 213,789 - 213,789 Utility5et Up 4,852 - 4,852 Public Notices 776 - 776 Misc.Expense 26,062 - 26,062 Total Expenditures 11,377,709 12,476,424 (1,098,716) �� �� 19 Town of Westlake Update for Quarter Ended 03/31/2019 CAPITAL PROJ ECTS U PDATE PROJECT DIRECTOR: TROY MEYER TRAI L PROJ ECTS The following Capital Projects are proposed to be funded by a bond issuance that will be placed on a future Council Agenda for discussion. Adopted YTD GL ACCOUNT NUMBER GL DESCRIPTION Budget Actuals Balance 410-74400-19-000-000042 1. Trail Connection at 114/Solana $ 30,000 $ - $ 30,000 410-74400-19-000-000053 2. Trail - Dove/Pearson/Aspen 290,016 - 290,016 $ 320,016 $ - $ 320,016 1. Trail Connection at 114/Solana #42 This project will extend existing 8 feet concrete trail an estimated 1,000 feet from the west side of Hwy 114 to the frontage road. The project will start after the frontage road is completed from Davis to Solana Blvd. 2. Trail - Dove/Pearson/Aspen #53 This project will provide trail connectivity from Aspen Lane north to Dove Road along the east side of Pearson Road. It will also include crosswalk devices at the corner of Dove and Pearson. ACADEMY PROJECTS Adopted YTD GL ACCOUNT NUMBER GL DESCRIPTION Budget Actuals Balance 410-73000-17-000-000077 1. WA-Pond Repairs $ 82,000 $ - $ 82,000 1. Westlake Pond Repairs #77 The irrigation pond at the Westlake Academy continues to leak on the east side with water running onto the property east of the campus. In March of 2017 a clay dam was installed which has slowed the water flow. This project will remove the silt from the pond and install a clay liner. 20 Town of Westlake Update for Quarter Ended 03/31/2019 CAPITAL PROJ ECTS U PDATE PROJECT DIRECTOR: TROY MEYER SIGNAGE PROJECTS Adopted YTD GL ACCOUNT NUMBER GL DESCRIPTION Budget Actuals Balance 410-74400-19-000-000067 2. Wayfinding Signage $ 229,500 $ - $ 229,500 2. Wavfindinq Siqnaqe #67 The "Wayfinding" Sign Project will showcase the town's major venues, direct visitors through major corridors that lead to various Town destinations and trails. The project would include the locations, design and cost estimates to create and install the wayfinding signage. The package will include but not be limited to the following, • Development of a Master Plan to provide staff a guideline and template for wayfinding implementation. • Recognizable wayfinding system that is easily adaptable for future development • Create a signage system that blends into Westlake • Material selections • Define trail access points 21 Town of Westlake Update for Quarter Ended 03/31/2019 CAPITAL PROJ ECTS U PDATE PROJECT DIRECTOR: TROY MEYER CEMETERY PROJECTS The following Capital Project is cash funded Adopted YTD GL ACCOUNT NUMBER GL DESCRIPTION Budget Actuals Balance 410-73000-19-000-000076 Cemetery Improvements $ 50,000 $ 2,293 $ 47,707 The architect firm has completed a draft layout of the internal road system which include two circler islands. This plan will be presented to the Town Council in June 2019. Cemetery Improvements #76 In 2018 staff completed the following improvements at the Cemetery: • Pipe and cable fence extension on the south property • Removal of the old cell tower concrete pad • Added concrete headwalls to all three entrances • Installed 2-inch water line to irrigate the trees in the cemetery • Installed the stone on all the head walls • Completed a tree survey and topography of the five acres • Hired an architect firm to create a master plan of the cemetery Staff is currently working with the architect firm on the master plan for the cemetery which will be presented to the council in Spring 2019. 22 Town of Westlake Update for Quarter Ended 03/31/2019 CAPITAL PROJ ECTS U PDATE PROJECT DIRECTOR: .IASON POWER TECHNOLOGY PROJECTS Adopted YTD GL ACCOUNT NUMBER GL DESCRIPTION Budget Actuals Balance 410-74400-20-000-000081 Fiber Connectivity $ 300,000 $ 9,000 $ 291,000 This project will reduce critical infrastructure downtime - with the addition of the EOC at the new Fire/EMS station and a complete fiber duct between all our locations, we have the opportunity to install our own dark fiber between all of the locations to provide redundant and faster connectivity than is currently sourced through available providers. As we have moved to a virtual server architecture, having our own fast fiber connectivity between locations will allow us to move virtual servers to any location when necessary (disaster recovery, scheduled hardware down time for updates, upgrades, repairs, etc.). We will be able to have our data available at any of the locations without any reduction in speed or productivity. Using our own fiber will allow us greater flexibility in internet connectivity - options to combine the internet connection at each location into a single faster connection, or reduce or remove internet connectivity costs at one or more locations and route all internet traffic through fewer locations. With this rollout, we would start with 10Gbps connectivity between all of our locations (approximately 100X faster than our current connections), with the ability to increase to 40Gbps - 200Gbps in the future. We will work with consultants experienced in sourcing options for dark fiber connectivity to compile bid options for the project. 23 Town of Westlake Update for Quarter Ended 03/31/2019 CAPITAL PROJ ECTS U PDATE PROJECT DIRECTOR: .IARROD GREENWOOD TRANSPORTATION PROJECTS The following Capital Projects are proposed to be funded by a bond issuance that will be placed on a future Council Agenda for discussion. Adopted/ YTD GL ACCOUNT NUMBER GL DESCRIPTION Amended Actuals Balance Budget 410-73000-16-000-000040 1. Sam School Road R&D $ 281,960 $ - $ 281,960 410-73000-16-000-000075 2. Flashing Crosswalk Lights 48,956 - 48,956 410-73000-16-000-000078 3. Solana Pavement Repair 90,000 - 90,000 410-73000-16-000-000079 4. Wyck Hill Pavement Resurface 54,450 - 54,450 410-73000-16-000-000080 5. FM1938 Pavement Repairs 80,000 - 80,000 $ 555,366 $ - $ 555,366 1. Sam School Road Reconstruction and Drainaqe#40 The project will provide stabilization of road subgrade and 6" of asphalt to approximately 2,000 LF of Sam School Road and replace/improve culverts and ditches, consistent with 2011 Graham Pavement Evaluation Study. Anticipate crack sealing 2nd year from completion. Includes 150 linear feet of sidewalk. 2. Flashinq Crosswalk Liqhts #75 The town trail system currently starts and/or stops at the Westlake Academy campus. The use of the trail has increased over the past two years due to the growth of the community and the Academy. Flashing light at the crosswalk would give vehicles a warning that pedestrians are crossing at Dove Rd & Ottinger or pove Rd &Pearson. This project includes flashing signs and lights being installed in the pavement. Includes three flashing lights and striping of the crosswalk at Dove and Pearson. Lights would be activated by pedestrians walking on the trail that would need to cross over pove to go north on Pearson. 3. Solana Pavement Repair#78 This project will provide repairs to several sections of concrete pavement failures on Solana Boulevard. The repairs will consist of removal/replacement of concrete and failed subgrade and traffic control. 4. Wvck Hill Pavement Resurface #79 This project will provide for the removal and replacement of 1" to 2" of the existing 6" asphalt on Wyck Hill Lane. The existing subgrade is in excellent condition and does not require re-stabilization. 5. FM1938 Pavement Repairs #80 This project will provide repairs to several sections of stamped/stained concrete pavement failures on FM 1938. The repairs will consist of removal/replacement of concrete and failed subgrade and traffic control 24 Town of Westlake Update for Quarter Ended 03/31/2019 CAPITAL PROJ ECTS U PDATE PROJECT DIRECTOR: .IARROD GREENWOOD TRANSPORTATION PROJECTS The following Capital Project is cash funded Adopted YTD GL ACCOUNT NUMBER GL DESCRIPTION Budget Actuals Balance 410-74400-16-000-000020 FM1938 Town Improvements $ 220,000 $ 112,277 $ 168,679 FM1938 Town Improvements #20 This work includes repair and replacement of irrigation, wheelchair ramps and sidewalk. Other improvements include landscape replacement that is scheduled to be completed this spring for plants that are dead or in need of repair through the FM 1938 corridor. Funding for this work is from project savings from the 2012 FM 1938 TxDOT road construction landscape project and the subsequent 2013 streetscape project. 25 Town of Westlake Update for Quarter Ended 03/31/2019 CAPITAL PROJ ECTS U PDATE PROJECT DIRECTOR: .IARROD GREENWOOD WATER LINE PROJECT FY 17/18 FY 18/19 � TOTAL over(under) Account Number Acct Description Actuals Actuals • � BUDGET Budget 515-33501-16-000 Bond Proceeds $ - $2,100,000 $2,100,000 $2,100,000 $ - Total Revenues - 2,100,000 2,100,000 2,100,000 - 515-43310-16-000 Attorney-Boyle& Lowry 2,450 800 3,250 3,250 - 515-48838-16-000 Bond Issuance Fees - 44,250 44,250 44,250 - 515-46195-16-000 Construction - - - 2,052,500 (2,052,500) Total Expenditures 2,450 45,050 47,500 2,100,000 (2,052,500) . .- .- . i i i i i� � � � i The City of Fort Worth's contractor has been working on the west side of the railroad boring under SH 170 and all local road crossings in Fort Worth and laying waterline. The contractor still must bore under the railroad and Hwy 377. We are waiting for an update construction schedule from the Fort Worth engineer. 26 Town Cou nci I Item #4 — Discussion Items DISCUSSION ITEMS a. Presentation and discussion regarding State Highway 170/Roanoke Road intersection and TxDOT speed studies. b. Standing Item: Presentation and discussion of development projects per Staff Report March 2019 including an Entrada report from the Developer and projects in Planned Development PD 3-5. Westlake Town Council TYPE OF ACTION T x E i o w N o F WESTLAKE Workshop - Discussion Item oisriNcrivE sv oEsicN Westlake Town Council Meeting Monday, Apri122, 2019 ToPic: Presentation and discussion regarding SH 170/Roanoke Road intersection and TxDOT speed studies. STAFF CoNTAc'T: Jarrod Greenwood, Assistant Town Manager Strategic Alignment i � � . � . . , ; . . � � - 1 � High Quality Planning,Design& Planned/Responsible People,Faciliries, & Development-We are a desirable Improve Technology, Development Technology Well planned,high-quality Facilities& community that is distinguished by Equipment exemplary design standards. . , Outside the Scope of Identified Strategic Initiatives Time Line - Start Date: Apri122, 2019 Completion Date: Apri122, 2019 Funding Amount: TBD Status - � Unfunded Source - N/A EXECUTIVE SUMMARY(TNCLUDiNG APPLICABLE ORGANIZATIONAL HISTORY) Town staff presented a report at the December 12, 2018 Town Council meeting regarding a plan to close the Roanoke Road crossing at SH 170. At the December 2018 Council meeting, staff recommended closing the Roanoke Road crossing,just like the Ottinger Road crossing was closed in 2014, due to the traffic safety concerns and that the crossing will be closed when SH 170 is constructed through this intersection. Based on Council direction, the Town's traffic engineering consultant, Lee Engineering, conducted a traffic study of the SH 170/Roanoke Road intersection to identify options for Town and TXDOT consideration. In addition to this study, Lee Engineering also reviewed two separate TxDOT speed studies: 1) SH 114 between Solana Blvd. and Trophy Lake Drive; and 2) SH 170 from the SH 114 interchange to Roanoke Road. Page 1 of 3 As reported at the December 2018 Council meeting, the construction of the new main lanes on SH 170 has created congestion on SH 170 main lanes and service roads as motorists are attempting to weave and negotiate turning movements onto Roanoke Road. The current intersection configuration creates conditions on this section of roadway, which include: • Vehicles travelling westbound SH 170 must exit at Roanoke Road at a signalized intersection. • As the westbound main lanes on SH 170 transition from two (2) lanes down to one (1) lane that must eXit, motorists in the left hand lane attempt to accelerate past traffic in the right hand lane. • The current ramp configuration does not allow eastbound traffic to enter SH 170 main lanes prior to the Roanoke Road signal, resulting in traffic backing up from Roanoke Road to beyond US 377. This also backs up traffic for north and snowbound US 377 lanes. The Lee Engineering letter provides three options as Identified below: Pro Con Option 1 Roanoke . No Route Changes for the motorist • Highest total delay among all options Road crossing . Minimum construction/modification • Longest westbound queue is expected remains open efforts on SH 170 Option 2 Roanoke . Lower total delay than option 1 • Requires more Road closed . Lowest total delay during the PM peak construction/modification efforts hour compared to Option 1 • Shorter westbound queue is expected on • Re-routing is required for motorist SH 170 from Roanoke Road • Lower delays at Roanoke Road intersection at SH 170 frontage roads than existing conditions Option 3 Roanoke . Lower total delay than Option 1 • Higher total delay compared to Option Road closed . Total delay is similar to Option 2 during 2 during the PM peak hour the AM peak hour • Requires more • Shorter westbound queue is expected on construction/modification efforts SH 170 compared to Optionl • Re-Routing is required for motorist from Roanoke Road • Southbound traffic on Roanoke Road at SH 170 WBFR is predicted to experience excessive delay or be re- routed Page 2 of 3 Staff is currently scheduling a meeting with TxDOT to discuss the SH 170/Roanoke intersection options and speed studies within the next week. A communication plan will be developed to inform Westlake residents/businesses and neighboring communities regarding any plans for the SH 170/Roanoke Road intersection. RECOMMENDATION Review and discussion of the information with staff. ATTACHMENTS Lee Engineering SH 170/Roanoke Road letter Lee Engineering Review of SH 170 and SH 114 Speed Studies Page 3 of 3 i , ARIZONA i TEXAS ��_,���.���� NEW MEXICO (��' �� OKLAHOMA ���,'t�.....r�,,�• �1� _���j �ncfn�C��nc ����� ��=�� �. , J��''L��� �o ��� y�w��s���aeoo.ra��ass�ee������ni����� �� �-�c��;L ����'�' '� April 3,2019 9'�..............�...e...v.Q......� �i�.a�; 1045�� � i Jarrod Greenwood f, O,�•.,�f���g��:t`,�� Director of Public Works ,�,�45���3;••'��``�: Town of Westlake ��,�,�, ,��,. 1500 Solana Boulevard, Building 7, Suite#7200 . — Westlake,TX 76262 - -— - - o�l°3lza l `( RE: Traffic Analysis—Roanoke Road Intersections at SH 170 Frontage Roads Dear Mr. Greenwood: Per the Town of Westlake's request, Lee Engineering has assessed possible traffic operation improvement measures for the SH 170 Frontage Roads between Roanoke Road and US 377.Traffic operation improvement measures described in this letter are based on traffic counts and queue data collected within the study area,and capacity analysis performed as a part of this study. A review of existing conditions shows the SH 170 westbound freeway main lanes end and traffic exits to the westbound frontage road (WBFR) approximately 375 feet east of Roanoke Road. During the PM peak hour, traffic backs up on the SH 170 WBFR from US 377 (Main Street) onto the SH 170 westbound main lanes. Lee Engineering evaluated year 2021 AM and PM peak hour scenarios. These scenarios assumed built out of the following developments and capacity improvements: • Charles Schwab campus south of SH 114 and SH 170 interchange in the Town of Westlake • Village of Roanoke on southeast corner of US 377 and Parish Lane in the City of Roanoke • Two99 Monroe Apartments on northwest corner of Parish Lane and Roanoke Road/Walnut Street in the City of Roanoke • Parish Lane connection between Roanoke Road/Walnut Street and the SH 170 frontage roads • Schwab Way connection as a southern leg of the Parish Lane and SH 170 frontage roads diamond interchange With these assumptions,Lee Engineering evaluated the following two option under the year 2021 AM and PM peak hour scenario: Option 1: Roanoke Road link remain in place between the SH 170 frontage roads Option 2:Without Roanoke Road link between the SH 170 frontage roads(Roanoke Road intersections with SH 170 frontage roads as Right In/Right Out intersections) In March 2019, Lee Engineering submitted a report to the Town with Options 1 and 2. Under Option 2, Lee Engineering had assumed a traffic signal at the intersection of Roanoke Road at SH 170 WBFR and a Two- way Stop control for the intersection of Roanoke Road at SH 170 EBFR. The Town requested to evaluate additional Option 3 defined as: Option 3: Option 2+Two-way Stop control for Roanoke Road intersections at SH 170 frontage roads 3030 LBJ Freeway,Suite 1660, Dallas,TX 75234 (972)248-3006 office (972)248-3855 fax � www.leeengineering.com Page 1 of 6 Trip generation calculations are provided as an attachment to this letter.Figures for study intersections,existing traffic counts, assumed directional distribution and total traffic for both options are also provided with the attachment. Table 1 below presents the result of the capacity analysis performed for this study. Table 2 presents the total delay in hours for the intersections of SH 170 frontage roads at Roanoke Road and US 377 (Main Street). Table 1: Capacity Analysis Results SH 170 WBFR and Roanoke Rd(Int.9) Scenario Peak Hour Intersection EB WB NB SB Exisring(2019)Conditions AM 181 (B)t -- 16.5(B) 30.4(C) 40.6(C) PM 53.7(D) -- 55.8(E) 22.5(C) 38.5(D) Option 1 with Existing AM 21.7(C) -- 20.5(C) 26.5(C) 39.6(D) Timing PM 1681 (F) -- 181.8(F) 221 (C) 38.8(D) Option 1 With AM 159(B) -- 10.7(B) 56.3(E) 71.4(E) Coardination PM 1553(F) -- 1679(F) 189(B) 379(D) Option 2 AM 7A(A) -- 3.6(A) -- 73A(E) PM 32.7(C) -- 29.0(C) -- 94.5(F) Option 3 AM -� -- OA(A) -- 56.1 (F) PM -- -- 0.0(A) -- >300(F) SH 170 EBFR and Roanoke Rd(Int.10) Scenario Peak Hour Intersection EB WB NB SB Exisring(2019)Conditions AM 190.8(F) 208.7(F) -- 51.3(D) 32A(C) rM sl.i ��� s3.6��� -- s9.��E� za.a�c� Option 1 with Existing AM >300(F) >300(F) -- 52.0(D) 41.8(D) Timing PM 90.4(F) 101.4(F) -- 64.5(E) 45.4(D) Option 1 With AM 212A(F) 205.5(F) -- 2369(F) >300(F) Coardination PM 100.8(F) 113.5(F) -- 371 (D) 74.7(E) AM -- OA(A) -- 0(A) -- Option 2 pM -- OA(A) -- 0(A) -- AM -- OA(A) -- 0(A) -- Option 3 pM -- OA(A) -- 0(A) -- SH 170 WBFR and US 377(int.11) Scenario Peak Hour Intersection EB WB NB SB Exisring(2019)Conditions AM 28.8(C) -- 29.5(C) 24.8(C) 33A(C) PM 78.3 (E) -- l ll.7(F) 27.0(C) 32.7(C) Option 1 with Existing AM 35.7(D) -- 43.5(D) 24.2(C) 27.6(C) Timing PM 173.8(F) -- 262.5(F) 25.5(C) 311 (C) Option 1 With AM 33.8(C) -- 271 (C) 40.8(D) 45.4(D) Coardination PM 1273(F) -- 1523(F) 69(A) 1593(F) Option 2 AM 359(D) -- 31.0(C) 411 (D) 45.5(D) PM 149.6(F) -- 182.4(F) 83(A) 167.2(F) Option 3 AM 36.6(D) -- 323(C) 411 (D) 45.5(D) PM 157.0(F) -- 193.8(F) 8.3(A) 167.2(F) SH 170 EBFR and US 377(Int.12) Scenario Peak Hour Intersection EB WB NB SB Exisring(2019)Conditions AM 56.7(E) 75.6(E) -- 329(C) 26.8(C) PM 54.5(D) 77.0(E) -- 38.0(D) 25A(C) Option 1 with Existing AM 122.3(F) 199.5(F) -- 34.5(C) 25.4(C) Timing PM 759(E) 123.8(F) -- 32.3(C) 28.2(C) Option 1 With AM 74.4(E) 661 (E) -- 103.6(F) 38.7(D) Coardination PM 117.6(F) 180.1 (F) -- 69.0(E) 51.4(D) Option 2 AM 773 (E) 65.6(E) -- 109.4(F) 56.5(E) PM ll0A(F) 147.5(F) -- 165.5(F) 43.2(D) Option 3 AM 773 (E) 65.6(E) -- 109.4(F) 56.5(E) PM llOA(F) 147.5(F) -- 165.5(F) 43.2(D) 1 Delay in Seconds/Vehicle;2 HCM methodology does not provide delay values for a Two-Way Stop Control intersections LCC CI�ICII�CC�II�IC Page 2 of 6 Table 2: Total Delay Peak Hour Total Alternative Dela (Hrs) AM PM Existing 278.8 233.9 Option 1 With Existing Timing 620.3 565.8 Option 1 With Coordination 366.1 551.3 Option 2 141.0 400.3 Option 3 139.3 445.6 Synchro reports for the capacity analysis are provided with the attachment. Lee Engineering developed the following options to manage the traffic operations in the study area. Option 1: Roanoke Road link remain in place between the SH 170 frontage roads L Intersection Improvements/Modifications • At the intersection of SH 170 WBFR at US 377 (Main Street), the existing westbound left turn lane is approximately 280 feet long. Provide longer (1000 feet) westbound left turn lane to improve signal efficiency. • Install yield to ramp signage at the intersection of SH 170 westbound exit ramp and SH 170 WBFR 2. Warning Beacons and Signs on SH 170 main lanes and Exit Ramp Queue data collection noted the queue of 81 vehicles/2025 feet (81*25 = 2025 feet) on the SH 170 westbound exit ramp.Based on the field observations,the queue extends onto SH 170 westbound main lanes to the existing"ALL TRAFFIC MUST EXIT"sign. This sign is located approximately 2200 feet upstream of the gore point of the SH 170 westbound exit ramp and the SH 170 WBFR.Implementation of Option 1 is expected to result in queue from US 377 (Main Street)to back beyond Roanoke Road. The crest vertical curve of SH 1701imits drivers' ability to see a queue of stopped cars which creates a safety concern. Lee Engineering provides the following recommendations to address this safety concern. • Install two "CAUTION WATCH FOR SLOW TRAFFIC AHEAD" signs with flashers that are activated by vehicle queue detectors. Recommended locations for these two signs are: • 800 feet upstream of"FREEWAY ENDS '/z MILE" sign • 1500 feet upstream of Roanoke Road on SH 170 westbound Exit Ramp 3. Signal Timings Following coordination patterns were used to evaluate the effects of Signal coordination. • The AM peak hour of year 2021 total conditions was evaluated with 150 seconds cycle lengths for the signalized intersections. • For the PM peak hour of year 2021 total conditions: o A 180 seconds cycle lengths was used for US 377 (Main Street) intersections at SH 170 frontage roads. LCC CI�ICII�CC�II�IC Page 3 of 6 o The intersections of Roanoke Road at SH 170 frontage roads were evaluated at half cycle (90 seconds). Option 2: Without Roanoke Road link between the SH 170 frontage roads L Intersection Improvements/Modifications Evaluated • Remove signal at the intersection of SH 170 EBFR and Roanoke Road. Provide channelization for northbound right turns to operate the northbound right turn as a free right turn. Keep signalization in place at the intersection of SH 170 WBFR and Roanoke Road to provide safe gaps for the southbound traffic at the intersection. • At the intersection of SH 170 WBFR at US 377 (Main Street), the existing westbound left turn lane is approximately 280 feet long. Provide longer (1000 feet) westbound left turn lane to improve signal efficiency. • Restripe to provide two southbound left turn lanes at the intersection of SH 170 EBFR at US 377 (Main Street). • Install yield to ramp signage at the intersection of SH 170 westbound exit ramp and SH 170 WBFR 2. Warning Beacons and Signs on SH 170 main lanes and Exit Ramp Similar to Option 1,implementation of Option 2 is also expected to result in queue from US 377(Main Street)to back beyond Roanoke Road. The crest vertical curve of SH 1701imits drivers' ability to see a queue of stopped cars which creates a safety concern. Lee Engineering provides the following recommendations to address this safety concern. • Install two "CAUTION WATCH FOR SLOW TRAFFIC AHEAD" signs with flashers that are activated by vehicle queue detectors. Recommended locations far these two signs are: • 800 feet upstream of"FREEWAY ENDS '/z MILE" sign • 700 feet upstream of Roanoke Road 3. Signal Timings Following coordination patterns were used to evaluate the effects of Signal coordination. • The AM peak hour of year 2021 total conditions was evaluated with 150 seconds cycle length for the signalized intersections. • For the PM peak hour of year 2021 total conditions: o A 180 seconds cycle lengths was used for US 377 (Main Street) intersections at SH 170 frontage roads. o The intersection of Roanoke Road at SH 170 WBFR was evaluated at half cycle(90 seconds). The intersection of Roanoke Road at SH 170 EBFR was evaluated as an unsignalized intersection. LCC CI�ICII�CC�II�IC Page 4 of 6 Option 3:Without Roanoke Road link between the SH 170 frontage roads and TWSC for Roanoke Road intersections at SH 170 frontage Roads l. Intersection Improvements/Modifications Evaluated • Remove signals at the intersection of SH 170 EBFR and Roanoke Road. Provide channelization for northbound right turns to operate the northbound right turn as a free right turn. • Keep signalization in place at the intersection of SH 170 WBFR and Roanoke Road for a transition period. During this transition period flash westbound approach signals yellow and southbound approach signal red. i. Observe, delays and queue length for the southbound approach during the transition period. ii. If the southbound traffic diverts to the other roadways and delays and queue length reduces to acceptable levels then remove signals and operate the intersection as a TWSC intersection. • At the intersection of SH 170 WBFR at US 377 (Main Street), the eXisting westbound left turn lane is approximately 280 feet long. Provide longer (1000 feet) westbound left turn lane to improve signal efficiency. • Restripe to provide two southbound left turn lanes at the intersection of SH 170 EBFR at US 377 (Main Street). • Install yield to ramp signage at the intersection of SH 170 westbound exit ramp and SH 170 WBFR 2. Warning Beacons and Signs on SH 170 main lanes and Exit Ramp Implementation of Option 3 is also expected to result in queue from US 377 (Main Street) to back beyond Roanoke Road. The crest vertical curve of SH 170 limits drivers' ability to see a queue of stopped cars which creates a safety concern. Lee Engineering provides the following recommendations to address this safery concern. • Install two "CAUTION WATCH FOR SLOW TRAFFIC AHEAD" signs with flashers that are activated by vehicle queue detectors. Recommended locations for these two signs are: • 800 feet upstream of"FREEWAY ENDS '/z MILE" sign • 700 feet upstream of Roanoke Road 3. Signal Timings Following coordination patterns were used to evaluate the effects of Signal coordination. • The AM peak hour of year 2021 total conditions was evaluated with 150 seconds cycle length for the signalized intersections of US 377 (Main Street) at SH 170 frontage roads. • For the PM peak hour of year 2021 total conditions was evaluated with 180 seconds cycle length for the signalized intersections of US 377 (Main Street) at SH 170 frontage roads. Table 3 below shows pros and cons of each option. LCC CI�ICII�CC�II�IC Page 5 of 6 Table 3: Pros and Cons Alternative Pro Con • No route changes for the motorists • Highest total delay among all options Option 1 • Minimal construction/modification • Longest westbound queue is expected on efforts SH 170 • Lower total delay than Option 1 • Requires more construction/modification • Lowest total delay during the PM peak efforts compared to Option 1 hour • Rerouting is required for motorist from Option 2 • Shorter westbound queue is expected on Roanoke Road SH 170 • Lower delays at Roanoke Road intersections at SH 170 frontage roads than existin conditions • Lower total delay than Option 1 • Higher total delay compared to Option 2 • Total delay is similar to Option 2 during during the PM peak hour the AM peak hour • Requires more construction/modification • Shorter westbound queue is expected on efforts compared to Option 1 Option 3 SH 170 • Rerouting is required for motorist from Roanoke Road • Southbound traffic on Roanoke Road at SH 170 WBFR is predicted to experience excessive delay or be rerouted Should you have any questions regarding this study,please contact me at(972)248-3006. Sincerely � �='_. Hetal H Bhatt,P.E.,PTOE Proj ect Engineer Lee Engineering,LLC TBPE Firm F-450 Attachments: A 1 —Trip Generation A2—Figures A3—Synchro Reports �������������� Page 6 of 6 Attachment 1: Trip Generation Trip Generation for the Proposed Schwab Campus Land Use(ITE Land Use) ITE Code Variable(X) Average Weekday AM Peak Hour PM Peak Hour Equation/Rates Single Tenant Office Building 715 Employees Ln(T)=0.60Ln(X)+3.71 T=0.50(X)+20.20 T=0.44(X)+34.43 Directional Splits Single Tenant Office Building 715 Employees 50/50 89/11 15/85 Trips Generated Land Use Amount Variable(X) Total Enter Exit Total Enter Exit Total Enter Exit Single Tenant Offcie Building Total Trips 6660 Employees 8,042 4,021 4,021 3,350 2,982 369 2,965 445 2,520 Total Trips 8,042 4,021 4,021 3,350 2,982 369 2,965 445 2,520 Trip Generation for the Proposed Two99 Monroe Apartments Land Use(ITE Land Use) ITE Code Variable(X) Average Weekday AM Peak Hour PM Peak Hour Equation/Rates Multi-Family Housing(Mid-Rise) 221 Dwelling Units T=5.45(X)-1.75 Ln(T)=0.98 Ln(X)-0.98 Ln(T)=0.96 Ln(X)-0.63 Directional Splits Multi-Family Housing(Mid-Rise) 221 Dwelling Units 50/50 26/74 61/39 Trips Genereted Land Use Amount Variable(X) Total Enter Exit Total Enter Exit Total Enter Exit Multi-Family Housing(Mid-Rise) 307 Dwelling Units 1,671 836 836 103 27 76 130 79 51 Total Trips 1,671 836 836 103 27 76 130 79 51 Trip Generation for the Proposed Village at Roanoke Land Use(ITE Land Use) ITE Code Variable(X) Average Weekday AM Peak Hour PM Peak Hour Equation/Rates Shopping Center 820 1000 SQFT Ln(T)=0.68 Ln(X)+5.57 T=0.94(X) Ln(T)=0.74 Ln(X)+2.89 Directional Splits Shopping Center 820 1000 SQFT 50/50 62/38 48/52 Trips Generated Land Use Amount Variable(X) Total Enter Exit Total Enter Exit Total Enter Exit Shopping Center 46.55 1000 SQFT 3,574 1787 1787 44 27 17 309 148 161 Total Trips 3,574 1,787 1,787 44 27 17 309 148 161 Attachment 2: Figures � / SH 170 WB � � / Off-Ramp NOT TO SCALE � � .� � 4 Two99 Monroe Apartments a A 5 ¢,iQ- Henrietta Creek Rd 14 Parish Ln 13 Fxtension�F n� �w'��c�' � tUre) � Schwab Facility 7 ���J<¢,1 J'�' Village at Roanoke �Q 8 ,c��o� �a Q �o y. o`�` Q-`DF �.eC\ s�� o° �+ ^^o �0 �� ^^O 2 �� � � Y 3 0 � 0 ^ � � M J� 9 SH 170 W d 11 Fronta9e R 10 1��ER 12 F onta9e d LEGEND ■ STUDY LOCATIONS • CRITICAL INTERSECTIONS # COUNT LOCATION(NO#6) 3030 LBJ FREEWAY SUITE 1660 DALLAS,TEXAS75234 Vicinity Map and Study Locations Figure 1 972-248-3006 FAX 972-248-3855 �ee en��nee��n� � Notes: A$31•�Zl � _ � — N 1. Intersection may peak at different times. � � � � � � � 2. No Int.#6 1 � � � � NOT TO SCALE / tio`'y�� � � � �2 � 4 �0 2 � ^ti� I I ��\� �'°J � � 1 �s �� / � �w��' / 14 �3 5 /s� ^,����. Henrietta Creek Rd Parish Ln � � � � � \ / \ / � � i � i ���� 8 ' _ � _ � COUNT LOCATION 4 COUNT LOCATION 5 ^^h^� SH 170 WB Frontage SH 170 EB Frontage and and Main St. J T Ottinger Rd. 2 ��� � �`1' � — � � — � y � i �� � i � °_ ^��'� / ,�°'`° \ c"'v 0 3 ^�` �� � 2g � `°� � � � ��n. � / /O� � �� �29 (65) v� 9 � �' �1610(2501) � � \ \'�� � � I � ���,� .� j �100 (113) sr+�vo we 1 °/o� / � �y �/ f 11 FronlageRd \ � � I 10 � � a^ � N� � i � „'� , ...,..., � � � � �� — — �� SH1i0eRd � � Fron+ag I COUNT LOCATION 7 COUNT LOCATION 8 COUNT LOCATION 9 12 SH 170 WB Frontage Rd. SH 170 EB Frontage Rd. SH 170 WB Frontage Rd. � and Parish Ln. and Parish Ln. and Roanoke Rd. � � — � � — � � °'o �v � --� � �u=,--� � �`�', �� / M� � � ��� � �v �M �151 (52) Mo / �� \ / a�� �32 (25j � �1218(1683) �� M � "'°'� �15 48 � rn v .� 1 �273 (768) 1 �► � � 1 _ � � •J 1 �► �17 (18) � 1 � � T 224 (407) � r �. 34 (38) � '� T � 185 (92) � � r �. 2061 1585 � ._ � 35 19 � � 2866(18)72)� t � �� 23 (183))� �N � 42 (84) � �� � 72 (108) � v�� � 28(116) rn cNo %`O V / \ CO v Z � �� ro`�° � ov�°i / Mrorn � �v � vco � / � ��c� � � i \ \ � � , / COUNT LOCATION 10 COUNT LOCATION 11 COUNT LOCATION 12 COUNT LOCATION 13 COUNT LOCATION 14 SH 170 EB Frontage Rd. SH 170 EB Frontage Rd. SH 170 WB Frontage Rd. Roanoke Rd and US 377 and and Roanoke Rd. and US 377 and US 377 Parish Ln. Henrietta Creek Rd/Parish Ln. 3030 LBJ FREEWAY SUITE 1660 DALLAS,TEXAS75234 2019 Existing AM (PM) Peak Hour Traffic Volumes Figure 2 972-248-3006 FAX 972-248-3855 �ee en��nee��n� �- - - � � _ , - ,.-� -- - y �- r '• �J � �� '� iF 1- �i�+►.. i'^�f•r.- � _ .8 o i 4 3�'�iy k; � . '�•-��i�¢ � . � �.�' � 1 f��r'� . � 'rn � A". � � !r ]��, � R. 1/ 'y"� � � � � a�Y . F� ' � �� Yi-R�• t6• - -'��' .. �. �1• �yi' �..� fg � � '.��' � y 44•r � �•f B0�' .�� G '.�' d' � 'e+~ �. , y { �f, � • # Jr�yy F��`r � � �,}f� �f}R� a. ' . �}�' 1 w 5 Y��`,y1 7 fr;y 5 1` �� !. wYt+ �, r � I��� Pp �.y f t, �i. ��±*1 �G-S'-��i , �� `+ , ,R —� r.S � � g �Y�" �' '. �}�'j x�t ��iTr� •'t= �.... � {w. } 'f � � �pl�. {'A"' � .��'�`~��a r`+*•r~ � ���w ���7�JY��.YrJ y}��.�,, �I.�r'� 1�' ~ ! F .yi4:*-Qy r d.s ��~:.. � - ' � .��,� '. � ..I� _ ,�. i jr._�,.` {� �}s. � �t�,: F.'��� .� , O , �c,'- �`'' iC y* k G�' • , �� ��. _ . -�. .w.s� r�`.�' - ... � ...'�`', . +��_�: .-b. .( 4� r}.�P"'�r,` �/�* � • --' • . . ' � � rfi '�r •� 'S' ��rr �'�y°�s�.rf� � � Y�� i� G..i[��'ha "`-] �44J° ".d,+, ' -� ���qr�" .`.t��� ��f �•' ti �� I. .. I: � ��� 1.i1 n . 1�'� �' � ..J ��� � ~ M, �'} 1n' . . #�� lf� ' �•• �4 i �.' � � � ��' ..yree.� C. . G ��� �l y�ti�' 4s • - �'�'+�r.� Y .. f�-�� ' '' , - ' '.'�����l�k .�f','r y�q�� �.+�,'.' � Y ;; ,�` �� +„ •",�•'� ..+c �:.�' ��� . '.�.�_'�' � �T� �?;` . - `9, � �..� rY4� � F. t� .°'�' 3.. {y "A'y���T��Ati� � • �i ;k_ ''�" � *�1� ;:. i p -�a..`.,.-,- �` w.. �� - r._ I�1 � 's• F �rF�G,�:` '.rLk��•� � ��t ' 4 -�.-.��', w.�t.ir.,�l� w� ��'' i i � r�' '��. ��'� . - a.r y:.^l`� _ ." � -# i y .•A� �+," .�' R-� 4 " # 7 '��f,' � ri� r� � {;��.� d.• � a _ 1 `� -.� . �`..�� �'� � i . p =�.�. �c�,`��^' �,tt ,r �,� � �i��. r4 � � - f i• ,-�. „�r f-� r. �� � �'r . -�7i • �` P :� �''!��'°' T'��: arw t� T,' J�l1` � "'. ��R' ,S #` : '` .xi '• • �' �, h�° t•- � =��.�..:....�, ._,�. �` y� x �,� - - , � 1. I. I, _ ' � ' - ti. _ . '� ._.�:�-�.{� � �'�-�� � �'1'FS �`! �' '� _ , ��Y �'��_ _ A .� f... ,t,�� '� � w l ' ' y�n.`��4d1�S�l-,.�'*'y'r��Cr`�.. � ti� . r 4 � . _ � --� �R }� _ � , � , [f� 1 1 S� r ...si *� � � ,]��� ����i`i�'��ar':�?���� , r �t , -� 5�i .� t. a, . ~ � ry��.i � . •�. .4 � � ��' 5�' 4: : ; Iw f � � S• -:i ' �' : �+ -� r. H�Ly r, -' .. �� '�" 1 �`.. =' :_� ��,*�� ,'� i, . � _ia F � } � y� �Y, �(��ti ' { - !�?y�G� -e:.d,n...• f �4 .� � � Y 'y r: I a '� I 1 /� art .�'V,.�4a . 1. .� C""S '4- � �'" �? � � �� Y��{'T � �* '■ y= y �� y X IS � �5 + � a��_ 8 �!.•'� '�.ti - +4�"�GP�J rr, �r� ����}°JL��.r� , y. ���r�M'�i r �� _' .�({� ' '� 4�y� y iiS y" �,� � .�+ �__+� �'.. i ti 1 � � 'r 0 _ � _ � '�, ;hr,.�y•� _� t �;�• y � I�•e o ; ��'" }# �r �b _7 ��' �M r• '�� * �+� � w-.� �7 ��_ ' . f+�•. ��;"^iio�`�f�! ��.. �. , h �.;. .�; � �4 +-jf � ,l1 11''� } •�� - • '� 1'. v. r '� .. C _ G # �7ir,.� �. ti ,� �'4�� �a, �e.nT, 4� � i4- ! � _ • _ �. _ *�^ ��� Y��� �YSd 'ti "S' •r 1�. '�r•+q. S'. y i, .{,�.p� Ih .� 's - �-'.`e4� , '� .�,��. k i ,, ���� .?q t '.�. J� � fJ . ��'�.� +wF+, 'i4' j "�" � o� ' �� :,��� r r~{ � � yr, �i� �� � �l �, � � ��F'4~'� lr 1V��0 _ � � J4 f �• � � �� � �� F i �r f i`i.� �r4�. i- � ; `.+��, • .'r .r ��' F� '� �.�;, • _ a:�a � y� . . � � 1.� �� � '�'�■ #i:'-. ..� i,*tr�'^ti� �z . �; +�f�4 ��I��I,S.j� �� ;i-' . {���' -� ' .�'P�� � �'iY Y. �f,r� �_ _ � ��J�+� � J'�_,_w� }:Jr.._..:L.,tyrti�-", i � ' � �'�*'re e..� .,y_.���•`„}. • � � �_ ,��., . � �+ + �� '� _+Y.,In R`�Rr}. �. � ` Y..� .� � i•. �� +. ��;� ' - ry� .Y�� � �1S . .�rrir���d�w.�r�,. 2��o �i� � 'F .yay'�� „yy," # "�r 1.�.:�� ,�� .�� �eF^* ��_ � �� ..�.. ���.; .� A..�'�'�f. � �,� �..'� � •r�. '�"f ,�4 E ,.��'�-�, r ... - 1 � i� ���` � Ar■ .� rt� t � � . • '�I!' �:�� fr o �a '�� �� .! �},� . -- _ _ ..��� l��. � �.,, 0�0 �t �.` ?�,'� �' `'��� y��� . � . �k''`'r 'a � � �t- � �� - .�?.- `��s �.._ 3 2 �•*�'� e'�- - .,,�'. � "'rwF� ��"�:�r. ..��'t}�--.' :lr- � `?t i�f�� ��}f� - ..�r `� _ �;1 ._,��4 'S' k� {`Sr 7� J..,� _ ..,+ � ���'" { •'�`'� 4 .�;,:'�-.'" � x � �_`i�� �,� �_ �z . . ��� �,c�_ . :� . - . _ � ;. .'�__.. - 500/ �ry,�; n' �� �" -C'' � R{ - y , F s. ' .. . i�r� '�+ o ��c� 4� .. ,�� �� x I F- �.. �;'�.� r ; i� � ��, .� � ,�..a�: _�,; .�. �`� ; . ' .�� -�'- - � +"r'�' , -_ . " - r� -`_ - �- ,`�� 4��[� 4�. � �" � � S � � - � � i ^F � y �'� _ ' - _;y�r�. ���� J t.y{ . �M� • i �'� -- -'4. ..- 13 „ - 48'% _. '" 1�'� � � +n� � . � �j.`� ,� . y ��3�` ._� .r �.� • I � � 3 - -- w I ..,. o - �. � i4 i .'�� ��7 l4 3/� 6 � • � _ ; •',1, �� ,�. � �v .__._,__ , ,>>: � ����� ;� �. � �` �� - . _ ,'��..... , ��;:�-,�y'��r r 7,.,'� ,�.' _r � ,, « - 'B�'rr,�.�,,, � ' �a�_ . 31•.•G '� i�f�+ F i �� +1 �`�`- �� � "'��'- �~��i f I�� �I � ' ��� 'A ' ��.Aa ' . �;='.`�_�" ' - . � �� A : � � � , , S��� . � �� � �� +O� -{f . , � •� •�, , . �4�,,i �� � _-- • +r�.i �� ,` _ ' � , � ' � �'.-,.:: . � . . � � .� ,.,�� - ='_ ' • � ,f•'fl , i' k. �a �n , ;.T'� +�.�e-_' t `� 'ti �� - _ �,. h i..-S 1 . „ ';r� .:.n ` � r # �' _ _ �1 �� w �� ti��� !. � - �, �4' � k� + � ^^'. ?� � t � ; '� y- o�.-:t,�t,�.;� + 1� 4 •� �+ti, �`• n,�p • ��,.I ,�..; : � . . r � '�Ir 1 � * M ���}� ���.. #i .i �, , ••,�,r _ �• fi �" M �*���'� � ��',� �r'. . i r �.�� '�h'�F a # ."'� t �� � y i i i *�r•�!k * +a4 �1 `s�L�� r r � � - i�� : .-� �-� � - ��,.# 5�� �{ ,, r 5 yi ra S7 � . �' � � � � -' . �� w 4 � "� �i,• .R ��� F i� s � i ` r� + � + _ r � ' 9 � � � � '♦ �.*F �` +4� � '+* �+ F�t•y� �k 1 � ;� ��'�� � � �� .t' i�+r . _ a • tr ' ! � * * +*� ys �� 1 -�S i�L � 9t.i' s_..t3_,a.f :' �� � Y� Y■ � _1,. ' 1 ' -t -. . :. , ' !�+ t TM'��l��• .{�i . ��P* �d�. � � r - . T; � .>_ , W ai' �.. i �Y F i a ��►#���e'_ .. '"� �o-.. . . ,,; '�..��} + " � t i{ i 1� � r1 , 1� 15% 10% 11 ;�;. ..�,,tiJ�;�`•;.F� ' ' S - 4 � � �.,�"`�' , � �� �• 11= ' �'+,�M LEGEND ;.� •,•"•�1�n:•�� . r --1{ i �' . ` , 4 �,�_ ' * 12 � ' , • i w. , �+r �;:.,;+y'�_4�+����°� • �i �k O# Intersection Identifier, Data Collected '.M �' � . i � � � . .+;� ,�� � � . �� � o � ; - #' ' * ' ` � t� ,�1�Ii« ` � .4� �'.. 4• �� ��ti �-' � ;� : f� 2�° �. � '� _ � * ,, �� � *•• y���•' , . � t � O# Intersection Identifier (Data Not Collected, Not Part of Study) ,' k ` -�.f� o �� , �'t . L�� t�+� .•�" i'" � �; ►�+��� � p � '��i Z�O �. �• r1 �7 ��� ,�'.h � � ��i�k� `�, , 10/a �.:.;�,.„,._•- , �ti �, ,,� ,�,��� �,�'�' ��,�;,-�,�; �¢; , `+� , XX/XX AM/PM Peak-HourVolume � , � +� . r � •, / � �F `� ` �ti� ' 1 Vehicle Movement y#!rh'�� IS% �� ,-�_ � i ` i�� ti{ 1 ���� =� ; ti*�+�,�' � I � ll�,�'`• ., ' �Y, . ., + � +� ` '+�-� '�11,' � €.� �� t ,"',� • �� �+ i �ei �: h.��: s �j i �� .. _ k y� '� � � ? � - '��" - � O Distribution Percentage SCHWAB „ _.. . :�.f�, ��_w .a.�r��". ', � . .'� � .Y . ., -�".�� XX/o � Village at Roanoke (46,550 SF, LUC#710) � Charles Schwab XX% Distribution Percentage ROANOKE PROPERTIES � � Two99 Monroe Apts. (307 DU, LUC#221) Not to soaie SH 170 Speed Study, Westlake, TX General Trip Distribution Percentages Figure 3 Adjacent Developments 0 N Cb°\� NOT TO SCALE �� Ad��sh Henrietta Creek Rd Parish Ln �xt�'hsory e ��o P � a� ��s�oJ� r���\o� r� �+ ��g�J � ° �r ��,a �^��� � �� �,a �oC a�� Y ��� aFQ � 0 m ��y� oQ- ',O�(.�a � N �° 5� ^o�.�' �,�, �,�a� ^ in rn �, o �j o c �,Z, �i 0 J� �' 1 i 15% ^���� N o �—► .� � N � � � '— (5%) ' � 1 �' o\� �' �^�' ry o 50/0 � T 10% -� 5%—' oA� o ^ N o�� � LEGEND INBOUND(OUTBOUND)PERCENTAGE • CRITICAL INTERSECTION 3030 LBJ FREEWAY SUITE1660 Assumed Trip Distribution Percentages DALLAS,TEXAS75234 Figure 4A 972-248-3006 FAX972-248-3855 Roanoke Developments �ee en��nee��n� � I NOT TO SCALE � o �c�f��� � ��� Schwab Facility 3�o e S�oa� ��o 3i r��o �a� � � �i)o�J ,p .�oc oJ �� �ry�+��.�5 �� �p�J �G a ° ��° � � �a� o�o n g�2`o� �`LD\� � �� �Q � � �a Y o11 �� �cQ � � \`L�a\ �� �a l�,� a � � c / � ,/�`�, �1, ��O ^,�O�Q- M ��^o ��oc�,a J� i 10% � �_� f--(�o�io) � r-(�o%) 1 o� � r � p°�o `� � 2 10%� �' o\� O � � p N o�� � LEGEND ^ INBOUND(OUTBOUND)PERCENTAGE • CRITICAL INTERSECTION 3030 LBJ FREEWAY SUITE1660 Assumed Trip Distribution Percentages DALLAS,TEXAS 75234 F i g u re 4 B 972-248-3006 FAX972-248-3855 Schwab Development �ee en��nee��n� � � � — — � NOT TO SCALE i � / �� \ � \ / ry�o Aar� I22(S�/� \� �kf�'S onne � / �a� \ � �,p .\o� � � rs����� � � i �Q 5 !`+ NM - _ a Q � O�� ��� �� �� �� OC '� 1 �5 (11) �... ,�o �2� �n N � ,�o T � 1 � � 5� � � T a> � Y � _ � � � / � `-' (0 / \ ^ � � � \ � � M / � � 2 \ J I 2�S�/� � � ' SH 170 WB / Frontage Rd � � � � � �� � — _ � �N SH 170 EB I 1 L' Frontage Rd 3 (11)� T N � M V 1 5 (23)� t 3 (11)� � LEGEND M � AM(PM)PEAK HOUR VOLUMES • CRITICAL INTERSECTION 3030 LBJ FREEWAY SUITE1660 AM/PM Peak Hour Site Assignments DALLAS,TEXAS75234 Figure 5 972-248-3006 FAX972-248-3855 Roanoke Developments �ee en��nee��n� � � ��,----�,�. NOT TO SCALE �' �� �� i � �� � ^� � A � ari j 89 /'3J�� 6�,IA�6/ 1� �kf�s onne � 28� l \ � \rp� � V C / `p �O � , a � �� ��� r�`+��c `� e 5 t` ��----' mcc s\�o o°��Q �37 (252) ^^o �� �37 (252) �74 (504) g'r ^,�o �� (5�) -o y� � N Y ___ O i�� �� C �� / � � \\\ M � � \ / � \ J� � 8s 1 I ��3 ��g � I J�. �. �5�4 � 1 ���,r J � SH 170 WB � Frontage Rd � �' � � �� �h�� i � ti i . � � �� o �� _� u� ��-- SH 170 EB I 1 Frontage Rd �• N 596 (89) � � �n ..., N � O � � M 1 298 (45) � � �, LEGEND v m AM(PM)PEAK HOUR VOLUMES N • CRITICAL INTERSECTION 3030 LBJ FREEWAY SUITE1660 AM/PM Peak Hour Site Assignments DALLAS,TEXAS75234 Figure 6 972-248-3006 FAX972-248-3855 Schwab Development �ee en��nee��n� � I NOT TO SCALE ���---�;�� � ° ��\�� �// `O ``Lo�` \� pdr�sh i/ '�2 "�,1��`� \�� Fxfe�s,�a�� i isg � � i °n i i � �sa�i�sl i a� � 2s� � ���oc �\ i r���c5 � � �Q g /'-�- M(O �\ / a Q �C/ �� p \\ � �/ ��� �� Q- �� L 151 (52) rn o� �---�� �� a �� pc �1260 (1946) �-�- Q- o Q, .� 1 � 310 (1020) �� L 29 65 '�� � �^ � �1684 (3005) ,�+�,a�' r�'r ^�� '1 T � 1 ��o� ��ss� � ���o� �� �� •� T �, o��a �v Y ___�� C '� P� �� �\ �� vo m ^ � �� � � ,� �� � , �'�°c�� � \�� M �� � i � i s, � J� � 89 �����„ ��4 �I I 1� � �j� �spQ� �� � \\ ooy�� � � ` � � �\\ ^��� //� �� � titi i �� � N ���_�'i O� r 1 `► � � 4 (17)� � �+ �N 3462(1961)� �� 28 (116)� o� N� �O N O V� I�O 1 � N 229 (430)� t �+ 2362 (1641)� 23 (183)� �M �� AM(PM)PEAK HOUR VOLUMES 3030 LBJ FREEWAY SUITE1660 2021 Estimated Total Traffic Conditions DALLAS,TEXAS75234 Figure 7 972-248-3006 FAX972-248-3855 Future Roadway Network �ee en��nee��n� � I NOT TO SCALE _ •�� o,���� �� `� ♦ / i �(L�,�` ��\ par,s i/ ''2 �'���ry� \\� Fxfe s�n � � �64/ � �� I 1 � s�/(�s� � \�� �\ �6/ � �v.\p�` � � r���� \ � �Q Gj -h M c��o \�\\ /�� ��a ��Q �i �� L 151 (52) m ���----' � Q- �� a �� O° �1260 (1946) � Q- p � •� 1 � 505 (1363) °' �$839 (3196) ,�.����'�' r''r'� ^^� � T 'J � C����C 5� m� � O��a �v Y ___�� Mc�O N ^� �1� � // \\\ / � M � , �'��c�� �� \�� � J� �/ 89, �sj � \1 I �i���� �4 � I �� � 1��, �Soq� 1 � �,\ � / \ `�Oy4�1 � � `l, � � / � '� � / ♦� ^P�cb ,� �� �ti i � �� 3533(2037)� � �� 132 (391)� N rn� W O N V M I� 1 `+ N 233 (447) � t �+ 2359 (1630)� 23 (183) � �M �� AM(PM)PEAK HOUR VOLUMES 3030 LBJ FREEWAY SUITE1660 2021 Estimated Total Traffic Conditions DALLAS,TEXAS75234 Figure 8 972-248-3006 FAX972-248-3855 With Roanoke Improvements �ee en��nee��n� Attachment 3: Synchro Outputs Timings 2019 Existing Timings 2019 Existing 9:Roanoke Rd&SH 170 WBFR aM Peak Hour 10:Roanoke Rd&SH 170 EBFR aM Peak Hour ~ �, T 1 � l T � 1 Lane Group WBT NBL NBT SBT 05 06 08 Lane Group EBT EBR NBT SBL SBT 01 02 04 Lane Configurations r'{'�'� r� '� Lane Configurations r'{'� � '� r� Traffc Volume(vph) 1610 48 47 64 Traffc Volume(vph) 2866 28 71 48 95 Future Volume(vph) 1610 48 47 64 Future Volume(vph) 2866 28 71 48 95 Turn Type NA D.P+p NA NA = Turn Type NA Perm NA D.P+p NA � Protected Phases 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 1 1 2 2 Detector Phase 8 8 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 10.0 5A 5A 5A 5.0 10.0 Mlnimum Initial(s) 10.0 10A 5A 5A 5A 5.0 10.0 Minimum Split(s) 17.0 11.0 11.0 11.0 11.0 17.0 - Minimum Split(s) 17.0 17.0 11.0 11.0 11.0 11.0 17.0 - Total Split(s) 67.0 31.0 36.0 31.0 36.0 67.0 Total Split(s) 67.0 67.0 36.0 31.0 31.0 36.0 67.0 TotalSplit(%) 50.0% 23.1% 26.9% 23% 27% 50% - TotalSplit(%) 50.0% 50.0% 26.9% 23.1% 23% 27% 50% - Yellow Time(s) 5.0 4.0 4.0 4.0 4.0 5.0 Yellow Time(s) 5.0 5.0 4.0 4.0 4.0 4.0 5 0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 - All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 - Lost Tlme Atljust(s) 0.0 0.0 Lost Tlme Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 7.0 6.0 - Total Lost Time(s) 7.0 7.0 6.0 - LeadlLag Lead Lag Lead Lag LeadlLag Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes - Lead-Lag Optimize? Yes Yes Yes Yes - Recall Mode None None None None None None Recall Mode None None None None None None None Act Effct Green(s) 60.3 22.5 14.4 - Act Effct Green(s) 60.3 60.3 12.7 22.5 - Actuated g/C Ratio 0.59 022 0.14 Actuated g/C Ratio 0.59 0.59 0.12 022 v/c Ratio 0.67 0.30 0.31 � v/c Ratio 1.41 0.03 0.80 0.48 � Conhol Delay 16.5 30.4 40.6 Conhol Delay 210.8 0.1 51.3 32.0 Queue Delay 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 16.5 30.4 40.6 Total Delay 210.8 0.1 51.3 32.0 LOS B C D LOS F A D C Approach Delay 16.5 30.4 40.6 Approach Delay 2087 51.3 32.0 Approach LOS B C D Approach LOS F D C Intersection Summary Intersection Summary Cycle Length:134 Cycle Length:134 Actuated Cycle Length:101.9 Actuated Cycle Length:101.9 Natural Cycle:150 Natural Cycle:150 Control Type:Actuated-Uncoordinated Control Type:Actuated-Uncoordinated Maximum v/c Ratio:1.41 - Maximum v/c Ratio:1.41 - Intersection Signal Delay:18.1 Intersection LOS:B Intersection Signal Delay:190.8 Intersection LOS:F Intersection Capacity Utilization 56.4% ICU Level of Service B Intersection Capacity Utilization 115.1% ICU Level of Service H Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 9:Roanoke Rd&SH 170 WBFR Splits and Phases: 10,Roanoke Rd&SH 170 EBFR �9 �9 �9 �9 �9 �9 �T�� 1T�z r�4 �T�� 1T�z r�4 T�o ��Io* ��o T�o ��Io* ��o �5 +I L36 1438 �5 +I L36 1438 Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12019 Existing AMsyn H:1T1566.10-New SH170 main lane speed studylSynchro12019 Existing AMsyn Timings 2019 Existing Timings 2019 Existing 11:US 377&SH 170 WBFR AM Peak Hour 12:US 377&SH 170 EBFR AM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 05 06 08 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � � '�'� Traffc Volume(vph) 273 1218 138 645 313 190 Traffc Volume(vph) 224 2061 486 676 109 431 Future Volume(vph) 273 1218 138 645 313 190 Future Volume(vph) 224 2061 486 676 109 431 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 4 1 1 2 2 2 Detector Phase 8 8 6 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 5A 5A 5A 5.0 5.0 5.0 5.0 5.0 Mlnimum Initial(s) 5A 5A 5A 5A 5A 5.0 5.0 5.0 Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Total Split(s) 48.0 48.0 38.0 48.0 48.0 38.0 48.0 48.0 Total Split(s) 48.0 48.0 48.0 48.0 38.0 38.0 48.0 48.0 TotalSplit(%) 35.8% 35.8% 28.4% 35.8% 35.8% 28% 36% 36% - TotalSplit(%) 35.8% 35.8% 35.8% 35.8% 28.4% 28% 36% 36% - Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - LeadlLag Lead Lag Lag Lead Lag LeadlLag Lag Lag Lead Lead Lag Lead-Lag Optimize? - Lead-Lag Optimize? - Recall Mode None None None None None None None None Recall Mode None None None None None None None None Act Effct Green(s) 40.2 40.2 20.3 40.8 12.5 12.5 - Act Effct Green(s) 40.2 40.2 20.1 20.1 12.7 40.8 - Actuated g/C Ratio 0.41 0.41 021 0.42 0.13 0.13 Actuated g/C Ratio 0.41 0.41 021 021 0.13 0.42 v/c Ratio 0.45 0.82 0.43 0.50 0.55 0.59 ' v/c Ratio 0.33 1.10 0.82 0.73 0.49 0.30 ' Conhol Delay 24.9 30.3 54.0 18.6 43.3 16.1 Conhol Delay 22.8 80.6 37.8 20.8 56.1 19.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 24.9 30.3 54.0 18.6 43.3 16.1 Total Delay 22.8 80.6 37.8 20.8 56.1 19.4 LOS C C D B D B LOS C F D C E B Approach Delay 29.5 24.8 33.0 Approach Delay 75.6 32.9 26.8 Approach LOS C C C Approach LOS E C C Intersection Summary Intersection Summary Cycle Length:134 Cycle Length:134 Actuated Cycle Length:97.1 Actuated Cycle Length:97.1 Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Uncoordinated Control Type:Actuated-Uncoordinated Maximum v/c Ratio:1.10 - Maximum v/c Ratio:1.10 - Intersection Signal Delay:28.8 Intersection LOS:C Intersection Signal Delay:567 Intersection LOS:E Intersection Capacity Utilization 87.6% ICU Level of Service E Intersection Capacity Utilization 87.6% ICU Level of Service E Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 11,US 377&SH 170 WBFR Splits and Phases: 12,US 377&SH 170 EBFR �11 =t1 =11 =11 �t1 =11 �T�� lt�z �4 �T�� lt�z �4 ��z ��Iz* ��z ��z ��Iz* ��z �L35 +I L36 �L38 �L35 +I L36 �L38 Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12019 Existing AMsyn H:1T1566.10-New SH170 main lane speed studylSynchro12019 Existing AMsyn Timings 2019 Existing Timings 2019 Existing 9:Roanoke Rd&SH 170 WBFR PM Peak Hour 10:Roanoke Rd&SH 170 EBFR PM Peak Hour ~ �, T 1 � l T � 1 Lane Group WBT NBL NBT SBT 05 06 08 Lane Group EBT EBR NBT SBL SBT 01 02 04 Lane Configurations r'{'�'� r� '� Lane Configurations r'{'� � '� r� Traffc Volume(vph) 2501 28 85 125 Traffc Volume(vph) 1872 116 99 25 220 Future Volume(vph) 2501 28 85 125 Future Volume(vph) 1872 116 99 25 220 Turn Type NA D.P+p NA NA = Turn Type NA Perm NA D.P+p NA � Protected Phases 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 1 1 2 2 Detector Phase 8 8 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 10.0 5A 5A 5A 5.0 10.0 Mlnimum Initial(s) 10.0 10A 5A 5A 5A 5.0 10.0 Minimum Split(s) 17.0 11.0 11.0 11.0 11.0 17.0 - Minimum Split(s) 17.0 17.0 11.0 11.0 11.0 11.0 17.0 - Total Split(s) 67.0 31.0 36.0 31.0 36.0 67.0 Total Split(s) 67.0 67.0 36.0 31.0 31.0 36.0 67.0 TotalSplit(%) 50.0% 23.1% 26.9% 23% 27% 50% - TotalSplit(%) 50.0% 50.0% 26.9% 23.1% 23% 27% 50% - Yellow Time(s) 5.0 4.0 4.0 4.0 4.0 5.0 Yellow Time(s) 5.0 5.0 4.0 4.0 4.0 4.0 5 0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 - All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 - Lost Tlme Atljust(s) 0.0 0.0 Lost Tlme Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 7.0 6.0 - Total Lost Time(s) 7.0 7.0 6.0 - LeadlLag Lead Lag Lead Lag LeadlLag Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes - Lead-Lag Optimize? Yes Yes Yes Yes - Recall Mode None None None None None None Recall Mode None None None None None None None Act Effct Green(s) 60.5 33.1 24.7 - Act Effct Green(s) 60.5 60.5 18.1 33.1 - Actuated g/C Ratio 0.54 029 022 Actuated g/C Ratio 0.54 0.54 0.16 029 v/c Ratio 1.04 023 0.34 � v/c Ratio 1.03 0.14 0.85 0.50 � Conhol Delay 55.8 22.5 38.5 Conhol Delay 56.4 7.8 597 22.2 Queue Delay 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 55.8 22.5 38.5 Total Delay 56.4 7.8 597 222 LOS E C D LOS E A E C Approach Delay 55.8 22.5 38.5 Approach Delay 53.6 597 22.2 Approach LOS E C D Approach LOS D E C Intersection Summary Intersection Summary Cycle Length:134 Cycle Length:134 Actuated Cycle Length:112.8 Actuated Cycle Length:112.8 Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Uncoordinated Control Type:Actuated-Uncoordinated Maximum v/c Ratio:1.04 - Maximum v/c Ratio:1.04 - Intersection Signal Delay:537 Intersection LOS:D Intersection Signal Delay:51.1 Intersection LOS:D Intersection Capacity Utilization 81.0% ICU Level of Service D Intersection Capacity Utilization 95.2% ICU Level of Service F Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 9:Roanoke Rd&SH 170 WBFR Splits and Phases: 10,Roanoke Rd&SH 170 EBFR �9 �9 �9 �9 �9 �9 �T�� 1T�z r�4 �T�� 1T�z r�4 T�o ��Io* ��o T�o ��Io* ��o �5 +I L36 1438 �5 +I L36 1438 Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12019 Existing PMsyn H:1T1566.10-New SH170 main lane speed studylSynchro12019 Existing PMsyn Timings 2019 Existing Timings 2019 Existing 11:US 377&SH 170 WBFR PM Peak Hour 12:US 377&SH 170 EBFR PM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 05 06 08 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � � '�'� Traffc Volume(vph) 768 1683 148 677 586 319 Traffc Volume(vph) 407 1585 401 289 124 1154 Future Volume(vph) 768 1683 148 677 586 319 Future Volume(vph) 407 1585 401 289 124 1154 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 4 1 1 2 2 2 Detector Phase 8 8 6 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 5A 5A 5A 5.0 5.0 5.0 5.0 5.0 Mlnimum Initial(s) 5A 5A 5A 5A 5A 5.0 5.0 5.0 Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Total Split(s) 48.0 48.0 38.0 48.0 48.0 38.0 48.0 48.0 Total Split(s) 48.0 48.0 48.0 48.0 38.0 38.0 48.0 48.0 TotalSplit(%) 35.8% 35.8% 28.4% 35.8% 35.8% 28% 36% 36% - TotalSplit(%) 35.8% 35.8% 35.8% 35.8% 28.4% 28% 36% 36% - Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - LeadlLag Lead Lag Lag Lead Lag LeadlLag Lag Lag Lead Lead Lag Lead-Lag Optimize? - Lead-Lag Optimize? - Recall Mode None None None None None None None None Recall Mode None None None None None None None None Act Effct Green(s) 40.1 40.1 19.6 54.1 26.5 26.5 - Act Effct Green(s) 40.1 40.1 16.5 16.5 29.6 54.1 - Actuated g/C Ratio 0.36 0.36 0.18 0.49 024 024 Actuated g/C Ratio 0.36 0.36 0.15 0.15 027 0.49 v/c Ratio 1.15 1.15 0.50 0.41 0.50 0.64 ' v/c Ratio 0.69 1.09 0.74 0.48 027 0.69 ' Conhol Delay 122.0 108.3 52.2 21.3 38.3 22.4 Conhol Delay 38.5 84.8 46.1 11.2 47.9 22.5 Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 122.0 108.3 522 21.4 38.3 22.4 Total Delay 38.5 84.8 46.1 112 47.9 22.6 LOS F F D C D C LOS D F D B D C Approach Delay 1117 27.0 327 Approach Delay 77.0 38.0 25.0 Approach LOS F C C Approach LOS E D C Intersection Summary Intersection Summary Cycle Length:134 Cycle Length:134 Actuated Cycle Length:110.2 Actuated Cycle Length:110.2 Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Uncoordinated Control Type:Actuated-Uncoordinated Maximum v/c Ratio:1.15 - Maximum v/c Ratio:1.15 - Intersection Signal Delay:78.3 Intersection LOS:E Intersection Signal Delay:54.5 Intersection LOS:D Intersection Capacity Utilization 1172% ICU Level of Service H Intersection Capacity Utilization 1172% ICU Level of Service H Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 11,US 377&SH 170 WBFR Splits and Phases: 12,US 377&SH 170 EBFR �11 =t1 =11 =11 �t1 =11 �T�� lt�z �4 �T�� lt�z �4 ��z ��Iz* ��z ��z ��Iz* ��z �L35 +I L36 �L38 �L35 +I L36 �L38 Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12019 Existing PMsyn H:1T1566.10-New SH170 main lane speed studylSynchro12019 Existing PMsyn Timings 2021 Total Option 1 Timings 2021 Total Option 1 9:Roanoke Rd&SH 170 WBFR aM Peak Hour 10:Roanoke Rd&SH 170 EBFR aM Peak Hour ~ �, T 1 � l T � 1 Lane Group WBT NBL NBT SBT 05 06 08 Lane Group EBT EBR NBT SBL SBT 01 02 04 Lane Configurations r'{'�'� r� '� Lane Configurations r'{'� � '� r� Traffc Volume(vph) 1684 48 51 88 Traffc Volume(vph) 3462 28 72 70 104 Future Volume(vph) 1684 48 51 88 Future Volume(vph) 3462 28 72 70 104 Turn Type NA D.P+p NA NA = Turn Type NA Perm NA D.P+p NA � Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 2 - Permitted Phases 8 6 - Detector Phase 4 1 1 2 2 Detector Phase 8 8 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 10.0 5A 5A 5A 5.0 10.0 Mlnimum Initial(s) 10.0 10A 5A 5A 5A 5.0 10.0 Minimum Split(s) 17.0 11.0 11.0 11.0 11.0 17.0 - Minimum Split(s) 17.0 17.0 11.0 11.0 11.0 11.0 17.0 - Total Split(s) 67.0 31.0 36.0 31.0 36.0 67.0 Total Split(s) 67.0 67.0 36.0 31.0 31.0 36.0 67.0 TotalSplit(%) 50.0% 23.1% 26.9% 23% 27% 50% - TotalSplit(%) 50.0% 50.0% 26.9% 23.1% 23% 27% 50% - Yellow Time(s) 5.0 4.0 4.0 4.0 4.0 5.0 Yellow Time(s) 5.0 5.0 4.0 4.0 4.0 4.0 5 0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 - All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 - Lost Tlme Atljust(s) 0.0 0.0 Lost Tlme Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 7.0 6.0 - Total Lost Time(s) 7.0 7.0 6.0 - LeadlLag Lead Lag Lead Lag LeadlLag Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes - Lead-Lag Optimize? Yes Yes Yes Yes - Recall Mode None None None None None None Recall Mode None None None None None None None Act Effct Green(s) 60.4 27.1 18.9 - Act Effct Green(s) 60.4 60.4 15.8 27.1 - Actuated g/C Ratio 0.57 025 0.18 Actuated g/C Ratio 0.57 0.57 0.15 025 v/c Ratio 0.73 028 0.35 � v/c Ratio 1.78 0.03 0.85 0.65 � Conhol Delay 20.5 26.5 39.6 Conhol Delay 376.1 0.1 52.0 41.8 Queue Delay 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 20.5 26.5 39.6 Total Delay 376.1 0.1 52.0 41.8 LOS C C D LOS F A D D Approach Delay 20.5 26.5 39.6 Approach Delay 373.1 52.0 41.8 Approach LOS C C D Approach LOS F D D Intersection Summary Intersection Summary Cycle Length:134 Cycle Length:134 Actuated Cycle Length:1067 Actuated Cycle Length:1067 Natural Cycle:150 Natural Cycle:150 Control Type:Actuated-Uncoordinated Control Type:Actuated-Uncoordinated Maximum v/c Ratio:1.78 - Maximum v/c Ratio:1.78 - Intersection Signal Delay:217 Intersection LOS:C Intersection Signal Delay:336.4 Intersection LOS:F Intersection Capacity Utilization 58.2% ICU Level of Service B Intersection Capacity Utilization 137.1% ICU Level of Service H Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 9:Roanoke Rd&SH 170 WBFR Splits and Phases: 10,Roanoke Rd&SH 170 EBFR �9 �9 �9 �9 �9 �9 �T�� 1T�z 7�4 �T�� 1T�z 7�4 T�o ��Io* ��o T�o ��Io* ��o �5 +I L36 1438 �5 +I L36 1438 Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 1 WithExisting Timingsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 1 WithExisting Timingsyn Timings 2021 Total Option 1 Timings 2021 Total Option 1 11:US 377&SH 170 WBFR AM Peak Hour 12:US 377&SH 170 EBFR AM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 05 06 08 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � � '�'� Traffc Volume(vph) 310 1260 138 659 327 199 Traffc Volume(vph) 229 2362 494 974 109 482 Future Volume(vph) 310 1260 138 659 327 199 Future Volume(vph) 229 2362 494 974 109 482 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 4 1 1 2 2 2 Detector Phase 8 8 6 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 5A 5A 5A 5.0 5.0 5.0 5.0 5.0 Mlnimum Initial(s) 5A 5A 5A 5A 5A 5.0 5.0 5.0 Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Total Split(s) 48.0 48.0 38.0 48.0 48.0 38.0 48.0 48.0 Total Split(s) 48.0 48.0 48.0 48.0 38.0 38.0 48.0 48.0 TotalSplit(%) 35.8% 35.8% 28.4% 35.8% 35.8% 28% 36% 36% - TotalSplit(%) 35.8% 35.8% 35.8% 35.8% 28.4% 28% 36% 36% - Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - LeadlLag Lead Lag Lag Lead Lag LeadlLag Lag Lag Lead Lead Lag Lead-Lag Optimize? - Lead-Lag Optimize? - Recall Mode None None None None None None None None Recall Mode None None None None None None None None Act Effct Green(s) 40.4 40.4 20.9 51.9 23.0 23.0 - Act Effd Green(s) 40.4 40.4 30.0 30.0 13.8 51.9 - Actuated g/C Ratio 0.37 0.37 0.19 0.48 021 021 Actuated g/C Ratio 0.37 0.37 028 028 0.13 0.48 v/c Ratio 0.56 0.94 0.47 0.45 0.35 0.47 ' v/c Ratio 0.37 1.39 0.91dr 0.90 0.50 029 ' Conhol Delay 34.4 45.3 60.3 16.5 37.0 12.0 Conhol Delay 29.9 207.4 31.8 39.9 61.0 17.3 Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 34.4 45.3 60.3 16.6 37.0 12.0 Total Delay 29.9 207.4 31.8 39.9 61.0 17.3 LOS C D E B D B LOS C F C D E B Approach Delay 43.5 24.2 27.6 Approach Delay 193.5 34.5 25.4 Approach LOS D C C Approach LOS F C C Intersection Summary Intersection Summary Cycle Length:134 Cycle Length:134 Actuated Cycle Length:108.5 Actuated Cycle Length:108.5 Natural Cycle:110 Natural Cycle:110 Control Type:Actuated-Uncoordinated Control Type:Actuated-Uncoordinated Maximum v/c Ratio:1.39 - Maximum v/c Ratio:1.39 - Intersection Signal Delay:357 Intersection LOS:D Intersection Signal Delay:122.3 Intersection LOS:F Intersection Capacity Utilization 104.3% ICU Level of Service G Intersection Capacity Utilization 104.3% ICU Level of Service G Analysis Period(min)15 Analysis Period(min)15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: 11,US 377&SH 170 WBFR ^11 ❑u ❑11 Splits and Phases: 12�.US 377&SH 170 EBFR �T�� lt�z �4 �=��� �it�z ��4 ��z ��Iz* ��z �L35 +I p6 �y3g -12 -lI2* -12 �L35 +I�L36 �L38 Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 1 WithExisting Timingsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 1 WithExisting Timingsyn Timings 2021 Total Option 1 Timings 2021 Total Option 1 9:Roanoke Rd&SH 170 WBFR PM Peak Hour 10:Roanoke Rd&SH 170 EBFR PM Peak Hour ~ �, T 1 � l T � 1 Lane Group WBT NBL NBT SBT 05 06 08 Lane Group EBT EBR NBT SBL SBT 01 02 04 Lane Configurations r'{'�'� r� '� Lane Configurations r'{'� � '� r� Traffc Volume(vph) 3005 28 101 180 Traffc Volume(vph) 1961 116 104 76 275 Future Volume(vph) 3005 28 101 180 Future Volume(vph) 1961 116 104 76 275 Turn Type NA D.P+p NA NA = Turn Type NA Perm NA D.P+p NA � Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 2 - Permitted Phases 8 6 - Detector Phase 4 1 1 2 2 Detector Phase 8 8 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 10.0 5A 5A 5A 5.0 10.0 Mlnimum Initial(s) 10.0 10A 5A 5A 5A 5.0 10.0 Minimum Split(s) 17.0 11.0 11.0 11.0 11.0 17.0 - Minimum Split(s) 17.0 17.0 11.0 11.0 11.0 11.0 17.0 - Total Split(s) 67.0 31.0 36.0 31.0 36.0 67.0 Total Split(s) 67.0 67.0 36.0 31.0 31.0 36.0 67.0 TotalSplit(%) 50.0% 23.1% 26.9% 23% 27% 50% - TotalSplit(%) 50.0% 50.0% 26.9% 23.1% 23% 27% 50% - Yellow Time(s) 5.0 4.0 4.0 4.0 4.0 5.0 Yellow Time(s) 5.0 5.0 4.0 4.0 4.0 4.0 5 0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 - All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 - Lost Tlme Atljust(s) 0.0 0.0 Lost Tlme Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 7.0 6.0 - Total Lost Time(s) 7.0 7.0 6.0 - LeadlLag Lead Lag Lead Lag LeadlLag Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes - Lead-Lag Optimize? Yes Yes Yes Yes - Recall Mode None None None None None None Recall Mode None None None None None None None Act Effct Green(s) 60.5 40.5 31.3 - Act Effd Green(s) 60.5 60.5 19.9 40.5 - Actuated g/C Ratio 0.50 0.34 026 Actuated g/C Ratio 0.50 0.50 0.17 0.34 v/c Ratio 1.34 023 0.43 � v/c Ratio 1.16 0.15 0.87 0.82 � Conhol Delay 181.8 22.1 38.8 Conhol Delay 106.8 9.1 64.5 44.8 Queue Delay 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.6 Total Delay 181.8 22.1 38.8 Total Delay 106.8 9.1 64.5 45.4 LOS F C D LOS F A E D Approach Delay 181.8 22.1 38.8 Approach Delay 101.4 64.5 45.4 Approach LOS F C D Approach LOS F E D Intersection Summary Intersection Summary Cycle Length:134 Cycle Length:134 Actuated Cycle Length:120.1 Actuated Cycle Length:120.1 Natural Cycle:130 Natural Cycle:130 Control Type:Actuated-Uncoordinated Control Type:Actuated-Uncoordinated Maximum v/c Ratio:1.34 - Maximum v/c Ratio:1.34 - Intersection Signal Delay:168.1 Intersection LOS:F Intersection Signal Delay:90.4 Intersection LOS:F Intersection Capacity Utilization 96.1% ICU Level of Service F Intersection Capacity Utilization 1052% ICU Level of Service G Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 9:Roanoke Rd&SH 170 WBFR Splits and Phases: 10,Roanoke Rd&SH 170 EBFR �9 �9 �9 �9 �9 �9 �T�� 1T�z 7�4 �T�� 1T�z 7�4 T�o ��Io* ��o T�o ��Io* ��o �5 +I L36 1438 �5 +I L36 1438 Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 1 With existing timingsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 1 With existing timingsyn Timings 2021 Total Option 1 Timings 2021 Total Option 1 11:US 377&SH 170 WBFR PM Peak Hour 12:US 377&SH 170 EBFR PM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 05 06 08 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � � '�'� Traffc Volume(vph) 1020 1946 148 734 618 340 Traffc Volume(vph) 430 1641 435 334 124 1438 Future Volume(vph) 1020 1946 148 734 618 340 Future Volume(vph) 430 1641 435 334 124 1438 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 4 1 1 2 2 2 Detector Phase 8 8 6 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 5A 5A 5A 5.0 5.0 5.0 5.0 5.0 Mlnimum Initial(s) 5A 5A 5A 5A 5A 5.0 5.0 5.0 Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Total Split(s) 48.0 48.0 38.0 48.0 48.0 38.0 48.0 48.0 Total Split(s) 48.0 48.0 48.0 48.0 38.0 38.0 48.0 48.0 TotalSplit(%) 35.8% 35.8% 28.4% 35.8% 35.8% 28% 36% 36% - TotalSplit(%) 35.8% 35.8% 35.8% 35.8% 28.4% 28% 36% 36% - Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - LeadlLag Lead Lag Lag Lead Lag LeadlLag Lag Lag Lead Lead Lag Lead-Lag Optimize? - Lead-Lag Optimize? - Recall Mode None None None None None None None None Recall Mode None None None None None None None None Act Effct Green(s) 40.2 40.2 21.3 63.4 34.1 34.1 - Act Effct Green(s) 40.2 40.2 25.1 25.1 30.2 63.4 - Actuated g/C Ratio 0.34 0.34 0.18 0.53 028 028 Actuated g/C Ratio 0.34 0.34 021 021 025 0.53 v/c Ratio 1.51 1.50 0.50 0.41 0.45 0.61 ' v/c Ratio 0.79 122 0.60 0.43 029 0.80 ' Conhol Delay 271.1 259.4 56.3 19.1 36.3 21.6 Conhol Delay 50.0 139.1 39.5 8.1 47.8 26.3 Queue Delay 0.7 0.1 0.0 02 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 02 Total Delay 271.8 259.5 56.3 19.3 36.3 21.6 Total Delay 50.0 139.1 39.5 8.1 47.8 26.5 LOS F F E B D C LOS D F D A D C Approach Delay 262.5 25.5 31.1 Approach Delay 123.8 32.3 28.2 Approach LOS F C C Approach LOS F C C Intersection Summary Intersection Summary Cycle Length:134 Cycle Length:134 Actuated Cycle Length:1197 Actuated Cycle Length:1197 Natural Cycle:140 Natural Cycle:140 Control Type:Actuated-Uncoordinated Control Type:Actuated-Uncoordinated Maximum v/c Ratio:1.51 - Maximum v/c Ratio:1.51 - Intersection Signal Delay:173.8 Intersection LOS:F Intersection Signal Delay:75.9 Intersection LOS:E Intersection Capacity Utilization 1292% ICU Level of Service H Intersection Capacity Utilization 1292% ICU Level of Service H Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 11,US 377&SH 170 WBFR Splits and Phases: 12,US 377&SH 170 EBFR �11 =t1 =11 =11 �t1 =11 �T�� lt�z �4 �T�� lt�z �4 ��z ��Iz* ��z ��z ��Iz* ��z �L35 +I L36 �L38 �L35 +I L36 �L38 Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 1 With existing timingsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 1 With existing timingsyn Timings 2021 Total Option 1 Timings 2021 Total Option 1 9:Roanoke Rd&SH 170 WBFR aM Peak Hour 10:Roanoke Rd&SH 170 EBFR aM Peak Hour ~ �, T 1 � l T � 1 Lane Group WBT NBL NBT SBT 05 06 08 Lane Group EBT EBR NBT SBL SBT 01 02 04 Lane Configurations r'{'�'� r� '� Lane Configurations r'{'� � '� r� Traffc Volume(vph) 1684 48 51 88 Traffc Volume(vph) 3462 28 72 70 104 Future Volume(vph) 1684 48 51 88 Future Volume(vph) 3462 28 72 70 104 Turn Type NA D.P+p NA NA = Turn Type NA Perm NA D.P+p NA � Protected Phases 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 1 1 2 2 Detector Phase 8 8 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 10.0 5A 5A 5A 5.0 10.0 Mlnimum Initial(s) 10.0 10A 5A 5A 5A 5.0 10.0 Minimum Split(s) 17.0 11.0 11.0 11.0 11.0 17.0 - Minimum Split(s) 17.0 17.0 11.0 11.0 11.0 11.0 17.0 - Total Split(s) 114.0 13.0 23.0 13.0 23.0 114.0 Total Split(s) 114.0 114.0 23.0 13.0 13.0 23.0 114.0 TotalSplit(%) 76.0% 8.7% 15.3% 9% 15% 76% - TotalSplit(%) 76.0% 76.0% 15.3% 8.7% 9% 15% 76% - Yellow Time(s) 5.0 4.0 4.0 4.0 4.0 5.0 Yellow Time(s) 5.0 5.0 4.0 4.0 4.0 4.0 5 0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 - All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 - Lost Tlme Atljust(s) 0.0 0.0 Lost Tlme Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 7.0 6.0 - Total Lost Time(s) 7.0 7.0 6.0 - LeadlLag Lead Lag Lead Lag LeadlLag Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes - Lead-Lag Optimize? Yes Yes Yes Yes - Recall Mode C-Max None None None None C-Max Recall Mode C-Max C-Max None None None None C-Max Act Effct Green(s) 107.0 24.0 17.1 - Act Effct Green(s) 107.0 107.0 17.0 24.0 - Actuated g/C Ratio 071 0.16 0.11 Actuated g/C Ratio 071 071 0.11 0.16 v/c Ratio 0.58 0.51 0.54 � v/c Ratio 1.42 0.03 1.37 1.50 � Conhol Delay 107 56.3 71.4 Conhol Delay 207.1 0.0 236.9 305.2 Queue Delay 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 107 56.3 71.4 Total Delay 207.1 0.0 236.9 3052 LOS B E E LOS F A F F Approach Delay 107 56.3 71.4 Approach Delay 205.5 236.9 305.2 Approach LOS B E E Approach LOS F F F Intersection Summary Intersection Summary Cycle Length:150 Cycle Length:150 Actuated Cycle Length:150 Actuated Cycle Length:150 Offset:13(9%),Referenced to phase 4:WBTL and 8;Start of Green Offset:13(9%),Referenced to phase 4:WBTL and 8;Start of Green Natural Cycle:150 Natural Cycle:150 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Maximum v/c Ratio�,1.50 Maximum v/c Ratio�,1.50 Intersection Signal Delay:15.9 Intersection LOS:B Intersection Signal Delay:212.0 Intersection LOS:F Intersection Capacity Utilization 582% ICU Level of Service B Intersection Capacity Utilization 137.1% ICU Level of Service H Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 9:Roanoke Rd&SH 170 WBFR Splits and Phases: 10�.Roanoke Rd&SH 170 EBFR =9 =9 =9 =9 =9 =9 �T�� lT�z ��4 �T�� lT�z ��4 ��o ��o ��o ��o ��o ��o l�5 1T�� �8 l�5 1T�� �8 Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 1 With Coordinationsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 1 With Coordinationsyn Timings 2021 Total Option 1 Timings 2021 Total Option 1 11:US 377&SH 170 WBFR AM Peak Hour 12:US 377&SH 170 EBFR AM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 05 06 08 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � � '�'� Traffc Volume(vph) 310 1260 138 659 327 199 Traffc Volume(vph) 229 2362 494 974 109 482 Future Volume(vph) 310 1260 138 659 327 199 Future Volume(vph) 229 2362 494 974 109 482 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 4 1 1 2 2 2 Detector Phase 8 8 6 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 5A 5A 5A 5.0 5.0 5.0 5.0 5.0 Mlnimum Initial(s) 5A 5A 5A 5A 5A 5.0 5.0 5.0 Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Total Split(s) 82.0 82.0 35.0 33.0 33.0 25.0 43.0 82.0 Total Split(s) 82.0 82.0 43.0 43.0 25.0 35.0 33.0 82.0 TotalSplit(%) 54.7% 54.7% 23.3% 22.0% 22.0% 17% 29% 55% - TotalSplit(%) 54.7% 54.7% 28.7% 28.7% 16.7% 23% 22% 55% - Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - LeadlLag Lead Lag Lag Lead Lag LeadlLag Lag Lag Lead Lead Lag Lead-Lag Optimize? - Lead-Lag Optimize? - Recall Mode None None None None None None None C-Max Recall Mode C-Max C-Max None None None None None None Act Effct Green(s) 74.0 74.0 26.0 60.0 26.0 26.0 - Act Effct Green(s) 74.0 74.0 35.5 35.5 16.5 60.0 - Actuated g/C Ratio 0.49 0.49 0.17 0.40 0.17 0.17 Actuated g/C Ratio 0.49 0.49 024 024 0.11 0.40 v/c Ratio 0.43 0.71 0.52 0.53 0.43 0.57 ' v/c Ratio 0.28 1.05 1.26dr 127 0.58 0.35 ' Conhol Delay 25.0 27.5 90.6 297 57.4 257 Conhol Delay 237 697 66.6 178.3 907 26.9 Queue Delay 0.0 0.0 0.0 0.7 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 25.0 27.5 90.6 30.3 57.4 257 Total Delay 237 697 66.6 178.3 907 26.9 LOS C C F C E C LOS C E E F F C Approach Delay 27.1 40.8 45.4 Approach Delay 66.1 103.6 387 Approach LOS C D D Approach LOS E F D Intersection Summary Intersection Summary Cycle Length:150 Cycle Length:150 Actuated Cycle Length:150 Actuated Cycle Length:150 Offset:0(0%),Referenced to phase 3:and 8:EBTL,Start of Green Offset:0(0%),Referenced to phase 3:and 8:EBTL,Start of Green Natural Cycle:110 Natural Cycle:110 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Maximum v/c Ratio�,1.27 Maximum v/c Ratio�,1.27 Intersection Signal Delay:33.8 Intersection LOS:C Intersection Signal Delay:74.4 Intersection LOS:E Intersection Capacity Utilization 1043% ICU Level of Service G Intersection Capacity Utilization 1043% ICU Level of Service G Analysis Period(min)15 Analysis Period(min)15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: 11�.US 377&SH 170 WBFR -11 �11 ❑11 Splits and Phases: 12�.US 377&SH 170 EBFR �T�� lT�z �4 -�� ��� ��� �T�� 1T�z �4 ��z ��z ��z � �635 1T66 �p8'R'� -12 =1I2* -12 �s35 +I65 �s38 3s Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 1 With Coordinationsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 1 With Coordinationsyn Timings 2021 Total Option 1 Timings 2021 Total Option 1 9:Roanoke Rd&SH 170 WBFR PM Peak Hour 10:Roanoke Rd&SH 170 EBFR PM Peak Hour ~ �, T 1 � l T � 1 Lane Group WBT NBL NBT SBT 05 06 08 Lane Group EBT EBR NBT SBL SBT 01 02 04 Lane Configurations r'{'�'� r� '� Lane Configurations r'{'� � '� r� Traffc Volume(vph) 3005 28 101 180 Traffc Volume(vph) 1961 116 104 76 275 Future Volume(vph) 3005 28 101 180 Future Volume(vph) 1961 116 104 76 275 Turn Type NA D.P+p NA NA = Turn Type NA Perm NA D.P+p NA � Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 2 - Permitted Phases 8 6 - Detector Phase 4 1 1 2 2 Detector Phase 8 8 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 10.0 5A 5A 5A 5.0 10.0 Mlnimum Initial(s) 10.0 10A 5A 5A 5A 5.0 10.0 Minimum Split(s) 17.0 11.0 11.0 11.0 11.0 17.0 - Minimum Split(s) 17.0 17.0 11.0 11.0 11.0 11.0 17.0 - Total Split(s) 50.0 15.0 25.0 15.0 25.0 50.0 Total Split(s) 50.0 50.0 25.0 15.0 15.0 25.0 50.0 TotalSplit(%) 55.6% 16.7% 27.8% 17% 28% 56% - TotalSplit(%) 55.6% 55.6% 27.8% 16.7% 17% 28% 56% - Yellow Time(s) 5.0 4.0 4.0 4.0 4.0 5.0 Yellow Time(s) 5.0 5.0 4.0 4.0 4.0 4.0 5 0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 - All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 - Lost Tlme Atljust(s) 0.0 0.0 Lost Tlme Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 7.0 6.0 - Total Lost Time(s) 7.0 7.0 6.0 - LeadlLag Lead Lag Lead Lag LeadlLag Lag Lead Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes - Lead-Lag Optimize? Yes Yes Yes Yes - Recall Mode C-Max None None None None C-Max Recall Mode C-Max C-Max None None None None C-Max Act Effct Green(s) 45.6 25.4 17.9 - Act Effct Green(s) 45.6 45.6 16.4 25.4 - Actuated g/C Ratio 0.51 028 020 Actuated g/C Ratio 0.51 0.51 0.18 028 v/c Ratio 1.33 027 0.57 � v/c Ratio 1.15 0.14 0.75 1.05 � Conhol Delay 167.9 18.9 37.9 Conhol Delay 119.6 9.9 37.1 747 Queue Delay 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 167.9 18.9 37.9 Total Delay 119.6 9.9 37.1 747 LOS F B D LOS F A D E Approach Delay 167.9 18.9 37.9 Approach Delay 113.5 37.1 747 Approach LOS F B D Approach LOS F D E Intersection Summary Intersection Summary Cycle Length:90 Cycle Length:90 Actuated Cycle Length:90 Actuated Cycle Length:90 Offset:0(0%),Referenced to phase 4:WBTL and 8:,Starl of Green Offset:0(0%),Referenced to phase 4:WBTL and 8:,Start of Green Natural Cycle:130 Natural Cycle:130 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Maximum v/c Ratio�,1.33 Maximum v/c Ratio�,1.33 Intersection Signal Delay:155.3 Intersection LOS:F Intersection Signal Delay:100.8 Intersection LOS:F Intersection Capacity Utilization 96.1% ICU Level of Service F Intersection Capacity Utilization 1052% ICU Level of Service G Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 9:Roanoke Rd&SH 170 WBFR Splits and Phases: 10�.Roanoke Rd&SH 170 EBFR =9 =9 =9 =9 =9 =9 �T�� ♦T�z �}��, �T�� ♦T�z �}��, s s ��o ��� ��o ��o ��o ��o �5 1T 66 �438 �5 1T 66 �438 Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 1 With Coordinationsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 1 With Coordinationsyn Timings 2021 Total Option 1 Timings 2021 Total Option 1 11:US 377&SH 170 WBFR PM Peak Hour 12:US 377&SH 170 EBFR PM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 04 05 06 08 012 016 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 08 012 016 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � � '�'� Traffc Volume(vph) 1020 1946 148 734 618 340 Traffc Volume(vph) 430 1641 435 334 124 1438 Future Volume(vph) 1020 1946 148 734 618 340 Future Volume(vph) 430 1641 435 334 124 1438 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 12 1 1 2 2 4 5 6 8 12 16 Protected Phases 8 16 6 5 5 6 1 2 4 8 12 16 Permitted Phases 4 12 2 Permitted Phases 8 16 6 Detector Phase 4 12 4 12 1 1 2 2 2 Detector Phase 8 16 8 16 6 6 5 5 6 Switch Phase Switch Phase Mlnimum Initial(s) 5A 5.0 5.0 5.0 5.0 5.0 5.0 1 0 1 0 Mlnimum Initial(s) 5A 5A 5.0 5.0 5.0 5.0 5 0 1 0 1 0 Minimum Split(s) _ 13.0 13.0 13.0 45.0 13.0 13.0 45.0 9.0 9.0 Minimum Split(s) _ 13.0 13.0 13.0 13.0 13.0 45.0 45.0 9.0 9.0 TotalSplit(s) 75.0 25.0 25.0 69.0 83.0 35.0 51,0 11,0 11,0 TotalSplit(s) 35.0 35.0 83.0 75.0 25.0 69,0 51,0 11,0 11,0 TotalSplit(%) � 41.7% 13.9% 13.9% 38% 46% 19% 28% 6% 6% TotalSplit(%) � 19.4% 19.4% 46.1% 42% 14% 38% 28% 6% 6% YellowTime(s) 5.0 5.0 5.0 50 50 50 50 50 50 YellowTime(s) 5.0 5.0 5.0 50 50 50 50 50 50 All-Red Time(s) � 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time(s) � 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lost Time Atljust(s) 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 Total Lost Time(s) 8.0 8.0 8.0 LeadlLag Lag Lead Lead Lag Lag Lead Lag Lead Lead LeadlLag Lead Lead Lag Lag Lead Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode Min None None None Min None C-Max None None Recall Mode None None Min Min None None C-Max None None Act Effct Green(s) 72.0 72.0 67.0 92.0 17.0 17.0 Act Effct Green(s) 55.2 55.2 25.8 25.8 75.0 108.8 Actuated g/C Ratio 0.40 0.40 0.37 0.51 0.09 0.09 Actuated g/C Ratio 0.31 0.31 0.14 0.14 0.42 0.60 v/c Ratio 1.27 1.26 024 0.43 1.36 0.84 v/c Ratio 0.86 1.33 0.89 0.52 0.18 0.70 Conhol Delay 156.0 150.8 16.4 3.5 229.4 31.5 Conhol Delay 77.9 201.3 85.5 137 15.4 5.6 Queue Delay 0.6 0.1 0.0 1.5 0.1 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 48.9 Total Delay 156.6 150.9 16.4 5.0 229.6 31.5 Total Delay 77.9 201.3 85.5 137 15.4 54.5 LOS F F B A F C LOS E F F B B D Approach Delay 152.3 6.9 159.3 Approach Delay 180.1 69.0 51.4 Approach LOS F A F Approach LOS F E D Intersection Summary Intersection Summary Cycle Length:180 Cycle Length:180 Actuated Cycle Length:180 Actuated Cycle Length:180 Offset:108(60%),Referenced to phase B:EBTL,Start of Green Offset:108(60%),Referenced to phase S:EBTL,Start of Green Natural Cycle:140 Natural Cycle:140 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Maximum v/c Ratio�,1.36 Maximum v/c Ratio�,1.36 Intersection Signal Delay:127.3 Intersection LOS:F Intersection Signal Delay:117.6 Intersection LOS:F Intersection Capacity Utilization 1292% ICU Level of Service H Intersection Capacity Utilization 1292% ICU Level of Service H Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 11�.US 377&SH 170 WBFR Splits and Phases: 12�.US 377&SH 170 EBFR =11 =11 =11 =l1 =11 =11 =11 =l1 ♦T�2 �4 F��z ��� ♦T�z �4 F��z ��� 5 5 -12 -12 -12 -12 -12 -12 -12 -12 ����1��5 1T6fi ��8� ����1��5 1T6� ��8� s s Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 1 With Coordinationsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 1 With Coordinationsyn Timings 2021 Total Option 2 HCM 2010 TWSC 2021 Total Option 2 9:SH 170 WBFR&Roanoke Rd aM Peak Hour 10:Roanoke Rd&SH 170 EBFR aM Peak Hour � r Lane Group WBT SBR Intersection Lane Configurations '�'�'� � Int Delay,slveh 0 Tra�c Volume(vph) 1839 99 Movement EBT EBR WBL WBT NBL NBR Future Volume(vph) 1839 99 Lane Configurations TT � � Tum Type NA Prot Traffc Vol,veh/h 3462 146 0 0 0 272 Protected Phases 1 Future Vol,vehlh 3462 146 0 0 0 272 Permitted Phases 4 Conflicting Peds,#/hr 0 0 0 0 0 0 Detector Phase 4 1 Sign Conhol Free Free Free Free Stop Stop Switch Phase RT Channelized - Yield - None - Free Mlnimum Initial(s) 5A 5.0 Storage Length - 200 - - - 0 Minimum Split(s) 22.5 9.5 Veh in Median Storage,# 0 - -16983 0 - Total Split(s) 110.0 40.0 Grade,% 0 - - 0 0 - Total Split(%) 73.3% 26.7% Peak Hour Factor 97 97 92 92 97 97 Yellow Time(s) 3.5 3.5 Heavy Vehicles,% 2 2 2 2 2 2 All-Red Time(s) 1.0 1.0 Mvmt Flow 3569 151 0 0 0 280 Lost Tlme Atljust(s) 0.0 0.0 Total Lost Time(s) 4.5 4.5 LeadlLag Major/Minor Major1 Minor1 Lead-Lag Optimize? ConFlicting Flow All 0 0 - - Recall Mode C-Max None Stage 1 - - - - Act Effct Green(s) 126.6 14.4 Stage 2 - - - - Actuated g/C Ratio 0.84 0.10 Critical Hdwy - - + - - v/c Ratio 0.52 0.67 Critical Hdwy Stg 1 - - - - Conhol Delay 3.6 73A Critical Hdwy Stg 2 - - - - Queue Delay 0.0 0.0 Follow-up Hdwy - - - - Total Delay 3.6 73.0 Pot Cap-1 Maneuver - - 0 0 LOS A E Stage 1 - - 0 0 Approach Delay 3.6 Stage 2 - - 0 0 Approach LOS A Plaloon blocked,% - - Mov Cap-1 Maneuver - - - - Intersection Summary Mov Cap-2 Maneuver - - - - Cycle Length:150 Stage 1 - - - - Actuated Cycle Length:150 Stage 2 - - - - Offset:103(69%),Referenced to phase 4:WBT,Start of Green Natural Cycle:40 Control Type:Actuated-Coordinated Approach EB NB Maximum v/c Ratio�,0.67 HCM Control Delay,s 0 0 Intersection Signal Delay:7.0 Intersection LOS:A HCM LOS A Intersection Capacity Utilization 50.9% ICU Level of Service A Analysis Period(min)15 MinorLane/MajorMvmt NBLn1 EBT EBR Splits and Phases: 9:SH 170 WBFR&Roanoke Rd Capacity(veh/h) - - - HCM Lane V/C Ratio J a� s3�`�'� HCM Control Delay(s) 0 - - HCM Lane LOS A - - HCM 95ih%tile Q(veh) - - - Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 2 with coordinationsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 2 with coordinationsyn Timings 2021 Total Option 2 Timings 2021 Total Option 2 11:US 377&SH 170 WBFR AM Peak Hour 12:US 377&SH 170 EBFR AM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 05 06 08 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � �� '�'� Traffc Volume(vph) 505 1260 138 662 329 199 Traffc Volume(vph) 233 2359 494 974 306 489 Future Volume(vph) 505 1260 138 662 329 199 Future Volume(vph) 233 2359 494 974 306 489 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 4 1 1 2 2 2 Detector Phase 8 8 6 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 5A 5A 5A 5.0 5.0 5.0 5.0 5.0 Mlnimum Initial(s) 5A 5A 5A 5A 5A 5.0 5.0 5.0 Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Total Split(s) 82.0 82.0 35.0 33.0 33.0 25.0 43.0 82.0 Total Split(s) 82.0 82.0 43.0 43.0 25.0 35.0 33.0 82.0 TotalSplit(%) 54.7% 54.7% 23.3% 22.0% 22.0% 17% 29% 55% - TotalSplit(%) 54.7% 54.7% 28.7% 28.7% 16.7% 23% 22% 55% - Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - LeadlLag Lead Lag Lag Lead Lag LeadlLag Lag Lag Lead Lead Lag Lead-Lag Optimize? - Lead-Lag Optimize? - Recall Mode None None None None None None None C-Max Recall Mode C-Max C-Max None None None None None None Act Effct Green(s) 74.0 74.0 26.1 60.0 25.9 25.9 - Act Effct Green(s) 74.0 74.0 35.5 35.5 16.5 60.0 - Actuated g/C Ratio 0.49 0.49 0.17 0.40 0.17 0.17 Actuated g/C Ratio 0.49 0.49 024 024 0.11 0.40 v/c Ratio 0.70 0.72 0.52 0.54 0.43 0.57 ' v/c Ratio 0.29 1.05 1.39dr 127 0.83 0.36 ' Conhol Delay 33.5 30.3 91.6 29.9 57.5 25.8 Conhol Delay 23.8 69.3 75.1 178.5 91.5 347 Queue Delay 0.0 0.0 0.0 0.7 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 33.5 30.3 91.6 30.6 57.5 25.8 Total Delay 23.8 69.3 75.1 178.5 91.5 347 LOS C C F C E C LOS C E E F F C Approach Delay 31.0 41.1 45.5 Approach Delay 65.6 109.4 56.5 Approach LOS C D D Approach LOS E F E Intersection Summary Intersection Summary Cycle Length:150 Cycle Length:150 Actuated Cycle Length:150 Actuated Cycle Length:150 Offset:0(0%),Referenced to phase 3:and 8:EBTL,Start of Green Offset:0(0%),Referenced to phase 3:and 8:EBTL,Start of Green Natural Cycle:110 Natural Cycle:110 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Maximum v/c Ratio�,1.27 Maximum v/c Ratio�,1.27 Intersection Signal Delay:35.9 Intersection LOS:D Intersection Signal Delay:77.3 Intersection LOS:E Intersection Capacity Utilization 107.1% ICU Level of Service G Intersection Capacity Utilization 107.1% ICU Level of Service G Analysis Period(min)15 Analysis Period(min)15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: 11�.US 377&SH 170 WBFR -11 �11 ❑11 Splits and Phases: 12�.US 377&SH 170 EBFR �T�� lT�z �4 -�� ��� ��� �T�� 1T�z �4 ��z ��z ��z � �635 1T66 �p8'R'� -12 =1I2* -12 �s35 +I65 �s38 3s Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 2 with coordinationsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 2 with coordinationsyn Timings 2021 Total Option 2 HCM 2010 TWSC 2021 Total Option 2 9:SH 170 WBFR&Roanoke Rd PM Peak Hour 10:Roanoke Rd&SH 170 EBFR PM Peak Hour � r Lane Group WBT SBR Intersection Lane Configurations '�'�'� � Int Delay,slveh 0 Tra�c Volume(vph) 3196 199 Movement EBT EBR WBL WBT NBL NBR Future Volume(vph) 3196 199 Lane Configurations TT � � Tum Type NA Prot Traffc Vol,veh/h 2037 391 0 0 0 274 Protected Phases 4 1 Future Vol,vehlh 2037 391 0 0 0 274 Permitted Phases Conflicting Peds,#/hr 0 0 0 0 0 0 Detector Phase 4 1 Sign Conhol Free Free Free Free Stop Stop Switch Phase RT Channelized - Yield - None - Free Mlnimum Initial(s) 10.0 5.0 Storage Length - 200 - - - 0 Minimum Split(s) 17.0 11.0 Veh in Median Storage,# 0 - -16983 0 - Total Split(s) 72.0 18.0 Grade,% 0 - - 0 0 - Total Split(%) 80.0% 20.0% Peak Hour Factor 96 96 92 92 96 96 Yellow Time(s) 5.0 4.0 Heavy Vehicles,% 2 2 2 2 2 2 All-Red Time(s) 2.0 2.0 Mvmt Flow 2122 407 0 0 0 285 Lost Tlme Atljust(s) 0.0 0.0 Total Lost Time(s) 7.0 6.0 LeadlLag Major/Minor Major1 Minor1 Lead-Lag Optimize? ConFlicting Flow All 0 0 - - Recall Mode C-Max None Stage 1 - - - - Act Effct Green(s) 65.0 12.0 Stage 2 - - - - Actuated g/C Ratio 072 0.13 Critical Hdwy - - + - - v/c Ratio 0.97 0.97 Critical Hdwy Stg 1 - - - - Conhol Delay 29.0 94.5 Critical Hdwy Stg 2 - - - - Queue Delay 0.0 0.0 Follow-up Hdwy - - - - Total Delay 29.0 94.5 Pot Cap-1 Maneuver - - 0 0 LOS C F Stage 1 - - 0 0 Approach Delay 29.0 Stage 2 - - 0 0 Approach LOS C Plaloon blocked,% - - Mov Cap-1 Maneuver - - - - Intersection Summary Mov Cap-2 Maneuver - - - - Cycle Length:90 Actuated Cycle Length:90 Stage 1 - - - - Offset:18(20%),Referenced to phase 4:WBT,Start of Green Stage 2 - - - - Natural Cycle:90 Control Type:Actuated-Coordinated Approach EB NB Maximum v/c Ratio�,0.97 HCM Control Delay,s 0 0 Intersection Signal Delay:32.7 Intersection LOS:C HCM LOS A Intersection Capacity Utilization 88.6% ICU Level of Service E Analysis Period(min)15 MinorLane/MajorMvmt NBLn1 EBT EBR Splits and Phases: 9:SH 170 WBFR&Roanoke Rd Capaciry(veh/h) - - - HCM Lane V/C Ratio J a� aa HCM Control Delay(s) 0 - - HCM Lane LOS A - - HCM 95ih%tile Q(veh) - - - Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 2 with coordinationsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 2 with coordinationsyn Timings 2021 Total Option 2 Timings 2021 Total Option 2 11:US 377&SH 170 WBFR PM Peak Hour 12:US 377&SH 170 EBFR PM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 04 05 06 08 012 016 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 08 012 016 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � �� '�'� Traffc Volume(vph) 1363 1946 148 751 622 340 Traffc Volume(vph) 447 1630 435 334 472 1438 Future Volume(vph) 1363 1946 148 751 622 340 Future Volume(vph) 447 1630 435 334 472 1438 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 12 1 1 2 2 4 5 6 8 12 16 Protected Phases 8 16 6 5 5 6 1 2 4 8 12 16 Permitted Phases 4 12 2 Permitted Phases 8 16 6 Detector Phase 4 12 4 12 1 1 2 2 2 Detector Phase 8 16 8 16 6 6 5 5 6 Switch Phase Switch Phase Mlnimum Initial(s) 5A 5.0 5.0 5.0 5.0 5.0 5.0 1 0 1 0 Mlnimum Initial(s) 5A 5A 5.0 5.0 5.0 5.0 5 0 1 0 1 0 Minimum Split(s) _ 13.0 13.0 13.0 45.0 13.0 13.0 45.0 9.0 9.0 Minimum Split(s) _ 13.0 13.0 13.0 13.0 13.0 45.0 45.0 9.0 9.0 TotalSplit(s) 70.0 25.0 25.0 74.0 88.0 25.0 56,0 11,0 11,0 TotalSplit(s) 25.0 25.0 88.0 70.0 25.0 74,0 56,0 11,0 11,0 TotalSplit(%) � 38.9% 13.9% 13.9% 41% 49% 14% 31% 6% 6% TotalSplit(%) � 13.9% 13.9% 48.9% 39% 14% 41% 31% 6% 6% YellowTime(s) 5.0 5.0 5.0 50 50 50 50 50 50 YellowTime(s) 5.0 5.0 5.0 50 50 50 50 50 50 All-Red Time(s) � 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time(s) � 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lost Time Atljust(s) 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 Total Lost Time(s) 8.0 8.0 8.0 LeadlLag Lag Lead Lead Lag Lag Lead Lag Lead Lead LeadlLag Lead Lead Lag Lag Lead Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode Min None None None Min None C-Max None None Recall Mode None None Min Min None None C-Max None None Act Effct Green(s) 77.0 77.0 62.0 87.0 17.0 17.0 Act Effct Green(s) 59.0 59.0 17.0 17.0 80.0 105.0 Actuated g/C Ratio 0.43 0.43 0.34 0.48 0.09 0.09 Actuated g/C Ratio 0.33 0.33 0.09 0.09 0.44 0.58 v/c Ratio 1.32 1.32 026 0.46 1.36 0.91 v/c Ratio 0.84 124 1.31 0.64 0.32 0.73 Conhol Delay 184.8 181.5 15.9 4.9 232.6 47.6 Conhol Delay 72.3 163.8 208.4 21.8 15.8 3.2 Queue Delay 0.1 0.0 0.0 2.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 1.1 48.6 Total Delay 184.9 181.6 15.9 6.8 232.6 47.6 Total Delay 72.3 163.8 208.4 21.8 16.9 51.8 LOS F F B A F D LOS E F F C B D Approach Delay 182.4 8.3 167.2 Approach Delay 147.5 165.5 43.2 Approach LOS F A F Approach LOS F F D Intersection Summary Intersection Summary Cycle Length:180 Cycle Length:180 Actuated Cycle Length:180 Actuated Cycle Length:180 Offset:126(70%),Referenced to phase B:EBTL,Start of Green Offset:126(70%),Referenced to phase S:EBTL,Start of Green Natural Cycle:150 Natural Cycle:150 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Maximum v/c Ratio�,1.36 Maximum v/c Ratio�,1.36 Intersection Signal Delay:149.6 Intersection LOS:F Intersection Signal Delay:110.0 Intersection LOS:F Intersection Capacity Utilization 134.5% ICU Level of Service H Intersection Capacity Utilization 134.5% ICU Level of Service H Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 11�.US 377&SH 170 WBFR Splits and Phases: 12�.US 377&SH 170 EBFR ❑11 ❑11 =11 ❑ll ❑11 ❑11 =11 ❑ll ♦T�2 �4 ��2 d�� ♦T�z �4 ��2 d�� 5 5 -12 -12 -12 -12 -12 -12 -12 -12 ����1��5 1T�6 ��8 ����1��5 1T�6 ��8 s s Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 2 with coordinationsyn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 2 with coordinationsyn HCM 2010 TWSC 2021 Total Option 2 HCM 2010 TWSC 2021 Total Option 2 9:SH 170 WBFR&Roanoke Rd aM Peak Hour 10:Roanoke Rd&SH 170 EBFR aM Peak Hour Intersection Intersection Int Delay,slveh 2.8 Int Delay,slveh 0 Movement EBL EBT WBT WBR SBL SBR Movement EBT EBR WBL WBT NBL NBR Lane Configurations r�'� � Lane Configurations TT � � Traffc Vol,veh/h 0 0 1839 80 0 99 Traffc Vol,veh/h 3462 146 0 0 0 272 Future Vol,vehlh 0 0 1839 80 0 99 Future Vol,vehlh 3462 146 0 0 0 272 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Conhol Free Free Free Free Stop Stop Sign Conhol Free Free Free Free Stop Stop RT Channelized - None - Yield - None RT Channelized - Yield - None - Free Storage Length - - - - - 0 Storage Length - 200 - - - 0 Veh in Median Storage,# - - 0 - 0 - Veh in Median Storage,# 0 - -16983 0 - Grade,% - 0 0 - 0 - Grade,% 0 - - 0 0 - Peak Hour Factor 92 92 87 87 87 87 Peak Hour Factor 97 97 92 92 97 97 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 0 2114 92 0 114 Mvmt Flow 3569 151 0 0 0 280 Major/Minor Majo2 Mino2 Major/Minor Major1 Minor1 ConFlicting FlowAll - 0 - 1103 ConFlicting FlowAll 0 0 - - Stage 1 - - - - Stage 1 - - - - Stage 2 - - - - Stage 2 - - - - Critical Hdwy - - - 7.14 Critical Hdwy - - + - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - - - 3.92 Follow-up Hdwy - - - - Pot Cap-1 Maneuver - - 0 177 Pot Cap-1 Maneuver - - 0 0 Stage 1 - - 0 - Stage 1 - - 0 0 Stage 2 - - 0 - Stage 2 - - 0 0 Platoon blocked,% - - Plaloon blocked,% - - Mov Cap-1 Maneuver - - - 177 Mov Cap-1 Maneuver - - - - Mov Cap-2 Maneuver - - - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 1 - - - - Stage 2 - - - - Stage 2 - - - - Approach � WB SB Approach EB NB HCM Control Delay,s 0 56.1 HCM Control Delay,s 0 0 HCM LOS F HCM LOS A MinorLane/MajorMvmt WBT WBRSBLni MinorLane/MajorMvmt NBLn1 EBT EBR Capaciry(veh/h) - - 177 Capaciry(veh/h) - - - HCM Lane V/C Ratio - - 0.643 HCM Lane V/C Ratio - - - HCM Control Delay(s) - - 56.1 HCM Control Delay(s) 0 - - HCM Lane LOS - - F HCM Lane LOS A - - HCM 95th%tile Q(veh) - - 37 HCM 95ih%tile Q(veh) - - - Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 3syn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 3syn Timings 2021 Total Option 2 Timings 2021 Total Option 2 11:US 377&SH 170 WBFR AM Peak Hour 12:US 377&SH 170 EBFR AM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 05 06 08 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � �� '�'� Traffc Volume(vph) 505 1260 138 662 329 199 Traffc Volume(vph) 233 2359 494 974 306 489 Future Volume(vph) 505 1260 138 662 329 199 Future Volume(vph) 233 2359 494 974 306 489 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 1 1 2 2 5 6 8 Protected Phases 8 6 5 5 6 1 2 4 Permitted Phases 4 2 - Permitted Phases 8 6 - Detector Phase 4 4 1 1 2 2 2 Detector Phase 8 8 6 6 5 5 6 Switch Phase - Switch Phase - Mlnimum Initial(s) 5A 5A 5A 5.0 5.0 5.0 5.0 5.0 Mlnimum Initial(s) 5A 5A 5A 5A 5A 5.0 5.0 5.0 Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Minimum Split(s) 45.0 45.0 13.0 13.0 13.0 13.0 13.0 45.0 - Total Split(s) 82.0 82.0 35.0 33.0 33.0 25.0 43.0 82.0 Total Split(s) 82.0 82.0 43.0 43.0 25.0 35.0 33.0 82.0 TotalSplit(%) 54.7% 54.7% 23.3% 22.0% 22.0% 17% 29% 55% - TotalSplit(%) 54.7% 54.7% 28.7% 28.7% 16.7% 23% 22% 55% - Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5 0 5 0 All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - All-Red Time(s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 - Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - Total Lost Time(s) 8.0 8.0 8.0 8.0 8.0 - LeadlLag Lead Lag Lag Lead Lag LeadlLag Lag Lag Lead Lead Lag Lead-Lag Optimize? - Lead-Lag Optimize? - Recall Mode None None None None None None None C-Max Recall Mode C-Max C-Max None None None None None None Act Effct Green(s) 74.0 74.0 26.1 60.0 25.9 25.9 - Act Effct Green(s) 74.0 74.0 35.5 35.5 16.5 60.0 - Actuated g/C Ratio 0.49 0.49 0.17 0.40 0.17 0.17 Actuated g/C Ratio 0.49 0.49 024 024 0.11 0.40 v/c Ratio 0.70 0.72 0.52 0.54 0.43 0.57 ' v/c Ratio 0.29 1.05 1.39dr 127 0.83 0.36 ' Conhol Delay 35.1 31.4 91.6 29.9 57.5 25.8 Conhol Delay 23.8 69.3 75.1 178.5 91.5 34.6 Queue Delay 0.0 0.0 0.0 0.7 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 35.1 31.4 91.6 30.6 57.5 25.8 Total Delay 23.8 69.3 75.1 178.5 91.5 34.6 LOS D C F C E C LOS C E E F F C Approach Delay 32.3 41.1 45.5 Approach Delay 65.6 109.4 56.5 Approach LOS C D D Approach LOS E F E Intersection Summary Intersection Summary Cycle Length:150 Cycle Length:150 Actuated Cycle Length:150 Actuated Cycle Length:150 Offset:0(0%),Referenced to phase 3:and 8:EBTL,Start of Green Offset:0(0%),Referenced to phase 3:and 8:EBTL,Start of Green Natural Cycle:110 Natural Cycle:110 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Maximum v/c Ratio�,1.27 Maximum v/c Ratio�,1.27 Intersection Signal Delay:36.6 Intersection LOS:D Intersection Signal Delay:77.3 Intersection LOS:E Intersection Capacity Utilization 107.1% ICU Level of Service G Intersection Capacity Utilization 107.1% ICU Level of Service G Analysis Period(min)15 Analysis Period(min)15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: 11�.US 377&SH 170 WBFR -11 �11 ❑11 Splits and Phases: 12�.US 377&SH 170 EBFR �T�� lT�z �4 -�� ��� ��� �T�� 1T�z �4 ��z ��z ��z � �635 1T66 �p8'R'� -12 =1I2* -12 �s35 +I65 �s38 3s Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 3syn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total AM Option 3syn HCM 2010 TWSC 2021 Total Option 2 HCM 2010 TWSC 2021 Total Option 2 9:SH 170 WBFR&Roanoke Rd PM Peak Hour 10:Roanoke Rd&SH 170 EBFR PM Peak Hour Intersection Intersection Int Delay,slveh 67.6 Int Delay,slveh 0 Movement EBL EBT WBT WBR SBL SBR Movement EBT EBR WBL WBT NBL NBR Lane Configurations r�'� � Lane Configurations TT � � Traffc Vol,veh/h 0 0 3196 166 0 199 Traffc Vol,veh/h 2037 391 0 0 0 274 Future Vol,vehlh 0 0 3196 166 0 199 Future Vol,vehlh 2037 391 0 0 0 274 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Conhol Free Free Free Free Stop Stop Sign Conhol Free Free Free Free Stop Stop RT Channelized - None - Yield - None RT Channelized - Yield - None - Free Storage Length - - - - - 0 Storage Length - 200 - - - 0 Veh in Median Storage,# - - 0 - 0 - Veh in Median Storage,# 0 - -16983 0 - Grade,% - 0 0 - 0 - Grade,% 0 - - 0 0 - Peak Hour Factor 92 92 95 95 95 95 Peak Hour Factor 96 96 92 92 96 96 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 0 3364 175 0 209 Mvmt Flow 2122 407 0 0 0 285 Major/Minor Majo2 Mino2 Major/Minor Major1 Minor1 ConFlicting FlowAll - 0 - 1770 ConFlicting FlowAll 0 0 - - Stage 1 - - - - Stage 1 - - - - Stage 2 - - - - Stage 2 - - - - Critical Hdwy - - - 7.14 Critical Hdwy - - + - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - - - 3.92 Follow-up Hdwy - - - - Pot Cap-1 Maneuver - - 0 -62 Pot Cap-1 Maneuver - - 0 0 Stage 1 - - 0 - Stage 1 - - 0 0 Stage 2 - - 0 - Stage 2 - - 0 0 Platoon blocked,% - - Plaloon blocked,% - - Mov Cap-1 Maneuver - - - -62 Mov Cap-1 Maneuver - - - - Mov Cap-2 Maneuver - - - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 1 - - - - Stage 2 - - - - Stage 2 - - - - Approach � WB SB Approach EB NB HCM Control Delay,s 0 $1210.4 HCM Control Delay,s 0 0 HCM LOS F HCM LOS A MinorLane/MajorMvmt WBT WBRSBLni MinorLane/MajorMvmt NBLn1 EBT EBR Capaciry(veh/h) - - 62 Capaciry(veh/h) - - - HCM Lane V/C Ratio - - 3.379 HCM Lane V/C Ratio - - - HCM Control Delay(s) - $1210.4 HCM Control Delay(s) 0 - - HCM Lane LOS - - F HCM Lane LOS A - - HCM 95th%tile Q(veh) - - 22 HCM 95ih%tile Q(veh) - - - Notes -:Volume exceeds capacity $:Delay exceeds 300s +:Computation Not Defined ':All major volume in platoon Page 1 Synchro 10 Report Page 2 Synchro 10 Report H:1T1566.10-New SH170 main lane speed stutly\Synchro12021 Total PM Option 3syn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 3syn Timings 2021 Total Option 2 Timings 2021 Total Option 2 11:US 377&SH 170 WBFR PM Peak Hour 12:US 377&SH 170 EBFR PM Peak Hour � ~ `� t 1 r � � T I' �* 1 Lane Group WBL WBT NBL NBT SBT SBR 04 05 06 08 012 016 Lane Group EBL EBT NBT NBR SBL SBT 01 02 04 08 012 016 Lane Configurations � r'{'�'� � '�'� '�'�'� � Lane Configurations � r'{'�'� '�'�'� � �� '�'� Traffc Volume(vph) 1363 1946 148 751 622 340 Traffc Volume(vph) 447 1630 435 334 472 1438 Future Volume(vph) 1363 1946 148 751 622 340 Future Volume(vph) 447 1630 435 334 472 1438 Turn Type Perm NA Prot NA NA Perm Turn Type Perm NA NA Perm Prot NA Protected Phases 4 12 1 1 2 2 4 5 6 8 12 16 Protected Phases 8 16 6 5 5 6 1 2 4 8 12 16 Permitted Phases 4 12 2 Permitted Phases 8 16 6 Detector Phase 4 12 4 12 1 1 2 2 2 Detector Phase 8 16 8 16 6 6 5 5 6 Switch Phase Switch Phase Mlnimum Initial(s) 5A 5.0 5.0 5.0 5.0 5.0 5.0 1 0 1 0 Mlnimum Initial(s) 5A 5A 5.0 5.0 5.0 5.0 5 0 1 0 1 0 Minimum Split(s) _ 13.0 13.0 13.0 45.0 13.0 13.0 45.0 9.0 9.0 Minimum Split(s) _ 13.0 13.0 13.0 13.0 13.0 45.0 45.0 9.0 9.0 TotalSplit(s) 70.0 25.0 25.0 74.0 88.0 25.0 56,0 11,0 11,0 TotalSplit(s) 25.0 25.0 88.0 70.0 25.0 74,0 56,0 11,0 11,0 TotalSplit(%) � 38.9% 13.9% 13.9% 41% 49% 14% 31% 6% 6% TotalSplit(%) � 13.9% 13.9% 48.9% 39% 14% 41% 31% 6% 6% YellowTime(s) 5.0 5.0 5.0 50 50 50 50 50 50 YellowTime(s) 5.0 5.0 5.0 50 50 50 50 50 50 All-Red Time(s) � 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time(s) � 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lost Time Atljust(s) 0.0 0.0 0.0 Lost Time Atljust(s) 0.0 0.0 0.0 Total Lost Time(s) 8.0 8.0 8.0 Total Lost Time(s) 8.0 8.0 8.0 LeadlLag Lag Lead Lead Lag Lag Lead Lag Lead Lead LeadlLag Lead Lead Lag Lag Lead Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode Min None None None Min None C-Max None None Recall Mode None None Min Min None None C-Max None None Act Effct Green(s) 77.0 77.0 62.0 87.0 17.0 17.0 Act Effct Green(s) 59.0 59.0 17.0 17.0 80.0 105.0 Actuated g/C Ratio 0.43 0.43 0.34 0.48 0.09 0.09 Actuated g/C Ratio 0.33 0.33 0.09 0.09 0.44 0.58 v/c Ratio 1.32 1.32 026 0.46 1.36 0.91 v/c Ratio 0.84 124 1.31 0.64 0.32 0.73 Conhol Delay 198.5 192.3 15.9 4.9 232.6 47.6 Conhol Delay 72.3 163.8 208.4 21.8 15.8 3.2 Queue Delay 0.1 0.0 0.0 2.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 1.1 48.6 Total Delay 198.6 192.3 15.9 6.8 232.6 47.6 Total Delay 72.3 163.8 208.4 21.8 16.9 51.8 LOS F F B A F D LOS E F F C B D Approach Delay 193.8 8.3 167.2 Approach Delay 147.5 165.5 43.2 Approach LOS F A F Approach LOS F F D Intersection Summary Intersection Summary Cycle Length:180 Cycle Length:180 Actuated Cycle Length:180 Actuated Cycle Length:180 Offset:126(70%),Referenced to phase B:EBTL,Start of Green Offset:126(70%),Referenced to phase S:EBTL,Start of Green Natural Cycle:150 Natural Cycle:150 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Maximum v/c Ratio�,1.36 Maximum v/c Ratio�,1.36 Intersection Signal Delay:157.0 Intersection LOS:F Intersection Signal Delay:110.0 Intersection LOS:F Intersection Capacity Utilization 134.5% ICU Level of Service H Intersection Capacity Utilization 134.5% ICU Level of Service H Analysis Period(min)15 Analysis Period(min)15 Splits and Phases: 11�.US 377&SH 170 WBFR Splits and Phases: 12�.US 377&SH 170 EBFR ❑11 ❑11 =11 ❑ll ❑11 ❑11 =11 ❑ll ♦T�2 �4 ��2 d�� ♦T�z �4 ��2 d�� 5 5 -12 -12 -12 -12 -12 -12 -12 -12 ����1��5 1T�6 ��8 ����1��5 1T�6 ��8 s s Page 3 Synchro 10 Report Page 4 Synchro 10 Report H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 3syn H:1T1566.10-New SH170 main lane speed studylSynchro12021 Total PM Option 3syn , ARIZONA TEXAS NEW MEXICO OKLAHOMA ��� �nc�n����nc Apri12, 2019 Jarrod Greenwood Director of Public Works Town of Westlake 1500 Solana Boulevard, Building 7, Suite#7200 Westlake, TX 76262 RE: Speed Study for SH 170 and SH 114 through the Town of Westlake Dear Mr. Greenwood: After reviewing the speed studies prepared by TxDOT for SH 170 (Limits: from east of Roanoke Road to Trophy Lake Drive) and SH 114 (Limits: from Trophy Lake Drive to Southlake Ciry limits east of Solano Boulevard), Lee Engineering made the following observations: • The recommended 70mph is supported by the speed data collected. • The SSmph on SH 170 was recommended considering the crash experience and the speed limit on the frontage road that the main lanes are feeding into. • Length of 70 mph speed zone is approximately 2.7 miles. The state law allows cities to establish a speed limit up to 60 mph by a city ordinance.Any section of highway within the ciry limit that needs to be over 60 mph must be established by Transportation Commission minute order. TxDOT manual Procedure for Establishing Speed Zones' states that TxDOT should malce every effort to secure the cooperation of the city so that the zones will be set by city ordinance. The setting of speed limits within a city by commission minute order should be a last resort if an agreement cannot be reached with the city. A case could be made that the length of the 70 mph speed zone, approx. 2.7 miles is too short and that the 65 mph zone from Southlake should be extended through Westlake. TxDOT procedures do indicate the speed zones should be as long as possible. The drop to 55 mph along SH 170 is further support for not raising the speed limit to 70mph for the short section of highway and then dropping to SSmph. Problems should be expected any time when a traffic signal is located at the end of a freeway section. The posted speed limit alone should not be expected to address these challenges. We have additional recommendations in a separate study. These recommendations include warning signs with flashers that are activated when slow speeds or queues are detected. A similar situation can be found on SB SH 121 approaching SH 183 where a sign with flashers has been installed. 3030 LBJ Freeway,Suite 1660, Dallas,TX 75234 (972) 248-3006 office (972)248-3855 fax � www.leeengineering.com Page 1 of 2 If you have any questions,please contact me at(972)248-3006. Sincerely, � � �° ;�° �t` �� .� � Josep T Short,P.E.,PTOE President Lee Engineering, LLC TBPE Firm F-450 LCC CI�ICInCC�II�IC Page 2 of 2 . f � �,y r � �. �- r� ;. . � • _ � _' - wc {�r -� T' � zr-�--r-� � ��5. � �i��Ih �k�� �,` �:�-" { , , � �� .� � ?�1��� � ...�. ��'� � ` n `�� �'} 'd �N � � .. �R _..�� � •ti�► �.�.'�� . _ .�� C , �� . •� P:�� �'�.IN� '+:'Y,9'� y, � � � ih •' � � `" :. ' `1;'�'► . � , .�.�..L ',� '�� � �i^ r ,�. :5'�....�'. �i � � ''�1C}� ' �. �•. �� (� � '� „ i ' +F'�k}��. 1` k.�: ���'' !� `���� `�� _ � r'�� �.�,�� �� ` rC � �" { �... �r'� �^.k�'" 1.'�� '� .$t J ` '''�;:,ir6,h'� f• -.. 4 ,� v, ; � .. : � , ���r �+6 'a' • �'��:�..� ���� � �- � a. . . �•�+f.� r. , ' �r r • �y .R f.,i,:� . •ti '•�j1".[.�wW l'� . i i _ i.'.w• �./"�[''�j��' ""*` •�r ��� � .� .� �,"�.,�' ��� ��' '�? � �i� ' E ''r; -tip+ ti� r�l���r •�•�l!'��'�� "'� � `�{* �. l �r•�' �:���., +'1 �� � �� �� .��� ���`�� F���.. � �� � ��-.��.:� .LY7:'•�'s�' •�:� -A ,a �. ��'� ' :.r ��~ �y� ,"�, � • � 4 •S:i � � 1 r ry. ' •�•��,.. � ��Y.;• �� ' r f.n t�`•� �� �y�;�� :I,„�'pr-, '�.�' �•►d f,��Z - ; �,�����• - i� � � � ,ftk�.. ,�' , = ;•,w ^ti ��i�t ^� .,, _ .�. } .�,'� ?� �"r .:���• ° . .� .,,� �' � .> � .�; , .� � �;.;,.�' � .,�,�►- ` � . . 'r;t � � �°r'� ;,��`. �'. + '�. , �, � �_.,� � ,�: a• ( � . � .,._ � � � • :��, � r �•'� �' .� � � �' � • _ � � �. "a,:•.. +f s. ►�! ■ �'r i. n•_` ' �� f-' pry,;c E,,/'��,p�• �� S �rt :� �� � "Y;' Mr;.�':r � * �{i ,�, i r '� } ��• -�� ; 'I".� • 4"'- r � � � � '.1 � •a. r '„r,r '4 � .i . • `7 ,�.�� ��y���#.� �� /y�.T'.�^'� ♦�":��..�'''� ����� ' .�� - �.,! �, �•. ��"�, �f��" S • � � .. ..=� `=i. :�' h. !t'�+;�"R � t. .�. � l . • � � �.■.SY:�� . I i ' _ ;.i !.� 1�;Z r -�"r..�f 1�•• .w• - r� y �.�' � "�.� ,;y� '� �� � ,�',+�+ t�� ` a�n.�, {4. .w w � . �• �' ��I+�i ..�fi.^+ �� ..�f I� �ft ��� � �y(�� � �: � �ij •• •� � w . �, � �., Y ��%..•• }�4 . ... :kt6..� f '��� �1 /I • i � �� � ����.f �' �^ � - r�M'ti��� ' t�� ..,�'�F.. , .�rR:,_ .� ���� �;..5� :"'' .� •./ +i�ya.�� `.�`��� ''r� �'�e�- '�•-��hA\ � ��'aA"- �ry ������ � 4 J.er_. j' ��r I r Itp . }: _ � /,f AC-` �% '� L_jw.�- •4 � 4 '.t-,�� i. ��,. =�i �' r w ���j„u.4y,�++��;�,f A �;r. - �,� �.q,� - '''/ f� • - / � �=---- , . .� ' � •r• X , r .' � • Ik1,,rr. �h•� ry'� +•. . . ` • . 'r � y� ,�� '}�'. ''' a ;ii��� :� ,}. Y�+�k� �' � �f� ' •,�`� '� �� .r����' �� ���r• " rrf r14T ..�' T �- �,.�; �~ .�`r-� •F:- �I- � 15�'iiL��- 'f�• ���. .�. 1 fF •r -� ����. .�';w -' �'1�.�+ M � J �' '-1 � . FIn.. • ' �� '/�' ��. _ .#j5al7�.'�.. I_ "� + sF. •�f•� ,�. R ��\ � vi"�'• •�i+ .z� ��'u�� �"��` -'� �...��+„�.� � , i .. .E '. , :d.' � , � ,���. � . r' b • •� .. •y�R+, � C/ • . _ ':,�1 r t".��� �y r� •�y '�, Ele. t �a'�r7!�r�Y'R . . :.. _�� • e , a R _ � . '!�l f r i... A Y�� 1� �:A � ^ •/ 5 � ' 'AT •.�' s �},, ,� j� �f�F� k � � � �' 7`Vi� I ' '. �. . '�1 4 ! 'S''.i � . - e. �� ` - �' �' .. ��'•�' , �.����`�i'•�"'�� .... •: �� ,�# , , , -� . , � ..•�': .� - �`,��H " ; _. ; � ',.- � fx..�...,.� _'� ,�s�, _L � ■ K� $R*+ ,ti „v '�'�'�'• '- . / � r � � �a. � ;�1'.' �F' !/ '�� i��-ar . `fi► .`.':..�,� � :f �'.. � �,.' •'� �, Y"��y''':���, � � ••�.x• 1 1 Tq� K � 4 � {� '�' F "�' •%� �Y`7� 1 y �* � �� � .�N� .. .sF. ;��� � ��k '3 . F �t... �� • . 21 i �� � � y � "�+:: � Af , � �*'�•�. � ..,.R ..rr'iiMi p ' /�� 4 '! � ,t � '• 1 ��'�'...�, �w�� �� �_ 4_ .0 ;�� ,'' sti,' y Y.�:' ks �, ., �. ' • ��✓: t � Iw~ �� � A. �1 ��� � rr .11 r } �., '�"'r'r r'+'��, . �„ �� � Q,��Y� � r'�Y� - ,�� � 'r�S�f . * - ��a � �1 .1.�.: ' .... iu�;��i�iu, .�^�'-'-� '� 't � � 'r ,`�'��• . .=�. .� y�• � .�,tj�",:, ' :i.' ��_:a ,� � ! , �'`' 'r�1 ° •'y� '�� �� „�� '''�-� �1. t� 1 L � '- �: Z�� �f ���' � ti' �� 4• � ���� y� � i �• "`*��'+\,�. "�E �x` t•'''`� �'' •c� '� K 1► . �. _ � ,��;-��� • V � !���,1�� '�� r.'�a iy���1� `�Hk�a`�"���' �►S'�� � . . �.}��.�.�'� `� ,^�+;ti„^ �� ,� ��. ` ��`� R .�� "� '1.� .F.�r�:`_ 'S ���►�o�_• ; * � �� � .is�;j� �r�i �� 1''��5 •'",t„"Ib,. �. � t �,�'' ��\�'f • ��.��4",.��� �,.:,..� � �. ' . � ' .y� x rrcfj �+�• y . -�1••� . .. F f; '�i �. . ,'�.`� '� � li i�i�. `�;. � ; • / � f F �^c� �y � �? a ��5. — " � 1� �. L 1" r , 1 � , . �� .. �.,�. �,' h .. ,. �a �� J,�. . ti ... , , �.` , f •. �"� �:�'�; � �.. ►.� -- �' � � f� � K� ��a �r ���,�� � �, ��� `, � �� �.. ` �' [�` ' S�, � ..� di^. �'�� '^;.. . ����� '�.y r��r'� •�'� �I���� ��,���_1 ' I ' ` � � r � �� �� � �� � ,y � . , /! ��p-r �� � a � ' ~,�'C '%�.•. � � ��.* 6 k�e� . "� '� r Il � � �1�1' I�?� A 1� � �� % �..�� i � ,� � a. ,`,. t .. �, � ;�: , , • ��r ,,� + ,�tti,t , .��-"��. V s . � • r.. �,.z, .� ��. ,�,..r.. . . � w.. .w �r �� � � � +�� � �. *1► � � . • S ■ �,. ���a . "`�' l .. �r ��� � r> � . . -�-''+ �� ;� , ' � � k � ��r ' r � ' r� •' � r - ��' �.' �•' � ,�r� i ;� � � , ��' ry y.� � !-- ..� ,,.�•_ r. •r,. . • � f ^w� �� r+�k�!,,r. ��"� � �y�/"� a� '��Ilt�..- •-�;'�'r..�'+•:�., ���'�•�'� _ ►,�=' ,F�,T � _ �.r � � ! d:.� -�� s..�; ri'e al�•�Ll6�'-'�.' 'ti. f _� � �f' -. [j� � �....� . . � . '-� `'� '�� - - �� r"� .tir�R r.' � - y� 1 r'��, 1 � �` ����'A� � . ,� •�* �� rA -�-�1 , ' � y/,�'iii, k� •. � \s '� .�,."� ' �s } yr� . ':. ~�� '~� • • ~�� # �h••�..�1����� `.'�R�..{�• ^ r�. `��� �� }- �� �~ • `� �� � ��. � ��:� �.. �. .I � '' a �`" + � _ ' . ti �.l � `�� �, ��•��� �" "4 � '�► • �. �� ,.�..._.. . , :•��.•� . .; � } ��,", ��:,4, ,�� • � "� �� � ' .�'-,.�'� � r - :" ,. . �. .,`�^., .�����-.�.. �'"�.,�- y '� '� -��-����� .�+T; � �s � u .'� � �f.J � �� . 0 �f ' , ^ � .� �.'• � :�. +, � �+-''..."i�r` 4�1 , •� �s•� � � L�� •1 �4 � �`'� w�.i ��, ';�~'ry �;� �, � � '�� � � '. i�'�� �� �� �y/. ���� i 1! +� �{. ' '!: •;�!R' ', r# �` � �"� ��.:.�: i��� �' � �_ .� � _•�.,�. . .�r' �i 1 R L��� �I � �� T�"• � i a,� � ..�' �� � , y f•: � 1 � �•�. �� � '!s# �r�s � F � !��� ` e� �• .y�i'c� 1 �. �. � ; - � � �]� .rn...�,�,.�` '�/. �; �`� t �.��� 1 , '11,ti ti� � ��_ _ 'X� r � ' �� � � :!�*!ry v, 'ir � �� .•��� ��+� . � - � .�j �� .•`v n�+ i; • x � �- � . 45 i: �`., � r � I j. A• 4 � 'f�' .a• � r..•• �� eI r� "''�' 'h"' }° �j ti��'�� � y` � .�"Xi � •�' '+' �•� ���' r. . � r� • .�v , i r �'.�. 1�1 � � �r �r ti�� �h' �� ..� � �•� ��� ;� �x�� 5� '� t .. .. . '{��' �. , i ',�i� '���� ' � � � i �� ,' +' �'�F'_ w� � � .ro y �• � '� 'Mr ♦ � �1� * �a � ��''� � .• r �'n i� ��1 r k•..�.�. , �`';��� '�,y • 1 Kl��' ' .�L •«r .-•��}e,,.. ,Ti� zW� '=�� ^�� �+ �., ,f � �• �t , .■ ^� � � • 7t' .�4`iwrl�'. r _��, � i'"" � 1 , �'��:.�'�• .. � ��+ +• � ��� �� , , I . �� � " ��� � i� � ��.y�. �s '�' � � � . ' '',�,•.. � �r .�r• �, ��a ` . !�1� �y�. 'F e i � ��i^ � /• H.�� i��a n 5 J�@i.��� 1q� � �C`��� _`... � L '7'y'��l a�� �..I ��.4y �• „-:y.. �'$:Ir} l� '° r� �, y'I�r ' �t • '� `�'� , ' . � i• -•.ww.�►a. � .. . � ,M• �r? . 1 •r � �R�.,; ,� .s9�" ,f,�,,,�*� :�' � :r�.e r'� '; 'r� a�.. � ' � �! 1�ri':� � ���: �i';y, �, A:;_,,,.'�� ,���,i :� '�•' �r' ti• +�r u '� ••„ , � 't'f - � '� f, r � "� ,�, . � j � � , ' " �� { +, �►�. , �.' 11:. i,��. :�I .+�'}�� M .t� "�M� ���� •,� �,. �� .,7., �,•��s►y,, � �, ' � ' _� � , � i � � �� � .T• 6. �'�' �' r[':�'.i 7� � ' t• + - • .i���.r+. ,. � , �+ �1 , �- ih• � ��„ . ••• • .�a-'{y �t: � ,i�� �",`"� ��,;, �+ _,. �..' �'s�•� �.:�r:war." , .�� . . �p W �+ . . � � � � � ` + .� � / ���T .A. �1 .' -��� !�1� �`. � � �,' p ..t� ��� �•.s � � . 7 •� M ■ '� � � i� � � �','r' '+��3 �Y :� � � �� ',+��� ~ � �'�����4'.�. � 'r .�.5 , � A'.. ' �'i R �� +.r .� ����•A-'�,�,w..�. �� ���`�_'�'��`. 4; •�.:. y, 1 a� M � �i � � � 5;�f�-rA• _ � "' .5", •Y. , - ` �"�� Y� -f� i� y� !�'} r. ��`R.•+''._� ' �'*��'N r �. �� �• ,�' �1� �' �ti � '�1 __ .�` � � � , � • � �•! ,.P i MS't'�•"" ��� :,,` r'! \ .'y�'�� .F_ 4't4,�N� p�� 1� � ` � ''�. :� i....r.. ++ � r �x.� � �• ` � `1 �4 � ���"� ,J� .� ; . ' ` ' ' ti ,� , J';:=�'��i�" ` . ° '��y gR� .�,..� �1.•. �kw—;. � !� T,�'> ,�h�� �' n ; ��`'�,�, .` '� r �, � „W_r '� � � . � � zp r q� w� • R_�'--�' �� �Li- � , � �� 1 r. /. ,� i R.{ � � •'fi 7}� " '�X�' •�� �y'� A1�e� �. x� �♦ k� ..� • r� 1 �� .a � _ " •� � , � _1���� ' � �`�.`l' • � •- �� t*,J. �' I'. � �r �1K'� .i1f� 1 �" �. _ �! _. _ _... `wFCa- �. .`��i�r Il a LEGEND Existing Proposed � SPEEO __——_ SPEED LPIR LMIT 55 65 i SPEED LWIT NOT TO SCALE 6� saEEo LWIT 65 3030 LBJ FREEWAY SUITE 1660 DALLAS,TEXAS75234 Existing and Proposed Speed Limit 972-248-3006 FAX 972-248-3855 S H 114 a n d S H 17 0 ��� �nc�n����nc DALLAS-PHOENIX-ALBUQUERQUE OKLAHOMA CITY-SAN ANTONIO T H E T � W H a F 1111 E T L �► K E DISTINCTIVE BY DESIGN Development Snapshot March 2019 N � � 1@yRoN = m : NF�S > > ��y_ � Oiye��O n �; � - Od2' � �� � CITY OF � d P on �� i H [ T 0 W k 0 F ROANOKE � a �� W ESTLAi�E Q M���ST 5N'-17o S H:>>q �� I�iSlihCl[v( dv hkt,i[sr� MAIN� �� ar.....r.�..�..�..�� O ,y� �]�• SCHWAB.WAY TOWN OF h / � ' � i �,�/ �3 23 d � � o� .� TROPHY CLUB o g� ❑ � ._..i �r �7zC�l'�j � /°yti � �. A '2G 46 45 (� C,p �f/r F � �F � q�'�sy R'�Po�� -- r � i Fk�pR c,� _-------- ---- --- �N__-- _- ------- ----� a / �Np)PN I��..�.. � � ! � � .-.- ' � -- —Pui---- - -- -- - - - - -- - �M •��• •��yJ � � h Y y'�v r �F �� o �� o SH`� NORTH .'����/// � � 29 44\��I d Q // �� 35 36�38. �,n � 4 � H�170 Jy ��d 44 � a � d 37 � �a � z� � � � � �• �! � �'��� � � �s ����v0 N5 > S�LANq� gOLP � e�'VD� m DOVE�RD ��� O � .�..�..�..w......�. DOVE�RD o. � • 5i �1-� �� . - � S�� 111 n i � �j ��•� I `,r.._.._.. � � �s � �..�..� 1 � � � o `�� . ._ Le g e n d � ; ���,_ ._+ � ° �°���a,�� 14� , �. { I �i 6 �a n ,�..�..�.....0��6R� , O Announced � Q � �"� 5 <. �•I • � d W � a�..�.. ..� o • Conceptual � ~ i CITY OF . `� � CITY OF � o underConstruction KELLER � � i _ SOUTHL-AKE a � � � °> ` ! � Existing J i._.._.._ .� • Town Limits �. �.� Development Activities Status March 2019 Project Project / Number Percent Estimated Development Land Use of Lots/ Size Development Status No. Name Units Complete Completion 5 Vaquero Residential 296 510 acres 265/296 lots under construction or completed 87•67�� N/A 1 1,45,46,47 Charles Schwab Phase 1 Office 554,000 29 acres Phase 1 under construction 70% Fall 2019 Granada Phase 1 41 39/41 lots under construction or completed 84.37% N/A 13 Residential 84 acres Granada Phase 2 43 23/43 lots under construction or completed 39.53�o N/A 14 Carlyle Court Residential 8 10 acres 8/8 lots under construction or completed 81.25% N/A 15 Knolls at Solana Residential 56 62.5 acres Infrastructure improvements under construction 0% N/A 17 Quail Hollow Residential 96 188 8acres 10/96 lots under construction 5.21�o N/A 19 Terra Bella Residential 26 55 acres 24/26 lots under construction or completed 86.54% N/A 22 Fire/EMS Station Government 1 5 acres Completed 100% March 2019 23,72,73 Charles Schwab Phase 2 Office bl 6,000 30 acres Phase 2 site work under construction 5% 2021 25 Spec's Retail 1 12,000 sf Additional square footage under construction and remodel 75% 2019 J:6 units Block J has b/b lots currently under construction Entrada 2,700sf- 28 Residential I: 12 units 4,500sf Block I has 12/12 lots currently under construction 4.66% Varies Residential E: 12/14 units Block E has 12/141ots currently under construction 29,30 Entrada Retail Corner Retail/Office 4 -50,000 s.f. Retail Corner under construction;Starbucks under construction 35% Fall 2019/2020 Hospitality, 34 Entrada Plaza Mayor Condominium, 4 5 acres Site work and foundations under construction -% 2021 Retail Restaurant Row/Chapel & A: 15,422 sf 35,38,40,43,71 Reception Hall/Gas Well Restaurants/ 5 Under construction 25% 2019 Entertainment g/C:22,414 sf Garage 51 Paigebrooke Residential 6 20 acres 4/b lots under construction or completed bb.bb% N/A Residential Subdivision Buildout March 2019 . . . . - • . � . - . . . . . . - � - . - - . . - - - . . . . . . - - - - . - . Aspen Lane/Shelby Estates 4/7/1981 8 0 132.6 Built-out 100� 8 8 Carlyle Court 3/7/2016 8 1 10.2 Under development 81•25� 8 5 Entrada 12/14/2015 322 292 85.9 Under development 5�0 30 0 Glenwyck Farms 3/13/2000 84 0 104.3 Built-out 100.00% 84 84 Granada Phase I b/17/2013 41 2 85.37�0 39 31 84.3 Under development Granada Phase II 12/12/2016 43 22 39.53�0 23 11 Knolls at Solana - 56 56 62.5 Under development 0.00% 0 0 Mahotea Boone (Carpenter) 12/9/1977 14 0 31.6 Built out 100.00�0 14 14 Paigebrooke 3/8/2004 6 2 20.3 Under development 66.67% 4 4 QuailHollow 3/28/2016 96 88 188.3 Underdevelopment 5.21�0 8 0 Stagecoach 8/16/1971 47 6 55.5 Mostly built-out 86.17% 41 40 Terra Bella 1 1/1 1/2008 26 1 54.8 Under development 84.62% 24 20 Vaquero 3/27/2000 296 32 510 Mostly built-out 87.67% 265 254 Wyck Hill 4/3/1996 13 2 22.4 Mostly built-out 84.62% 1 1 1 1 Other/Miscellaneous - 23 2 - Mostly built-out 86.96% 21 19 1,083 501 1,362.7 50.00% 582 501 ► .;. ' ' •� �_ rc'• �r►1��, '""� Z + Retail Corner = r ��� ' ��' •{ �� '� � . ;P�ord»� �-2� Entrada Status Ma March 20 I 9 �� ' ¢7`�-� '����'� �- --�'1`' ' � ' � � `3w•�r� r 2P�Ord 809 I 12-12-16 � � � �� $' '� _ �� r ����.,�� .� �r�"s.. _ , � �,� �� --'_� �� �"' '� r',� �- � � �� - , - r �� � �� •��'"` � � . __"'"�«.. - �- � Amphitheater . _ �� , d►o,;+` ,�,�� ►� � I a � � - - _ .�' •�i' .,,� 4 � � � .. 7. '*�.0 �� .� ,7�C � , 4 /r� , ' � '� 1: C 7 .ti . - fgT ti.�'. `�# �'�C�'. � ,�� �� \/ �.� .�- -- - r • �� 'L � '► V '�t '_ P'4 RR'w_ .�'t �. �` ♦ � � �a' � �,��M �` - Restaurant Row � � _ `�'� �ifice� �t , '� �� � • - ♦ �'•". - , � r: .� ,; �� �. �*�' �� � '` c. .w�,�� _ _ � � � — �--�-�� .� �. I<BI x h�' ►a� .. .�_ � • ~ . ,� + _ �� `' Bloc ., 2. -- . ,�._. � � +�.. _��,_. a � � + � �,�-�+a�' �'' Chapel/Reception Hall '-1 � .i�•.� � - •- _ '� µ � -- � �� �� Gas Well Pad Site � �� '--—��`=-._ _ ��� �� sP I ord as3�a-3o-ia - - . ` � r�� � _ . �. �:-� - :�� ��- �. ' - � . . � S7ic���778�328i \ P t -- a,'.� -��_ Z . � Y • � } G_,s,,, ��5`��� � �� *� . . !� E' ���� K�� ���•�_. v ' cvs � � � '�.+ i. � � ��' _�.. � #`� f�l •� + " w � i � > — �� • Town Hall -��- CVS �� ' '� � _ - . . v� �` , - SPIOrd���i i�_ia_i� . ' � '� i r^�{� _I-!---� � r � . �� � 'r f� FP I Ord 761 I I� � : \ �II. ' f /M. .u-� y� � � r•'•�w , � �r . � - spr ti,.. t � �i _� .� '..���i�_ 'S' � A�` �,�� � f `� ��� a� .�.�. o 4 . �I '� -�!' ''��;:7�:�,;�`_': rPj / �4 B!. �L�,�• `. I -- I 1 % i:�S�r'LLt:;r-T..`-_�. �� , f" � ti . . �'��, � ,�..1� +�c Primrose � �' , � � Plaza Ma or A � ' ' ' � • � j;L�; 'f' Y � ..� Phase 2 °l Ord 763 12-I� � = � • � • SP I Ord 854�5-21-18 C �� . q � _ � - h .f� ^ n O f��� "��f �P'n��n azn i 06-19-V . �..._��.� � ��_�� P'?.. f <♦ d�,P 6°- ..'� .f � '. . _ _ _ ,� __ - 4', O�a o��p� _I� � . � a ` � rf 'y� ' . . '� �s' �:�18 � G; � *���� �����- r,r. ��., - !� �;,- �yM. � �� ..� - .S �� 9E . .�3. ��� � ''���'' � .�� . � � _ pj � ��A� � Blocl<D�l�'� ��� ; , �! _ ' y f: � I 4 ��, 'G T �Y( ~ \ y �,� � * r f � `• �F _� S F�' � '►• �a �,� "� � '•� �� aS ��/ � � e 9� ���. ' � d.• � G LEGEND ` �`�i-d���►-r�*L '�''� - � s 'J '`', '�!r ' •:," . � .���� �� J�+�' � �R �� �f ��'�. , �� Sice Plan Received � �s ry 1 �1 f. - � �� y � ��`�`� "' ��� r�'�� � 1 �� � p�� �locl<E Comill*Court �'` � � SitePlanApproved 5 I': _ •�' , � ' ( � �.. • i► � r� � � � ���'�/�'� �� ..�i<f__(CataloniaCour�� . ��o<i<� ' �..i. . ..� Y,� S�Ord837 9=11-V ���� , . r� g . �r.�- /�y � Buildin Permir.Rece�ived �• .�-�•`,,:•• � A SP I Ord 783�4-25-16 b �� --�1` � RP F � T ����{F r �iY S',��y� h. '+�� � 1S Building Under Cons�rucnon `�/�r{�,,', � ��/ �� � t t? , r��� 71' • � �•��.� '��"���"�y'' rJ+:� � i�Blocl<I . ��S .� � , Bullding Completed � :� �R��= +�i ��r��.�`;;_r ��'� Blod<I (Piedra Court � , � � i�.j ,� �y�,,� e'�.` �, +�h' ,�� r '1 r�{�����-;*,�• '��. �� O rd 847�2-26-18 � . �: � i �i�.� . ' . ^� � �'�%r.•L r.��'S�P �-���� �, � �� , ' • .�r � r��ti sX l�i.�� , -_ I . 1_ .� ,�� 3 . 4 � � . • � i ��,�J�•�4'�'"•� .� , � '�� � �� ! � V , �� ^�� T '`= 3 ��`_n . .. ��► �i, ' _, �. '° •r* . � x r� �'�,t*`��� �� Entrada Project Status March 2019 . - . . - . . - . - - . . . � - - . . - . � . . - . CVS Pharmacy 1 13,378 sf Wurzel Builders Completed February 2017 Primrose Daycare 1 12,460 sf Cooper General Contractors Completed May 2017 Entrada Sales Center 1 3,463 sf Crescent Custom Homes Completed June 2018 Retail Office:43,336 sf Entrada Retail Corner 3 Starbucks:2,834 sf Diesel Design Build Building permits issued;under constr�ction Fall 2019/ Early 2020 Retail l: 1,370 sf Entrada Residential Block J 6 -4,500 sf ea Calais Custom Homes Building permits issued;under construction;3 units nearing Varies completion Entrada Residential Block E 14 -5,000 sf ea Crescent Custom Homes Building permits issued;under construction;5 units nearing Varies completion Entrada Residential Block I 12 -3,600 sf ea Pentavia Custom Homes Building permits issued;under construction Varies Pedestrian Bridge 1 - Crescent C�stom Homes Building permit issued;under construction 2019 Gas Pad Parking Garage 1 148,398 sf Diesel Design Build Building permit issued;under construction 2019 A: 15,422 sf Building permits issued for all of restaurant row; Resta�rant Row 3 Crescent C�stom Homes 2019 B/C:22,414 sf under construction Chapel& Chapel:3,207 2 Crescent C�stom Homes Building permits issued;under construction 2019 Reception Hall Reception Hall: 14,418 sf Hotel:95,048 sf Condo A:N/A Entrada Plaza Mayor 4 Tri-Arc Building plans under review;site work under construction 2021 Condo B: 131,571 sf Parking Garage: 120,912 SF Town of Westlake's Building Permits Issued - Last Month Month of March, 2019 i H E T � w �I p F � � �� �� � � Contractor Project Number Project Type Full Address Permit Issued Date Owner Name Tenant Name Business Name Square Footage Value Spec's 2341 Highway 377 Commercial West Coast CFO-19-0043 Finish-Out(C) 2341 Denton Hwy 03/28/2019 Highway LLC Spec's Dimension Group 11,843 $125,000.00 Westlake,TX 76262 Commercial Finish-Out(C) Total Value $125,000.00 (Avg.:$125,000.00) Total Square Footage 11,843.00 (Avg.: 11,843.00) Permits Issued: 1 Construction Plans 3050 Schwab Westlake Retail Peloton Land CIVIL-18-0262 �CIVIL) Way 03/06/2019 Assoc Solutions 3050 SH 170 TX MYGOV.US Town of Westlake�Building Permits Issued-Last Month�Printed 04/15/2019 at 10:31 AM Page 1 of 5 Westlake,TX 76262 3051 Schwab CS Kinross Lake Construction Plans Way Parkway C/O Peloton Land CIVIL-18-0358 �CIVIL) Westlake,TX 03/06/2019 Charles Schwab Charles Schwab Solutions 76262 Construction Plans(CIVIL) Total Value $0.00 (Avg.:$0.00) Total Square Footage 0.00 (Avg.:0.00) Permits Issued: 2 2145 JT Ottinger DEMOR-19- Demolition Permit Rd. Rogers Kenneth Lindamood 0045 (R) Westlake,TX 03/07/2019 Demolition 1,200 $8,000.00 76262 Demolition Permit(R) Total Value $8,000.00 (Avg.:$8,000.00) Total Square Footage 1,200.00 (Avg.: 1,200.00) Permits Issued: 1 Pedestrian Bridge MRW Investors, ELECC-19-0056 Electrical Permit 56 Girona Dr. 03/25/2019 LLC Total Electric, Inc. $3,400.00 (C) Westlake,TX 76262 Electrical Permit 54 Cortes MRW Investors, ELECC-19-0052 �C� Westlake,TX 03/21/2019 LLC Total Electric, Inc. $2,100.00 76262 Electrical Permit(C) Total Value $5,500.00 (Avg.:$2,750.00) Total Square Footage 0.00 (Avg.:0.00) MYGOV.US Town of Westlake�Building Permits Issued-Last Month�Printed 04/15/2019 at 10:31 AM Page 2 of 5 Permits Issued: 2 Spec's 2341 Highway 377 West Coast IRRC-19-0054 Irrigation Permit 03/25/2019 Highway LLC Spec's R&R Landscape $12,000.00 (C) 2341 Denton Hwy Management, LLC Westlake,TX 76262 Irrigation Permit(C) Total Value $12,000.00 (Avg.:$12,000.00) Total Square Footage 0.00 (Avg.:0.00) Permits Issued: 1 5 Cardona Dr. IRR- 19-0021 Irrigation Permit Westlake,TX 03/20/2019 Israel Bernal Texas $2,500.00 (R) �6262 Landsculpture 1401 Dove Rd. IRR-19-0048 Irrigation Permit Westlake,TX 03/18/2019 City of Southlake N1 Meter Station #1 American $3,500.00 (R) �6262 Backflow 2005 Valencia Peter Michelsen Irrigation Permit Cove Fossil Creek Tree IRR-19-0046 �R) Westlake,TX 03/18/2019 Rachel Michelsen Farm&Nursery $10,000.00 76262 Irrigation Permit(R) Total Value $16,000.00 (Avg.:$5,333.33) Total Square Footage 0.00 (Avg.:0.00) Permits Issued: 3 2001 Nighthawk Glenn Goebel SFR-19-0027 New Single Family Ct. 03/01/2019 Mary Goebel Kore Real Estate ��00 $1,000,000.00 Home Permit(R) Westlake,TX Development LLC MYGOV.US Town of Westlake�Building Permits Issued-Last Month�Printed 04/15/2019 at 10:31 AM Page 3 of 5 76262 2226 Barcelona Alec Marshi SFR-19-0035 New Single Family Ct. 03/01/2019 Marshi Larry Stewart 7 688 $1,200,000.00 Home Permit(R) Westlake,TX Custom Homes 76262 1872 Lakeshore Randy Lentz Lori SFR-19-0037 New Single Family Dr. 03/01/2019 Lentz SCH Homes 18,196 $3,374,250.00 Home Permit(R) Westlake,TX 76262 2213 Barcelona SFR-19-0047 New Single Family Ct. 03/29/2019 BG Fox LLC Pentavia Custom g,034 $2,136,424.00 Home Permit(R) Westlake,TX Homes 76262 New Single Family Home Permit(R) Total Value $7,710,674.00 (Avg.:$1,927,668.50) Total Square Footage 42,618.00 (Avg.: 10,654.50) Permits Issued: 4 1401 Post Oak PI. James Smith Living Water POOL-19-0041 Pool Permit Westlake,TX 03/14/2019 Custom Pools 675 $60,000.00 76262 1645 Trace Bella MG Luxury Homes Watercrest Pools POOL-19-0059 Pool Permit Westlake,TX 03/29/2019 Inc. 1,863 $85,000.00 76262 Pool Permit Total Value $145,000.00 (Avg.:$72,500.00) Total Square Footage 2,538.00 (Avg.: 1,269.00) Permits Issued: 2 RMDLR-19- Residential 1715 Terra Bella 03/05/2019 Payton&Andrea Garabedian 200 $20,000.00 0031 Remodel Permit Dr. Mayes Revo TR Properties MYGOV.US Town of Westlake�Building Permits Issued-Last Month�Printed 04/15/2019 at 10:31 AM Page 4 of 5 �R� Westlake,TX 76262 Residential Remodel Permit(R) Total Value $20,000.00 (Avg.:$20,000.00) Total Square Footage 200.00 (Avg.:200.00) Permits Issued: 1 2202 King Fisher WWPP-19-0026 Water Well Permit �r� 03/26/2019 Bruce Heikkinen Barco Well Service $47,942.00 Westlake,TX 76262 1814 Scenic Cir. Thomas&Tina WWPP-19-0049 Water Well Permit Westlake,TX 03/20/2019 Kidd Barco Well Service $51,000.00 76262 1804 Glade Ct. Cole Hamels Heidi WWPP-19-0050 Water Well Permit Westlake,TX 03/27/2019 Hamels Barco Well Service $47,942.00 76262 Water Well Permit Total Value $146,884.00 (Avg.:$48,961.33) Total Square Footage 0.00 (Avg.:0.00) Permits Issued: 3 TOTALS: Square Footage: 58,399.00 (Avg.:3,244.39) Value: $8,189,058.00 (Avg.:$454,947.67) Total Projects: 20 Permits Issued: 20 MYGOV.US Town of Westlake�Building Permits Issued-Last Month�Printed 04/15/2019 at 10:31 AM Page 5 of 5 MRW Westlake Ma'or Pro'ects Schedule 2019-02-11 � � �� � � ��! . �� . .. ��� � C . ��� •,• �� • C � ���� ��� � ���� ��� � . �� y C � ��� � � � � WE-6 WE-5 y WE-4 � � WE-3 � � WE-7 � � �� � tr7 n � Phase II U1 n � — � d W�-� � we-,-Hwd r-' WE-2 • we�x-i��t��� lTJ wE-a-Raemurm,i Row W E-d-nmph dnaalor WE-5-OHce+Warvho�se WE-6-Re1an Plaxa WE�7-Wr�dOing Cnopei Town Cou nci I Item # 5 — Executive Session EXECUTIVE SESSION The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: a. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 b. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the offer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana - Waterside Land Company LLC Town Cou nci I Item # 6 — Reconvene Council Meeting Town Cou nci I Item # 7 — Council Recap / Staff Direction COUNCIL RECAP / STAFF DIRECTION Town Cou nci I Item # 8 — Adjournment Work Session ITEMS OF COMMUNITY INTEREST: Mayor and Council Reports Town Cou nci I on Items of Community Interest pursuant to Texas Government Code Section 551.0415 the Town Council may report on the following items: (1) expression of thanks, congratulations or condolences; (2) information about holiday schedules; (3) recognition of individuals; (4) reminders about upcoming Town Council events; (5) information about community events; and (6) Item # 2 — Items of announcements involving imminent threat to public health and Community Interest safety. ✓ Westlake Municipal Offices Closed in Observance of Good Friday Friday, April 19, 2019 **There will no interruption to this week's trash& recycling services;Service will occur on the regular col%ction day ofFriday,April 19, Z019. ✓ Westlake Academy closed in Observance of Easter Weekend Friday,April 19 and Monday, April 22, 2019 -Staff and students return Tuesday,Apri/23, Z019; These days scheduled for Bad Weather Make-up Days but not needed this year. ✓ Early Voting for May 4 General Election Begins Monday,April 22 and runs through Tuesday,April 30, 2019 -Aftention Residents:Both Carroll ISD&Kel%r ISD are holding e%tions. The General Election indudes municipalities(none in Westlake;council members running unopposed), ISDs, and Special Districts The c%sest po/ling/ocations for ear/y voting:Southlake Town Ha/l and Ke/%r Town Hall. For more information, visit our Town website or contact Town Secretary Ke/ly Edwards for assistance via email or cal/817-490-5710 ✓ Town Council Work Session/Meeting Monday,April 22, 2019* Westlake Town Hall, Solana Terrace-BIdg.7, Suite 7100 -Council Chambers ✓ Westlake Annual New Resident Dinner Reception Tuesday, April 23, 2019; 6:30-8:30 pm Home of Mayor Laura Wheat&Mr. Doug Wheat -Invitations to be emailed out first week in April to all new residents since April 20i8 for this highly anticipated evening to o�cially we%me you to our community and thank you for choosing Westlake/RS�Ps are respectfully requested. If you do not receive the emailed invitation,please contact Ginger Awtry via emai/or at 817-490-5719. ✓ WA Secondary Campus Open Tour Thursday,April 25, 2019; 3:45-5:00 pm WA Main Entrance-PYP Office -Open to all prospective secondary parents and students(grades 6-i2)for a tour of Westlake Academy's campus and an opportunity to learn more about the IB curriculum, our WA teaching philosophy, col%ge preparation, and student life. Questions?Contact Assistant Secondary Princi,oal Jennifer Furnish via email or 817-490-5762. ✓ MasterWorks Spring Concert in Westlake with Escape,a Journey Tribute Band (2 of 2) Thursday,April 25, 2019; 7:00-8:00 pm Solana Plaza Courtyard (outdoors), 1301 Solana Boulevard, Bldg. 4-The Plaza Annual free spring concerts sponsored by Arts Council Northeast, Cushman Wake�eld, & Town of Westlake; We hope to see you out on the patio!Questions?Contact Ginger Awtry�ia email or call Si7-490-57i9 ✓ WA National Honor Society&National]r. Honor Society Induction Ceremonies Monday, April 29, 2019; Joint program begins at 6:00 pm WA Campus-Multi-Purpose Hall (MPH) -Need more info?Contact Mrs Martha McKinnev at W,4. ✓ WA Grade 10 Personal Project Exhibition Tuesday, April 30, 2019; 8:15 am - 11:00 am; WA Campus-Gym -As a culmination of the studenYs experience in the IB Middle Years Programme(G6-10), the intention of the Persona/Project is for the student to demonstrate his or her ability to initiate, manage, and direct his or her own inquiry in a global context that results in a dearly defined product or outcome. Westlake residents and businesses are encouraged to attend and experience first-hand the caliber of these projects completed by our Grade 10 students. Questions?Contact Mrs Katie Estrada at WA. ✓ WA Secondary Awards Wednesday, May 1, 2019; Both programs in WA Gym • Senior Clap-Out&DP Awards (G11 & 12) begin at 9:00 am with Seniors Kinder Buddy Lunch immediately following in the Lee Fieldhouse • MYP Awards(G6-10) begin at 1:00 pm ✓ WA Annual Teacher of the Year Reception; Presented by the WA Campus Leadership Team Wednesday, May 1, 2019; 3:30 pm WA Campus-Multi-Purpose Hall (MPH) ✓ May General Election Day Saturday, May 4, 2019; Polls open from 7:00 am to 7:00 pm Aftention Residents:Both Carroll&Kel%r ISDs are holding e%tions. You may vote at Westlake Town Hall on May 4 Election Day only—no Early �oting at Westlake Town Hall. For more information, �isit our Town website or contact Town Secretary Ke/ly Edwards for assistance via emai/or call 817-490-5710 ✓ WA Annual Bandana Bonanza; Hosted by the House of Commons(HOC) Saturday, May 4, 2019; 4:00—7:00 pm; WA Campus -Entire West/ake community in vited.�Come join our WA families for a day of family fun on the W,4 campus hosted by our parent-teacher organization—thank you to our HOC.�Enjoy bounce house, laser tag,petting zoo, caricature portraits, euro bungee,zipline, face painting and food from Meat-U Anywhere, Kona Ice and our WA Student Clubs. Pre-Sale Tickets are auailable at a discount on/ine at.• wa-hoc.orq/bandana-bonanza-2019;and, tickets wil/be a uai/ab/e at the door for regu/ar price. ✓ Coffee&Conversation with the Mayor/Board President Monday, May 6, 2019; 8:00—9:30 am Marriott Solana Hotel—Great Room -Thank you to the Marriott for pro�iding complimentary coffee&tea each month! ✓ Board of Trustees Work Session/Meeting Monday, May 6, 2019* Westlake Town Hall, Solana Terrace-BIdg.7, Suite 7100 -Council Chambers ✓ Westlake Historical Preservation SocietvlWHPS� Board Meeting Tuesday, May 7, 2019; 6:00 pm* Westlake Town Hall, Solana Terrace-BIdg.7, Suite 7100 -Council Chambers ✓ Public Art Competition Advisor�Committee Meeting Monday, May 13, 2019; 11:00 am* Westlake Town Hall, Solana Terrace-BIdg.7, Suite 7100 -Council Chambers ✓ Planning &Zoning Work Session/Meeting Monday, May 13, 2019* Westlake Town Hall, Solana Terrace-BIdg.7, Suite 7100 -Council Chambers ✓ Town Council Work Session/Meeting Monday, May 20, 2019* Westlake Town Hall, Solana Terrace-BIdg.7, Suite 7100 -Council Chambers Save the Dates for other important May&June events coming up soon in our community... ♦ WA PYP Exhibition - May 22, ♦ WA Fine Arts Banquet—May 24 ♦ Westlake Decoration Day—May 27 ♦ WA Grade 5 (PYP)Graduation—May 29 ♦ WA Senior Bricklaying, Baccalaureate, and Luncheon—May 30 ♦ WA Senior Banquet—May 30, 6:00 pm,The Bowden ♦ WA Graduation—June 1, 2:00 pm, Hurst Conference Center ♦ Westlake Residents'Public Safety Fair—June 2; 3:00-5:00 pm, Fire-EMS Station ♦ Board of Trustee Work Session/Meeting—June 3 ♦ Planning &Zoning—June 10 ♦ Town Council Work Session/Meeting—June 17 *For meetinA aAendas and detai/s on W,4 calendar events or Municipal calendar events,please visit the Westlake Academy website or the Town of West/ake website for further assistance. Town Cou nci I Item # 3 — Citizen Comments CITIZEN COMMENTS: This is an opportunity for citizens to address the Council on any matter whether or not it is posted on the agenda. The Council cannot by law take action nor have any discussion or deliberations on any presentation made to the Council at this time concerning an item not listed on the agenda. The Council will receive the information, ask stafF to review the matter, or an item may be noticed on a future agenda for deliberation or action. Town Cou nci I Item # 4 — Consent Agenda CONSENT AGENDA: All items listed below are considered routine by the Town Council and will be enacted with one motion. There will be no separate discussion of items unless a Council Member or citizen so requests, in which event the item will be removed from the general order of business and considered in its normal sequence. a. Consider approval of the revised minutes from the meeting on January 7, 2019. b. Consider approval of the revised minutes from the meeting on February 25, 2019. c. Consider approval of Resolution 19-17, Authorizing the Town Manager to execute a contract with Jerry Hodge &Associates, LLC for project management services related to TxDOT construction of State Highway 114 services roads and other improvements and amending the adopted budget to provide funding. d. Consider approval of the minutes from meeting on March 25, 2019. r H E r o w H o � WESTLAKE MINUTES OF THE TOWN OF WESTLAKE, TEXAS TOWN COUNCIL MEETING 7anuary 7, 2019 PRESENT: Mayor Laura Wheat and Council Members: Alesa Belvedere, Greg Goble, and Carol Langdon. ABSENT: Michael Barrett and Rick Rennhack OTHERS PRESENT: Town Manager Tom Brymer, Assistant Town Manager Amanda DeGan, Town Secretary Kelly Edwards, Director of Public Works Jarrod Greenwood, Director of Information Technology Jason Power, Director of Facilities & Parks Troy Meyer, Communications Manager Jon Sasser. Reqular Session 1. CALL TO ORDER Mayor Wheat called the regular session to order at 5:06 p.m. 2. DISCUSSION AND CONSIDERATION OF ORDINANCE 874, CALLING AND ORDERING AN ELECTION FOR THE PURPOSE OF ELECTING THREE (3) COUNCIL MEMBERS TO BE HELD ON MAY 4, 2019. Town Secretary Edwards provided an update regarding the contracts, dates and times of Early Voting with both counties. Town Council Minutes 01/07/19 Page 1 of 3 MOTION: Council Member Goble made a motion to approve Ordinance 874. Council Member Belvedere seconded the motion. The motion carried by a vote of 3-0. 3. EXECUTIVE SESSION Council convened into executive session at 5:07 p.m. The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: a. Section 551.071. Consultation with Attorney (1) when the governmental body seeks the advice of its attorney about: (A) pending or contemplated litigation: Builder Recovery Services, LLC vs. Town of Westlake b. Section 551.072 to deliberate the purchase, exchange, lease, or value of real property regarding the conservation area at The Knolls at Solana c. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the ofFer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana - Charles Schwab - Maguire Partners-Solana Land, L.P., related to Centurion's development known as Entrada and Catalyst Commercial d. Section 551.074(a)(1): Deliberation Regarding Personnel Matters —to deliberate the appointment, employment, evaluation, reassignment, duties, of a public officer or employee: - Town Manager evaluation 4. RECONVENE MEETING Mayor Wheat reconvened the meeting at 6:08 p.m. 5. TAKE ANY ACTION, IF NEEDED, FROM EXECUTIVE SESSION ITEMS. MOTION: Council Member Langdon made a motion to approve Resolution 19-01. Council Member Belvedere seconded the motion. The motion carried by a vote of 3-0. Mayor Wheat recessed the meeting at 6:09 p.m., to begin the Board of Trustee's work session. Town Council Minutes 01/07/19 Page2of3 Mayor Wheat reconvened the meeting at 8:09 p.m., convened back into executive session. Mayor Wheat reconvened the meeting at 9:57 p.m. No additional action taken from executive session. 6. AD]OURNMENT There being no further business before the Council, Mayor Wheat asked for a motion to adjourn the meeting. MOTION: Council Member Belvedere made a motion to adjourn the meeting. Council Member Langdon seconded the motion. The motion carried by a vote of 3-0. Mayor Wheat adjourned the meeting at 9:57 p.m. APPROVED BY THE TOWN COUNCIL ON APRIL 22, 2019. ATTEST: Laura Wheat, Mayor Kelly Edwards, Town Secretary Town Council Minutes 01/07/19 Page3of3 r H E r o w H o � WESTLAKE MINUTES OF THE TOWN OF WESTLAKE, TEXAS TOWN COUNCIL MEETING February 25, 2019 PRESENT: Mayor Laura Wheat and Council Members Carol Langdon, Michael Barrett, and Greg Goble. Rick Rennhack arrived at 5:15 ABSENT: Alesa Belvedere OTHERS PRESENT: Town Manager Amanda DeGan, Assistant to the Town Manager Jarrod Greenwood, Town Secretary Kelly Edwards, Town Attorney Stan Lowry, Fire Chief Richard Whitten, Deputy Fire Chief]ohn Ard, Building Official Pat Cooke, Development Coordinator Nick Ford, Finance Director Debbie Piper, Director of Facilities & Parks Troy Meyer, Director of Communications Ginger Awtry, Communications Manager Jon Sasser, Director of Information Technology Jason Power, and Director of Human Resources and Administrative Services Todd Wood. Work Session 1. CALL TO ORDER Mayor Wheat called the work session to order at 5:11 p.m. 2. PLEDGE OF ALLEGIANCE Mayor Wheat led the Pledge of Allegiance to the United States and Texas flags. Town Council Minutes 02/25/19 Page 1 of 8 3. REVIEW OF CONSENT AGENDA ITEMS FOR THE TOWN COUNCIL REGULAR MEETING AGENDA. No additional discussion. 4. DISCUSSION ITEMS a. Presentation and discussion regarding a contract with N.G. Painting for repairs and repainting the 685,000-gallon ground storage tank and amending the adopted budget to provide funding. Director Greenwood provided an overview of the item. b. Presentation and discussion regarding the proposed amendment regarding Smoking. Director Greenwood provided an overview of the item with the revisions discussed at the November meeting. Discussion ensued regarding concerns for current businesses, proposed ordinance restrictions, enforcement, neighboring cities' regulations, and the possibility of phasing the ban. c. Presentation and discussion regarding the Report of Quarterly Financial Dashboard and Analysis as well as Capital Projects for the Quarter ended December 31, 2018. Town Manager DeGan and Directors Piper and Greenwood provided a presentation and overview of the item. Discussion ensued restricting the CIP unfunded needs, academy capital projects, academy maintenance costs, conduit funds, the trail along Ottinger Road to cemetery, and priorities of projects. d. Presentation and discussion of our Legislative priorities for 2019 and any progress or discussions had to date regarding the 86th Legislative Session. Town Manager DeGan provided an overview of the item. Discussion ensued regarding the '�Property Cap Bill" SB & HB 2, including SB 657, and SB 3. Town Council Minutes 02/25/19 Page2of8 e. Standing Item: Presentation and discussion of development projects per Staff report January 2019, including an Entrada report from the Developer and projects in Planned Development PD 3-5. Director Ruthven provided an overview of the following developments: Entrada: retail corner stone, Starbucks location, gas well pad site including the parking garage, residential buildings along the lakefront, reviewing of TxDOT curb cut for possible utility conflicts, and funding for enhancements of the TxDOT drive location. Schwab: the estimated completion of Phase I, staging for Phase II, and opening Phase I scheduled for fall 2019. Knolls: grading of roadways, detention pond, and the installation of fencing delineating the conservation area. 5. EXECUTIVE SESSION Council convened to into executive session at 6:15 p.m. The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: a. Section 551.071. Consultation with Attorney (1) when the governmental body seeks the advice of its attorney about: (A) pending or contemplated litigation: Builder Recovery Services, LLC vs. Town of Westlake b. Section 551.072 to deliberate the purchase, exchange, lease, or value of real property regarding the conservation area at The Knolls at Solana c. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 d. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the offer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana e. Section 551.074(a)(1): Deliberation Regarding Personnel Matters —to deliberate the appointment, employment, evaluation, reassignment, duties, of a public officer or employee: - Town Manager evaluation Town Council Minutes 02/25/19 Page3of8 6. RECONVENE MEETING Mayor Wheat reconvened the meeting at 7:36 p.m. 7. COUNCIL RECAP / STAFF DIRECTION Review of the CIP items, bids for CIP items, and allocating money to the conduit funds. 8. AD70URNMENT Mayor Wheat adjourned the work session at 7:37 p.m. Reqular Session 1. CALL TO ORDER Mayor Wheat called the regular session to order at 7:37 p.m. 2. ITEMS OF COMMUNITY INTEREST Director Awtry provided an overview of the upcoming events. Town Manager DeGan reviewed options to move the first of the public hearing meetings regarding property tax. 3. CITIZEN COMMENTS David DeCovas, 2001 Holley Pkwy., Roanoke, spoke in opposition of the proposed Smoking ordinance. Anthony Ukperaj, 1149 Bandit Road, Keller, spoke in opposition of the proposed Smoking ordinance and harm it poses his business in Westlake. Neil McNaby, 1815 Broken Bend, would like to provide input regarding document dedicating the conservation area. 4. CONSENT AGENDA a. Consider approval of the minutes from the meeting on January 28, 2018. b. Consider approval of Resolution 19-08, Authorizing the Town Manager to execute an agreement with the State of Texas for furnishing, installing, operation Town Council Minutes 02/25/19 Page4of8 and maintenance of trafFic signal preemption equipment on state highway rights- of-way. c. Consider approval of Resolution 19-09, authorizing the Town Manager to execute a contract with N.G. Painting for repairs and repainting of the 685,000- gallon ground storage tank and amending the adopted budget to provide funding. d. Consider approval of Resolution 19-10, Approving amendments to the Personnel Manual. e. Consider approval of Ordinance 880, Canceling the May 4, 2019, General Election and declaring each unopposed candidate elected to office. MOTION: Council Member Goble made a motion to approve the consent agenda. Council Member Rennhack seconded the motion. The motion carried by a vote of 4-0. 5. DISCUSSION AND CONSIDERATION OF ORDINANCE 877, AMENDING CHAPTER 46, ARTICLE VI, TOBACCO PRODUCTS, SMOKING AND E-CIGARETTES, PROHIBITING SMOKING AND VAPING WITHIN THE TOWN OF WESTLAKE EXCEPT IN PRIVATE CLUBS. Discussion ensued regarding the exemption of specific locations such as established restaurants. Attorney Lowry stated that an exemption should be to exempt a classification of possible businesses. MOTION: Council Member Rennhack made a motion to table Ordinance 877 to the meeting on March 25, 2019. Council Member Goble seconded the motion. The motion carried by a vote of 4-0. 6. CONDUCT A PUBLIC HEARING AND CONSIDERATION OF A RESOLUTION 19-11, A FINAL PLAT FOR A 4.986-ACRE PORTION OF LAND GENERALLY LOCATED SOUTH OF HIGHWAY 114 AND EAST OF WESTLAKE PARKWAY, ALSO KNOWN AS FIDELITY INVESTMENTS ADDITION PHASE IV. Director Ruthven provided an overview of the item. Mayor Wheat opened the public hearing. No one addressed Council. Mayor Wheat closed the public hearing. MOTION: Council Member Langdon made a motion to approve Resolution 19-11. Council Member Barrett seconded the motion. The motion carried by a vote of 4-0. Town Council Minutes 02/25/19 Page5of8 7. CONDUCT A PUBLIC HEARING AND CONSIDERATION OF AN ORDINANCE 878, AMENDING THE COMPREHENSIVE PLAN, ESTABLISHED BY ORDINANCE 747, ADDING PROVISIONS FOR URBAN LIGHTING ZONES. Director Ruthven and Mr. Robin McCaffery, Mesa Planning, provided a presentation and overview of the item. Discussion ensued regarding the proposed amendment and how current lighting would be updated throughout the town. Mayor Wheat opened the public hearing. No one addressed Council. Mayor Wheat closed the public hearing. MOTION: Council Member Goble made a motion to approve Ordinance 878. Council Member Langdon seconded the motion. The motion carried by a vote of 4-0. 8. CONDUCT A PUBLIC HEARING AND CONSIDERATION OF ORDINANCE 879, AMENDING CHAPTER 102, ��ZONING"ARTICLE 6 ��PERFORMANCE STANDARDS", DIVISION 2 "OUTDOOR LIGHTING", SECTIONS 102-206 THROUGH 102-240 BY PROVIDING FOR NEW DEFINITIONS AND NEW STANDARDS FOR OUTDOOR LIGHTING. Director Ruthven provided an overview of the item. Discussion ensued regarding percent of lighting that may be out of compliance with this amendment and the current lighting of Fidelity's parking garage. Mayor Wheat opened the public hearing. No one addressed Council. Mayor Wheat closed the public hearing. MOTION: Council Member Langdon made a motion to approve Ordinance 879. Council Member Barrett seconded the motion. The motion carried by a vote of 4-0. Town Council Minutes 02/25/19 Page6of8 Pursuant to LCG 211.007(b) The Town Council may not take action, however discussion may ensue, on Item 9 of the agenda until the Planning and Zoning Commission makes a final recommendation. The Planning and Zoning Commission postponed this item durinq the February 11, 2019, meeting until March 11, 2018. 9. CONDUCT A PUBLIC HEARING AND CONSIDERATION OF ORDINANCE APPROVING A ZONING CHANGE REQUEST FROM R-5 COUNTRY RESIDENTIAL TO PLANNED DEVELOPMENT DISTRICT NUMBER 7 (PD7) FOR AN APPROXIMATELY 37.8-ACRE PORTION OF LAND GENERALLY LOCATED EAST OF PEARSON LANE AND SOUTH OF ASPEN LANE, TO INCLUDE PRIMARILY SINGLE FAMILY RESIDENTIAL USES, INCLUDING A REQUEST FOR APPROVAL OF A CONCEPT PLAN AND DEVELOPMENT PLAN, AND A SPECIFIC USE PERMIT FOR PRIVATE STREETS. Town Manager DeGan stated there would be no presentation or overview of this item since it was tabled by the Planning and Zoning Commission but the Mayor would open the public hearing. Mayor Wheat opened the public hearing. No one addressed Council. Mayor Wheat asked for a motion to continue the public hearing. MOTION: Council Member Barrett made a motion to continue the public hearing at the March 25, 2019, meeting. Council Member Rennhack seconded the motion. The motion carried by a vote of 4-0. 10. EXECUTIVE SESSION Council did not convene into executive session. The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: a. Section 551.071. Consultation with Attorney (1) when the governmental body seeks the advice of its attorney about: (A) pending or contemplated litigation: Builder Recovery Services, LLC vs. Town of Westlake b. Section 551.072 to deliberate the purchase, exchange, lease, or value of real property regarding the conservation area at The Knolls at Solana c. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 d. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory Town Council Minutes 02/25/19 Page7of8 of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the ofFer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana e. Section 551.074(a)(1): Deliberation Regarding Personnel Matters —to deliberate the appointment, employment, evaluation, reassignment, duties, of a public ofFicer or employee: - Town Manager evaluation 11. RECONVENE MEETING 12. TAKE ANY ACTION, IF NEEDED, FROM EXECUTIVE SESSION ITEMS. 13. FUTURE AGENDA ITEMS No additional discussion required. 14. AD70URNMENT There being no further business before the Council, Mayor Wheat asked for a motion to adjourn the meeting. MOTION: Council Member Goble made a motion to adjourn the meeting. Council Member Rennhack seconded the motion. The motion carried by a vote of 4-0. Council Member Rennhack adjourned the meeting at 8:20 p.m. APPROVED BY THE TOWN COUNCIL ON APRIL 22, 2019. ATTEST: Laura Wheat, Mayor Kelly Edwards, Town Secretary Town Council Minutes 02/25/19 Page8of8 Westlake Town Council TYPE OF ACTION T x E i o w N o F WESTLAKE Regular Meeting - Action Item o i sr i N o r i v E s v o E s i c N Westlake Town Council Meeting Monday, Apri122, 2019 ToPrc: Consider a Resolution authorizing the Town Manager to execute a contract with Jerry Hodge &Associates, LLC for project management services related to TxDOT construction of SH 114 services roads and other improvements and amending the adopted budget to provide funding. STAFF CONTACT: Jarrod Greenwood, Assistant Town Manager Strategic Alignment i i � . � . . , � . . � � - � i High Quality Planning,Design& Planned/Responsible People,Facilities, & Development-We are a desirable Improve Technology, Development Technology Well planned,high-qualiry Facilities& community that is distinguished by Equipment exemplary dcsign standards. � Outsidc thc Scopc of Idcntificd Stratcgic Initiativcs Time Line- Start Date: April 1, 2019 Completion Date: March 31, 2020 Funding Amount: $96,000 Status - ❑ Funded Source - Capital Projects Fund EXECUTIVE SUMMARY (INCLUDING APPLICABLE ORGANIZATIONAL HISTORY) As you are aware, the SH 114 service road project has moved through the TxDOT design process at a significantly faster progress than what is typically eXpected for a construction project. Due to the project's pace and the impact to adjacent developments and Westlake residents, staff recommends retaining the same consultant working with Southlake, Jerry Hodge & Associates, LLC, to help ensure Westlake stakeholders are represented in the design and construction process and that the Town's aesthetic standards are included in the construction plans. Page 1 of 2 The service road project is expected to take approximately 24 to 36 months. The proposed contract with Jerry Hodge & Associates is a 12-month contract that can be extended based on TXDOT's construction schedule. The date of the contract would be retroactive to April 1, 2019 in order to include work performed by Hodge & Associates, which the Town was required to perform. Funding for the proposed contract was not included in the FY 18/19 Adopted Budget. Therefore, this will require an amendment to the CIP budget to allocate funding. Additionally, staff is in discussions with adjacent property owners regarding some cost participation arraignments, which would require an economic development agreement with each. Because of the significance and speed at which this project is moving, staff would still recommend approving the contract without any stakeholder participation. RECOMMENDATION Staff recommends approval of the proposed Resolution. ATTACHMENTS Resolution with EXhibit"A" Page 2 of 2 TOWN OF WESTLAKE RESOLUTION NO. 19-17 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF WESTLAKE, TEXAS, ENTERING INTO AN AGREEMENT WITH JERRY HODGE & ASSOCIATES, LLC. FOR PROJECT MANAGEMENT SERVICES RELATED TO CONSTRUCITON OF SH 114 SERVICE ROADS AND OTHER IMPROVEMENTS, AND AMENDING THE ADOPTED BUDGET TO PROVIDE FUNDING AND AUTHORIZING THE TOWN MANAGER TO EXECUTE THE AGREEMENT ON BEHALF OF THE TOWN OF WESTLAKE, TEXAS. WHEREAS, the TeXas Department of Transportation is developing plans for the construction of service roads, "Texas U-Turns", and bridge improvements in Westlake between FM 1938 and Dove Road; and WHEREAS, Westlake desires to ensure construction improvements that preserves the Town's aesthetic and design standards; and WHEREAS, this project is of great importance to the health, safety, and welfare of the citizens and economic strength of Westlake; and WHEREAS, the Town Council find that the proposed contract for project management services related to SH 114 service road construction is sound infrastructure planning and consistent with goals and objectives within the adopted strategic plan; and WHEREAS, the Town Council finds that Town oversight of the service road construction is necessary and that the Capital Improvement Plan should be amended to allocate appropriate funding; and. WHEREAS, the Town Council finds that the passage of this Resolution is in the best interest of the public. NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF WESTLAKE, TEXAS: SECTION 1: All matters stated in the Recitals above are found to be true and correct and are incorporated herein by reference as if copied in their entirety. SECTION 2: The Town Council of the Town of Westlake hereby approves the contract with Jerry Hodge & Associates, LLC for project management services related to construction of SH 114 service roads and other improvements, attached as Exhibit "A", and further authorizes the Town Manager to execute the agreement on behalf of the Town of Westlake, Texas. Resolution 19-17 Page 1 of 2 SECTION 3: The Town Council of the Town of Westlake hereby approves a budget amendment to the Capital Improvement Plan for the creation of a SH 114 Service Road Capital Project and provide funding in the amount of$96,000. SECTION 4: If any portion of this Resolution shall, for any reason, be declared invalid by any court of competent jurisdiction, such invalidity shall not affect the remaining provisions hereof and the Council hereby determines that it would have adopted this Resolution without the invalid provision. SECTION 5: That this resolution shall become effective from and after its date of passage. PASSED AND APPROVED ON THIS 22"d DAY OF APRIL, 2019. ATTEST: Laura Wheat, Mayor Kelly Edwards, Town Secretary APPROVED AS TO FORM: L. Stanton Lowry, Town Attorney Resolution 19-17 Page 2 of 2 Exhibit A AGREEMENT TO PROVIDE PROFESSIONAL CONSULTING SERVICES THIS AGREEMENT ("Agreement") is entered into this 1 st day of April, 2019 effective immediately by and between Jerry Hodge &Associates, LLC ("CONSULTANT") and the TOWN OF WESTLAKE, TEXAS, a municipal corporation of the State of Texas ("TOWN"). For convenience, the CONSULTANT and the TOWN may sometimes be referred herein collectively as "parties" and individually as a "party." WITNESSETH WHEREAS, TOWN desires to engage the CONSULTANT to provide comprehensive project management and assistance as more fully described on Attachment "A" attached hereto and incorporated herein by reference; and WHEREAS, CONSULTANT agrees to provide such work and services for the TOWN in accordance with the terms of this Agreement; NOW, THEREFORE, for the mutual promises set forth herein, and for other valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereto mutually agree as follows: 1. Employment of Consultant. (a) TOWN agrees to engage the CONSULTANT and the CONSULTANT hereby agrees to perform the services described in Attachment"A"attached hereto and incorporated herein by reference. (b) Notwithstanding anything to the contrary contained in this Agreement, TOWN and CONSULTANT agree and acknowledge that TOWN is entering into this Agreement in reliance on CONSULTANT's special and unique abilities with respect to public works and project management. CONSULTANT accepts the relationship of trust and confidence established between it and the TOWN by this Agreement. CONSULTANT covenants with TOWN to use his best efforts, skill, judgment, and abilities to perForm the work required by this Agreement and to further the interests of TOWN in accordance with TOWN's requirements, in accordance with the highest standards of CONSULTANT's profession or business and in compliance with all applicable national, federal, state, municipal, laws, regulations, codes, ordinances, orders and with those of any other body having jurisdiction. The CONSULTANT warrants, represents, covenants, and agrees that all of the work to be perFormed by the CONSULTANT under or pursuant to this Agreement shall be of the standard and quality which prevail among similar businesses and organizations of superior knowledge and skill engaged in providing similar services in major United States urban areas under the same or similar circumstances and involving the work to be performed in accordance with Attachment "A" attached hereto and incorporated herein. CONSULTANT Resolution 19-17 Page 1 of 7 warrants, represents, covenants, and agrees that the work he perForms will be accurate and free from any material errors. 2. Term. The term of this Agreement shall be twelve (12) months commencing April 1, 2019. This contract is anticipated to be renewed in subsequent Town fiscal years and may be extended under the similar terms and conditions by the mutual written agreement of the parties until the subject project is constructed and completed. 3. Compensation. The TOWN agrees to pay the CONSULTANT a lump sum fee of $96,000 in order to perform work as described in Attachment "A" attached hereto. Furthermore, the CONSULTANT agrees not to exceed this amount without receiving prior written authorization. CONSULTANT agrees that should the need arise for additional services should arise, CONSULTANT will seek authorization before proceeding and if requested, supply TOWN with best estimate of the proposed fee adjustment. 4. Method of Payment. The CONSULTANT shall be paid monthly based on twelve (12) equal payments of $8,000 per month. Total payments shall not exceed the amount shown in (3), above. TOWN shall pay invoices within 30 days of receipt; provided, however, that in the event TOWN requests any supporting documentation for charges, payment shall be made within 30 days of receipt of the documentation. 5. Chanqes. TOWN or CONSULTANT may, from time to time require changes in the scope of services of the CONSULTANT to be performed hereunder. Such changes, which are mutually agreed upon by and between TOWN and the CONSULTANT, shall be incorporated in written amendment to this Agreement. 6. Services and Materials to be Furnished bv TOWN. TOWN shall furnish the CONSULTANT with all available information, data, and material CONSULTANT requests pertinent to the execution of this Agreement. TOWN shall cooperate with the CONSULTANT in carrying out the work herein and shall provide adequate staff for liaison with the CONSULTANT. TOWN shall provide project related printing, meeting accommodations and scheduling of ineetings. 7. Confidential Information. CONSULTANT agrees that CONSULTANT shall not use in any manner, directly or indirectly, any Confidential Information except in promoting TOWN business, and as necessary in performing his duties under this Agreement; 8. Termination of Aqreement. TOWN or CONSULTANT has the right to terminate this Agreement for any reason upon 30 days' notice to the other party. Upon termination pursuant to this paragraph, the CONSULTANT shall be entitled to payment of such amount as shall compensate CONSULTANT for the services satisfactorily performed from the time of the last payment date to the termination date in accordance with this Agreement, provided the CONSULTANT shall have delivered to TOWN such statements, accounts, reports and other materials as required herein, and provided that CONSULTANT shall have delivered to TOWN all reports, documents and other materials prepared by CONSULTANT prior to termination. TOWN shall not be Resolution 19-17 Page2of7 required to reimburse CONSULTANT for any services perFormed or expenses incurred after the date of the termination notice. 9. Information of Reports. The CONSULTANT shall, at such time and in form as TOWN may require, furnish such periodic reports concerning the status of the work to be performed under this Agreement, and copies of proposed and executed plans and other information relative to the work perFormed under this Agreement as may be requested by TOWN. The CONSULTANT shall furnish TOWN, upon request, with copies of all documents and other material prepared or developed in relation with or as part of the work performed under this Agreement. The CONSULTANT shall furnish TOWN with an electronic copy of all materials prepared or developed in relation with or as part of the work performed under this Agreement. 10.Records and Inspections. CONSULTANT shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of six months after the completion of the work performed under this Agreement, or if litigation relating to any aspect of this Agreement is commenced within that two year period, until there is a final, non-appealable judgment or a settlement agreement has been executed between all the parties. TOWN shall have free access at all proper times to such records, and the right to examine and audit the same and to make transcripts there from, and to inspect all program data, documents, proceedings, and activities. 11.Completeness of Contract. This Agreement and the documents incorporated herein by specific reference contain all the terms and conditions agreed upon by the parties hereto, and no other agreements, oral or otherwise, regarding the subject matter of this contract or any part thereof shall have any validity or bind any of the parties hereto. If there is any conflict between the terms of this Agreement and the documents attached hereto, the terms of this Agreement shall control. This Agreement may not be subsequently modified except by a written agreement signed by both parties. 12.TOWN Not Obliqated to Third Parties. TOWN shall not be obligated or liable hereunder to any party other than the CONSULTANT. 13.When Riqhts and Remedies Not Waived. In no event shall the making by TOWN of any payment to the CONSULTANT constitute or be construed as a waiver by TOWN of any breach of covenant, or any default which may exist on the part of the CONSULTANT and the making of any such payment by TOWN while any such breach or default shall exist in no way impairs or prejudices any right or remedy available to TOWN in respect to such breach or default. 14.Final Decisions. Serving as a consultant to the TOWN, CONSULTANT shall advise all parties that final decisions regarding the projects and programs on which he is working shall be made by the TOWN Council and/or TOWN Manager. 15.Personnel. All of the services required hereunder will be perFormed by the CONSULTANT or under CONSULTANT's supervision, and all personnel engaged in the work shall be qualified to perForm such services. Resolution 19-17 Page 3 of 7 16.Conflict of Interest. It is understood and agreed to by the parties to this agreement that Jerry Hodge and Associates, LLC will not represent the Town of Westlake under this agreement in any requests for funding related to this project as it may be construed as a Conflict of Interest. 17.Assiqnabilitv. The parties hereby agree that CONSULTANT may not assign, convey or transfer its interest, rights and duties in this Agreement without the prior written consent of TOWN. 18.Notices. Any notices, bills, invoices, or reports required by this Agreement shall be sufficient if sent by the parties via personal delivery, facsimile, or via United States certified mail, postage paid, to the addresses noted below: Amanda DeGan Jerry L. Hodge, President Town Manager Jerry Hodge & Associates, LLC Town of Westlake 1213 Huron Drive 1500 Solana Blvd., Ste. 7200 Grapevine, Texas 76051 Westlake, TX 76262 19.Governinq Law/Venue. This Agreement shall be governed by and construed in accordance with the laws of the State of Texas. Venue for any action brought to interpret or enforce the terms of this Agreement shall lie in Tarrant County, Texas. 20.Authority to Siqn. The parties hereby warrant and represent that the undersigned persons have full authority and are duly authorized to sign on behalf of their respective principals and that such principals have duly authorized the transaction contemplated by this Agreement. IN WITNESS WHEREOF, TOWN and the CONSULTANT have executed this Agreement as of the date first written above. TOWN OF WESTLAKE, TEXAS Jerry Hodge & Associates, LLC By: By: Amanda DeGan, Town Manager Jerry L. Hodge, President Date Date Resolution 19-17 Page 4 of 7 ATTACHMENT A Consultant shall complete the projects shown below, consulting with TOWN staff as required. Scope of Services SH 114 Frontaqe Roads between Kirkwood Boulevard and Davis Blvd (FM1938): • Act as the project team leader for the westbound and eastbound SH114 frontage roads (Solana Blvd./Kirkwood Blvd. to Davis Blvd.) project including Texas Turnarounds and coordinate all administrative items and meetings between stakeholders to include Westlake, the engineer of record, TxDOT, U.S. Army Corps of Engineers and other agencies including but not limited to Westlake property owners, other adjacent municipalities and individual parties, as appropriate and necessary. • Identify, coordinate and develop any partnering agreements such as Memorandums of Understanding (MOU's) and inter-local agreements with other governmental agencies. • Manage and accelerate, whenever possible, all planned actions and milestones that are part of the subject project schedule. • Facilitate and review the development of research of available and necessary right-of-way to construct said proposed SH114 westbound and eastbound frontage roads, environmental requirements, public utility relocations, temporary construction easements and drainage in the project zone by a third-party consultant. • Review and coordinate all remaining geometric design schematics (60%, 90% and 100%) for completeness, accuracy, constructability and any aesthetic enhancements identified by TOWN staff and coordinate reviews with all affected stakeholders, where needed, • Facilitate all activities leading to the successful completion of the environmental assessment and acquisition of the environmental clearance for the project. • Represent Westlake in all public involvement activities associated with the project. • Manage and coordinate the development and review of the plans, specifications and Opinion of Probable Cost (OPCC) being developed by third-party consultants. Resolution 19-17 Page5of7 • Facilitate and oversee the development of a design schematic of the proposed SH114 frontage roads by a third-party consultant. Intersection Improvements at Solana Blvd./Kirkwood Blvd. and SH 114 • Act as the project team leader in developing an engineered concept schematic, final plans and estimates to design and construct any remaining intersection improvements and/or relocation of existing signals at Solana Blvd./Kirkwood Blvd. and SH114 frontage roads. • Facilitate and manage the development of research of public utilities and drainage in the project zone by a third-party consultant. Davis Blvd (FM1938) and SH114 Intersection Analysis • Facilitate and manage the development of research of public utilities and drainage in the project zone by a third-party consultant. • Act as the project team leader in developing an engineered concept schematic and estimates to design and construct any remaining intersection improvements at Davis Blvd. (FM1938) and SH114 frontage roads. As the lead CONSULTANT on these projects, it shall be the responsibility of CONSULTANT to: • Develop a working group of stakeholders including major landowners including the Town of Westlake, all adjacent landowners, the developer of Entrada, Fidelity, Blackstone, Harbert Management, TxDOT, and consultants as required. • Research and develop necessary information for project start-up. • Interview and submit to TOWN for consideration for hire design consultants as needed for the project. • Prepare budget for preliminary and final project costs of utilities. • Attend and participate weekly construction meetings on site with the TxDOT contractor and TxDOT construction inspectors and District personnel to ensure that Change Orders are kept to a minimum and that the project continues on a timely basis. • Attend all meetings and make presentations as needed. • Review all reports by consultants. Resolution 19-17 Page6of7 • Serve as a member of the Project Construction Team through project construction completion. • Review all change orders and recommend action for Town to take, if required. • Take all complaints from the Town residents and business owners. Deal with all questions and problems that arise with land owner properties. • Apply for drive permits for all driveways and deceleration lanes. • Design plans for the frontage roads on East and West SH114 from Solana Blvd./Kirkwood Blvd. to Davis Blvd. (FM1938) to include any aesthetic enhancements identified by TOWN staff. • Right-of-way and utility relocation. • Construction management of all projects design and construction. • Be the primary contact with TxDOT during this process. All requests from the Town and/or property owners will be presented to me to handle with TxDOT. • Keep Town staff informed on all aspects of the project. Resolution 19-17 Page7of7 r H E r o w H o � WESTLAKE MINUTES OF THE TOWN OF WESTLAKE, TEXAS TOWN COUNCIL MEETING March 25, 2019 PRESENT: Mayor Laura Wheat and Council Members Carol Langdon, Alesa Belvedere, Rick Rennhack, and Greg Goble. Michael Barrett arrived at 5:15 p.m. ABSENT: OTHERS PRESENT: Town Manager Amanda DeGan, Assistant to the Town Manager ]arrod Greenwood, Town Secretary Kelly Edwards, Town Attorney Stan Lowry, Fire Chief Richard Whitten, Deputy Fire Chief John Ard, Building Official Pat Cooke, Development Coordinator Nick Ford, Finance Director Debbie Piper, Director of Facilities & Parks Troy Meyer, Director of Communications Ginger Awtry, Communications Manager Jon Sasser, Director of Information Technology Jason Power, Director of Human Resources and Administrative Services Todd Wood, and Municipal Court Administrator Jeanie Roumell. Work Session 1. CALL TO ORDER Mayor Wheat called the work session to order at 5:10 p.m. 2. PLEDGE OF ALLEGIANCE Mayor Wheat led the Pledge of Allegiance to the United States and Texas flags. Town Council Minutes 03/25/19 Page 1 of 7 3. REVIEW OF CONSENT AGENDA ITEMS FOR THE TOWN COUNCIL REGULAR MEETING AGENDA. No additional discussion. 4. REPORTS a. Annual report from the Keller Police Department relative to police services and the racial profiling report for the Town of Westlake. Discussion ensued regarding declining numbers, traffic stops, crimes, two factors driving the decrease: focusing on Westlake Academy and freeway traffic accidents, quality traffic analysis, racial data profiling is driven by the legislature, and future reports categorizing by race and gender. 5. DISCUSSION ITEMS a. Presentation and discussion regarding the annual Comprehensive Annual Financial Report (CAFR) presented by Weaver and Tidwell, L.L.P., for the fiscal year ended September 30, 2018. Mr. John DeBurro, Weaver and Tidwell, and Director Piper provided a presentation and overview of the item. Discussion ensued regarding the breakdown of sales tax and use tax, one time appropriations, and the implementation of GASB 75. b. Presentation and discussion providing an update regarding the status of the work to date of the Westlake Public Art Competition Advisory Committee and adding another member to the Committee. Mr. Russell Tether and Mr. Robin McCaffrey provided an overview of the item. Discussion ensued regarding the number of applicants, four (4) semi-finalists, next steps, an additional member joining the committee, citizen involvement, and a high-level communication to residents regarding the committee and artist. c. Presentation and discussion regarding Regular Agenda Item 5 - Proposed Rezoning from R5-Country Residential. Director Ruthven and Mr. Robin McCaffrey, Mesa Planning, provided an overview of the item. Town Council Minutes 03/25/19 Page 2 of 7 Discussion ensued regarding setback being minimum of 30 feet from Vaquero, green belt width, distances from the 9th hole and 1St tee to the homes, development density, revisions from previously submitted documents, gross density, and sending and receiving areas as stated in the Comprehensive Plan. d. Standing Item: Presentation and discussion of development projects per Staff report February 2019 including an Entrada report from the Developer and projects in Planned Development PD 3-5. Director Ruthven provided an overview of the following developments: Entrada: Starbucks location, tower construction in relation with the retail building, restaurants, parking garage, gas well pad site, and the service road along Highway 114. Schwab: Phase I - Temp CO allowing for the delivery of furniture and fixtures and Phase II going vertical. Erosion along with Dove Road and connectivity between the Town of Trophy Club and the Charles Schwab campus. 6. EXECUTIVE SESSION Council convened to into executive session at 7:48 p.m. The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: a. Section 551.071. Consultation with Attorney (1) when the governmental body seeks the advice of its attorney about: (A) pending or contemplated litigation: Builder Recovery Services, LLC vs. Town of Westlake b. Section 551.072 to deliberate the purchase, exchange, lease, or value of real property regarding the conservation area at The Knolls at Solana c. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 d. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the offer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana Town Council Minutes 03/25/19 Page 3 of 7 - Waterside Land Company LLC 7. RECONVENE MEETING Mayor Wheat reconvened the meeting at 9:08 p.m. 8. COUNCIL RECAP / STAFF DIRECTION - Racial Profiling Report— breakout by race and gender for future reports. - Public Art Competition Advisory Committee — citizen communication regarding the Committee Members, time devoted, caliber of artist submittals (4 finalist), and timeline for the completion moving forward. 9. ADJOURNMENT Mayor Wheat adjourned the work session at 9:08 p.m. Regular Session 1. CALL TO ORDER Mayor Wheat called the regular session to order at 9:08 p.m. 2. ITEMS OF COMMUNITY INTEREST Director Awtry provided an overview of the upcoming events. Chief Whitten expressed appreciation to the Council on behalf of the Fire Department employees regarding the new Fire Station. 3. CITIZEN COMMENTS Neil McNabnay, 1815 Broken Bend, spoke regarding the conservation area behind the Knolls development. 4. CONSENT AGENDA a. Consider approval of the minutes from the meeting on February 25, 2018. b. Consider approval of Resolution 19-12, Appointing an additional member to the Public Art Competition Advisory Committee. Town Council Minutes 03/25/19 Page 4 of 7 c. Consider approval of Resolution 19-13, Amending the authorized signers on the Town of Westlake Trust Account with First Financial Bank d. Consider approval of Resolution 19-14, Accepting the annual Comprehensive Annual Financial Report (CAFR) presented by Weaver and Tidwell, L.L.P., for the fiscal year ended September 30, 2018. e. Consider approval of Resolution 19-15, Authorizing the Town Manager to enter into a purchase agreement with Rush Bus Center to purchase a 71-passenger activity bus and authorize the Town Manager to make funding changes not to exceed $25,000 on this project. MOTION: Council Member Belvedere made a motion to approve the consent agenda. Council Member Langdon seconded the motion. The motion carried by a vote of 5-0. 5. CONTINUE THE PUBLIC HEARING AND CONSIDERATION OF ORDINANCE 881, APPROVING A ZONING CHANGE REQUEST FROM R-5 COUNTRY RESIDENTIAL TO PLANNED DEVELOPMENT DISTRICT NUMBER 7 (PD7) FOR AN APPROXIMATELY 37.8-ACRE PORTION OF LAND GENERALLY LOCATED EAST OF PEARSON LANE AND SOUTH OF ASPEN LANE, TO INCLUDE PRIMARILY SINGLE FAMILY RESIDENTIAL USES, INCLUDING A REQUEST FOR APPROVAL OF A CONCEPT PLAN AND DEVELOPMENT PLAN, AND A SPECIFIC USE PERMIT FOR PRIVATE STREETS. Mr. Paul Pastore, Waterside Land Company, LLC, Mr. Rich DeOtte, DeOtte Engineering, Mr. Clay Nelson, CA Nelson Architects, and David Evans, Cooper Clinic, provided an overview of the item. Discussion ensued regarding how to protect the continuity of the development. Mayor Wheat continued the public hearing for item 5. The following people spoke in favor of the item: Joe Schneider, Hillwood Properties; Tony Dawson, 1229 Castle Cove, Keller; and Matt Rose, 1110 Post Oak Place. The following people spoke in opposition of the item: David Elmer, 2017 Bantry Drive, Keller; Donna Dettbarn, 2021 Bantry Drive, Keller; and John Landry, 2029 Bantry Drive, Keller. Mayor Wheat closed the public hearing Discussion ensued regarding different number of plans submitted, how to ensure a single homebuilder Planning &Zoning Commission approval, Cooper Clinic possibilities, the right and best product for Westlake, staff recommendation, and how to interpret the Comprehensive Plan. Town Council Minutes 03/25/19 Page 5 of 7 MOTION: Council Member Rennhack made a motion to deny without prejudice Ordinance 881. Council Member Goble seconded the motion. The motion carried by a vote of 5-0. 6. DISCUSSION AND CONSIDERATION OF ORDINANCE 877, AMENDING CHAPTER 46, ARTICLE VI, TOBACCO PRODUCTS, SMOKING AND E-CIGARETTES, PROHIBITING SMOKING AND VAPING WITHIN THE TOWN OF WESTLAKE EXCEPT IN PRIVATE CLUBS. Discussion ensued regarding moving this item to the May 20, 2019 meeting. 7. EXECUTIVE SESSION Council did not convene into executive session. The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: e. Section 551.071. Consultation with Attorney (1) when the governmental body seeks the advice of its attorney about: (A) pending or contemplated litigation: Builder Recovery Services, LLC vs. Town of Westlake f. Section 551.072 to deliberate the purchase, exchange, lease, or value of real property regarding the conservation area at The Knolls at Solana g. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 h. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the ofFer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana - Waterside Land Company LLC 8. RECONVENE MEETING 9. TAKE ANY ACTION, IF NEEDED, FROM EXECUTIVE SESSION ITEMS. MOTION: Council Member Rennhack made a motion approve Resolution 19-16 accepting the donation of approximately 22.881 acres as a conservation area and municipal parkland, and, further authorizing the Town Manager to execute any and all document Town Council Minutes 03/25/19 Page6of7 required to transfer the property to the Town of Westlake. Council Member Langdon seconded the motion. The motion carried by a vote of 5-0. 10. FUTURE AGENDA ITEMS No additional discussion required. 11. AD70URNMENT There being no further business before the Council, Mayor Wheat asked for a motion to adjourn the meeting. MOTION: Council Member Rennhack made a motion to adjourn the meeting. Council Member Barrett seconded the motion. The motion carried by a vote of 5-0. Council Member Rennhack adjourned the meeting at 10:35 p.m. APPROVED BY THE TOWN COUNCIL ON APRIL 22, 2019. ATTEST: Laura Wheat, Mayor Kelly Edwards, Town Secretary Town Council Minutes 03/25/19 Page7of7 Westlake Town Council TYPE OF ACTION T x E i o w N o F WESTLAKE Regular Meeting - Action Item o i sr i N o r i v E s v o E s i c N Westlake Town Council Meeting Monday, Apri122, 2019 ToP►c: Presentation and discussion regarding the project summary of the Westlake Fire-EMS Station No. 1. STaFF CoNTaCT: Troy J. Meyer, Facilities Director Strategic Ali�nment i i � . � . . , ; . . � � - 1 � Mission: Wcstlakc is a unique community blending preservation of our natural Exemplary Service&Governance environment and -We set the standard by delivering Improve Technology, viewscapes,while serving People,Facilities, & unparalleled municipal and Facilities& our residents and businesess Technology educational services at the lowest Equipment with superiar municipal and academic services that are cost. accessible, efficient,cost- effective, &transparent. � Outside the Scope of Identified Strategic Initiatives Time Line- Start Date: Apri122, 2019 Completion Date: May 31, 2019 Funding Amount: $11.9M Status - � Funded Source - Bond Issuance EXECUTIVE SUMMARY (INCLUDING APPLICABLE ORGANIZATIONAL HISTORY) The Westlake Fire-EMS Station No. 1 opened for service in February 2019, followed by the Grand Opening on March 23, 2019. In 2015,the staff assessed the need for a new Fire-EMS Station by evaluating the existing 12-year- old, temporary facility and considering the results of a residential survey as it related to the following: • Importance of Public Safety in the Community • Essential Services • Health & Safety • High-level Building Standards • Fire-EMS Being Housed in a Temporary Building For 12 Years • Providing Quality Services • Strategic Location of Fire Station • Ability to Provide the Best Possible Response Times • Residential and Commercial Growth The results of the 2015 & 2017 Residential Surveys also gave staff insight on the needs of our community and the importance our residents placed on being prepared for an emergency event as well as public safety. The results are as follows: 2015: Public safety was ranked as the number one municipal service that residents felt was most important to our community. The low crime rate and quality of public safety was ranked as the fifth most important reason in a residents decision to move to Westlake. And it was ranked as the fourth most important reason a resident would stay in Westlake over the next five years. 2017: Once again, public safety Q1. O�erall Satisfaction With Town Services ranked as the most important by Major Category by percentege of respontlents who ratetl the I�m as a 1 to 0 on a o-poirrt scale,eulutling tlon't kno�,��s i municipal service residents C]ualiry of public safety servlces 53% 41% value in our community. The a 1.,1 Westlake's emergency preparetlness efforts 52% 37% e56 l�W C'rlme rate anU YuUllC' SafetJ parksitrailslopen spacesfs[reetscapingifacilites 45% 37% i2�5 ess SeFV1CeS WaS I1SteCl �lS tlle SeCO11Cl Qua�iryotcustomerservice 44% 38°-o i�ss s� (overall) most important factor ��a���afg�Vernmen,sery��esproV�aea 4,� 4�°� ��� �� 111 tllelT CIeC1S1011 t0 I110Ve t0 E�ctiveness orcommunication byme lovrn 48% 34°-; ��� a9+ Westlake and was ranked as the °�a°ty°`ma'���a�Ce°r�°"'�stfEe`� azr �r ,o� ,�� �ualiry of enforcement oT cotles 8 ortlinances 3fi% 40% �a55 s� S1Xt11 1110St llllp01�111t f1CtOP lll �a�ueorwesnakencademyromero�,i•n 50% 23% »�s the�deCiSl�n t� Stay in Qualityoiunllryservlces 36% 35% �?H � weStllke. Ill 1C1C11t1011� y0U C111 va�ueyourecelvefromyourtar��ees 32% 37% 2o�s ��� see the satisfaction level our o� zo� 40� so� 80� �oo� �.} 1� 7,�7 oVery Satlsiletl(5 i oSatisfietl(41 oNeutral(31 oDissatisfietl(1i21 re"Sl�e'nt`S re'Y�l�e'�Wlt"YuU11C' Soiuce_EiCI tauteDn�sc�ioFtds��C01'-�'estia',�,TX safety and emergency preparedness in our last survey. In a Town Council workshop in 2017, staff presented these results along with a proposal, to build a new Fire-EMS Station. After the location study and budget estimates for the project were completed, the Council approved an agreement with Brown Reynolds Watford Architects (BRW) to design the Westlake Fire-EMS Station No. L The agreement with BRW included the design of a station with a four-door, drive through apparatus bay, administration offices, meeting space, a training/EOC room and living quarters. April 3, 2017 the Council gave staff the direction to proceed with the project with the additional scope and funding to ensure that the station meet the iconic look to stay true to the high Westlake building standards. These project changes increased the budget by the amount of$2.76M which was to be funded using $1.2M (one-time money) from the sale of a six-acre tract of land and a $1.SM seven-year note, with the remaining $60K being provided by a fund balance. In 2017 the construction contract with Core Construction was approved by the Town Council and construction started in 2018. Construction was completed, and the station went into service in February 2019 with the Grand Opening held on March 23, 2019. Total proj ect budget is $11.9M which includes a public art allowance of$100,000. Final numbers will be presented at the June 2019 Town Council meeting. RECOMMENDATiON Review of current status of the project. Staff will continue to finalize budget numbers which will be presented to Town Council in the June for approval. ATTACHMENTS N/A Town Cou nci I Item # 6 — Executive Session EXECUTIVE SESSION The Council will conduct a closed session pursuant to Texas Government Code, annotated, Chapter 551, Subchapter D for the following: a. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 b. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the offer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana - Waterside Land Company LLC Town Cou nci I Item # 7 — Reconvene Council Meeting Town Cou nci I Item #8 — Necessary Action NECESSARY ACTION a. Section 551.071 (2) Consultation with Attorney on a matter in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with this chapter: Trophy Club Municipal District No. 1 b. Section 551.087 Deliberation Regarding Economic Development Negotiations (1) to discuss or deliberate regarding commercial or financial information that the governmental body has received from a business prospect that the governmental body seeks to have locate, stay, or expand in or near the territory of the governmental body and with which the governmental body is conducting economic development negotiations; or (2) to deliberate the offer of a financial or other incentive to a business prospect described by Subdivision (1) for the following: - BRE Solana - Waterside Land Company LLC Town Cou nci I Item # 9 — Future Agenda Items FUTURE AGENDA ITEMS: Any Council member may request at a workshop and / or Council meeting, under "Future Agenda Item Requests", an agenda item for a future Council meeting. The Council Member making the request will contact the Town Manager with the requested item and the Town Manager will list it on the agenda. At the meeting, the requesting Council Member will explain the item, the need for Council discussion of the item, the item's relationship to the Council's strategic priorities, and the amount of estimated staff time necessary to prepare for Council discussion. If the requesting Council Member receives a second, the Town Manager will place the item on the Council agenda calendar allowing for adequate time for staff preparation on the agenda item. - None Town Cou nci I Item # 10 — Adjournment Regular Session