Loading...
HomeMy WebLinkAboutEntrada PID ExhibitsWestlake Entrada PID SAP Appendix Exhibits Work session Meeting December 16, 2013 Ap p e n d i x A : T h e P I D M a p Improvement Amount Roadway Improvements 49,000 SY 6-inch concrete 34,500 SY 8-inch concrete Water System Improvements 15,600 LF 12-inch water lines 6,000 LF 8-inch water lines Fire hydrants Sanitary Sewer System Improvements 14,500 LF 8-inch sewer lines Manholes, force mains, & lift stations Storm System Improvements 6,000 LF RCP pipes Manholes Headwalls Inlets Landscaping and Public Park Improvements 12-acre central lake area Planting vineyard Trees Rubble stone walls Pathways (2.5 Miles of 8’-12’ wide concrete paths with seating areas and lighting) PID Improvement Summary Ap p e n d i x C : A u t h o r i z e d I m p r o v e m e n t s Common-to -All: Roads, Water, Sanitary Sewer, and Drainage Common-to -All Improvement Cost Summary Item Cost Paving $ 5,223,992 Utilities – Water $ 815,110 Utilities – Sanitary Sewer $ 1,544,067 Utilities – Storm Sewer $ 2,678,575 8% Inspection & Bonds $ 892,329 Subtotal – Infrastructure $11,154,069 Ap p e n d i x C : A u t h o r i z e d I m p r o v e m e n t s Common-To -All: Landscape Ap p e n d i x C : A u t h o r i z e d I m p r o v e m e n t s Common-To -All: Landscape Common-to -All Landscape Cost Summary Item Cost Davis Boulevard $ 477,000 Solana Boulevard $ 515,000 114 Frontage $ 557,500 Two Small Wells (25 gpm each) $ 211,000 Lake Fountains (3) with aeration $ 231,000 Large Capacity Well (175 gpm) $ 635,000 Desalinization Plant $ 645,000 Subtotal $ 3,271,500 Common-to -All Improvement Cost Summary Item Cost Paving $ 5,223,992 Utilities – Water $ 815,110 Utilities – Sanitary Sewer $ 1,544,067 Utilities – Storm Sewer $ 2,678,575 8% Inspection & Bonds $ 892,326 Subtotal – Infrastructure $11,154,069 Landscape – Common to All $ 3,271,500 10% Contingency $ 1,442,557 14% Engineering/Surveying/Construction Admin. $ 2,019,580 GRAND TOTAL $17,887,706 Ap p e n d i x C : A u t h o r i z e d I m p r o v e m e n t s West Residential: Roads, Water, Sanitary Sewer, and Drainage Item Cost Paving $ 803,293.02 Utilities – Water $ 214,800.00 Utilities – Sanitary Sewer $ 222,155.60 Utilities – Storm Sewer $ 980,653.88 Subtotal $ 2,220,902.50 8% Inspection and Bonds $ 177,672.20 10% Contingency $ 222,090.00 14% Engineering/Surveying/Const. Admin. $ 310,926.00 GRAND TOTAL $ 2,931,590.70 West Residential Improvement Cost Summary Ap p e n d i x C : A u t h o r i z e d I m p r o v e m e n t s East Residential: Roads, Water, Sanitary Sewer, and Drainage Item Cost Paving $ 1,011,332.91 Utilities – Water $ 176,438.70 Utilities – Sanitary Sewer $ 637,087.80 Utilities – Storm Sewer $ 715,315.00 Subtotal $ 2,540174.41 8% Inspection and Bonds $ 203,213.95 10% Contingency $ 254,017.00 14% Engineering/Surveying/Const. Admin. $ 356,624.00 GRAND TOTAL $ 3,353,029.36 East Residential Improvement Cost Summary Ap p e n d i x C : A u t h o r i z e d I m p r o v e m e n t s Common-To -All: Lighting Item Cost Common to All (incl. Landscaping) $ 17,887,706.00 West Residential $ 2,931,590.70 East Residential $ 3,353,029.36 GRAND TOTAL $ 24,172,326.06 PID Total Improvement Cost Summary