Loading...
HomeMy WebLinkAboutSchwab, Quail Hollow, and the Knolls Staff Presentation 11-13-17Planning and Zoning Commission NOVEMBER 13TH, 2017 1 Item 4 –Charles Schwab Batch Plant SUP-10-06-17 SPECIFIC USE PERMIT 2 Summary •Part of Charles Schwab Phase 1 construction •Allows for concrete manufacturing on-site •Reduces traffic in the area •Increases rate of construction •Not part of Schwab Way construction •Located on west of Phase 1 3 Vicinity Map 4 Batch Plant Location 5 Batch Plant Staff Recommendation Staff recommends approval of this item subject to the following conditions: •Hours of Operation and Noise: Must follow town noise ordinance. •TCEQ Requirements:Batch plant must comply with all TCEQ Regulations for batch plants (air/dust quality) •Removal of Batch Plant: The batch plant must be removed prior to issuance of a CO for any building of the Phase 1 campus 6 Item 5 –Quail Hollow Phase 3 FP-11-06-17 FINAL PLAT 7 Summary •Phase 3 is the last phase in the Quail Hollow subdivision •Final legislative action for Quail Hollow •Phase 3 consists of 16 residential lots on 33.8 acres •All lots at least 1-acre •Increase of 4 lots = % increase of ~4% (with a ±10% allowed) 8 Phase Preliminary Plat Lots Final Plat Lots 1 34 36+ 2A 16 16= 2B 24 28+ 3 18 16- 92 96 Vicinity Map 9 Location Map 10 Final Plat 11 Staff Recommendation •This Final Plat comports with the preliminary plat •All requirements have been fulfilled by the developer as set forth in the preliminary plat, economic development agreement, development agreement, and code of ordinances including zoning requirements •$5k per lot will be paid at approval by Town Council per the economic development agreement Staff recommends approval of this item on the condition that: •Engineering comments are satisfied •Sealed by surveyor/engineer •Town boundary •Names of property owners adjacent within 100 feet •Etc… 12 Newer Concept Plan (11-13-17)