HomeMy WebLinkAboutRes 17-15 Approving an Interlocal Agreement with Tarrant County for Dove Road Reconstruction TOWN OF WESTLAKE
RESOLUTION NO. 17-15
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF WESTLAKE,
TEXAS,APPROVING AN INTER-LOCAL AGREEMNT WITH TARRANT COUNTY
FOR THE RECONSTRUCITON OF DOVE ROAD,AND AUTHORIZING THE TOWN
MANAGER EXECUTE THE AGREEMENT.
WHEREAS, Tarrant County and Westlake are both governmental entities engaged in
the purchase of goods and services, which is a recognized governmental function; and,
WHEREAS, Westlake desires to provide residents and commuters safe and aesthetically
pleasing street to travel; and,
WHEREAS, the Town Council finds that the inter-local agreement and improvements of
Dove Road benefit the public; and
WHEREAS, the Town Council finds that the passage of this Resolution is in the best
interest of the citizens of Westlake.
NOW,THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN
OF WESTLAKE,TEXAS:
SECTION 1: That, all matters stated in the Recitals hereinabove are found to be true
and correct and are incorporated herein by reference as if copied in their entirety
SECTION 2: That the Town of Westlake Town Council does hereby authorize the
Town Manager to execute the Tarrant County inter-local agreement, attached as Exhibit "A".
SECTION 3: If any portion of this Resolution shall, for any reason, be declared invalid
by any court of competent jurisdiction, such invalidity shall not affect the remaining provisions
hereof and the Council hereby determines that it would have adopted this Resolution without the
invalid provision.
Resolution 17-15
Page 1 of 2
SECTION 4: That this resolution shall become effective from and after its date of
passage.
PASSED AND APPROVED ON THIS 27th DAY OF MARCH 2017.
ATTEST:
Laura L. Wheat, Mayor
2` la
L,-,
Kelly Edward, Town Secretary Thomas E. Brymer, 7anager
flr` t„,1ST
APPROVED S TO F
O ;
x
L. on Lo wn orney
Resolution 17-15
Page 2 of 2
ATTACHMENT A
THE STATE OF TEXAS
INTERLOCAL AGREEMENT
COUNTY OF TARRANT
This Interlocal Agreement is between Tarrant County, Texas ("COUNTY"),
and the Town of Westlake ("TOWN").
WHEREAS, the TOWN is requesting the COUNTY's assistance to:
Rehabilitate and Resurface Dove Road located within the Town of
Westlake from approximately 550 feet east of FIVI 1938 to
Westlake/South lake City limits (Approximately 6,230 linear feet).
Hereinafter referred to as the "Project".
WHEREAS, the Interlocal Cooperation Act contained in Chapter 791 of
the Texas Government Code provides legal authority for the parties to enter into
this Agreement; and
WHEREAS, during the performance of the governmental functions and the
payment for the performance of those governmental functions under this
Agreement, the parties will make the performance and payment from current
revenues legally available to that party; and
WHEREAS, the Commissioners Court of the COUNTY and the TOWN
Council of the TOWN each make the following findings:
a. This Agreement serves the common interests of both parties;
b. This Agreement will benefit the public;
C. The division of costs fairly compensates both parties to this
Agreement; and
d. The TOWN and the COUNTY have authorized their representative
to sign this Agreement.
e. Both parties acknowledge that they are each a "governmental
entity" and not a "business entity" as those terms are defined in
Tex. Gov't Code § 2252.908, and therefore, no disclosure of
interested parties pursuant to Tex. Gov't Code Section 2252.908 is
required.
Resolution 17-15
Page 1 of 5
NOW, THEREFORE, the COUNTY and the TOWN agree as follows:
TERMS AND CONDITIONS
1. COUNTY RESPONSIBILITY
The COUNTY will furnish the labor and equipment to assist the TOWN in
completing the Project:
Dove Road: Following milling and removal of the excess materials
by the TOWN, the COUNTY will stabilize the exposed subgrade,
regrade, shape, and prime the roadbed, place three inches of
asphalt base, place two inches of asphalt surface, backfill the
pavement edges and clean the project jobsite.
2. TOWN RESPONSIBILITY
2.1 The TOWN.will furnish and pay for the actual cost of the materials,
including any delivery or freight cost. The TOWN will provide a
purchase order and will be billed directly by the material supplier.
The COUNTY may accumulate and bill the TOWN for incidental
material cost.
2.2 The TOWN will pay for one-half of the COUNTY's fuel used to
construct this Project. The COUNTY will invoice the TOWN for the
fuel consumed at the conclusion of the Project.
2.3 The TOWN will be responsible for all traffic control necessary to
safely construct this project. This responsibility includes all advance
notices, signage, barricades, pilot vehicles, and flagmen necessary
to control traffic in and around the construction site. The TOWN will
be responsible for and provide portable message boards to
supplement traffic control as needed.
2.4 The TOWN will remove the existing surface and make any
necessary roadway repairs prior to the COUNTY starting work.
2.5 The TOWN will adjust all utilities, manholes and valve boxes for this
Project.
2.6 The TOWN will provide the COUNTY with a hydrant meter and all
the water necessary for construction of the Project at no cost to the
COUNTY.
2.7 The TOWN will provide or pay for any engineering, survey, and
laboratory testing required for this Project.
2.8 The TOWN will furnish a site for dumping all spoils and waste
materials generated during construction of this Project.
2.9 If required, the TOWN will be responsible for the design and
development of a Storm Water Pollution Prevention Plan (SWPPP).
The TOWN further agrees to pay for all cost (including sub-
Resolution 17-15
Page 2 of 5
contractor materials, labor and equipment) associated with the
implementation of the plan. The COUNTY will be responsible for
maintenance of the plan during the duration of the Project.
Documentation and record keeping of the SWPPP will be the
responsibility of the TOWN.
3. PROCEDURES DURING PROJECT
COUNTY retains the right to inspect and reject all materials provided for this
Project.
If the TOWN has a complaint regarding the construction of the project, the
TOWN must complain in writing to the COUNTY no later than 30 days of the date
of project completion.
4. NO WAIVER OF IMMUNITY
This Agreement does not waive COUNTY rights under a legal theory of
sovereign immunity. This Agreement does not waive TOWN rights under a legal
theory of sovereign immunity.
5. OPTIONAL SERVICES
5.1 If requested by the TOWN, the COUNTY will apply permanent
striping coordinated through the Transportation Department.
Application of striping by the COUNTY is limited to Project
roadways. If the TOWN desires permanent striping applied to any
roadways or portions of roadways not covered by this Agreement,
the TOWN will need to enter into a separate agreement with the
COUNTY for the provision of those services.
6. TIME PERIOD FOR COMPLETION
The TOWN will give the COUNTY notice to proceed at the appropriate time.
However, the COUNTY is under no duty to commence construction at any
particular time.
7. THIRD PARTY
This contract shall not be interpreted to inure to the benefit of a third party not a
party to this contract. This contract may not be interpreted to waive any statutory
Resolution 17-15
Page 3 of 5
or common law defense, immunity, including governmental and sovereign
immunity, or any limitation of liability, responsibility, or damage of any party to
this contract, party's agent, or party's employee, otherwise provided by law.
8. JOINT VENTURE & AGENCY
The relationship between the parties to this Agreement does not create a
partnership or joint venture between the parties. This Agreement does not
appoint any party as agent for the other party.
9. EFFECTIVE DATE
This Agreement becomes effective when signed by the last party whose signing
makes the Agreement fully executed.
10. TERMINATION
This Agreement will automatically terminate on either September 30, 2017 or on
the date the project is completed, whichever occurs first. Nothwithstanding the
foregoing, or any other language to the contrary, either party may terminate this
Agreement without cause upon thirty (30) days' written notice to the other party
prior to the intended date of termination. In the event of termination by either
party, neither party shall have any further obligations to the other party under
this Agreement, except that the TOWN remains liable to the COUNTY for any
outstanding invoice for materials that the COUNTY provides for the project, if
any.
Resolution 17-15
Page 4of5
TARRANT COUNTY, TEXAS TOWN OF WESTLAKE
B. Glen Whitley Thomas E. ' ry
County Judge Town Manager
Date: Date: " i
Attest:
Gary Fidkes
Commissioner, Precinct 3 '
Date: ��6
Kelly)Edwar Town Secretary
-- � �� Db
OF WAS
rE�'
APPROVED AS TO FORM* APP O F RM ND LEGALITY
Criminal Distri t Attorney's Office* L to n Lo ry, To`n A &ney
r11 111 An
* By law, the Criminal District Attorney's
Office may only approve contracts for its
clients. We reviewed this document as to
form from our client's legal
perspective. Other parties may not rely on
this approval. Instead those parties should
seek contract review from independent
counsel.
Resolution 17-15
Page 5 of 5
Approval of a Project for an Interlocal Agreement Between
Tarrant County, Texas and Town of Westlake
Tarrant County, Texas, acting by and through the Tarrant County Commissioners Court,
has been advised of the following described Project involving the construction, improvement, or
repair of a building, road or other facility. In accordance with Texas Government Code §
791.014, Tarrant County hereby gives its specific written approval for the Project prior to the
Project beginning. The Project information is as follows:
PROJECT and LOCATION:
• Rehabilitate and Resurface Dove Road located within the Town of
Westlake and Tarrant County Commissioner Precinct #3 from
approximately 550 feet east of FM 1938 to Westlake/Southlake City limits
(Approximately 6,230 linear feet).
The local governments that have requested the Project and with whom the Interlocal
Agreement is by and between are Tarrant County, Texas, and the Town of Westlake, Texas.
By vote on the date below, the Tarrant County Commissioners Court has approved the
Project identified above and authorized execution of this document by the presiding officer of the
Tarrant County Commissioners Court.
Date: _ (� yt � � �� —apn
By:
Presiding Officer of the
Tarrant County Commissioners Co t
Dove Road (5)
(Town of Westlake)
3/6/2017
Limits: 550 ft east of Precinct Line Road(end of divided section)to City Limits(Terra Bella)
Existing Condition: Pavement is in good condition from west end to Fair Oaks. Subgrade appears to be sound. Light severity of unsealed cracking with 1 or 2 very minor,small
distressed areas.and appear to be environmental or thermal related and not load. Cracking,distresses and patching increases to moderate severity from Far
Oaks to the east.
Scope Of Work: From Divided Section to 450 east(transitional area):Mill 2 inches and place 2 inches HMAC. From end of transition to City limits(east radius return of Terra
Bella):Remove 4 inches of existing material. Reclaim the existing roadbed, stabilize the recycled material(eight inches),regrade,place three inches of asphalt
binder and two-inches HMAC surface. Backfill shoulders and clean jobsite. Stripe.
Project Size: Roadway Length(if): 450 if
West to north of Fair Oaks Stabilization Width(ft): ft Stab Area: sy
2 in HMAC Overlay Binder Width(ft): ft Binder Area: sy
Surface Width(ft): 43 ft 62 ft to 24 ft Surface Area: 3,083 sy
Additional Areas(sy): 933 sy Overlay Randol Mill Intersection
Project Size: Roadway Length(If): 5,780 If
North of Fair Oaks to East Stabilization Width(ft): 26 ft Stab Area: 16,698 sy
Reconstruct Binder Width(ft): 25 ft Binder Area: 16,056 sy
Surface Width(ft): 24 ft Surface Area: 15,413 sy
Additional Areas(sy): sy
Estimate:
Roadway Materials:
.Overlay
Sq Yds Rate/SY Cost Estimate Final $Estimate $Final
Tack Coat Surface 3,083 0.10gal/sy $ 2.05 $/ al 308al al $ 632.08
HMAC(2" 3,083 0.11 to/s $ 59.13 $/in 339 to to 1 $ 20,054.93
Backfill Edges 2,344 0.0156 c/If $ 45.00 $/c 37 c $ 1,645.49
Reconstruct Subtotal $ 22,332.50
Cemiime 8" 16,698 28 lb/s $ 165.00 $/tn 233.77 to to $ 38,571.87
Prime 50/50 AEP 16,698 0.20 gal/s $ 1.75 $/ al 3340 gal gal $ 5,844.22
Tack Coat Binder 16,056 0.10gal/s $ 2.05 $/ al 1606 gal gal $ 3,291.39
HMAC Binder 3" 16,056 0.17 to/sy $ 53.13 $/tn 2649 to to $ 140,750.23
Tack Coat Surface 15,413 0.10 qal/sy $ 2.05 $/ al 1541 galai $ 3,159.73
HMAC 2" 15,413 0.11 to/s $ 59.13 $!tn 1695 to to $ 100,252.94
Backfill Ed es(Topsoil) 5,780 0.0556 c/if $ 45.00 $/c 321 c $ 14,461.56
Subtotal $ 306,331.94
Misc Cost
Millin 4") $ 31,026.67 CITY Provided
Millin 2"
$ 5,595.83 CITY Provided
Fuel Cost Estimate 50%Actual $ 7,750 $ 3,875.00
Tabs 0.5 $lea $ 623 $ 311.50
Stripe 0.033 $/If $ 24,920 $ 822.36
Materials+Misc Cost $ 347,963.30
10%Contin enc $ 34,796.33
Total: $382,759.63 $
Material cost based on Sept 2016 pricing. Construction Time Estimate: 33 days
Comments: City will responsible for all traffic control required to construct this project.
City will adjust all utilities and manholes/valves for this project.
City will provide a nearby disposal area for spoils.
City will provide a hydrant meter and all water for this project.
Res 17-15 City may provide material for backfilling edges. Prepared by: Richard Schiller
Estimated stabilization rate of 28#,8 inches deep. Tarrant County-Precinct Three