Loading...
HomeMy WebLinkAboutMunicipal Budget presentation  Town Council Budget Workshop 3 1. As a Policy Document •budget policies, goals and objectives 2. As a Financial Plan •financial structure, stewardship and setting service levels 3. As an Operations Guide •direction through the use of goals and objectives 4. As a Communications Device •for readers with a non-financial background 5. Vision, Values & Mission •aligns resources and strategic plan to V V M 08/10/2016 Vision Statement An oasis of natural beauty that maintains our open spaces in balance with distinctive developments, trails, and quality of life amenities amidst an ever expanding urban landscape. Mission Statement Westlake is a unique community blending preservation of our natural environment and viewscapes, while serving our residents and businesses with superior municipal and academic services that are accessible, efficient, cost-effective, and transparent. Strategic Themes Natural Oasis Exemplary Service & Governance High Quality Planning, Design & Development Exemplary Education – Westlake Academy Town Council Budget Workshop 08/10/2016 4 V V M Forging Westlake Challenges Identified Comp Plan Town Council Budget Workshop 08/10/2016 5 Themes Perspectives Outcomes Town Council Budget Workshop S L A Comp Plan Challenges 08/10/2016 6 FY 2012-13 “Driving Service Excellence” Leadership, Teamwork, Integrity FY 2013-14 “Moving Forward Together” A Growing Community & School FY 2014-15 “Community Growth” On the Horizon FY 2015-16 “Forging Westlake” Writing the Next Chapter Town Council Budget Workshop Section 1 Pages 2-3 08/10/2016 Packet Pages 8 -9 7 Town Council Budget Workshop Section 1 Pages 2-3 08/10/2016 Packet Pages 8 -9 8 Town Council Budget Workshop 08/10/2016 9 1.Recognized for Transparency Efforts & Fiscal Stewardship •4th City to receive new Comptroller Transparency Award; GFOA Awards for Budget, CAFR, PAFR 2.Began Using the Updated Comprehensive Planning Document 3.Continued Use of the Balanced Scorecard System for Strategic Planning 4.Westlake Academy Continued Growth 5.Granada Phase I Underway 6.Granada Phase II Infrastructure Being Built 7.Entrada Infrastructure Being Built 8.Solana Complex Revitalization Continues 9.Charles Schwab Location Announced 08/10/2016 Town Council Budget Workshop 10   Town Council Budget Workshop 08/10/2016 11 REGIONAL CHALLENGES 1.DFW Metro Area Employment 2.Population Growth 3.Water Demand 4.Transportation, Mobility and Traffic Congestion Town Council Budget Workshop Section 1 Pages 3-4 08/10/2016 Packet Pages 9 -10 12 LOCAL CHALLENGES - MUNICIPAL 1.Westlake’s Permanent Population Growth 2.Traffic Demands Due to Growth (Westlake & Surrounding) 3.Balanced Growth to Impact Cost of Municipal Services 4.Daytime Population 5.Housing Start Increases 6.Maintaining Westlake’s High Quality Residential Housing Town Council Budget Workshop Section 1 Pages 4-8 08/10/2016 Packet Pages 10 -14 13 LOCAL CHALLENGES – MUNICIPAL (continued) 6.Commercial Development, Economic Development 7.Construction Costs Increases 6.Implementation of the Comprehensive Plan 7.Pursuit of Infrastructure & Services Reinvestment While Combating Cost Increases 8.Staffing Levels, Insurance Costs, and Retention 9.Continued Emphasis on Long-Range Financial Planning Town Council Budget Workshop Section 1 Pages 4-8 08/10/2016 Packet Pages 10 -14 14 LOCAL CHALLENGES - ACADEMIC 1.Continued Impact of Westlake Academy on Residential Growth 2.Public Education Funding Shortfall 3.Staffing Levels, Insurance Costs, and Retention 4.Westlake Academy Overall Enrollment 5.Continued Emphasis on Long-Range Financial Planning Town Council Budget Workshop Section 1 Pages 4-8 08/10/2016 Packet Pages 10 -14 15   Town Council Budget Workshop 08/10/2016 16 Town Council Budget Workshop Compiled Using the Town Council Fiscal and Budgetary Policies No Changes to the existing Town Council Financial Policies except one… 08/10/2016 17 Town Council Budget Workshop Recommend Addition of Compensation Policy o General policy and collection of rules that govern the calculation of salary and benefit entitlement for all individuals employed by the Town of Westlake such as… •Determination of Salary/Benefits for New Employees •Point Bands •Market Adjustments •Performance Pay •Etc. 08/10/2016 18 Town Council Budget Workshop 08/10/2016 1. Municipal General Fund 2. Academic General Fund 3. Enterprise Funds (Utility Fund; Cemetery Fund) 4. Internal Service Funds (Utility M&R; General M&R; Vehicle M&R) 5. Special Revenue Funds (Visitor Fund, 4B Fund, ED Fund, LS Fund, PID Fund) 6. Debt Service Funds (DS Fund 300; DS Fund 301) 7. Capital Projects Funds (Capital Fund 410; WA Expansion Fund) 19 Town Council Budget Workshop Section 2 Page 16 PROPOSED FY16/17 $36.716M Revenues and Other Sources •24% increase of $7.071M (line 23) $37.944M Expenditures and Other Uses •30% increase of $8.758M (line 54) $(1.227)M Net Change to Fund Balance (All Funds) $15.855M Ending Fund Balance (All Funds) 08/10/2016 Packet Page 22 $8M Bond Revenue $(1.4M) Contributions $8M Fire Station General Fund, Enterprise, Internal, Special Revenue, Debt, Capital, Academy 20 Town Council Budget Workshop 08/10/2016 Projected Total Total Projected Beginning Revenues Expenditures Ending Fund and Other and Other Fund Change Change Balance Sources Uses Balance Amount Percent General Fund 8,201,322 8,983,854 8,810,747 8,374,429 173,107 2% Academic Funds 1,117,391 8,399,173 8,397,745 1,118,819 1,428 0% BUDGET IS BALANCED $ 9,318,713 $ 17,383,027 $ 17,208,492 $ 9,493,248 $ 174,535 2% Enterprise Funds •Utility Fund; Cemetery Fund 2,030,713 3,681,992 4,242,077 1,470,628 -560,085 -28% Internal Service Funds •Utility M&R; General M&R; Vehicle M&R 1,001,323 929,203 1,458,700 471,827 -529,497 -53% Special Revenue Funds •Visitor Fund, 4B Fund, ED Fund, LS Fund, PID 1,718,552 3,118,150 3,282,856 1,553,846 -164,706 -10% Debt Service Funds •DS Fund 300; DS Fund 301 29,976 2,117,357 2,147,333 0 -29,976 -100% Capital Projects Funds •Capital Fund 410; WA Expansion Fund 2,983,271 9,486,785 9,604,585 2,865,471 -117,800 -4% PLANNED USE OF FUND BALANCE $ 7,763,835 $ 19,333,487 $ 20,735,551 $ 6,361,772 $ -1,402,064 -18% GRAND TOTAL ALL FUNDS $ 17,082,548 $ 36,716,514 $ 37,944,043 $ 15,855,020 $ -1,227,529 -7% Individual Fund Summaries will detail these changes 21 I F O NLY M UNICIPAL O PERATING E XPENDITURES were taken into consideration (removal of all expenditures related to Capital Projects, Westlake Academy and Transfers) the FY 16/17 proposed budget would show A N I NCREASE OF 3% = $398,100 compared to the FY 16/17 base budget Town Council Budget Workshop Estimated Proposed Budget Budget CHANGE CHANGE FY 15/16 FY 16/17 AMOUNT PERCENT Total Payroll & Related 4,207,966 4,702,017 494,052 12% Total Expenditures 9,906,009 9,810,057 -95,951 -1% LINE 43 TOTAL $ 14,113,975 $ 14,512,075 $ 398,100 3% Section 2 Page 16 08/10/2016 Packet Page 22 22   Town Council Budget Workshop 08/10/2016 23 Town Council Budget Workshop 08/10/2016 The Town utilizes “service level adjustments” to NORMALIZE tracking of our budget cost increases or decreases. A service level adjustment (SLA) is a request for any dollars in excess of the “Base Budget”. (FY 2015-16 budget, adjusted for year-end estimates, less one-time purchases). 24 Town Council Budget Workshop ONE-TIME ON-GOING TOTAL DETAILS Bond Revenue 8,500,000 -0- 8,500,000 Bond Revenue Fire Station Transfers In 450,000 179,672 629,672 Will be offset by Transfers Out $450K Expansion $10K lots All Other 710,000 934,689 1,644,689 $706K - Bldg Permits/Reviews $450K - ED Fund WA $10K lots $260K - GWF Ductbank $125k - Property Tax Academic -482,425 442,516 -39,909 $(25)K - Blacksmith decrease TOTAL $ 9,177,575 $ 1,556,877 $ 10,734,452 percentage 85% 15% 100% 08/10/2016 25 Town Council Budget Workshop ONE-TIME ON-GOING TOTAL DETAILS Debt -0- 138,065 138,065 Fire Station Debt Payment Eco Dev -0- 320 320 ED Fund 210 Deloitte Hotel Tax Payment R&M 3,000 15,209 18,209 R&M costs for medians, buildings, equipment, HVAC, mechanical, electrical, grounds Rent & Utilities -0- 337,824 337,824 $337K to increase lease/utilities to $570K Service 70,000 135,666 205,736 $47K Laserfische; $45K IT Upgrades; $30K Masterplan; $25K VA Consultant; $16K Keller PD Supplies 7,724 7,276 15,000 $6K Radio Supplies; $1K Computer Equipment; $5K HVAC Supplies; $2K Security Supplies Transfer Out 450,000 179,672 629,672 Will be offset by Transfers Out $450K Expansion $10K lots Water Purchases -0- 64,000 64,000 UF Fort Worth Water Purchases Academic -0- -406,103 -406,103 WA expenditure decrease TOTAL $ 530,724 $ 471,999 $ 1,002,723 percentage 53% 47% 100% 08/10/2016 26 Town Council Budget Workshop ONE-TIME ON-GOING TOTAL DETAIL Capital Outlay -0- 186,000 186,000 $175K - FFE new lease space $ 12K - Fire Equipment Capital Projects 7,215,685 128,400 7,344,085 $8M - Fire Station $691K - Dove Road R&D Major Maint/Replacement 1,132,700 110,130 1,242,830 $ 55K - Marshal Vehicle $963K - Public Works Projects $140K - WA Facilities Maintenance $ 84K - IT Upgrades TOTAL $ 8,348,385 $ 424,530 $ 8,772,915 percentage 95% 5% 100% 08/10/2016 27 Town Council Budget Workshop Description Amount (4) New Positions 242,140 (2) Change to Full Time 62,563 Market Increase (3%) 61,011 Base Wages & Salaries $ 365,714 Insurance (16%) 73,360 Taxes (13%) 35,583 Retirement (10%) 37,435 Related Expenditures $ 146,378 TOTAL PAYROLL $ 512,092 08/10/2016 28 Town Council Budget Workshop BASE WAGES TAXES & INSURANCE TOTAL IMPACT Building Inspector 56,000 19,662 75,662 Development Coord / Mgmt Analyst 75,000 23,238 98,238 Planning & Development Director 110,000 31,497 141,497 Full Time Fire Fighter (3 of 3 – last year) 62,150 33,773 95,923 ADDITIONAL EMPLOYEES $ 303,150 $ 108,170 $ 411,320 TSO/Admin Clerk (part time to full time) 37,440 15,660 53,100 Fire Marshal (part time to full time) 93,000 40,536 133,536 CHANGE TO FULL TIME $ 130,440 $ 56,196 $ 186,636 GRAND TOTAL $ 433,590 $ 164,366 $ 597,956 08/10/2016 29   Town Council Budget Workshop 30 08/10/2016 30 Town Council Budget Workshop 08/10/2016 31 Town Council Budget Workshop ONE-TIME ON-GOING TOTAL Financial Stewardship 8,462,391 2,272,061 10,734,452 TOTAL REVENUES $ 8,462,391 $ 2,272,061 $ 10,734,452 Citizens, Students & Stakeholders 2,605 197,940 200,545 Municipal Operations 10,419 385,656 396,075 Academic Operations -0- -406,103 -406,103 People, Facilities & Technology 8,348,385 936,622 9,285,007 TOTAL EXPENDITURES $ 8,361,409 $ 1,926,320 $ 9,881,627 TOTAL $ 100,982 $ 345,741 $ 446,723 Section 2 Page 18 08/10/2016 Packet Page 24 The next four slides will detail these changes 32 Objectives: Preserve Desirability & Quality of Life; Increase Customer Satisfaction Service Level Adjustment Amount $200,545 Town Council Budget Workshop 08/10/2016 SLA AMOUNT DESCRIPTION •$138K Debt Obligations (Fire Station Debt Pymt) •$ 64K Utility Fund Water Purchases •$ 2K Repair and Maintenance Expenditures •$ 2K Service Expenditures •$ 2K Supply Expenditures •$ (8)K Academic Expenditure Savings 33 Objectives: Increase Financial Capacity & Reserves; Increase Revenue Streams Service Level Adjustment Amount $10,734,452 Town Council Budget Workshop 08/10/2016 SLA AMOUNT DESCRIPTION $8.5M Fire Station Bond Revenue $714K Building Related Permits & Fees (based on current schedules) $710K Economic Development Revenue ($10 per lot) $260K Contributions (Glenwyck Duct Bank project) $629K Transfers In (offset by transfers out) $125K Property Tax (effective tax rate 0.13695 – more detail later) $ 33K Charge for Services (Utility Fund) $ 30K Franchise Fee Tax $ 16K Hotel Occupancy Tax 34 Objectives: Maximize Efficiencies & Effectiveness; Encourage Westlake’s Unique Sense of Place; Increase Transparency, Accessibility & Communications Service Level Adjustment Amount $(10,028) Town Council Budget Workshop 08/10/2016 SLA AMOUNT DESCRIPTION $ 337K Rent and Utilities (proposed $485K Rent + 85K Electric = $570K) $ 203K Service Expenditures (FW Water; Records Mgmt ; IT Upgrades; Masterplan; VA Consultant) $ 23K Supply Expenditures (Building; HVAC; Painting; Security; Mechanical) $ 15K Repair & Maintenance Expenditures (mechanical; electrical; equipment; building;) $ 629K Transfers Out (offset by transfers in) $(397)K Academic Expenditure Savings 35 Objectives: Attract, Recruit, Retain, & Develop the Highest Quality Workforce, Improve Technology, Facilities & Equipment, Optimize Planning & Development Capabilities Service Level Adjustment Amount $9,285,007 Town Council Budget Workshop 08/10/2016 SLA AMOUNT DESCRIPTION $8M Fire Station Complex $965K Public Works ($720K Glenwyck Duct Bank; $100K Repaint Ground Storage Tank; $87K Pump Station Equipment; $56K Solana Pavement Repair ) $691K Dove Road ($691K Reconstruction & Drainage Vaquero/Terra Bella) $512K Payroll & Related ($365 Salaries; $73 Insurance; $37K Retirement; $35K Taxes) $140K Facilities ($42K Roof Repairs; $26K Building Upgrades; $18K Flooring Upgrades ; $32K Update Security System and Cameras) $ 83K Information Technology ($71K Network Equipment; $12K Network & Phone System & Peripheral Devices) $ 55K Fire Dept ($55K Marshal Vehicle – auction off old vehicle) 36 Town Council Budget Workshop 08/10/2016 Recommend SLA Reduction o Pause the Community Tree Lighting Event •Estimated Cost $14.5K •Pros •Cons 37 Leasing Costs Town Council Budget Workshop 08/10/2016 38   Town Council Budget Workshop 08/10/2016 39 KEEP CALM AND BUDGET ON 40 08/10/2016 Town Council Budget Workshop Town Council Budget Workshop PROPOSED FY16/17 $8.983M Revenues and Other Sources •5% increase of $425K (line 19) $7.498M Operating Expenditures •15% increase of $994K (line 37) $1.312M Capital and Other Uses •20% increase of $217K (line 44) $173K Net Change to Fund Balance $8.374M Ending Fund Balance 08/10/2016 $125K Property Tax $510 Permits & Fees $(241)K Transfers In from UF $457K Payroll & Related $269K Services (LF-IT-MP-KP) $235K Rent & Utilities $186K Outlay (FFE-FD) $31K Transfers Out to DS 41 Town Council Budget Workshop PROPOSED FY16/17 $3.681M Revenues and Other Sources •1% increase of $33K $3.858M Operating Expenditures •12% decrease of $514K $ (383)K Capital and Other Uses •47% decrease of $339K $ (560)K Planned Use of Fund Balance $1.374M Ending Fund Balance 08/10/2016 $33K - UF Charge for Services $(350K) - SL Water Treatment $(225K) - FW Water Line Phase 1 $(96K) - N1 Sewer Project $(243K) - Transfer out to GF 42 Town Council Budget Workshop PROPOSED FY16/17 $929K Revenues and Other Sources •16% increase of $126K $1.458M Capital and Other Uses •203% increase of $977K $(529)K Planned Use of Fund Balance $333K Ending Fund Balance 08/10/2016 $260K - Contributions Duct Bank $(14K) - Fire Station insurance pymt $(8.7K) – PW Sales of Surplus ($110K) - Transfer in from GF $720K - Glenwyck Duct Bank $100K - Repaint Grnd Storage Tank $ 87K - Pump Station Equipment $ 56K - Solana Pavement Repair $ 75K - WA Facilities Maint Projects $ 40K - I.T. Equipment $ 55K - Marshal Vehicle 43 Town Council Budget Workshop PROPOSED FY16/17 $3.118M Revenues and Other Sources •11% decrease of $374K $1M Operating Expenditures •18% decrease of $220K $2.275M Capital and Other Uses •25% increase of $452K $(164)K Planned Use of Fund Balance $1.553M Ending Fund Balance (line 47) 08/10/2016 $16K - Hotel Occupancy Tax $450K - ED Fund Contributions $(752K) – PID Fund Fees $(35K) - Transfers In Fidelity Pymt $25K - VA Consultant Fee $51K - Rent & Utilities $(271K) - PID Fund Expenses $2K - Transfer to GF for Comm Dept $450K - Transfer to WA Expansion 44 Town Council Budget Workshop PROPOSED FY16/17 $2.117M Revenues and Other Sources •5 % increase of $99K $2.147M Operating Expenditures •7 % increase of $138K $ (29K) Planned Use of Fund Balance $ -0 - Ending Fund Balance 08/10/2016 $177K – Transfers In from GF $(78K) - Property Tax Effective rate and PY tax receipts Fire Station Debt Pymt Interest Only 45   Town Council Budget Workshop 08/10/2016 46 Town Council Budget Workshop 08/10/2016 47 $0.0 $0.5 $1.0 $1.5 $2.0 $2.5 $3.0 $3.5 $4.0 $4.5 $5.0 FY 2007FY 2008FY 2009FY 2010FY 2011FY 2012FY 2013FY 2014FY 2015FY 2016$2.60 $2.59 $2.27 $2.37 $2.74 $2.78 $3.47 $3.74 $4.23 $4.47 $0.91 $0.40 $0.60 $1.34 $0.44 $0.44 $0.17 $0.30 $0.89 $0.15 $0.13 $0.34 $0.75 $0.38 $0.30 $0.33 $0.48 $0.20 Millions Presumed One- Time Payments Audit Payments Economic Development Tax Base Sales Tax Town Council Budget Workshop 08/10/2016 48 $2.9 $3.6 $3.7 $3.8 $4.6 $3.7 $4.4 $4.7 $4.6 $4.5 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 Shown in millions Town Council Budget Workshop FY15/16 Estimated Sales Tax was decreased by $550K to $4.550M. FY16/17 Proposed Sales Tax was held flat at $4.550M DEC JAN FEB MAR APR MAY JUN JUL FY TOTAL FY2015 401,102 347,582 464,315 455,877 294,031 601,717 404,987 470,188 3,439,800 FY2016 367,143 359,390 507,568 339,685 346,511 476,291 350,919 304,036 3,051,543 (33,959) 11,808 43,253 (116,191) 52,480 (125,427) (54,068) (166,152) $ (388,257) If we collect more sales tax we have two choices. •Do nothing – overage rolls into fund balance •Add back in transfers out to major maint funds 08/10/2016 49   Town Council Budget Workshop 08/10/2016 50 Town Council Budget Workshop is the total tax rate calculated to raise the same amount of property tax revenue from the same properties. 08/10/2016 51 Town Council Budget Workshop will decrease by .01939 for a tax rate of $.13695 08/10/2016 The calculated effective rate for FY2016/17 Currently $.15634 52 Effective Tax Rate Town Council Budget Workshop FY 15/16 Adopted FY 16/17 Proposed Change Amount M&O 0.13947 0.12882 (0.01065) I&S 0.01687 0.00813 (0.00874) $ 0.15634 $ 0.13695 $ (0.01939) 08/10/2016 53 Town Council Budget Workshop Fiscal Year M&O I&S Actual Rate Total Effective Tax Rate FY 10-11 0.15620 0.00390 0.16010 FY 11-12 0.13835 0.01849 0.15684 0.17944 FY 12-13 0.14197 0.01487 0.15684 0.19326 FY 13-14 0.13888 0.01796 0.15684 0.16070 FY 14-15 0.13710 0.01924 0.15634 0.15634 FY 15-16 0.13947 0.01687 0.15634 0.15677 FY 16-17 0.12882 .00813 0.13695 0.13695 08/10/2016 54 Town Council Budget Workshop FY 10/11 Actual FY 11/12 Actual FY 12/13 Actual FY 13/14 Actual FY 14/15 Estimated FY 15/16 Adopted FY 16/17 Proposed General Fund 0.15620 0.13835 0.14197 0.13907 0.13710 0.13947 0.12882 Debt Service 0.00390 0.01849 0.01487 0.01777 0.01924 0.01687 0.00813 TOTAL RATE 0.16010 0.15684 0.15684 0.15684 0.15634 0.15634 0.13695 amount change (0.00326) - - (0.00050) - (0.01939) percent change -2.04% - - -0.32% - -12.4% 08/10/2016 55 Town Council Budget Workshop 08/10/2016 FY 10/11 Actual FY 11/12 Actual FY 12/13 Actual FY 13/14 Actual FY 14/15 Actual FY 15/16 Estimated FY 16/17 Proposed $1.03 $1.09 $1.21 $1.23 $1.25 $1.27 $1.43 Total Appraised Value (shown in billions) 56 Town Council Budget Workshop 08/10/2016 FY 11/12 Actual FY 12/13 Actual FY 13/14 Actual FY 14/15 Actual FY 15/16 Estimated FY 16/17 Proposed $9.37 $8.57 $8.89 $9.20 $9.43 $10.38 Net Taxable Value (shown in millions) 57 Town Council Budget Workshop TYPE AMOUNT Existing 329.9M New -0- TOTAL $ 329.9M 08/10/2016 Commercial Taxable Value 58 Town Council Budget Workshop TYPE AMOUNT *Existing $ 665.1M New 54.9M TOTAL $ 720.0M 08/10/2016 Residential Taxable Value * PY Same Homes $569.5M Increase of $95.6M (17%) 59 Town Council Budget Workshop 08/10/2016 How much of Assessed Value is tax exempt because of 60 Amount Exemption Type $ 91.9M Homestead Exemption $ 13.3M Over 65 Exemption $ 80.1M Deloitte (65%) ends 2022 $107.5M Fidelity (90%) ends 2019 Town Council Budget Workshop 0.00 0.10 0.20 0.30 0.40 0.50 0.484000 0.462000 0.434690 0.375120 0.328437 0.285693 0.13695 2015 Ad Valorem Tax Comparison per $100 Trophy Club Southlake Keller Roanoke Grapevine Haslet Westlake Source: www.tad.org/2015taxrates 08/10/2016 61 Town Council Budget Workshop 08/10/2016 62 Town Council Budget Workshop Westlake Average Property Tax Bill is Is $1595 ($1.455M Home) 08/10/2016 That’s only $4.37 a day! 63 Town Council Budget Workshop Keeping the Current Tax Rate at .15634 Gives us additional Property Taxes to use for… 08/10/2016 64 Town Council Budget Workshop 08/10/2016 $4.5M Westlake Academy Capital Project •$1.9M Cash from $10K lots •$2.6M issued bonds Use for Municipal Lease Start Up Costs 65 RECOMMEND HOLD TAX THE SAME Town Council Budget Workshop 08/10/2016 APPROX. 7242 SQ FT ADDITION •Large Art Classroom (Kiln/Storage) •One Dry Science Lab, •Two Wet Science Classrooms •Collaboration Area •Possibly hold us over 5 years 66 Town Council Budget Workshop PROPOSED FY16/17 $8.506M Revenues and Other Sources •295% increase of $6.351M (line 18) $9.603M Capital Projects •328% increase of $7.361M (line 40) $(1.097)M Net Change to Fund Balance $ 961K Ending Fund Balance (line 47) Section 9 Page 65 08/10/2016 Packet Page 71 •$8.5M Bond Revenue •$6K Interest Income •$8.8M Fire Station •$44K Outdoor Learning •$691K Dove Rd R&D 67 Town Council Budget Workshop Funded 08/10/2016 Project name $0 $5 $10 $15 $20 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20 FY 20/21 $2.241 $9.603 $0.683 $1.738 $1.124 $3.110 $16.911 $17.554 7.9M Facilities 1.4M Roads 7.5M Parks 16M Facilities 1.0M Roads 253K Parks 8.9M Facilities 691K Roads 68 Town Council Budget Workshop PROPOSED FY16/17 $8.3M Revenues and Other Sources •6% increase of $442K (line 18) $8.4M Operating Expenditures •5% decrease of $406K (line 33) $1.4K Net Change to Fund Balance $1.1M Ending Fund Balance (line 45) Section 8 Page 63 08/10/2016 Packet Page 69 •$63K Local revenues •$356K CTE Funding •$(592K) Supplies/Materials •$166K Debt Service 69 Town Council Budget Workshop 08/10/2016 VARIANCES FROM COUNCIL RETREAT FOR FY 15-16 AMENDED EXPENDITURES ($757K) $ 115K Substitute Teacher Pay (budget deleted in error from Adopted FY 15-16) $ 482K Accounting entry for iPad lease (offset with other resources) $ 150K Additional pay (new salary scale & additional August days) $ 125K Computers for teachers (theirs transitioned to carts for students) $(115)K Budget to actual numbers have been reviewed and reduced $ 757K TOTAL CHANGES TO FY15/16 EXPENDITURES 70 Town Council Budget Workshop 08/10/2016 VARIANCES FROM COUNCIL RETREAT FOR FY 16-17 PROPOSED EXPENDITURES ($17K) $(106)K Payroll & Related (true up actual personnel expenditures) $ 34K Contracted Services (contracted services vs Payroll Speech Pathologist) $ (46)K Determined effort to reduce expenditures to balance budget $ 135K Debt Service Lease (decision to receive iPads earlier and sale old iPads) $ 17K TOTAL CHANGES TO FY15/17 EXPENDITURES 71 Town Council Budget Workshop 08/10/2016 72 •Supports VVM and Strategic Plan •Conservative Financial Stewardship •Monitoring Growth Projections •Oversight of High Quality Development •Future Planning for Water Demands •Infrastructure Investment  