Loading...
HomeMy WebLinkAboutFire Station Communication PlanPage 1 of 3 Town of Westlake New Fire Station Communication Plan (for August 2016 Budget Workshop) Project description: A fire station facility with approximately 15, 000 square private donation of land, identified by two independen facility will include 3 equipment/apparatus bays, slee storage, administrative offices, kitchen/food prep as a community room, staff training room, and coordination with back-up generator for sust able space, which includes a s for station location; The for five (5) staff members, ulti-purpose space to serve operations Strategy: Develop and execute communication and tactics for both external messa;', f; o all Wes internal messaging to elected offic o include goals sses) and for Goals: Deliver clear, concise, and tii stakeholders (corporate/) as many as possible associated with the the fire station projec voicing concerns, etc. s Gusto co 0 g pub e residents and essaging strategies to ensure station, educated on costs zens' engagement regarding ing input, asking questions, facestrategy with a delivery timeline projecacceptance of land through completion. Key Tal The below 1. Public Sa 2. Emergency 3. New station i o dat "`eem to f zen desires ocation details Identified talking points (summarized) to date are: = Last citizen survey results indicate high value placed by our citizens on desire to have high quality public safety services (will use/pull info from report for back-up) • Residents surveyed indicated quality of public safety services as most important of town services (71%0 0 = New station is proposed to cost estimated $8.8 million funded by cash and certificates of obligation with debt paid for by sales tax; Property taxes will not increase for this project. ■ Project estimated to take 18-24 months to design, build, and place into operation. Page 2 of 3 ■ New station location will be more centrally located to 90+% of Westlake residents and businesses, offering improved emergency response times ■ New station location is more centrally located to all Westlake businesses and to the high volume of accident calls we receive on the heavy traffic highways going through Westlake where we make many EMS calls for vehicle accidents. ■ New site identified by 2 independent consultants. First, it was identified by the Town's planning consultant during the recent update to the Town's Comprehensive Plan. Secondly, it was also identified as a best site in a second site location analysis by a firm that specializes in fire station location and construction. • Increase in response times and great accessibility can effect ISO ratings Current fire station doesn't meet modern personnel safe tandards regarding proximity • of fumes to where fire personnel reside in the statin t does not have hazardous material cleanup capabilities for fire pe toip properly clean their thmodern protective equipment after a call. Current fire station has been temporary bld • + er 1 rt s. It does not meet. Town standards (we never would allow a privat=loper to pu ething like this in Westlake, much less allow them to us 10 plus years an' $ a build a permanent structure that meets Town standards) Current station is too small to properly h Messaging tactics identified to date Development of story for exte elected official and .y.a o Summ o 2 minute o Detailed o Determine o 0 o inclu• points ` s hfor c• r wt= key peg son(s; ssaging for internal use by to have o V' and e project for media and in-depth inquiries. enderings throughout campaign applicable sultant via Comp Plan and by industryexpert se of loc: nsultant 'cation C ire direct e e article aids ▪ Simply * Direct Mail (groundbre * Media — Press Re * Messaging on Town Website * Social Media Updates * Signage — at Construction Site * Project boards at key locations — Town Offices, Fire Station, Westlake Academy, etc. * Traveling presentation board displays for town events, neighborhood meetings, etc. * Speaking opportunities for specific key groups and/or businesses o Mayor's Coffees, Neighborhood meetings, New Resident Meetings, Chamber an local leadership organizations' events/meetings such as Mayor's Roundtable, Metroport Cities, Chamber Business Builder Coffee, etc. * Groundbreaking ceremony — Internal coordination due to timeline constraints s of 3) — Announcement of project, update during progress points), and station dedication/thank you Page 3 of 3 • Other considerations: o Project specific Town Hall Meetings with Fire Chief & personnel, Town Manager & key staff, Mayor, Council, project architects & general contractors, etc. o Construction time-lapse camera/drone for building progress on website o Video on Proposed Station with Firefighters, citizens and key government officials if cost effective o Planning of station dedication/grand opening could include citizens' committee Timeline: (still under construction) Messaging will begin with the Council's acceptance of land and that meeting date (Aug-?) will start the timeline. First communication will be via Westlake W in days following and then to follow timeline throughout project. FAQ Draft: (to date) <Why is a new fire station needed? <Why not renovate or expand the curren <Where will it be located? <Why is the location a desirable locatio <What is currently at the proposed site? <How large will the fire statio <What are the keys differenc <What features will the fire s <What are the costs of the fire fa -low will it be fund <CDescribe the ar**- h f the bu structures? (When is the s <When is the he fire station? ent tire" atwec o new fire station. do not have? o break t etion date atue o n t oise t 3. re s ect a intersec s neighborhood/area? 's Master Plan for ce the fire station is built and up and