HomeMy WebLinkAbout12-14-00 TC packet material TOWN OF WESTLAKE
MEMO
TO: Chairman and Members of the Planning&Zoning Commission
FROM: Trent Petty, Town Manager
Dan C. Boutwell, Town Planh�r
Jeff Williams, Town Engineer/
Eddie Haas, Traffic Planner
Melanie Vanlandingham, Landscape Planner
SUBJECT: Regular Meeting of December 14, 2000
DATE: December 12, 2000
ITEM:
Conduct staff presentation followed by a Public Hearing to consider a concept Plan/PD
Site Plan filed by Hillwood Development Corp. on 15.6 acres located in PD 3-7, Tract 7-
2,Lot 1.
RECOMMENDATION:
Staff recommends approval of the "Daimler-Chrysler Concept/Site Plan as submitted by
Hillwood Properties, conditional to the staff comments being satisfied prior to the
issuance of a building permit,
BACKGROUND:
Hillwood Properties has recently amended PD 3-7 to permit a campus office land use
product. The Daimler-Chrysler Concept/Site plan is the first development to be proposed
under this new scheme. The applicant has concurrently submitted the preliminary plat for
approval. Comments regarding the preliminary plat are included in that item. The
proposed development meets the general area regulations required in the amended PD
regulations. It is significant to note that whereas the PD regulations pen-nit a FAR of 0.4
this development has a FAR of approximately 0.25.
At the time of consideration of the rezoning of this property, it was recognized by all
parties involved that the rezoning will require significant revisions to the Town's Land
Use Plan, Thoroughfare Plan, Open Space Plan, and various utility plans. A number of
comments provided by the Town staff are related to future revisions of these plans.
These need to be addressed as variances to those plans. Until the master plans are
revised, these issues would technically be variances. Because these variances are all
defined in three broad areas; open space, flood plans dedication and road row, we have
attempted to convey these to P&Z with the understanding that all may be worked out but
that the Town must retain the authority for the strictest requirements in the event
agreement cannot be reached.
A general summary of the comments is as follows:
Condition#1: Outdoor lighting plan for parking lots, driveways, and pathways has been
provided. This plan addresses height of poles, foot candle measurements at ground level,
and wattage of lamp(250W).
Condition#2: As part of the site plan,the applicant should also indicate the type of light
pole and provide an indication of degree of cut-off.
Condition#3: Signs have not been provided on the site plan. All signs for this site are
subject to future review and approval prior to issuing of any sign permit.
Condition #4: Street "F" roadway (36') is not consistent with roadway cross-section V
requirements per the Circle T PD Ordinance (4-lane divided roadway) or the 6-lane
roadway requirement identified by the Town at the Zoning approval.
-.Condition #5: A temporary roadway section, consistent with previous applied temporary
roadway standards on PD3-1 (2-lane with left turn lanes) may be implemented as an
interim improvement to construct 1/2 of the ultimate roadway plus necessary turn-lanes.;
Condition #6: While the Town standards for Collector status streets allow for median
openings a minimum of 300', the change in density of the area dictate a median spacing
consistent with arterial streets (500' minimum). The proposed development plan would
allow for median breaks at the two northern drives but restrict access to the southern most
drive (right in/ right out only). The effects of these openings may not be conducive to
median openings on Tract 7-3 (one full median opening and other controlled
ingress/egress access points) or the lots north of the proposed development.
Condition #7: Staff will review ultimate median cut needs in conjunction with the
master Thoroughfare Plan update and reserves the ability to require changes.
Condition #8: Article II, Section 4(E) 4 calls for deceleration lanes if ingress volumes
exceed 50 vehicles in the design hour. Trip generation (ITE Code 715) for the morning
peak indicates an inbound volume of 211 vehicles (about 70 per drive). Under current
roadway conditions, low volumes do not dictate the need for such mitigation measure.
Condition #9: The Town will require (at the developer expense) dedication of
deceleration lanes at median openings and as necessary at minor accesses locations (right
in/right out).
1. Roadway cross-sections (temporary and ultimate)(TED) should be depicted on the
site plan.
2. Sidewalks are not depicted on the plan. If a trail system integrating all sites within
PD3-7 is intended in lieu of sidewalks, a detailed plan must be provided to adequately
address pedestrian integration.
Landscape comments (Site Plan)
1. The plans shall be prepared by a registered engineer, architect, or landscape
architect and bear his/her seal, signature and date.
2. Show locations and dimensions of all on site pavement and curbing.
3. Screen north side parking lot from the public road.
4. Regarding Acceptable Landscape Materials, the applicant should provide greater
species diversity within the open space screen and parking lot shrubs. Reference
Westlake acceptable materials.
Landscape comments (Concept Plan)
Staff recommends that the trail depicted in the open space plan run along the southern
portion of the development and then continues north on the west portion of the
development and tie back into Roanoke Road. This negates the need for a sidewalk on
the west side of the roadway and provides a more scenic pedestrian conveyance
opportunity. The applicant will have to illustrate the sidewalk however and request a
variance from the Board of Aldermen. The open space will reflect the land included on
the floodway on the Towns FEMA map. This area will be open space and be maintained
by the Town.