Loading...
HomeMy WebLinkAboutRes 12-34 Authorizing a Contract with Graham AssociatesTOWN OF WESTLAKE RESOLUTION NO. 12-34 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF WESTLAKE, TEXAS, AUTHORIZING THE TOWN MANAGER TO EXECUTE A CONTRACT WITH GRAHAM ASSOCIATES FOR ENGINEERING DESIGN AND CONTRACT MANAGEMENT SERVICES FOR A 1MG GROUND STORAGE TANK. WHEREAS, the state requires water purveyors to provide a safe and adequate supply of water to citizens and water customers within their geographic service area; and WHEREAS, the Town Council find that the design of a secondary ground storage tank is sound infrastructure planning consistent with goals and objectives within the adopted strategic plan; and WHEREAS, the Town Council finds that the engineering work related to the construction of a secondary ground storage tank is necessary to successfully complete the project and that funding is appropriate; and. WHEREAS, the Town Council finds that the passage of this Resolution is in the best interest of the public. NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF WESTLAKE, TEXAS: SECTION 1: That, all matters stated in the Recitals hereinabove are found to be true and correct and are incorporated herein by reference as if copied in their entirety. SECTION 2: That, the Town Council of the Town of Westlake, Texas, hereby approves the contract, in the amount of $88,685 for engineering services related to the construction of a ground storage tank attached here to as Exhibit "A", and further authorizes the Town Manager to execute said contract on behalf of the Town of Westlake, Texas. SECTION 3: If any portion of this Resolution shall, for any reason, be declared invalid by any court of competent jurisdiction, such invalidity shall not affect the remaining provisions hereof and the Council hereby determines that it would have adopted this Resolution without the invalid provision. Resolution 12-34 Page 1 of 2 SECTION 4; That this resolution shall become effective from and after its date of passage. PASSED AND APPROVED ON THIS 12TH DAY OF NOVEMBER 2012. ATTEST: KellEdwarb, Town Secretary APPROVED Laura L. Wheat, Mayor Zk-* I& Thomas E. BrymTT n Manager AS Resolution 12-34 Page 2 of 2 Graham Associates, Inc. CONSULTING ENGINEERS & PLANNERS October 17, 2012 Mr. Jarrod Greenwood, Director of Public Works Town of Westlake 3 Village Circle, Suite 202 Westlake, Texas 76262 Re: Proposal for Engineering Services Westlake Ground Storage Tank Dear Jarrod: Graham Associates, Inc. is pleased to present this proposal for engineering services associated with the proposed Westlake Ground Storage Tank at the West Pump Staticin. We propose to provide a complete civil engineering package including surveying, geotechnical work, construction plans, field inspection and bidding assistance. Based on our understanding of the project, we propose the following scope of services: A. Surveying 1. Perform a topographic survey of the tank site for design purposes. Fee: $2,500 2. Provide construction staking for the project consisting of tank location and alignment for piping. Fee: $2,040 R. Geotechnical Report 1. Prepare a geotechnical report of the tank site to be used for design of the concrete footing. This work will consist of boring three (3) test holes at the site to evaluate the soils. Summit Office Park 1300 Summit Ave., suile 419 Ft. Worth. Texas 76102-4418 (817)332-5756 Fox (8 17) 336.6909 Fee: $4,345 Centerpoint Three 600 Six Flags Drive, Suite 5W Arlington, Texas 76011-6356 (817) 649-1914 r Metro (817) 640-8535 FAX (817) 633-5240 Chase Bank 3200 Broadway Blvd. Suite 268 Garland, Texas 75043-1571 (972) 840-6671 FAX (972)-840-6671 Resolution 12-34 C. Civil Construction Plans The plans will be prepared in accordance with Town of Westlake design requirements and specifications. 1. Cover Sheet 2. General Notes 3. Site Plan 4. Yard Piping layout 5. Grading Plan 6. Tank Plan and Sections 7. Construction Detail Sheets 8. Erosion Control Plan 9. Contract Documents Fec: $28,260 D. Cathodic Protection Plans These plans will be prepared to provide cathodic protection Ibr the tank to prevent corrosion. 1. Cathodic Protection Layout 2. Cathodic Protection Details 3. Cathodic Protection — Yard Piping Details Fee: $27,580 E. Electrical Design These plans will be prepared to provide power to the cathodic protection system. 4. Cathodic Protection Layout 5. Cathodic Protection Details 6. Cathodic Protection — Yard Piping Details Fee: $2,500 E. Bidding Assistance Lind Construction Services 1. Prepare a tabulation of bids received. 2. Assist in researching the successful bidder. 3. Visit the construction site to review progress. Fee: $1,500 Resolution 12-34 F. Construction Inspection Services 1. Provide construction inspection services of the following items: a. concrete footing b. welding of structural steel c. protective coating of the tank Fee: $20,000 Total Fee: $88,685 The above scope of work does not include a tree survey, boundary survey or traffic control plan. The above services do not include reimbursable charges such as printing, messenger services, etc. Reimbursable charges will be billed at direct cost plus 10%. Billing shall be on a monthly basis for work completed to date with payment due the 15th of the month following invoice date. Consultant reserves the right to stop work if payment is not received within 30 days of invoice date until such time as satisfactory payment arrangements have been made. Ownership of all plans, reports, surveys and ether related data remain the property of Graham Associates, Inc. until payment for services has been received. Thank you for the opportunity to present this proposal. If you have any questions, please contact me. Sincerely, Graham Associates, Inc. Brian M. Avirett, P.E. Division Manager cc: Jeff Williams David McCarver Approved and acre ted: By: � f_ Date: l� j 2olZ Resolution 12-34