Discussion of the Portion on Dove Rd. East of FM 1938 in
the Proposed Thoroughfare Plan with Public Input
Town Council Meeting
February 9, 2015
Comprehensive Plan Purpose - blueprint to guide Town’s future
T-Fare Plan Purpose – guide to provide mobility and connectivity
based on Town’s future land uses and zoning
Town Council Meeting
February 9, 2015
Purpose
Existing Thoroughfare Plan
Town Council Meeting
February 9, 2015
Existing Thoroughfare Plan – “Collector” Section
Town Council Meeting
February 9, 2015
Citizen Comments – Workshop #1
“Dove Rd. getting worse - Need E &
W artery”
“Have property value issues along
Dove due to traffic already”
Other comments from Workshop #1:
•Solana Group: “Set aside right of way now to
plan for future”
•Deloitte Group: “Dove road traffic” – “no 6
lane Dove”
•Deloitte Group: “Dove keep current
characteristics…not expand”
•Edge Zone West Group: “ Residents quick
access to major highways”
•Turner District: “ Congestion zone – pay
toll…speed bumps”
Town Council Meeting
February 9, 2015
Town Council Meeting
February 9, 2015
Option 1: Thoroughfare Plan with P&Z
Recommended Approval
Characteristics:
•Dove Rd. east of Davis Blvd. remains as is, a 2-lane Pastoral Collector
•Dove Rd. extension to Solana Blvd. (Town Arterial) to relieve traffic
congestion on the existing Dove Rd. east of Davis Blvd. if needed.
Town Council Meeting
February 9, 2015
Option 1: Thoroughfare Plan with P&Z
Recommended Approval
Proposed
Thoroughfare Plan
Pastoral Collector
Town Council Meeting
February 9, 2015
Proposed
Thoroughfare Plan
Town Arterial
Option 2: Special Considerations
Town Council Meeting
February 9, 2015
Characteristics:
•Allows for either the widening of Dove Rd. east of Davis Blvd.
with no Dove Rd. extension to Solana Blvd. or
•The creation of a Dove Rd. extension to Solana Blvd. which
would keep Dove Rd. from Davis Blvd. to SH 114 as is, a 2-lane
Pastoral Collector.
Option 2: Special Considerations
Town Council Meeting
February 9, 2015
Option 3: Dove as Town Arterial - No Dove/Solana Ext.
Town Council Meeting
February 9, 2015
Characteristics:
•Elimination of Dove Rd. extension to Solana Blvd.
•Reclassification of Dove Rd. to SH 114 as Town Arterial
•Added notation: “Portion of connection through Southlake will
require cooperation”
Option 3: Dove as Town Arterial - No Dove/Solana Ext.
Town Council Meeting
February 9, 2015
•Questions to Staff and Consultants
•Receive Public Comments
•Provide Guidance to Staff and Consultants for Feb. 23rd Public
Hearing