Loading...
HomeMy WebLinkAboutComprehensive Thoroughfare Plan presentationTown Council Hearing Revised Proposed Thoroughfare Plan Recommendations post Feb. 9th Council Meeting with Public Input Town Council Hearing March 2, 2015 Proposed Thoroughfare Plan – Recommended by P& Z Commission Jan. 21st Town Council Hearing March 2, 2015 Revised Proposed Thoroughfare Plan Town Council Hearing March 2, 2015 Area #1 “The extension of Ottinger Road to the north will be as indicated on the map with an alignment that goes west of the hill and connects with Capital Parkway as shown.” Revised Proposed Thoroughfare Plan Town Council Hearing March 2, 2015 Area #2 “At the point in time when development occurs and the Capital Parkway and Ottinger thoroughfares are required, the TIA will recommend the appropriate traffic handling requirements at intersections.” Revised Proposed Thoroughfare Plan Town Council Hearing March 2, 2015 Area #3 “Further study is required to determine optimum design.” Revised Proposed Thoroughfare Plan Town Council Hearing March 2, 2015 Area #4 “The northerly extension of Pearson Lane from Dove Road to Capital Parkway will be made as an offset intersection at Dove Road as shown on the map. The design of the two intersections of Pearson Land with Dove Road will be completed utilizing a design that produces the most efficient traffic movement, which may likely include the installation of roundabouts at these two intersections.” Revised Proposed Thoroughfare Plan Town Council Hearing March 2, 2015 Area #5 “East Dove Road is shown on the proposed T-Fare Plan as a “roadway of special consideration” and continues to be shown (as it is shown in the Town’s 1992 Comprehensive Plan) with a 106 ft. right-of-way with median divided for 4 lanes of traffic (2 lanes in each direction) or 2 vehicle lanes with bike lanes. A “roadway of special consideration” means it has potential to be perceived as having an adverse effect on adjacent properties. Therefore, serious consideration regarding design, along with public hearings, should be held prior to final approval.” Revised Proposed Thoroughfare Plan Town Council Hearing March 2, 2015 Existing Thoroughfare Plan Town Council Hearing March 2, 2015 Existing Thoroughfare Plan – “Collector” Section 4 Lane Divided – 106’ ROW Town Council Hearing March 2, 2015 Existing Thoroughfare Plan – “Collector” Section 4 Lane Undivided – 86’ ROW Town Council Hearing March 2, 2015 Revised Proposed Thoroughfare Plan Other Important Language to be Added: “Roadway construction thresholds are set out in Policy B.2 of this Comprehensive Plan document” – to be placed in the disclaimer just below the Thoroughfare Plan figure (i.e. plate) Town Council Hearing March 2, 2015