Loading...
HomeMy WebLinkAbout08-23-07 PZ Agenda Packet r }, TOWN OF WESTLAKE, TEXAS PLANNING AND ZONING COMMISSION MEETING AGENDA August 23, 2007 7:00 P.M. WESTLAKE CIVIC CAMPUS - BOARD ROOM 2600 J. T. OTTINGER ROAD 1. CALL TO ORDER. 2. REVIEW AND APPROVE MINUTES OF THE PLANNING AND ZONING COMMISSION MEETING HELD ON JULY 26, 2007. 3. CONDUCT A PUBLIC HEARING AND CONSIDER AN APPLICATION FOR AN AMENDMENT TO THE CONCEPT PLAN IN PLANNED DEVELOPMENT 1; OWNED BY MAGUIRE PARTNERS-SOLANA LP, IN THE WESTLAKE/ SOUTH- LAKE ADDITION NO. 1; LOT 1, BLOCK 1, FOR APPROXIMATELY 7.42 ACRES OF LAND GENERALLY LOCATED AT THE NW CORNER OF STATE HIGHWAY 114 AND SOLANA BOULEVARD. 4. CONDUCT A PUBLIC HEARING AND CONSIDER AN APPLICATION FOR A REPLAT IN PLANNED DEVELOPMENT l; OWNED BY MAGUIRE PARTNERS- SOLANA LP, IN THE WESTLAKE/SOUTHLAKE ADDITION NO. 1; LOT 1, BLOCK 1 FOR APPROXIMATELY 75.20 ACRES OF LAND GENERALLY LOCATED AT THE NW CORNER OF STATE HIGHWAY 114 AND SOLANA BOULEVARD. 5. CONDUCT A PUBLIC HEARING AND CONSIDER AN APPLICATION FOR A hONING CHANGE REQUEST TO RESIDENTIAL AIRPARK (RA) FOR THE TRACT OF LAND DESCRIBED AS LOT 18 OF THE STAGECOACH HILLS ADDITION, RUTH BAKER SURVEY, ABSTRACT NO. 108, TARRANT COUNTY, TEXAS, AS RECORDED IN VOLUME 388-66, PAGE 53, PLAT RECORDS, TARRANT COUNTY; MORE COMMONLY KNOWN AS 5928 STEVE COURT, CURRENTLY ZONED RESIDENTIAL-1 ACRE MINIMUM (R-1). 6. CONDUCT A PUBLIC HEARING AND CONSIDER AN APPLICATION FOR A ZONING CHANGE REQUEST TO RESIDENTIAL AIRPARK (RA) FOR THE TRACT OF LAND DESCRIBED AS LOT 20A OF THE STAGECOACH HILLS ADDITION, RUTH BAKER SURVEY, ABSTRACT 108, TARRANT COUNTY, TEXAS, AS RECORDED IN VOLUME 388-66, PAGE 53, PLAT RECORDS, TARRANT COUNTY; MORE COMMONLY KNOWN AS 5920 STEVE COURT, CURRENTLY ZONED RESIDENTIAL-1 ACRE MINIMUM (R-1). 7. CONDUCT A PUBLIC HEARING AND CONSIDER AN APPLICATION FOR A ZONING CHANGE REQUEST TO RESIDENTIAL AIRPARK (RA) FOR THE TRACT OF LAND DESCRIBED AS APPROXIMATELY 1.13 ACRES OF LAND, IN THE RUTH BAKER SURVEY, ABSTRACT 108, TRACT 1COIA OR 1C1A (MAPPED) AND TRACT 1CO3A OR 1C3A (MAPPED), TARRANT COUNTY, TEXAS; MORE COMMONLY KNOWN AS 13291 ROANOKE ROAD, CURRENTLY ZONED RESIDENTIAL-1 ACRE MINIMUM (R-1). 8. CONDUCT A PUBLIC HEARING AND CONSIDER AN APPLICATION FOR A ZONING CHANGE REQUEST TO RESIDENTIAL AIRPARK (RA) FOR THE TRACT OF LAND DESCRIBED AS APPROXIMATELY 1.00 ACRE OF LAND, IN THE RUTH BAKER SURVEY,ABSTRACT NO. 108,TRACT 1C01116A OR TRACT IC1B6A (MAPPED), TARRANT COUNTY, TEXAS,MORE COMMONLY KNOWN AS 5900 STAGECOACH CIRCLE, CURRENTLY ZONED RESIDENTIAL-1 ACRE MINIMUM (R-1). 9. CONDUCT A PUBLIC HEARING AND CONSIDER AN APPLICATION FOR A ZONING CHANGE REQUEST TO RESIDENTIAL AIRPARK (RA) FOR THE TRACT OF LAND DESCRIBED AS APPROXIMATELY 1.506 ACRES OF LAND, IN THE RUTH BAKER SURVEY, ABSTRACT NO. 108, TRACT 1C1E AND TRACT IC3C, TARRANT COUNTY, TEXAS; MORE COMMONLY KNOWN AS 13299 ROANOKE ROAD, CURRENTLY ZONED RESIDENTIAL-1 ACRE (R-1). 10. CONDUCT A PUBLIC HEARING AND CONSIDER AN APPLICATION FOR A ZONING CHANGE REQUEST TO RESIDENTIAL AIRPARK (RA) FOR THE TRACT OF LAND DESCRIBED AS APPROXIMATELY 1.601 ACRES OF LAND, IN THE RUTH BAKER SURVEY, ABSTRACT 108, TRACT 1C05A1 OR IC5A1(lMAPPED), TARRANT COUNTY, TEXAS; MORE COMMONLY KNOWN AS 13345 THORNTON DRIVE, CURRENTLY ZONED RESIDENTIAL-1 ACRE MINIMUM (R-1). 11. CONSIDER AND TAKE APPROPRIATE ACTION REGARDING AN APPLICATION FOR A FINAL PLAT BEING 1.00 ACRE OF LAND, DESCRIBED AS LOT 1, BLOCK 1, BENDER ADDITION, RUTH BAKER SURVEY, ABSTRACT NO. 108, TARRANT COUNTY; COMMONLY KNOWN AS 5900 STAGECOACH CIRCLE. 12. ADJOURNMENT. CERTIFICATION I certify that the above notice was posted at the Town Hall of the Town of Westlake, 3 Village Circle, Suite 202 and Westlake Civic Campus, 2600 J.T. Ottinger Road, Westlake, Texas, 76262, on Monday, August 20, 2007, by 5 p.m. under the Open Meetings Act,Chapter 551 of the Texas Government Code. Kim Sutter, TRMC, Town Secretary If you plan to attend this public meeting and have a disability that requires special needs,please advise the Town Secretary 48 hours in advance at 817-490-5710 and reasonable accommodations will be made to assist you. Town of Westlake Memo TO: Chairman Bill Greenwood and Members of the Planning and Zoning Commission FROM: Trent Petty, Town Manager David McCarver, Town Engineer SUBJECT: Regular Meeting of August 23, 2007 DATE: August 17, 2007 Item Conduct a public hearing and consider an application for an Amendment to the Concept Plan in Planned Development 1; owned by Maguire Partners- Solana LP, in the Westlake /Southlake Addition No. l; Lot 1, Block 1, for approximatelO.42 acres of land generally located at the NW corner of State Highway 114 and Solana Boulevard. Conduct a public hearing and consider an application for a replat in Planned Development 1; owned by Maguire Partners - Solana LP, in the Westlake /Southlake Addition No. 1; Lot 1, Block 1 for approximately 75.20 acres of land generally located at the NW corner of State Highway 114 and Solana Boulevard. Backaround: Maguire Partners has made application to the Town for an amendment to their approved site plan in order to construct a new office building on Lot 1 of the Solana complex. The proposed project will provide 142,000 square feet of office space within a 5 -story building. A 2 -level parking garage beneath the building will have 446 spaces. This is the first phase of a 2 -phase project. The Town staff has reviewed the application and has determined that the proposed site plan complies with the Town's Uniform Development Code (UDC) and the PD 1 ordinance that governs the development of the site subject to the following conditions: Ordinance #202 which approved the Maguire Partners original PD 1 in 1992 establishes a maximum permitted building height for any principal or accessory building of seven hundred feet mean sea level. The requested allowance for height for the new phase I building is 716 feet msl and phase II is 721 feet msl. Since the PD Site Plan is the document that establishes development allowances, SEC fIO,N' 4 MAht:htVN1 lllUll:DING HEIGHT Section 4,1 General l xc,ept as provide4 below, and as limited by Section 10 of this Aa �icle Ul and the conttpl 'Plan_ the heiebt limit fin all struetur q :shall be the i sir of five stories above Pradc or 75 feet. 5mno.N io wsjD MNTtA1, P.Roxm'§1i'I"'t sLon Section 10,1 Determination of Proximity Slope Wight Restrictions Except as prodded in Section 10,2 baba, stTuctures shall not exc d: (s'1 the beiga t of a line drawn at a slope of ;a. t from an angle originating from any pro erty lino or last line x�c ned liar single family use. and (ii) alts height of a line drawn at a s epe of 2:1 from an angle aariM,inattcacg frcam any ri ht:- of -wav line rot a public roadway. if the -grade orthe f round rases or taalis from the point of origin of the slope line, the maximurn pc =raaitted caaaht shall increase or deer se, respectively; by the ti, eriiCal rnea%%r'entent of the d& &ence in grade. Section 10.2 Exceptions to slope tt quiremctat The ha i,,ht Emit imposed by Section 10.1 above shall not apple to any of the followins uses �rel,arditis of their location). elect cKal substation or utility distribatfion- hales. Solana PD 1 Development Standards ORDS 202 Max Coverage of Principal Use Buildings "CPUB" 10% Coverage of Principal Use Buildings 6.43% CPUB with expansion Minimum Lot Area 5 acres Setbacks 100 ft from public rd (ex Sam School 80 ft) 200 from SH 114 500 residentially zoned area otherwise 100 side yards and rear yards except lots 1 R and 2R Max Bldg Height 700 ms] Attachments: Site Plan, Replat and associated drawings Kelly & Associates 3690 Jefferson Drive, Frisco, Texas, 75034 (214) 697 -1328 (972) 668 -7867 fax TECHNICAL MEMORANDUM To: Rex M. Whitton From: Rod Kelly, P.E. Date: August 9, 2007, 2006 RE: HKS Project #10445, Traffic and Parking Study — Solana Blvd. Office Buildings (Revised Plan) Traffic and Parking Analysis, Westlake, Texas The purpose of this memorandum is to document the methodology, findings, and conclusions associated with an analysis of the traffic impacts of the subject proposed two -phase office building development and the internal traffic access and circulation requirements of the associated parking facilities for the proposed office buildings on Solana Blvd., in Westlake, Texas. TRAFFIC ANALYSIS Methodology The analysis was conducted for A. M. and P. M. peak hour traffic conditions. The first step in the traffic analysis process was to document existing traffic volumes now accessing the existing surface parking in the area where the subject facility is to be located. Traffic counts were made on Tuesday, November 21, 2006, at the two intersections shown with an asterisk ( *) in Figure 1. The traffic volumes obtained from these counts are contained in Appendix A. From this information, it was determined that the A. M. and P. M. peak hours for the combination of all intersection approaches are from 7:15 A. M. to 8:15 A. M. and 4:30 P. M. to 5:30 P. M., respectively. This existing count information is shown in Figure 2. To estimate the future traffic generated by the proposed site, trips were calculated for development Phases I and II, which total 298,748 square feet, using the 7th Edition of the ITE Trip Generation Manual. The trip generation rates for office uses, using Land Use Type 720 "General Office ", are as follows: AM peak hour - 456 entering, 62 exiting PM peak hour - 82 entering, 408 exiting The directions of approach and departure for traffic coming to and leaving the development site were determined by referring to the approach and departure routes of the motorists using the existing surface parking with access at the Solana Blvd. and Sam School Rd. intersection and using this information to estimating the routes of arrival and departure for Phase 1 and Phase II building tenants. Trips generated by the proposed office buildings were then assigned to the appropriate approaches of the intersections analyzed. The combination of existing traffic volumes and those that will be generated by the proposed development (Existing + Site Volumes) at the intersections in the vicinity of the proposed development are shown in Figure 3. The lane configurations and types of traffic control at these intersections are shown in Figure 4. Traffic and Parking Study — Phases I and 11 Solana Boulevard Office Building Page 2 of 10 August 9, 2007 re i — site Tian 0 r� :i Tam and Parking Study — Phases l and » Solana Boulevard Office Building Page ad m August 9, 2007 . � � � c ! 4 �� & !jr( 0 � O O � U @ � @ Legend FIGURE 2 » Flo_ B_ XX EzIst hg Vdumes _ ft_ w» C.OQ AM & P9 Peak Ha m Traffic and Parking Study— Phases 1 and 11 Solana Boulevard Office Building Page 4 of 10 August 9, 2007 } 4 C� Y r 0 Legend FIGURE 3 AV Polk eater xx ExIsTig Plus She Velumes =v Fbik Hur QM AM $ PM Peak Hours Traffic and Parking Study — Phases l and It Solana Boulevard Office Building Page 5 of 10 August 9, 2007 FIGURE 4 Interseebn Lane Ccrriuralon And Tra`f!c Control Traffic and Parking Study - Phases I and 11 Solana Boulevard Office Building Page 6 of 10 August 9, 2007 The above traffic information was entered as input data into the Trafficware "Synchro" traffic analysis software package, both for the existing conditions and for conditions that included the traffic added by the proposed development. The results were then tabulated and conclusions developed to determine the impact of the added traffic. Findings and Conclusions The analysis of impacts is measured in terms of traffic operating level of service (LOS). According to the Highway Capacity Manual, capacity is defined as the maximum number of vehicles that can be expected to travel on a given section of roadway or a specific lane during a given period under prevailing traffic conditions. The operational conditions of roadways are measured in terms of "Level of Service" (LOS). Level of Service refers to the operational conditions within a traffic stream and their perception by motorists in terms of delay, freedom to maneuver, traffic interruptions, comfort, convenience and safety. There are six levels of service (LOS) or capacity conditions for each roadway facility and are designated from "A" to "F ", with "A" representing an optimal, free -flow condition and "F" representing a congested, forced flow condition. An examination of the traffic count Table 1 - Intersection Capacity Analysis information in Figures 2 and 3, as well as the results of the capacity analyses in Table 1, indicate that, overall, both site intersections will operate acceptably. There is, however, some measurable delay associated with traffic operations during the AM and PM peak hour for certain individual intersection approaches. These include the intersection approach delays highlighted in yellow in Table 1 for those motorists leaving the site during these peak hour traffic periods. Also highlighted in yellow are delays for vehicles entering the site in the AM peak hour. These delays are the result of relatively heavy westbound through volumes on Solana Blvd. during the morning period, which make it difficult for traffic to enter and leave the site. Once the new FM 1938 is constructed and connected to the SH 114 eastbound frontage road at the new bridge, it is anticipated that much of this heavy westbound will be diverted to this alternative access route, especially for traffic Solana Blvd WB at Village Circle AM Base Plus Site Approach Delay(sec) LOS PM Base Plus Site Delay(sec) LOS WB 1.0 A 1.3 A NB 43.8 E 14.4 B SB 86.6 F 13.6 B Overall Intersection 3.1 A 7.2 A Solana Blvd EB at Village Circle Approach AM Base Plus Site PM Base Plus Site Delay(sec) LOS Delay(sec) LOS EB 0.1 A 0.0 A NB 9.3 A 13.3 B SB 1 12.3 B 15.7 C Overall Intersection 7.2 A 4.0 A Solana Blvd WB at Sam School Rd Approach AM Base Plus Site PM Base Plus Site Delay(sec) LOS Delay(sec) LOS WB 0.2 A 3.6 A NB 84.8 F 15.8 B SB 30.7 D 19.6 C Overall Intersection 11.4 B 11.4 B Solana Blvd EB at Sam School Rd Approach AM Base Plus Site PM Base Plus Site Delay(sec) LOS Delay(sec) LOS EB 1.5 A 0.1 A NB 10.6 B 12.6 B SB 11.2 B 29.8 D Overall Intersection 7.4 A 10.2 B approaching from the south. While the impacts are not expected to be significant for Phase I of the development, installation of a deceleration lane on the westbound approach of Solana Blvd, at Village Circle for traffic entering the site and a left turn lane in the median for eastbound traffic entering the site, as shown in Figure 5 Traffic and Parking Study — Phases I and Il Solana Boulevard Office Building Page 7 of 10 August 9, 2007 i Possible Future Left Turn Lane' 1 on Lane Figure 5 Main Entry Configuration with the dashed lines, to increase the operating efficiency of the intersection and reduce delays to an acceptable level. The analysis indicates that construction of the development will have only a limited impact on average approach delays at the intersections analyzed and that traffic operating levels of service, for the intersections as a whole, will remain at LOS "A" and "B ". These levels of service are considered as very acceptable for suburban peak hour traffic conditions. Details of the intersection computer analyses are provided in Appendix B. Traffic and Parking Study— Phases / and 11 Solana Boulevard Office Building Page 8 of 10 August 9, 2007 PARKING ACCESS AND CIRCULATION ANALYSIS As shown in Figure 1, two separate driveways provide access to the office garage. The driveway at Sam School Road, serving the existing parking lot to the west of the proposed development, will connect with a combined garage entrance /exit. The existing driveway has a curvilinear alignment, with no centerline pavement markings. A painted centerline should be added. The new second driveway, across from Village Circle, will provide access to two separate garage entrances and one combined entrance /exit. The recommended configuration of this main entry to the complex is shown in Figure 5. This entrance /exit roadway is designed to provide good traffic flow into and out of the development, with an entry separate right turn lane and a two lane exit. Within the site the entry roadway serves the multiple garage access points. With multiple garage access points, traffic should flow well within the site. Traffic and Parking Study— Phases / and // Solana Boulevard Office Building Page 9 of 10 August 9, 2007 Appendices Capacity Analysis Worksheets HCM Unsignalized Intersection Capacity Analysis AM Base + Site 1: Kirkwood Blvd WB & Village Circle 8/9/2007 Wweme}�eiri}'"'" .`--"`�;- =BCC EBT" EBR" 1118- .F-:VW" WBR - NBL NB7 9113W' "' L' ",`SBT -78 Lane Configurations Sign Control'` Free Free Stop- Stop Grade 0 %0 00% 0% 0% Volume (veh/h) 0` 0 0 210 1211` 233` 10 ` 2` 0 0" 25 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 228 1316' 253 11 2 0' 01 12 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream, signal (ft) pX, platoon unblocked vC, conflicting volume 1570 0 921 2026 0 1901' 1899 565 vC1, stage 1 conf vol 0 0 vC2, stage `2 conf vol 0 0 vCu, unblocked vol 1570 0 921 2026 0 1901 1899 565 tC, single (s) 4.1 4.1 7.5 -- 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 3.1 3.1 tF (s) 2.2 2.2' 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 86 91 96 100 100 54 97 cM capacity`(veh/h) 693 1622 126 49 1084 36 59 468 Pirechon,�Lane # � - � _ 1 "2 WB`3 VUB..4- 'NB 1 2 SB S . . Volume Total 228 527 527 517 11 2 39 Volume Left 228 0 0 0 11 0 0 Volume Right 0 0 0 253 0 0 12 cSH 1622 1700 1700 1700 126 49 80 Volume to Capacity 0.14 0.31 0.31 0.36 0.09 0.04 0.49 Queue Length 95th (ft) 12 0 0 0 7 3 51 Control Delay (s) 7.6 0.0 0.0 0.0 36.2 81.9 86.6 Lane LOS A E F F Approach Delay (s) 1.0 43.8 86.6- Approach LOS E F trtiersection Summary _ . -- - - ° • - Average Delay 3.1 Intersection Capacity Utilization 50.0% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Report HCM Unsignalized Intersection Capacity Analysis AM Base + Site 3- Kirkwood Blvd WB & Sam School Rd 8/9/2007 --.* --I. --t 4, *-- 4\ T �' �► 1 WBL' AVIlg7`.,1NBR`'.1�1 ,NBA; NBI_' .SBt 5Bl'TM Lane Configurations tt'* I t Sign Control' Free Free Stop Stop Grade 0% 0% 0% 0% Volume (veh/h) 0` 0'` 0 41 1001 190 60 118 0 0 30 5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 45 1088, 207 65 128 0 0' 33 5 Pedestrians Lane Width;(ft), Walking Speed (ft/s) Percent'Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream -signal (ft) pX, platoon unblocked vC,`conflicting volume 1295 0 474 1384 0 1345 1280 466 vC1, stage 1 conf vol 0 0 vC2, stage 2 conf vol 0 0 vCu, unblocked vol 1295 0 474 1384 0 1345 1280 466 tC, single (s)' 4.1 4.1 7.5 6.5 6.9 7,5 6.5 6.9 tC, 2 stage (s) 3.1 3.1 tF_(s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 97 83 7 100 100 80 99 cM capacity (veh/h) 732 1622 388 138 1084 20 160 543 _ D rectiori, rie # _ : 3IVB i WB 2 WB 3� WB 4-W f Volume Total 45 435 435 424 65 128 38 Volume Left 45 0 0 0 65 0 0 Volume Right 0 0 0 207 0 0 5 cSH 1622 1700 1700 1700 388 138 178 Volume to Capacity 0.03 0.26 0.26 0.25 0.17 0.93 0.21 Queue Length 95th (ft) 2 0 0 0 15 158 20 Control Delay' (s)` 7.3 0.0 0.0 0.0 16.2 119.8 30.7 Lane LOS A C F D Approach Delay (s) 0.2 84.8 30.7 Approach LOS F D lntersecbon ummary . Average Delay 11.4 Intersection Capacity Utilization 47.6% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Report HCM Unsignalized Intersection Capacity Analysis AM Base + Site 4- Kirkwood Blvd EB & Sam School Rd 8/9/2007 ilU{tyyvemerit . _ ,.:; a.. E1� BT " "EBR �_ -wgi 'VVBT rruBR ' NBt ` NBT 49 R' SBL 7 SBT"" :SBI Lane Configurations Vi W. T Sign Control Free Free Stop Stop Grade 0 %° _ 0% _ 0% 0% Volume (veh/h) 32 .1 101 21 0' 0` 0 0 146 63 17 54` 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 35 110 23 0 0 0 0 159 68' 18 59 0 Pedestrians Lane Width, (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 0 133 220 191 48 254 202 _0 vC 1, stage 1 conf vol 0 0 vC2, stage 2 conf vol 0 0 vCu, unblocked vol 0 133 220 191 48 254 202 0 tC, single (s) 4.1 4.1 7.5 6.5 6.9' 7.5 6.5 6.9 tC, 2 stage (s) 3.1 3.1 tF (s) 2.2 22 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 98 100 100 77 93 96 91 100 cM,capacity (veh/h) 1622 1044 659 688 1011 512 678 1084 Volume Total 35 44 44 45 106 121 18 59 Volume Left 35 0 0 0 0 0 18 0 Volume Right 0 0 0 23 0 68 0 0 cSH 1622 1700 1700 1706 688 839 512 678 Volume to Capacity 0.02 0.03_ 0.03 0.03 0.15 0.14 0.04 0.09 Queue Length 95th (ft) 2 0 0 0 14 13 3 7 Control Delay (s) 7.3 0.0 0.0 0.0 11.2 10.0 12.3 10.8 Lane LOS A B B B B Approach Delay (s) 1.5 10.6 11.2 Approach LOS B B interseca�on Average Delay 7.4 Intersection Capacity Utilization 47.6% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Report HCM Unsignalized Intersection Capacity Analysis AM Base + Site 14: Kirkwood Blvd EB & Village Circle 8/9/2007 � --► � "r .4- � 4\ u overnent`" _ J=BLa EB,i' EBR- YUBL 1NBTy. 1NBR" Bt ' ` 1VB7 NBR SBL SBT" SBI Lane Configurations Vi t Sign Control Free Free Stop Stop, Grade 0% 0% 00/0 0% Volume (veh/h) 2 144 35 0 0 0 0 10 19 25 210 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 157 38 0 0 0 0 11 21 27 228 0 Pedestrians _ Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked VC, conflicting volume 0 195 294 180 71 83 199 0 VC 1, stage 1 conf vol 0 0 vC2 stage `2 conf vol 0 0 vCu, unblocked vol 0 195 294 180 71 83 199 0 tC, single (s)_ 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 3.1 3.1 tF (s) 2.2 2.2 3.5' 4.0' 3.3 3.5 4.0 3.3 p0 queue free % 100 100 100 98 98 97 67 100 cM capacity (veh/h) 1622 1019 473 712 977 865 695 1084 ,.-�, __ . .e- v. Direction; Lane # EB 1 EB 2 EB 3 NB 1 SB 1 SR 24 n., . - _.,,11 _....r. , - _ . � :, - - , t.� Volume Total 41 78 77 32 27 228 Volume Left 2 0 0 0 27 0 Volume Right 0 0 38 21 0 0 cSH 1622 1700 1700 866 865 695 Volume to Capacity 0.00 0.05 0.05 0.04 0.03 0.33 Queue Length 95th (ft) 0 0 0 3 2 36 Control Delay (s) 0.4 0.0 0.0 9.3 9.3 12.7 Lane LOS A A A B Approach Delay (s) 0.1 9.3 12.3 Approach LOS A B intersection Average Delay 7.2 Intersection Capacity Utilization 50.0% ICU Level of Service A ' Analysis Period (min) 15 Synchro 6 Report HCM Unsignalized Intersection Capacity Analysis PM Base + Site 1: Kirkwood Blvd WB & Village Circle 8/9/2007 � � i- '1- 4% f / `► 1 � Synchro 6 Report Lane Configurations i ttt# Sign Control Free Free -- Stop Stop Grade 0% 0% 0% 0% Volume (veh/h) 0 0 0 51 190` 36 24 1 0 01. 143 82 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 55 207 39 26 1 0 D 155 89 Pedestrians Lane Width (ft) _ Walking Speed (ft/s) Percent Blockage Right turn flare (veh) _ Median type _ _ None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 246 0 347 357 0 338 337 88 vC1, stage 1 conf vol 0 0 vC2,'stage 2 conf vol 0 0 vCu, unblocked vol 246 0 347 357 0 338 337 88 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 3.1 3.1 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 97 94 100 100 100 72 91 cM capacity (veh/h) 999 1622 406 549 1084 576 563 952 Direiction, Lane #� V11B i,„ NHB 2 WB 3 Wg 4 _ NB 1v NB 2 SB �''��� Volume Total 55 83 83 80 26 1 245 Volume Left 55 0 0 0 26 0 0 Volume Right 0 0 0 39 0 0 89 cSH 1622 1700 1700 1700 406 549 661 Volume to Capacity 0.03 0.05 0.05 0.05 0.06 0.00 0.37 Queue Length 95th (ft) 3 0 0 0 5 0 43 Control Delay (s) 7.3 0.0 0.0 0.0 14.5 11.6 13.6 Lane LOS A B B B Approach Delay (s) 1.3 14.4 13.6 Approach LOS B B telon=Summaryf Average Delay 7.2 Intersection' Capacity Utilization 46.5% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Report HCM Unsignalized Intersection Capacity Analysis PM Base + Site 3: Kirkwood Blvd WB & Sam School Rd 8/912007 --* --. ---V ,r ♦- t 4\ t lb. `► 1 -� i%lovement I ... E�LEB` ESR4tB°1NBT' 1111BR " NBA NBT NBR. SBI:` SST 1SBE Lane Configurations I ttl* Ili t T, Sign i Control Free Free Stop - Stop Grade 0% 0% 0% 0% Volume (veh1h) 0 0 0 142 130; 24 10 27 0 0 1.90 73 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 154 141_' 26 ill 0 0' 207 79 Pedestrians _ _ Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 167 0 538 476 0 478 463 60 VC1, stage 1 conf Vol 0 0 vC2, stage 2 conf Vol 0 0 vCu, unblocked Vol 167 0 538 476 0 478 463 60 tC, single (s) 4.1 4.1 7.5 6-5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 3.1 3.1 tF(s) 2.2 2.2 3.5 4.0 3.3 3.5 4;0 3.3 p0 queue free % 100 90 95 93 100 100 54 92 cM capacity (veh/h) 1030 1622 233 440 1084 414 447 993 WB:1y W811' M- 9 ` Wl3 4 NB 1 ' N132 SB Volume Total 154 57 57 54 11 29 286 Volume Left 154 0 0 0 11 0 0 Volume Right 0 0 0 26 0 0 79 cSH 1622 1700 1700 1700 233 440 528 Volume to Capacity ' 0.10 0.03 0.03 0.03 0.05 0.07 0.54 Queue Length 95th (ft) 8 0 0 0 4 5 80 Control Delay (s) 7,5 0.0 0.0 0.0 212 13.8 19.6 Lane LOS A C B C Approach Delay (s) 3.6 15.8 19.6 Approach LOS C C lititersection aummary` . .a , Average Delay 11.4 Intersection Capacity Utilization 49.8% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Report HCM Unsignalized Intersection Capacity Analysis PM Base + Site 4: Kirkwood Blvd EB & Sam School Rd 8/9/2007 SL ;'° )=B, ` - EBR 1l1lBl. ' WB,, 1NBR NBC ' NBA' NBR' BC '' SBi`p SBI Lane Configurations ttl* tT* t Sign; Control Free Free Stop Stop Grade 0 % 0% 0% 0% Volume (veh/h) 6 589 66 0 0 0 0 31 38 103 229 _0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)` 7 640 72 0` 0 0 0 34 41 112-. 249 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type` None None. Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 0 712 814 689 249 285 725 0 vC1, stage 1 conf vol 0 0 vC2, stage '2 conf vol 0 0 vCu, unblocked vol 0 712 814 689 249 285 725 0 tC ,single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5' 6.9 tC, 2 stage (s) 3.1 3.1 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 100 100 91 94 80 29 100 cM capacity (vehlh) 1622 852 113 366 751` 565 349 1084 Direction;lane # ' tif 1 EI 2 't!4-3 ' 'M* N91 NB 2 59.1 SB 2 Volume Total 7 256 256 200 22 53 112 249 Volume Left 7 0 0 0 0 0 112 0 Volume Right 0 0 0 72 0 41 0 0 cSH 1622 1700 1700 1700 366 613 565 349 Volume to Capacity 0.00 0.15 0.15 0.12 0.06 0.09 0.20 0.71 Queue Length 95th (ft) 0 0 0 0 5 7 18 132 Control Delay (s) 7.2 0.0 0.0 0.0 15.5 11.4 12.9 37.3 Lane LOS A C B B E Approach Delay (s) 0.1 12.6 29.8 Approach LOS B D lnfersecbort S�immary . Average Delay 10.2 Intersection Capacity Utilization 49.8% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Report HCM Unsignalized Intersection Capacity Analysis PM Base + Site 14: Kirkwood Blvd EB & Village Circle 8/9/2007 Synchro 6 Report 4% t /,0. Icivement` �` ", �' �`� "ESL EB7" EBl3` tilltfC.," v,li3i` WBi IVBL�," fm r Sad`. Stet Lane Configurations t Sign Control Free Free Stop, Stop Grade 06/. 0% 0% 0% Volume (veh/h) 1 714 15 0 0 0 0 24 ` 47 143 51 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 776 16 0' 01 0 0 26 51 155 55 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) _ Upstream, signal (ft) - - _ .. ... ..___ pX, platoon unblocked vC conflicting volume 0 792 814 786 267 325 795 0 vC1, stage 1 conf vol 0 0 vC2,' stage `2 conf vol 0 0 vCu, unblocked vol 0 792 814 786 267 325 795 0 tC, single. (s) 4.1 4.1 7.5` 6.5 6.9 7.5 6.5 6.9 IC, 2 stage (s) 3.1 3.1 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 100 100 92 93 71 83 100 cM capacity_ (veh/h) 1622 832 233 322 731 527 319 1084 2-� 3 .. NB -1 EB 1 : EB ; -99 7-11 SB 2 . o_ .._ ... __.T Volume Total 195 388 210 77 155 55 Volume Left 1 0 0 0 155 0 Volume Right 0 0 16 51 0 0 cSH 1622 1700 1700 512 527 319 Volume to Capacity 0.00 0.23 0,12 0.15 0.29 0.17 Queue Length 95th (ft) 0 0 0 13 31 15 Control Delay (s) 0.0 0.0 0.0 13.3 14.7 18.7 Lane LOS A B B C Approach Delay (s) 0.0 13.3 15.7 Approach LOS B C Average Delay 4.0 Intersection Capacity Utilization ` 46.5% ICU Level of Service A` Analysis Period (min) 15 Synchro 6 Report Traffic Volume Counts Westlake Kirkwood /Solana & Sam School 11-21-06 METROCOUNT 9128 Couples Drive Plano, Texas 75025 Phone /Fax (972) 359 -6310 r`rnunc PrintprL I InChRad File Name :11211 Site Code :00011211 Start Date : 11/21/2006 Page No : 1 08:00 AM 0 From Parking Lot 1 Kirkwood/Solana 22 Sam School 6 196 Kirkwood/Solana 2 13 33 Southbound 34 2 Westbound 276 08:15 AM Northbound 0 1 Eastbound 24 166 Start Time Right Thru left Tote' Right Thru Left App � Right Thru Left App- Right Thru Left 22 146 10 178 25 1 9 35 6 26 5 1 250 08:45 AM ol 0 0 1 Total Total Factor 1.01 1.01 1.01 13 1.0 1.01 1.01 0 1.0 1.01 1.0 2 1.01 1.01 1.0 103 614 07:00 AM 0 0 0 0 13 209 1 223 15 0 6 21 2 14 0 16 260 07:15 AM 0 0 2 2 17 282 8 307 8 1 16 25 3 24 1 28 362 07:30 AM 0 3 1 4 15 253 B 276 17 2 13 32 5 18 1 24 336 07:45 AM 1 0 0 1 22 300 10 332 18 3 18 39 4 25 1 30 402 Total 1 3 3 7 67 1044 27 11381 58 6 53 117 14 81 3 98 1360 08:00 AM 0 1 1 2 22 168 6 196 18 2 13 33 9 34 2 45 276 08:15 AM 1 0 1 2 24 166 6 196 21 1 7 29 3 25 2 30 257 08:30 AM 0 0 0 0 22 146 10 178 25 1 9 35 6 26 5 37 250 08:45 AM 1 0 0 1 35 134 12 181 17 3 13 33 3 17 0 20 235 Total 2 1 2 5 103 614 34 751 81 7 42 1301 21 102 9 132 1018 BREAK '•' 3 07:45 AM 39 9 34 07:45 AM 45 Peak Factor 08:00 AM 0.563 Volume 0 3 1 4 22 300 10 332 04:00 PM 3 4 10 17 1 28 13 42 I 7 0 0 71 8 199 0 2071 273 04:15 PM 1 1 11 13 0 29 8 37 11 0 0 11 5 122 0 127 188 04:30 PM 0 2 12 14 1 22 14 37 9 0 4 13 10 179 0 189 253 04:45 PM 1 3 18 22 0 32 19 51 10 0 3 13 17 104 0 121 207 Total 5 10 51 66 2 111 54 1671 37 0 7 441 40 604 0 6441 921 05:00 PM 0 9 24 33' 2 33 22 57 8 1 3 12 21 186 0 207 309 05:15 PM 0 0 11 11 0 34 22 56 10 0 0 10 18 120 1 139 216 05:30 PM 4 2 15 21 2 28 25 55 13 0 2 15 14 109 0 123 214 05:45 PM 2 2 19 23 0 36 15 51 15 0 2 17 7 87 0 94 185 Total 6 13 69 881 4 131 84 219 46 1 7 541 60 502 1 563 924 Grand Total 14 27 125 1661 176 1900 199 2275 I 222 14 109 345 135 1289 13 1437 4223 Apprch % 8.4 16.3 75.3 7.7 83.5 8.7 64.3 4.1 31.6 9.4 89.7 0.9 Total % 0.3 0.6 3.0 3.9 4.2 45.0 4.7 53.9 j 5.3 0.3 2.6 8.2 3.2 30.5 0.3 34.0 v CGR RUM rlunl ui.w Hm To 1 1:43 ANI - t-eaK 1 From Parking Lot Kirkwood /Solana Sam School Kirkwood /Solana 0.837 Southbound Westbound Northbound Eastbound Intersection Start Time Right Thru Left i App. Right Thru Left Total Right Thru Left To a- Right Thru Lest To 32 1111 61 8 ol 129 21 101 5 1271 1376 Percent 11.1 44.4 44.4 6.8 90.3 2.9 1 4 47.3 al Total v CGR RUM rlunl ui.w Hm To 1 1:43 ANI - t-eaK 1 OT 1 0.563, 0.837 0.827 Intersection 07:15 AM 0.706 Peak Hour From 07:00 AM to 11:45 AM - Peak 1 of 1 Volume 1 4 4 9 76 1003 32 1111 61 8 60 129 21 101 5 1271 1376 Percent 11.1 44.4 44.4 6.8 90.3 2.9 1 4 47.3 6.2 46.5 27 16.5 79.5 3.9 7 07 :45 136 22 110 10 142 Percent 11.1 44.4 44.4 5.9 91.7 2.4 60.3 Volume 1 0 0 1 22 300 10 332 18 3 18 39 4 25 1 30 402 Peak Factor 08:00 AM Volume 0 3 1 4 22 300 0.856 High Int 07 :30 AM 3 07:45 AM 39 9 34 07:45 AM 45 Peak Factor 08:00 AM 0.563 Volume 0 3 1 4 22 300 10 332 18 3 18 39 9 34 2 45 Peak Factor 0.563, 0.837 0.827 0.706 Peak Hour From 07:00 AM to 11:45 AM - Peak 1 of 1 By Approach 07:15 AM 07:00 AM 07:45 AM 07:45 AM Volume 1 4 4 9 67 1044 27 1138 82 7 47 136 22 110 10 142 Percent 11.1 44.4 44.4 5.9 91.7 2.4 60.3 5.1 34.6 15.5 77.5 7.0 High Int 07:30 AM 07:45 AM 07:45 AM 08:00 AM Volume 0 3 1 4 22 300 10 332 18 3 18 39 9 34 2 45 Peak Factor 0.563 0.857 0.872 0.789 Peak Hour From 12:00 PM to 05:45 PM - Peak 1 of 1 Intersection 04:30 PM Volume 1 14 65 80 3 121 77 201 37 1 10 48 66 589 1 656 Percent 1.3 17.5 81.3 1.5 60.2 38.3 77.1 2.1 20.8 •. 10.1 89.8 0.2 05:00 Volume 0 9 24 33 2 33 22 57 8 1 3 12 21 186 0 207 -leak Factor High Int. 05:00 PM 05:00 PM 04:30 PM 05:00 PM Volume 0 9 24 33 2 33 22 57 9 0 4 13 21 186 0 207 Peak Factor 0.606 0.882 0.923 0.792 985 309 0.797 METROCOUNT 9128 Couples Drive Plano, Texas 75025 Phone /Fax (972) 359 -6310 File Name :11211 Site Code : 00011211 Start Date : 11/21/2006 Page No :2 From Parking Lot Kirkwood /Solana Sam School Kirkwood /Solana By Approach 05 :00 PM i Southbound Westbound Northbound Eastbound 4 127 88 219 Start Time Right I Thru I Left I Tots' Right Thru Left APP- Right Thru Left APP- Right Thru Left 0.961 0.794 0 - Total Total ear, Hour From 12.00 PM to 05 :45 PM - Peak 1 of 1 By Approach 05 :00 PM 04:45 PM 05:00 PM 04:30 PM Volume 6 13 69 88 4 127 88 219 46 1 7 54 66 589 Percent 6.8 14.8 78.4 1.8 58.0 40.2 85.2 1.9 13.0 10.1 89.8 High Int. 05:00 PM 05:00 PM 05 :45 PM 05:00 PM Volume 0 9 24 33 2 33 22 57 15 0 2 17 21 186 Peak Factor 0.667 ; 0.961 0.794 1 656 0.2 0 207 0.792 Westlake Kirkwood /Solana & Village Cir. 11 -21 -06 METROCOUNT 9128 Couples Drive Plano, Texas 75025 Phone /Fax (972) 359 -6310 Greuns Printed - Unshifted File Name : 11212 Site Code :00011212 Start Date : 11121/2006 Page No : 1 08:00 AM 0 NA 0 0 0 Kirkwood /Solana 63 Village Cir. 6 Kirkwood /Solana 1 7 14 Southbound 0 Westbound 315 Northbound 0 Eastbound 0 0 0 Start Time Right Thru 4 Left Tote* Right Thru Left Topaj Right Thru Left 0 Right Thru Left 172 53 225 6 0 4 10 9 43 0 52 287 08:45 AM 0 0 Tote- 0 175 42 al Total Factor 1.0 1 1.01 8 1.01 0 34 1.01 1.01 0 0 0 0 1.01 733 1.01 1.0 1.0 0 13 07:00 AM 0 0 0 0 0 220 27 247 0 0 1 1 0 30 0 30 278 07:15 AM 0 0 0 0 0 305 27 332 3 0 3 6 6 24 0 30 368 07:30 AM 0 0 0 0 0 274 47 321 7 1 3 11 6 33 0 39 371 07:45 AM 0 0 0 0 0 326 73 399 3 0 3 6 9 34 0 43 448 Total 0 0 0 0 0 1125 174 1299 13 1 10 24 21 121 0 142 1465 08:00 AM 0 0 0 0 0 192 63 255 6 0 1 7 14 39 0 53 315 08:15 AM 0 0 0 0 0 194 65 259 4 0 2 6 3 41 0 44 309 08:30 AM 0 0 0 0 0 172 53 225 6 0 4 10 9 43 0 52 287 08:45 AM 0 0 0 0 0 175 42 217 5 0 6 11 8 26 0 34 262 Total 0 0 0 0 0 733 223 9561 21 0 13 34 34 149 0 183 1173 - BREAK '•' 04:00 PM 0 0 0 0 0 39 9 48 5 0 4 9 0 211 0 211 268 04:15 PM 0 0 0 0 0 37 15 52 9 0 0 9 I 2 143 0 145 206 04:30 PM 0 0 0 0 0 30 11 41 7 0 3 10. 3 196 0 199 250 04:45 PM 0 0 0 0 0 47 10 57 8 0 4 121 1 133 0 134 203 Total 0 0 0 0 0 153 45 198 29 0 11 401 6 683 0 689 927 05:00 PM 0 0 0 0 0 48 17 65 18 0 6 24 6 211 0 2171 306 05:15 PM 0 0 0 0 0 44 13 57 14 0 11 25 5 137 0 1421 224 05:30 PM 0 0 0 0 0 48 14 62 7 0 7 14 2 133 0 135 211 05:45 PM 0 0 0 0 0 48 13 61 8 0 4 12 7 112 0 119 192 Total 0 0 0 0 0 188 57 245 47 0 28 751 20 593 0 6131 933 Grand Total 0 0 0 0 0 2199 499 26911 110 1 62 1731 81 1546 0 1627 4498 Apprch % 0.0 0.0 0.0 0.0 81.5 18.5 - 63.6 0.6 35.8 399 5.0 95.0 0.0 I 14 39 Total % 0.0 0.0 0.0 0.0 0.0 48.9 11.1 60.0 2.4 0.0 1.4 3.8 1.8 34.4 0.0 36.2 PM - Peak 1 wu l 1-11 NA Kirkwood /Solana Village Cir. I Kirkwood /Solana Southbound Westbound Northbound Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left App. Right Thru Left To Volume 0 0 0 0 Total 210 1307 19 Total 10 30 35 130 0 16° Percent al Total wu l 1-11 ui.w Intersection 07:15 AM Volume 0 0 0 0 0 1097 210 1307 19 1 10 30 35 130 0 16° Percent 0.0 0.0 0.0 0.0 83.9 16.1 63.3 3.3 33.3 21.2 78.8 0.0 07:45 Volume 0 0 0 0 0 326 73 399 3 0 3 6 9 34 0 43 Peak Factor High Int. 6:45:00 AM 07:45 AM 07:30 AM 08:00 AM Volume 0 0 0 0 0 326 73 399 7 1 3 11 14 39 0 53 Peak Factor 0.819 0.682 0.778 Peak Hour From 07:00 AM to 11:45 AM - Peak 1 of 1 By Approach 07:00 AM 07:15 AM 08:00 AM 07:45 AM Volume 0 0 0 0 0 1097 210 1307 21 0 13 34 35 157 0 192 Percent - - - 0.0 83.9 16.1 61.8 0.0 38.2 18.2 81.8 0.0 High Int. - 07:45 AM 08:45 AM 08:00 AM Volume - - - - 0 326 73 399 5 0 6 11 14 39 0 53 Peak Factor - 0.819 0.773 0.906 Peak Hour From 12:00 PM to 05:45 PM - Peak 1 of 1 Intersection 04:30 PM Volume 0 0 0 0 0 169 51 220 47 0 24 71 15 677 0 692 Percent 0.0 0.0 0.0 0.0 76.8 23.2 66.2 0.0 33.8 2.2 97.8 0.0 05:00 Volume 0 0 0 0 0 48 17 65, i 18 0 6 24 6 211 0 217 -leak Factor High Int. 05:00 PM 05:15 PM 05:00 PM Volume 0 0 0 0 0 48 17 65 14 0 11 25 6 211 0 217 Peak Factor 0.846 0.7101 0.797 1502 448 0.838 983 306 0.803 METROCOUNT 9128 Couples Drive Plano, Texas 75025 Phone /Fax (972) 359 -6310 File Name : 11212 Site Code :00011212 Start Date : 11/21/2006 Page No : 2 Peak Hour From 12 :00 PM to 05:45 PM - Peak 1 NA Kirkwood /Solana Village Cir. Kirkwood /Solana By Approach 12:00 PM 05:00 PM Southbound Westbound Northbound Eastbound 0 188 57 245 Start Time Right Thru I Left 62.7 0.0 37.3 Rght Thru Left Right I Thru I Left 0 48 17 65 Right Thru I Left 0.942 0.750 Topaz Total Total Total Total Peak Hour From 12 :00 PM to 05:45 PM - Peak 1 of 1 By Approach 12:00 PM 05:00 PM 04:45 PM 04:15 PM Volume 0 0 0 0 0 188 57 245 47 0 28 75 12 683 Percent - - - 0.0 76.7 23.3 62.7 0.0 37.3 1.7 98.3 High Int. - 05:00 PM 05:15 PM 05:00 PM Volume - - - - 0 48 17 65 14 0 11 25 6 211 Peak Factor - 0.942 0.750 0 695 0.0 0 217 0.801 Town of Westlake Memo To: Chairman Greenwood and members of the Planning and Zoning Commission From: Trent Petty, Town Manager Subject: Regular Meeting of August 23, 2007 Date: August 17, 2007 ITEM Conduct a Public Hearing and take appropriate action regarding a zoning change request to rezone the specific properties, as listed on the Agenda, from Residential -1 acre "R -1" to Residential Airpark "RA" zoning: RECOMMENDATIONS Staff recommends approval. BACKGROUND The P &Z and Board of Aldermen have approved a new zoning category called Residential Airpark Zoning. Forty one properties in Stagecoach Hills have chosen to be part of a multi - property zoning effort initiated by the Town to change their current R1 zoning to the new RA zoning category. A joint public hearing should be opened for all the properties requesting zoning. Following public comment and the closing of the public hearing, the P &Z may by motion and vote approve or deny the rezoning request for all properties rather than taking a separate vote on each property. The attached map illustrates all remaining properties that have chosen to be a part of this group zoning change. Of the six cases presented for rezoning at this August meeting date, five were tabled from the July 26th P &Z due to incorrect legal description or address references. The remaining case is a new application as the homeowner was allowed additional time to apply due to the late discovery of the property by Town staff. Town of Westlake Memo To: Chairman Bill Greenwood and Members of the Planning and Zoning Commission From: Trent Petty, Town Manager David McCarver, Town Engineer Subject: Regular meeting of August 23, 2007 Date: August 16, 2007 ITEM Consider an application and take appropriate action regarding a final plat, described as Lot 1, Block 1, Bender Addition, being 1.00 acre of land out of the R. Baker Survey, Abstract No. 108, Tarrant County, Texas and located at 5900 Stagecoach Circle. BACKGROUND This is an unplatted tract in Stagecoach Hills that is presented for platting in order to obtain a building permit. The lot was initially subdivided as a part of the unfiled plat known as Stagecoach Hills, Section 2. Approval of the plat will allow construction of a new home on the property. Item was tabled at July 26th meeting due to incorrect address on agenda and therefore, did not match legal notification. This item has since be republished and correctly reflected on all documentation. RECOMMENDATION Staff recommends that the final plat be approved as shown on the attached. ZONING EXHIBIT STAGECOACH HILLS TRACTS BEING REZONED FROM `R -1' TO `RA' P &Z MEETING 8/23/07 Graham Associates, Inc. CONSULTING ENGINEERS & PLANNERS 600 SIX FLAGS DRIVE, SUITE 500 ARLINGTON, TEXAS 76011 (817) 640 -8535