HomeMy WebLinkAboutDeloitte presentationf° r 4/13/2009
Deloitte University — Westlake, TX
Town Council Meeting- April 13, 2009
• s 7 i Zift7)
CIRCLE (Z RANCH' 1
Where we are today:
• P &Z approved the zoning amendment creating
Planned Development (PD) 3 -12 to contain Deloitte
University on 107 acres — May 2008; Town Council
approved on June 2008
• Also approved during the zoning amendment- the
permitted uses and concept plan for the conference
center — including a developer agreement with AIL
(Hillwood) regarding a westerly access road to SH
170 for service and employee entrance.
• P &Z recommended approval, with conditions, on both
the PD Site Plan and Preliminary Plat — April 2, 2009
z
1
PD 3 -3 Amendment
Case Z -08 -05 Created PD 3 -12
Approved Land Use changes:
deleted residential uses and increasing the square
footage allowed for office uses.
And
Creation of Buffer Zone:
200 foot wide area North of Dove Road with
restricting access from Dove Road.
Vicinity Map
Exhibit from PD 3 -12 zoning case
Ar
4 i
CIRCLE RANCH-
4/13/2009
W
Concept Plan
1?j'�
-i�7 n ,yip 5x 41
-�'�j� � ,� *,�ti � �, �^ 5 ''S• i� � � ,y .,� !I, 5195 '
T k 6,
k 3
4 V s
Protection of Dove Road
• The 200 foot wide buffer strip will protect the rural
feel and aesthetic qualities enjoyed currently along
that portion of Dove Road between Fidelity's
property and where Pearson Road intersects with
Dove Road.
• Restricted access to Dove Road will protect against
increased traffic /loading that might have otherwise
been experienced when the land to the North of
Dove Road is developed in the future.
6
4/13/2009
3
Items addressed during Zoning /Concept Plan
approval and in Developer Agreement
• Permitted uses
• Site access and traffic impact
• Perimeter and off -site roadway
improvements
• Development standards
• Building height and size limitations
• Building setbacks
• Lighting standards
• Tree and landscape minimum requirements
Site plan items not addressed in the
zoning approval process
• Utilities: Water and Sewer
• Storm water
• Setbacks/Building Lines
• Parking/Fire Lanes
• Solid Waste Collection Facilities
• Traffic Access Management/Internal Site Circulation and Connectivity to
Adjacent Property Tracts (both owner's and non - owner's tracts)
• Site Design
• Construction Materials, Building Design, Architecture, and Hard
Screening
• Landscaping and Landscape Screening
• Signage
• Lighting
• Water Features/Public Art
• Pedestrian Circulation (within the site)
• Pedestrian Access (around perimeter of and to the site)
• Trails /Open Space 8
4/13/2009
El
Next steps tonight:
• Review and consider approval of an
application submittal for the PD 3 -12 Site
Plan (for items not addressed during
zoning /concept plan approval)
• Review and consider approval of an
application submittal for the PD 3 -12
Preliminary Plat
9
Deloitte University - Project Description
➢ 712,000 sq. ft. facility designed around
major water feature
➢ 800 hotel rooms with attached conference
center
➢Grand Ballroom; 30,000 sq. ft.
➢Restaurant and Cyber -Cafe
➢ Unlighted athletic fields
➢ Stand -alone social venue; 18,000 sq. ft.
➢ Stand -alone data center; 30,000 sq. ft. 10
4/13/2009
4/13/2009
Deloitte University
Conference Center
Main Entrance
l/ 4
4/13/2009
Painted Hardiplank
Solarban60 Glass
Standing Seam Metal Roofing
15
Leaders Limestone
16
4/13/2009
Stucco
17
Site Plan
Architecture exhibit
18
4/13/2009
E
Social Venue
Architecture exhibit
19
4/13/2009
10
Data Center
Architecture exhibit
Data Center
Architecture exhibit
4/13/2009
11
Painted Tilt -up
23
View of proposed project from
JT Ottinger Road near the
entrance to Westlake Academy
24
4/13/2009
12
-
@g��,u� •III
r
f g
_ _ a
- --
�•, f`as
�„�
j`, ;• _msµ �'
� � ipi�tax fPiak�$ @GG y P' yR9 33 Rta9 kagS' ! 4ktlav 9pC1Ci
� pp poqq �9 s9a���jjEapa9:J a�a3��gk�ez�ICOt�s.�.�� sR�¢ ",x�� �kFe�sg#�9
�4 a F� k Ai 89il.Zi66pp 9 Cx�: Egi:��'Rs$���`$ ��D6aa �i 3!!p3
� � ag � p a 9 a "sfG:1liS ca f@ k 1�a °shy °a'� a R i s azzea �
1 i. za kdx g 5G9�i a�
�af k s!�
zS "p
a a.
6
r8 1
zppp
a S, tai 9� lei
W
w
N
O
O
4/13/2009
14
�I
4/13/2009
14
L0.0.2
4/13/2009
14
Dove Road Streetscape
Profile view
NNYIT6 W11Y E/ieF]BIT
InuuTnN Vxaa
FN�
14-
FJOQIIINiOO.E POID. � o >WDE RIOW ®N11lNE RVL B�CE!'NB>R
„�NwT�,„�T � cTNra aw.FUNru+a.
3I NOTRMNE EE ION AT DOVE ROAD
4/13/2009
15
Dove
Road Streetscape
�ETOen�C TUauLUNSm.
� 0 0
a o�
It NUWJ
EX6IIN0 TlBYLlYi 6IEi.1 - E106fINOlIBliWl81£a 1,
GATE FNOM ON HfETC 6E tv�� (MITE FROM ON efiETC OE 4
IELOIJ�i ®RYP.J RELOfwT ®R1R) Y
Dove Road Streetscape
Profile view
NNYIT6 W11Y E/ieF]BIT
InuuTnN Vxaa
FN�
14-
FJOQIIINiOO.E POID. � o >WDE RIOW ®N11lNE RVL B�CE!'NB>R
„�NwT�,„�T � cTNra aw.FUNru+a.
3I NOTRMNE EE ION AT DOVE ROAD
4/13/2009
15
Dove Road Fence
Heavy Cedar Fence: 6X6 Posts with 2X6 Rails
OL
—
+.
Town Staff Recommends:
Approval of the Site Plan and
Preliminary Plat with the conditions as listed
in both Section II. Staff Review Comments
and Section III. Staff Recommendations;
including the additional stipulations added
by the Planning and Zoning Commission
32
4/13/2009
16
Section III. Staff Recommendations
(stipulation summary)
• Site Plan: Access /Streets
• Primary public /guest ingress and egress from north
via private drive from Westlake Parkway
• Service/Employee ingress and egress from west
via private drive from J.T. Ottinger Road.
(conveyed by easement between Deloitte and
Hillwood)
• Preliminary Plat & Site Plan approval conditional
upon completion of westerly access road prior to
hotel /conference center receiving CO. 33
'Section III. Staff Recommendations
(stipulation summary, con't)
• Site Plan: Pedestrian Circulation/Trails /Open
Space /Streetscapiny,
o Portion of hike /bike trail along north side of Dove
Road, adjacent to PD 3 -12, to be constructed per
Town standards by developer
0 25' dual -use easement for utilities(duct bank) and
future trail use required along western property
line north, near J.T.Ottinger Road (with conditions)
o Trail along Dove Road to be curvilinear in design
34
4/13/2009
17
Section III. Staff Recommendations
(stipulation summary, con't)
• Site Plan: Pedestrian Circulation/Trails /Open
Space /Streetscaping (con't)
o Streetscape along Dove Road will include the
following per approval by Town staff prior to
installation
• split rail fencing
• native grasses
• stone treatments
35
Section III. Staff Recommendations
(stipulation summary, con't)
• Site Plan: Lighting
o Complies with all Town standards and with
International Dark Skies guidelines
o All fixtures are to be submitted and
reviewed /approved by Town staff prior to
installation
36
4/13/2009
18
Section III. Staff Recommendations
(stipulation summary, con't)
• Site Plan: Tree Mitigation
o To occur both on -site and off -site
o Must be in compliance prior to issuance of CO
• Site Plan: Si na e
o No signs, visible from public or private properties,
are proposed in submittal other than
directional /way finding signage
37
Section III. Staff Recommendations
(stipulation summary, con't)
• Site Plan: Building Design/Screening Fence
• Data center building permit issued only after plans
are provided indicating compliance with horizontal
and vertical articulation as required by ordinance.
• Data center screening fence must meet Town
requirements (i.e. solid masonry or Town Council
approval of stone columns with wrought iron
fencing)
38
4/13/2009
19
Section III. Staff Recommendations
(stipulation summary, con't)
• Preliminary Plat
oFloodway and floodplain may be
relocated prior to final platting
oDrainage and maintenance easements
along floodway boundary will be
provided prior to Certificate of
Occupancy (CO)
39
Additional stipulations; as added by
P &Z Commission
• Site Plan: Access /Streets
o The western access point /gate must be staffed and /or
monitored continuously on a 24/7 basis to allow
denied traffic onto the property for turnaround and to
avoid any traffic back -up on J. T. Ottinger.
40
4/13/2009
20
Additional stipulations added by
P &Z Commission, con't
• Site Plan: Pedestrian Circulation/Trails/
Open Space /Streetscaping
o In the event adjacent properties are final platted
without providing for continuation of the trail
easement to J. T. Ottinger Road, the dual -use
easement will revert to a single -use easement
for telecommunications use (duct bank).
41
Additional stipulations added by
P &Z Commission, con't
• Site Plan: Li htin
— Lighting for the construction offices, staging
areas and any material storage will comply
with the Town of Westlake requirements
without violation of OSHA regulations.
42
4/13/2009
21
Additional stipulations added by
P &Z Commission, con't
Site Plan: Building Design/Screening Fence
o While the Data Center is not compliant with
horizontal and vertical articulation as required, the
footprint of the building is acceptable with the
exterior elevations as presented. Approval is
recommended since vertical articulation would
only result in a taller building and the presented
mixture of materials, colors, and textures used on
the exterior walls provides a visual articulation that
meets the spirit and intent of the Code.
43
Additional stipulations added by
P &Z Commission, con't
• Site Plan: Building Design/Screening Fence
con't
o In addition to any approved fencing requirements
found in the PD 3 -12 and/or Westlake Code of
Ordinances, the applicant may use black vinyl
coated chain- link fencing with evergreen
vegetation to cover the fencing around the Data
Center only.
44
4/13/2009
22
Future steps:
• Final Plat — to be submitted for review at
later date; each lot within the tract is
required to be platted prior to issuance of
any building permit.
• Permitting — Building permits for work to
begin on the structures.
45
4/13/2009
23