HomeMy WebLinkAboutStrategic Plan 2009Westlake is a one-of-a-kind community — an
oasis with rolling hills, grazing longhorns, and
soaring red-tailed hawks, located in the heart
of the Fort Worth-Dallas metropolitan area.
Inviting neighborhoods and architecturally
vibrant corporate campuses find harmony
among our meandering roads and trails, lined
with native oaks and stone walls.
We are leaders. In education, we are known
for our innovative partnerships between the
Town-owned Charter school and its corporate
neighbors. We are environmental stewards —
exemplifying the highest standards.
Hospitality finds its home in Westlake. As a
community, we are fully involved and invested
in our rich heritage, vibrant present and
exciting, sustainable future.
Vision Statement
Mission Statement
“On behalf of the citizens, the mission of the Town of Westlake is to
be a one-of-a-kind community that blends our rural atmosphere
with our rich culture and urban location.”
3 Village Circle, Suite 202, Westlake, Texas 76262
www.westlake-tx.org (817) 430-0941
Strategic Plan
2009 Town of Westlake
“Westlake, a premier knowledge based community”
Vaquero Estates
Community Values
Innovation
A strong knowledge/education
base
Being friendly and welcoming
Family focus
Engaged citizens
A unique rural setting
emphasizing preservation of
our natural beauty
Aesthetic appeal and high
development standards
Table of Contents
History and Demographics 2
Key Result Area Summary and
Timelines
3
Community Strengths and
Challenges
4
Vision Point One 5
Vision Point Two 6
Vision Point Three 7
Outcome Strategies and
Objectives
8
DRAFT
Approximately 700 residents currently occupy the Town of Westlake’s 6.6 square miles,
which is situated in the northern triangle of the Fort Worth—Dallas area.
Originally settled in 1847, Westlake was incorporated in 1956. Today, the Town of
Westlake is home to several neighborhoods, all of which share a commitment to
excellence, but possess unique character and charm. All residents live in single-family
homes and there is an award winning private golf course in Town.
The median age in Westlake is 47, and 51% of the residents are female. Some of the
community’s top employers are: Fidelity Investments, Chrysler Financial, and First
American Real Estate Information Services, Inc. Several companies have offices in
Solana, a high-profile corporate campus near State Highway 114. Solana’s Village
Circle also provides a mix of retail spaces and restaurants, plus offers the 296-room
Marriott Solana hotel.
The sales tax rate in Westlake is 8.25%. Of the money collected, 6.25% is paid to the state
of Texas, 1% to the Town, and the remaining 1% to a local economic development fund
property tax relief fund.
Fidelity Investments North Texas Campus
Solana Corporate Campus
Chrysler Financial—Westlake Campus
First American Campus
Deloitte University Campus (in-design)
Marriott / Solana Hotel
History and Demographics
Major & Planned Developments
Solana Office Complex
Top Employers
Fidelity Investments
Chrysler Financial
First American Real Estate Information Services, Inc.
Wells Fargo Bank
McKesson Corporation
“Westlake,
a premiere
knowledge
based
community
Page 2 Town of Westlake
During the strategic planning process, the Town Council and staff Leadership Team
developed an overview of the major work related objectives and mission for the Town
of Westlake. The vision and mission statements were drafted to reflect the unique
characteristics found within our community and the values which are important to our
residents.
The information is contained within three vision points which describe the areas that
the Council has determined are vital to maintaining our Town and providing services
to enhance the quality of life of our residents.
Vision Point One—Inviting Residential and Corporate Neighborhoods
Vision Point Two—We are Leaders
Vision Point Three—Hospitality Finds Its Home in Westlake
Strategic Plan’s Organization and Timelines
The vision points are then divided into key Result Areas (KRA’s) and outcome
measures which serve to focus the efforts of the staff on achieving the desired results
of the Council.
These range from issues such as maintaining neighborhood integrity through
infrastructure maintenance and development standards to promoting historic
preservation and citizen involvement.
Within each outcome measure, the staff has identified key objectives and a timeline in
which to complete tasks and reach our goals. The timelines are either assigned short,
mid, or long-range goals, while some are considered to be on-going and necessary on a
reoccurring basis.
Short-Range Goals = 1—2 years
Mid-Range Goals = 2—5 years
Long-Range Goals = 5 or more years
The outcome measures are also assigned a Team Leader or Co-Leader who is
responsible for working with a staff team to complete or work toward achieving the
tasks in each Key Result Area.
Page 3 Town of Westlake
“Vision without
action is a dream.
Action without
vision is simply
passing the time.
Action with
vision is making
a positive
difference.” - Joel
Barker
The Westlake Mayor and Town Council are united in their view that the community enjoys
many strengths. Westlake has no current ad valorem tax, however, this requires the Town to
assess and evaluate alternative sources of revenue to maintain financial stability. The
history of responsible planning and zoning, along with a growing corporate campus base is
viewed as a benefit to the community.
The Mayor, Council and staff continue to anticipate, identify and prepare for external
conditions or activities, which would detract from the success and unique development of
the Town. Special attention is given to practicing fiscal conservatism while delivering the
highest quality of services to our residents.
Future questions on such issues as the consideration of oil and gas drilling standards within
the Town, creating a retail base, revenue opportunities, efficient service delivery, public safe-
ty concerns and the development of Westlake Academy will be important to Westlake elect-
ed officials, residents, the business community and staff.
Community Strengths and Challenges
Future Milestones and Events
Groundbreaking of Deloitte University
Completion of the Sam and Margaret Lee Arts and Sciences Center
Page 4 Town of Westlake
Strengths
Fully integrated community duct bank
Access to top quality of life amenities
Development of quality corporate campuses and partnerships
Promotion of the Town as an event and conference location
Opportunities and Challenges
Further development of a diversified revenue sources for the Town
Enlarged Westlake Academy campus with track, soccer, and baseball fields
Expanded park system
Attraction of major retail development
Development of extensive interconnected trail system with surrounding municipalities
Potential SH 114 connectivity to SH I-35
Expansion of eco-friendly / green initiatives within the Town
Further urban sprawl from surrounding communities
Review of maintenance needs of infrastructure and funding for major repairs
Need to identify location of secondary water source and develop existing water supplies
The Town is home to several communities; residential, corporate and agricultural uses.
Our largest residential development is home to a state of the art golf facility and many
beautiful homes. Stagecoach Hills is located along the historic stagecoach line which
transported passenger from Keller to Denton. Westlake neighborhoods include:
Aspen Lane ● Glenwyck Farms ● Mahotea Boone ● Paigebrooke Farms
Stagecoach Hills ● Terra Bella ● Vaquero ● Wyck Hill
The Town is located along the Tarrant and Denton County borders and has portions of
major State highways that surround our perimeter. We are an ideal location for
businesses and have enjoyed a long history with our corporate campus developments.
Highest Quality Development
and Aesthetic Standards
Short-Range Goals
Deloitte Groundbreaking
Update Codes/Amendments
Fidelity Phase II Completion
Deloitte/Hillwood Trail
System
Mid-Range Goals
Retail Development
Open Space Preservation
Short-Range Goals
Open Space Land Acquisition
Park Space Expansion
VISION POINT ONE—INVITING RESIDENTIAL AND CORPORATE NEIGHBORHOODS
Entrance to Glenwyck Farms
Fidelity Investments Construction Project
Sensitivity to Neighborhood
Integrity
Short-Range Goals
Landscaped Entrances
Mid-Range Goals
Connected Trail System
Long-Range Goals
Town-wide Completed Trail
System
Outstanding Community
Appearance
Short-Range Goals
Streetscape Projects
Key Result Areas Supporting the Vision Point
On-going comprehensive
planning
Short-Range Goals
Update Master Plans:
Comprehensive Use, Open
Space /Trails, Land Use
Mid-Range Goals
Precinct Line Rd.
Construction
Develop Master Plan as
Community Focal Point
Long-Range Goals
Completed Town Hall Center
Page 5 2009
Strategic Plan Summary
Town leaders foresaw the need for a facility to educate the children of Westlake in a
local setting and to provide the citizens with a civic campus.
In 2003, the Town raised funds to build Westlake Academy, the only open-enrollment
charter school owned and operated by a municipality in the State. The Academy offers
the rigorous International Baccalaureate curriculum and all residents are eligible to
enroll their children.
The elected Town Council also serves as the Board of Trustees for the Academy. The
unique arrangement serves to strengthen the working relationship between the
Academy and the Town.
Westlake is also one of a handful of towns in Texas that does not levy a property tax.
Instead, revenue from sales taxes, user fees, and franchise fees fund Town services.
High Quality Services Delivery
Coupled with Financial
Stewardship
Short-Range Goals
Review of growth related
policies: ”Growth pays for
Growth”
Public Safety Service Delivery
and Funding Review
Staff Professional
Development Program
Environmental Stewardship
Initiatives
Short-Range Goals
Create Westlake Green Team
Research Geo-Thermal
Options
Automated Recycling
Program
Plan for Environmental
Improvements and Water
Conservation Strategies
Bio-diesel conversions
Infrastructure Maintenance and
Planning
Short-Range Goals
Town Facility Master Plan
Develop Capital Improvement
Plans
Drainage Utility and Storm
Water Planning
Long-Range Goals
Regional Rail System
VISION POINT TWO—WE ARE LEADERS
Entrance to Westlake Academy
Producing Well Educated Future
Leaders and Thinkers
Short-Range Goals
Academy Students in
Internships at Corporate
Campuses
Academy and Deloitte
University Mentoring
Programs
Business Partnerships with the
Town and Westlake Academy
Short-Range Goals
Implement Westlake Speaker
Series to Feature Community
Leaders
Key Result Areas Supporting the Vision Point
Premier Educational Facilities
and Programs
Short-Range Goals
Opening of Arts and Sciences
Center
Westlake Academy
Page 6 Town of Westlake
Strategic Plan Summary
In an effort to foster citizen engagement, enhance our neighborhoods and increase partici-
pation in the community, many of the residents serve on various advisory boards that are
committed to furthering the mission of the Town and ensuring Westlake is truly a unique
community.
The Westlake Historical Preservation Society was created to identify, preserve, and
perpetuate the history of the Town of Westlake and the Cross Timbers region.
The Town is committed to protecting and improving the quality of life of Westlake residents,
businesses and students by encouraging, inspiring, educating and entertaining artistic and
creative endeavors. The Public Art Society of Westlake provides a wide range of professional
and artistic presentations to foster the arts in the community.
Westlake is also a member of Tree City USA . The Town must meet strict standards to ensure
there are viable tree management plans and programs in place to help support growth and
forestry.
Arts and Culture
Short-Range Goals
Begin Implementation of
Public Arts Master Plan
Public Arts and Sculptures at
Major Entries to Town
VISION POINT THREE—HOSPITALITY FINDS ITS HOME IN WESTLAKE
WA Campus Fountain
Historic Preservation
Short-Range Goals
Integrate Mission of the
Historical Preservation
Society into Community
Events
Tourism Development
Short-Range Goals
Host Regional Events
Development to Include
Additional Hotels and
Restaurants
Key Result Areas Supporting the Vision Point
Citizen Engagement and
Communication
Short-Range Goals
Improve Web Site User
Friendliness
Develop Communication Plan
Review E-government
Usage for Service Delivery
Conduct Regular Neigh-
borhood Meetings
Page 7 2009
Strategic Plan Summary
Outcome Strategies:
1. Update all master plans to guide development and provide a framework for future pro-
jects; promote the Master Plan as a community focal point — Short & Mid-Range Goals.
Team Co-Leaders: Tom Brymer / Eddie Edwards
Objective 1.1: Develop RFP for master plan review.
Estimated Completion Date: 2009
Objective 1.2: Work with consultant to draft the master plans — form community/staff
task force.
Estimated Completion Date: 2009/2010
Key Result Areas and Outcome Strategies
Glenwyck Park
Vaquero
Objective 1.3: Involve corporate partners in preparation.
Estimated Completion Date: 2009/2010
2. Precinct Line Road construction — Mid-Range Goal.
Team Leader: Jarrod Greenwood
Objective 2.1: Facilitate stakeholder meetings to communicate project status and
engage community members.
Estimated Completion Date: 2009
Objective 2.2: Finalize construction plans with TxDOT; TxDOT bid placement.
Estimated Completion Date: 2010
Objective 2.3: TxDOT commences construction.
Estimated Completion Date: Fall 2009 – Winter 2010
Page 8 2009
ON-GOING COMPREHENSIVE PLANNING — Ensure the master plans are continually
updated and reviewed to enhance the development of the Town.
Outcome Measure: All master plan documents are not more than 5 years old.
Vision Point One—Inviting Residential and Corporate Neighborhoods
“We are
limited, not by
our abilities, but
by our own
vision.”
- Anonymous
Entrance to Stagecoach Hills
Outcome Strategies:
1. Promote and develop landscaped entrances to neighborhoods — Short-Range Goal.
Team Leader: Troy Meyer
Objective 1.1: Review and update ordinances and Unified Development Code for all
landscaping requirements which would include, but not limited to:
irrigation systems, plans, trees, water features, lighting, gates, and signs.
Estimated Completion Date: 2010
Objective 1.2 Develop and implement a process to educate developers, homeowners
associations, and staff on new requirements.
Estimated Completion Date: 2011
2. Review and update the current trail system plan and develop interconnectivity options
with surrounding municipalities — Mid and Long-Range Goals.
Team Leader: Troy Meyer
Objective 2.1: Partner with Keller, Trophy Club and Roanoke on best location for
connecting local and regional trails systems.
Estimated Completion Date: 2010
Objective 2.2: Develop standards for park benches, water features, picnic tables, signs,
and pet stations.
Estimated Completion Date: 2010
Objective 2.3: Identify changes to the open space plan created March of 1999 and pre
sent to the Town Council for approval.
Estimated Completion Date: 2011
Arbor Days Hot Air Balloon Rides
Page 9 Town of Westlake
SENSITIVITY TO NEIGHBORHOOD INTEGRITY — Maintain the high standards of neigh-
borhood planning and residential construction to foster the Town’s unique character and rural atmos-
phere.
Outcome Measure: Utilize the 2009 Direction Finder survey to establish a benchmark measure for
neighborhood integrity.
Outcome Strategies:
1. Support our newest corporate partners, Deloitte and Fidelity, with Deloitte University and
the completion of Fidelity Phase II — Short-Range Goal.
Team Leader: Ginger Awtry
Objective 1.1: Facilitate communication between PR/marketing team and aid and promote
the groundbreaking and opening activities.
Estimated Completion Date: 2009
Objective 1.2: Coordinate and assist with press releases, special required permitting,
community traffic flow, security needs, local dignitary contacts, and any
other municipal areas in which assistance is warranted.
Estimated Completion Date: 2009
Objective 1.3: Continue to facilitate and coordinate progress reports to Town Council, staff
and citizens on the Deloitte University project via the community newsletter,
emails, etc.
Estimated Completion Date: 2011
Objective 1.4 Facilitate communication between the PR/marketing consultant and
Deloitte’s staff to promote opening activities.
Estimated Completion Date: 2011
J. T. Ottinger Road
Terra Bella Entry
Outcome Strategies:
1. Streetscape projects to enhance community appearance — Short-Range Goal.
Team Leader: Jarrod Greenwood
Objective 1.1: Work with consultants, TxDOT, and community stakeholders to develop
streetscape concept that will incorporate existing themes and
characteristics within Westlake.
Estimated Completion Date: 2009
Objective 1.2: Work with Public Art Committee to enhance the FM 1938 corridor by
developing a streetscape plan that includes areas dedicated for public art.
Estimated Completion Date: 2010
Page 10 2009
OUTSTANDING COMMUNITY APPEARANCE — Enhance the appearance of the Town with
public art displays and high-quality, environmentally responsible landscaping projects.
Outcome Measure: Utilize the 2009 Direction Finder survey to establish a benchmark measure for com-
munity appearance.
HIGHEST QUALITY DEVELOPMENT AND AESTHETIC STANDARDS — Ensure standards
are met which maintain the superior appearance and construction of developments.
Outcome Measure: At least one local, regional, or national award/recognition on an annual basis for new
Westlake residential or commercial development.
2. Revise and update all codes and related amendments — Short-Range Goal.
Team Leader: Eddie Edwards
Objective 2.1: Revise plan review checklists to reflect the new codes, policies, and
procedures.
Estimated Completion Date: 2009
Objective 2.2: Update Town of Westlake internet site to reflect the new code adoptions.
Estimated Completion Date: 2009
Objective 2.3: Update contractor handouts reflecting new codes, revised policies, and
procedures.
Estimated Completion Date: 2009
3. Finalize oil and gas drilling related ordinances — Short-Range Goal.
Team Leader: Eddie Edwards
Objective 3.1: Develop applications, forms, policies, and procedures related to issuing
permits and administering the adopted codes.
Estimated Completion Date: 2009
Objective 3.2: Amend technical standards provision in Code of Ordinances.
Estimated Completion Date: 2009
Objective 3.3: Amend zoning ordinance to allow drilling and production in additional
zoning districts.
Estimated Completion Date: 2009
4. Work to attract nationwide, well known anchor and retail businesses — Mid-Range
and On-going Goals.
Team Co-Leaders: Tom Brymer / Eddie Edwards
Objective 4.1: Explore viable economic development tools to attract retail
development, specifically in the western area of Westlake, which would
be beneficial to the Town and potential business partnerships.
Estimated Completion Date: 2010
Objective 4.2: Research the use of special districts and other incentives that would
allow the Town to be proactive in our effort to attract retail uses.
Estimated Completion Date: 2010 and On-going
Marriott / Solana Hotel
Cielo Restaurant
Page 11 Town of Westlake
Highest Quality Development and Aesthetic Standards (cont.)
Outcome Strategies:
1. Open space land management and park system expansion — Mid-Range Goal.
Team Co-Leaders: Don Wilson / Troy Meyer
Objective 1.1: Define the “Open Space Land Management” concept to develop practices
and policies to protect our natural resources.
Estimated Completion Date: 2009
Objective 1.2: Review current and proposed land management plans and “inventory”
the available open space/potentials sites which are located in the flood
plains and designated wet land areas.
Estimated Completion Date: 2009
Objective 1.3 Work with developers on maintaining and procuring open spaces for
aesthetics and environmental enhancements.
Estimated Completion Date: On-going
Objective 1.4 Develop long range plans to maintain resources including ordinances and
additional requirements to site plans/SUP submittals mandating open
space requirements as developments proceed through the Town.
Estimated Completion Date: 2010
Objective 1.5: Identify tools which can be utilized to maintain our standards and
recommendations identified in the comprehensive plan for open space.
Estimated Completion Date: 2010
Objective 1.6: Analyze the open space in relation to comprehensive trail system and
amend trail space to integrate cohesive planning.
Estimated Completion Date: 2010
Objective 1.7: Work with Planning Department to ensure public open spaces are
included in development proposals.
Estimated Completion Date: On-going
Objective 1.8: Select a consultant to provide recommendations for a revised trail master
plan, which would include an overview of system components, cemetery
and design elements; work to include trail master plan into overall
comprehensive planning document.
Estimated Completion Date: 2011
Objective 1.9: Examine the establishment of a parks master plan.
Estimated Completion Date: 2011
Vaquero
“Westlake has
been a lot of
things, but it has
never been
ordinary.”
Fort Worth
Star Telegram
Vaquero
Page 12 Town of Westlake
OPEN SPACE PRESERVATION — Maintain the rural atmosphere, spacious residential lots,
park facilities and open areas within the master planned community development.
Outcome Measure: Utilize comprehensive plan to develop a recommendation or feasible ratio of open
space to land development.
Outcome Strategies:
1. Complete the Sam and Margaret Lee Arts and Sciences Center — Short-Range Goal.
Team Leader: Troy Meyer
Objective 1.1: Pouring of concrete foundation.
Estimated Completion Date: 2009
Objective 1.2: Continual supervision and interaction with contractors and suppliers to
facilitate contract completion for construction related matters.
Estimated Completion Date: 2009
Objective 1.3: Opening of Arts and Sciences Center.
Estimated Completion Date: 2009
Objective 2.2: Meet with Head of Sections to develop a plan and determine what grade
levels would be applicable.
Estimated Completion Date: 2009
Objective 2.3: Based on meeting outcome ,scheduling limitations and student availability,
conduct a meeting with staff to identify field trip dates and assist the
respective Department Head with scheduling, if necessary.
Estimated Completion Date: 2009
Beginning Phase of A&S Site Preparation
Westlake Academy and Student Body
1. Create partnerships between municipal and Academy staff to utilize local government resources to enhance student
learning and achievement – Short-Term and On-going Goals.
Team Co-Leaders: Debbie Piper / Don Wilson
A. Field Trips
Objective 2.1: Discuss with the Leadership Team any field trip opportunities that will be of interest to the students and
introduce them to the responsibilities of local government services.
Estimated Completion Date: 2009
Page 13 2009
PREMIER EDUCATIONAL FACILITIES AND PROGRAMS — Develop high quality educa-
tional facilities and learning opportunities for the students of Westlake Academy.
Outcome Measure: Completion of Arts & Sciences Center.
Vision Point Two — We Are Leaders
PRODUCING WELL EDUCATED FUTURE LEADERS AND THINKERS — Support the
Academy staff in their efforts to educate the students.
Outcome Measure: Development of program processes and objectives; creation of 2 intern positions
and placement of students within 2 years.
B. Internships and Mentoring
Objective 2.4: Discuss with the Head of Secondary and determine the level of interest
for the students. Identify the number and length of internships and
eligibility criteria.
Estimated Completion Date: 2009
Objective 2.5: Meet with staff to determine level of assistance the interns will be able to
provide and formulate rotation to allow students the experience of
working in all aspects of local government.
Estimated Completion Date: 2009
Objective 2.6: Research other local high schools regarding internship programs that
involve job shadowing, students in government day, etc. and determine
applicability for students and Town; Research corporate internships with
Deloitte University and other area businesses; Identify the best time
frame for the internship — after or during school, summer break, etc.
Estimated Completion Date: 2010
Objective 2.7: Coordinate placement opportunities with local businesses.
Estimated Completion Date: 2010
Objective 2.8: Prepare evaluation forms and feedback process for both students and
employers.
Estimated Completion Date: 2010
Objective 2.9: Select interns and prepare a schedule with Town and Academy staff.
Estimated Completion Date: 2010
Page 14 Town of Westlake
Producing Well Educated Future Leaders and Thinkers (cont.)
DEVELOP BUSINESS PARTNERSHIPS WITH TOWN AND WESTLAKE ACADEMY
Facilitate relationships between Town residents, corporate leaders and the students.
Outcome Measure: Schedule two speaker sessions per year.
Outcome Strategies:
1. Implement a Westlake speaker series featuring community leaders – Short-Range and
On-going Goals.
Team Leader: Ginger Awtry
Objective 1.1: Research and identify similar programs involving community speaker
series and obtain Westlake Academy liaison to assist and determine
feasibility of implementing a speaker series for the student body.
Estimated Completion Date: 2009
Objective 1.2: Work with Academy liaison to determine the scope of a speaker series
with the teaching objectives for particular grades/subjects; Work with
Academy liaison and corporate leaders with speaker selection and
scheduling for a pilot program.
Estimated Completion Date: 2010
Objective 1.3: Evaluate the effectiveness of the speaker series and provide report to
the Council in order to determine the future direction of the program.
Estimated Completion Date: On-going
B. Recycling Program
Objective 1.4: Survey surrounding recycling and composting programs and available
services to develop a comprehensive program.
Estimated Completion Date: 2009
Objective 1.5: Implement recycling program at all Town facilities.
Estimated Completion Date: 2009
Objective 1.6: Provide hazardous material disposal for citizens.
Estimated Completion Date: On-going
Develop Business Partnerships with Town and Westlake Academy (cont.)
Spring Flowers
Page 15 2009
Outcome Strategies:
1. Develop a comprehensive automated recycling and composting program to identify new technology which may be utilized
in our environmental stewardship — Short-Range and On-going Goals.
Team Co-Leaders: Jarrod Greenwood / Don Wilson / Troy Meyer
Objective 1.1: Conduct Council workshop presentation to identify environmental stewardship initiatives and prioritize
tasks within the program.
Estimated Completion Date: 2009
A. Formation of Westlake Green Team
Objective 1.2: Establish the Westlake Green Team to address issues with recycling/composting. Will include Town
Council, staff, student representatives, corporate residents and waste management provider.
Estimated Completion Date: 2010
Objective 1.3: Coordinate activities of Team with NCTCOG, especially its Green Cities Committee.
Estimated Completion Date: 2010
ENVIRONMENTAL STEWARDSHIP INITIATIVES—Develop and implement comprehensive
‘green’ programs for the residents, corporations, and the Academy.
Outcome Measure: Implementation of approved environmental programs within five years.
C. Water Conservation Efforts
Objective 1.7: Develop water conservation messages for landscaping and the use of
xeriscaping in neighborhoods and common areas. Develop plant listing
for landscape ordinance.
Estimated Completion Date: 2010
Objective 1.8: Assist Academy with water conservation, protection, and production
education by speaking to students and arranging field trips to water and
wastewater treatment facilities.
Estimated Completion Date: On-going
Objective 1.9: Provide water conservation information to customers through the
website, mailings, news letters, and Academy publications.
Estimated Completion Date: On-going
D. Geo-thermal and Bio-diesel Processes
Objective 1.10: Benchmark other communities, ISD’s, charter, and private schools who
have implemented and operated geo-thermal systems for at least the
past five years.
Estimated Completion Date: 2009
Objective 1.11: Provide to Council a cost analysis to convert the current system to
geo-thermal.
Estimated Completion Date: 2010
Objective 1.12: Research grant opportunities to convert the existing diesel generator at
the pump station to alternative fuel (bio-diesel).
Estimated Completion Date: 2009
“Good business
leaders create a
vision, articulate
the vision,
passionately own
the vision, and
relentlessly drive it
to completion.“
- Jack Welch
Page 16 Town of Westlake
Environmental Stewardship Initiatives (cont.)
Outcome Strategies:
1. Establish a strategy for achieving long-term financial sustainability for the Town
government — Mid-Range Goal.
Team Leader: Tom Brymer
Objective 1.1: Review 2009 Direction Finders results with Council.
Estimated Completion Date: 2009
Objective 1.2: Council to review long-range financial forecast and determine possible
financial issues and their timing.
Estimated Completion Date: 2009
HIGH QUALITY SERVICES DELIVERY COUPLED WITH FINANCIAL STEWARDSHIP
Research available revenue resources to offset the cost of providing services; continue to provide out-
standing government administrative support services while working within the municipal budget.
Outcome Measure: Implementation of at least one new demand driven revenue source per year, over
the next five years.
2. Review and discussion of growth related policies — Short-Range Goals.
Team Co-Leaders: Tom Brymer / Todd Wood
A. Council discussion of ”Growth pays for growth” approach to financial stewardship and policy making.
Objective 1.1: Identify sources of Town expenditures related to service delivery which are not currently offset by fee
collection. Analyze identified expenditures, from the standpoint of current impact and future expansion
to ensure quality service delivery.
Estimated Completion Date: 2010
Objective 1.2: Identify actual or potential costs incurred by the Town.
Estimated Completion Date: 2010
Objective 1.3: Survey other communities to benchmark fee schedules for newly proposed fees and amendments of
existing fees.
Estimated Completion Date: 2010
High Quality Services Delivery Coupled with Financial Stewardship (cont.)
Westlake DPS Ambulance
Page 17 2009
Westlake DPS Engine
B. Impact Fee
Objective 1.4: Discuss and receive Council direction on impact fee feasibility study.
Estimated Completion Date: 2009
Objective 1.5: Prepare proposal of utility impact fee analysis and feasibility report.
Estimated Completion Date: 2010
Objective 1.6: Review impact fee recommendations and consider fee adoption.
Estimated Completion Date: 2011
C. Park Land Dedication and Development Fee
Objective 1.7: Discuss and receive Council direction on park land dedication and
development fee implementation.
Estimated Completion Date: 2009
Objective 1.8: Prepare proposal of park land dedication and development fee analysis
and feasibility report.
Estimated Completion Date: 2010
Objective 1.3: Staff to identify options and strategies.
Estimated Completion Date: 2009 — 2010
Objective 1.4: Council to prioritize service options and provide staff direction on future
budgeting and resource allocation.
Estimated Completion Date: 2009 — 2010
Westlake Academy
Page 18 Town of Westlake
3. Research feasibility of a professional development program for Academy/Town staff —
Short-Range Goal.
Team Leader: Amanda DeGan
Objective 3.1: During the budget process, explore the cost of adding tuition
reimbursement , pay for education level and degrees, certification pay,
and similar programs designed to encourage professional development.
Estimated Completion Date: 2009
4. Explore public safety service delivery options and funding — Short-Range Goal.
Team Co-Leaders: Tom Brymer / Don Wilson
Objective 4.1: Research available options to deliver and fund public safety programs.
Estimated Completion Date: 2009
Objective 4.2: Present options and recommendations to Council.
Estimated Completion Date: 2010
5. Enhance the effectiveness of service delivery via intergovernmental partnerships — Mid-
Range and On-going Goals.
Team Leader: Tom Brymer
Objective 5.1: Council discussion of the use of inter-local agreements as a means to
pursue various types of intergovernmental partnership opportunities with
area municipalities.
Expected Completion Date: 2009
Objective 5.2: Share a draft of a memorandum of understanding and/or inter-local
agreement with municipalities surrounding Westlake to determine the
interest level of such partnerships.
Estimated Completion Date: 2009 — 2010
Objective 5.3: Pursue dialogue and discussion at both the staff and elected officials
level with cities that have expressed an interest in pursuing identified
opportunities of mutual interest.
Estimated Completion Date: On-going
High Quality Services Delivery Coupled with Financial Stewardship (cont.)
INFRASTRUCTURE MAINTENANCE AND PLANNING — Identify the maintenance needs
of existing buildings, review the impact of severe weather patterns on our neighborhoods and
formulate a long-term capital improvement plan.
Outcome Measure: Approved capital improvement plan within two years.
Outcome Strategies:
1. Draft facility master plan with Council — Short-Range Goal.
Team Leader: Amanda DeGan
Objective 1.1: Work with the Leadership Team to establish a viable facility planning/CIP
process.
Estimated Completion Date: 2009
Objective 1.2: Discuss facility master plan (FMP) scope with Council and receive
direction.
Estimated Completion Date: 2010
Objective 1.3: Draft FMP scope and solicit project proposals; retain outside consultant
to assist staff on FMP.
Estimated Completion Date: 2011
Objective 1.4: Select priorities from FMP and convert into a rolling 5—10 year capital
improvement plan.
Estimated Completion Date: 2011
2. Review the drainage and storm water plans needed to minimize the impact of severe
weather on our neighborhoods — Short-Range Goal.
Team Leader: Jarrod Greenwood
Objective 2.1: Complete Stagecoach Hills subdivision draining improvement project.
Estimated Completion Date: May, 2009
3. Storm Water Utility review — Short Range Goal.
Team Leader: Jarrod Greenwood
Objective 3.1: Discuss storm water utility (SWU) fee with Council as to feasibility and
receive direction.
Estimated Completion Date: 2010
Objective 3.2: Draft SWU feasibility analysis scope; retain outside consultant to assist
staff.
Estimated Completion Date: 2011
Page 19 2009
Objective 3.3: Receive SWU report and present recommendations to Council.
Estimated Completion Date: 2011
Objective 3.4: Implement SWU fee.
Estimated Completion Date: 2011
4. Work with transportation representatives to include Westlake in a regional rail system
Long-Range and On-going Goals.
Team Leader: Kim Sutter
Objective 4.1: Compile a list of resources for information on a regional rail system.
Estimated Completion Date: 2009
Objective 4.2: Monitor progress of plans for and implementation of a regional rail
system through legislation, NCTCOG, NE Leadership Forum, etc.
Estimated Completion Date: On-going
Objective 4.3: Survey community interest/seek input from corporate neighbors and
residents for a rail system.
Estimated Completion Date: 2009
Objective 4.4: Consider Town Council resolution approval in support of rail system.
Estimated Completion Date: 2009
Objective 4.5: Communicate information and progress of system to corporate neighbors
and residents.
Estimated Completion Date: 2010 and On-Going
Page 20 2009
Infrastructure Maintenance and Planning (cont.)
Outcome Strategies:
1. Develop overall communication plan for the residents and businesses — Short-Range
and On-going Goals.
Team Leader: Kim Sutter
Objective 1.1: Coordinate with PR firm to develop a communications plan for the Town
and Academy.
Estimated Completion Date: 2009
Wyck Hill
Objective 1.2: Establish and conduct regular PR/marketing team meetings, to include,
selected business community members, to implement the
communication plan and gauge the success of the activities.
Estimated Completion Date: On-going
Objective 1.3: Establish regular monthly meeting dates and times with PR firm to
discuss promotion of the Town and Academy.
Estimated Completion Date: On-going
2. Use of technology to enhance service delivery and citizen engagement. — Short-Range
and On-going Goals.
Team Leader: Todd Wood
A. Web-site redesign
Objective 2.1: Increase user-friendly accessibility and information dissemination
Estimated Completion Date: 2009
Objective 2.2: Collectively review the website for updates; assess the relevance of
content and remove the obsolete information.
Estimated Completion Date: On-going
B. Review the use of e–government
Objective 2.3: Staff to conduct feasibility study and applications for integrated
e-government services for customers.
Estimated Completion Date: 2009
Objective 2.4: Present study to Council in workshop.
Estimated Completion Date: 2009
Objective 2.5: Implement Council directed e-government program.
Estimated Completion Date: 2010
Page 21 2009
Vision Point Three — Hospitality Finds Its Home in Westlake
CITIZEN ENGAGEMENT AND COMMUNICATION — Design a comprehensive plan to
communicate with residents, Academy families, corporate partners, and other community
stakeholders.
Outcome Measure: Utilize the 2009 Direction Finder survey to establish a benchmark for resident
satisfaction in communication and engagement efforts.
“Vision is the art
of seeing what is
invisible to
others.”
- Jonathan Swift
Page 22 Town of Westlake
Outcome Strategies:
1. Integrate the mission of the Westlake Historical Preservation Society (WHPS) into
community events — Short-Range and On-going Goals.
Team Leader: Ginger Awtry
Objective 1.1: Meet with WHPS president to review mission and strategic plan of both
the Society and the Town/Academy plan to assure continuity.
Estimated Completion Date: 2009
Objective 1.2: Coordinate and foster communication with community groups and
Westlake Academy liaison to ensure our local events promote historical
preservation and the Society’s visibility; coordinate the event calendars
of the groups.
Estimated Completion Date: On-going
Objective 1.3: Assist in communication between the WHPS and other groups,
specifically the Public Arts Society, to promote historical preservation and
visibility along trail pathways, entry points, parks and civic campus, etc.
Estimated Completion Date: On-going
Objective 1.4: Continue to provide assistance in the hosting of Decoration Day; assist
the PR firm in marketing the event to residents and the general public.
Estimated Completion Date: On-going
HISTORIC PRESERVATION — Record the events, individuals, or groups associated with the
Town of who had an impact on the region to provide an accurate portrayal of the history of Westlake.
Outcome Measure: Host two events on an annual basis to increase awareness of the Town’s history.
Decoration Day Flags
TOURISM DEVELOPMENT — Promote the Town as an ideal location for hosting conferences
and large meeting events and market the Town’s hotels and restaurants as an additional component
of regional attractions.
Outcome Measure: Increase in occupancy and group meeting rate bookings at the Marriott/Solana
Hotel within two years.
Outcome Strategies:
1. Host regional events to attract individuals to our restaurants, hotel and businesses —
Short-Range and On-going Goals.
Team Leader: Ginger Awtry
Objective 1.1 Facilitate and partner in communications with ARTSNET and our
corporate resident, Maguire Partners, to promote our Masterworks
Concert Series in an effort to provide local entertainment and attract
individuals from neighboring communities.
Estimated Completion Date: On-going
Westlake Academy / Civic Campus
Page 23 2009
Objective 1.2: Work with the PR/marketing team, PR consultant and other Masterworks
partners to develop a variety of concert series and increase participation by
10% on an annual basis.
Estimated Completion Date: On-going
Objective 1.3: Partner with the Recreation department in all aspects of the annual Arbor
Days celebration; working to increase resident, student and corporate
participation each year.
Estimated Completion Date: On-going
Objective 1.4: Review Town survey results, discuss with marketing team, other
municipalities and applicable corporate marketing staff to determine the
level of interest in hosting an expanded number of events in Westlake.
Estimated Completion Date: 2010
2. Develop and assist the PR/marketing team, working with the Town’s PR consultant group
to promote Westlake as a business and tourist destination — Short-Range Goal.
Team Leader: Kim Sutter
Objective 2.1: Develop concept for marketing team; including goals and objectives and
target audience (based on progress of communications plan).
Estimated Completion Date: 2009
Objective 2.2: Interact with PR firm, and possibly corporate partners, to develop
collateral material for use proactively/reactively to request for information
regarding the Town.
Estimated Completion Date: 2010
Objective 2.3: Formulate a contract with Marriott/Solana for the use of the hotel/motel
occupancy tax funds setting occupancy rate targets to promote the hotel as
a premiere tourist destination and to increase the visibility of the facility.
Estimated Completion Date: 2009
Tourism Development (cont.)
Page 24 Town of Westlake
Outcome Strategies:
1. Begin implementation a Public Art Master Plan — Short-Range and On-going Goals.
Team Leader: Kim Sutter
Objective 1.1: Review art master plan as adopted by the Council and assess the plan
recommendations to determine priority of placement and acquisition.
Estimated Completion Date: December, 2009
Objective 1.2: Depending on Council directives related to funding, purchasing and
placement, coordinate with the Westlake Public Arts Society to assist in
art projects.
Estimated Completion Date: June, 2010
Objective 1.3: Review proposed art placement with staff and discuss safety issues,
visibility and space requirements.
Estimated Completion Date: On-going
ARTS AND CULTURE — Develop and place art forms within the Town to compliment our natural
resources and diverse neighborhood and corporate architecture.
Outcome Measure: Acquisition of an initial art piece within 24 months; establish funding plan to add
one piece of public art every 12—24 months.
Sunrise at Westlake Academy
Successful strategic plans are not successful because of the plan itself. They are not successful because of
their vision statement, their mission statement, values, tactics, outcomes, or performance measures. Yes,
these things are all part of a successful strategic plan — but, the strategic plan must be a part of something
larger than even the plan’s vision. It must tell a story.
A story that captures one’s imagination, fires one’s dreams, and compels one to want to be a part
of that story, because it is so inspiring. Westlake’s story is not yet finished, and the best chapters are yet to
come! The 2009 strategic plan will help write the next chapters — the story of a “premier, knowledge based
community.” And, we hope this strategic plan inspires you, the reader, to want to be a
part of the Westlake story.
Tom Brymer
Town Manager/CEO Westlake Academy
Phone: (817) 430-0861
Fax: (817) 430-0967
www.westlake-tx.org
Premiere communities have a shared
vision, mission, and values. More
than that, they have a plan to turn
that vision into something real that
adds value to the community’s quali-
ty of life. This is the Westlake Town
Council’s strategic plan for its con-
tinued pursuit of excellence on behalf
of the residents of the Town of
Westlake.
3 Village Circle, Suite 202, Westlake,
Texas 76262