HomeMy WebLinkAboutBSC Update 11052012[WESTLAKE ACADEMY – STRATEGIC PLAN] May 20, 2011
Westlake Academy | <Table of Contents 1
11/05/2012
Westlake Academy
BSC Update
[WESTLAKE ACADEMY – STRATEGIC PLAN] May 20, 2011
Westlake Academy | <Table of Contents 3
Table of Contents
Introduction ............................................................................................................................................ 4
Developing a Strategic Management System ........................................................................................ 6
Where we are Now ................................................................................................................................. 7
Snapshot of Current Data ....................................................................................................................... 7
Quarter 1 Grade Report Comparison ................................................................................................. 8
Attendance ......................................................................................................................................... 7
[WESTLAKE ACADEMY – STRATEGIC PLAN] May 20, 2011
Westlake Academy | <Table of Contents 5
Introduction
Westlake Academy began the strategic planning process in 2009. Faculty and staff members took a
day to work in small groups focusing on the Academy’s vision and mission. During this process staff
began identifying areas of strategic interest, as well as short and long-term goals. Members of the
Westlake Academy Leadership Team participated in a facilitative role and later compiled the
information. This was further refined and organized into the first draft of the Academy’s strategic
plan.
The first draft was presented to the Board of Trustees in January 2010. During the workshop, Board
input was collected and integrated to further develop the Academy’s strategic plan. Through this
iterative process, staff identified the Academy’s five desired outcomes or strategic themes:
1. High Student Achievement - Develop inquiring, knowledgeable, caring and disciplined
young people who use their unique talents to create a better and more peaceful world
through intercultural understanding and respect.
2. Strong Parent & Community Connections - To involve all stakeholders in building a better
Westlake Academy community.
3. Financial Stewardship & Sustainability - To ensure sufficient, well-managed resources to
support and advance the mission of Westlake Academy.
4. Student Engagement & Extracurricular Activities - To ensure that all athletics, community
service and extracurricular activities are held to the same standard of excellence as the
curricula programs to promote well-balanced students.
5. Effective Educators & Staff - Recruit, develop and retrain a core faculty and staff with the
personal qualities, skills and expertise to work effectively with the IB inquiry-based, student-
centered curricula
The Board adopted the first Westlake Academy Strategic Plan in April 2010 and requested that staff
utilize this document as a tool to bring focus to the Academy’s efforts and more effectively
maximize the Academy’s resources.
The Academy’s five desired outcomes have continued to be central in the ongoing evolution of the
Academy’s vision, values, and mission. Each year the Board and members of the staff review the
strategic plan, take measure of our successes and shortfalls and try to bring to light areas for
improvement. The Academy’s vision, values and mission were updated most recently in the June
2012 strategic planning and budget retreat.
May 20, 2011 [WESTLAKE ACADEMY – STRATEGIC PLAN]
6 Developing a Strategic Management System | Westlake Academy
Developing a Strategic Management System
In an effort to create an actionable strategic plan, members of the Westlake Academy Leadership
Team focused on finding a framework or strategic management system that would provide direction
and focus at all levels of the organization. The Balanced Scorecard System (BSC) was identified as a
possible solution and an initial framework and draft was presented to the Board during the June
2011 budget and strategic planning retreat.
The BSC system helps visually identify connectivity between the Academy’s resources through four
lenses that exist in an organization: financial, human, processes, and stakeholders. During the
process of identifying these areas of connection, staff was forced to ask: What are we trying to
accomplish? Are we doing the right things, and if so, are we doing things right?
Table 1 - Balanced Scorecard Perspectives
Business Perspectives Westlake Academy Perspectives
1. Customer 1. Stakeholder Engagement
2. Financial 2. Financial Stewardship
3. Internal Processes 3. Educational & Administrative Methods
4. Learning and Growth 4. Leadership, Growth and Learning
Staff presented the results of this process in the form of the Academy’s Strategy map during the
June 2011 retreat. By answering these questions and creating an integrated strategic management
system that aligns daily activities, financial and human resources with the Academy’s vision, values,
and mission, the Academy’s faculty and staff members are better able to keep the focus of the
organization on specific areas of interest.
Ultimately, the strategic management system will incorporate the strategic planning, budget
process, program improvement plans, and reporting into one integrated tool, providing greater
insight into where the Academy’s limited resources have the greatest impact in reaching our desired
outcomes.
[WESTLAKE ACADEMY – STRATEGIC PLAN] May 20, 2011
Westlake Academy | <Table of Contents 7
Where we are Now
During the June 2012 budget and strategic planning retreat, the Board viewed a draft copy of the
Academy’s dashboard report. This report is designed to provide a visual tool that “spotlights” the
areas where the Academy is doing well, as well as areas for improvement.
During the retreat, staff presented several areas where data was not available and identified sources
for collecting the data in the future. The Board requested to see an initial dashboard report in the
September 2012 Board of Trustees workshop. Due to limited staff resources, and Board direction
requesting a greater focus be placed on the Academy’s facility expansion efforts, this initial report
was delayed.
Compounding this issue is the loss of members of the leadership team, primarily the MYP
Coordinator, and the anticipated loss of the DP Coordinator and the move of Dr. Calzini into the
classroom. These human resource shortfalls have not allowed sufficient time and resources for
implementation of the data collection processes that were identified in the June 2012 retreat has
not been completed.
Further, the Student Information System, TxEIS, that the Academy utilizes for managing the student
and business data (demographic, attendance, grade, and financial) has undergone a recent upgrade
which removed the ability to export some data in a usable format. Staff is in contact and working
with the Education Service Center (ESC) to either find/develop a work around or replace the
previous data export functionality.
With the current organizational structure it may be necessary to redefine the scope and timeline for
full implementation of the BSC strategic management system. In addition, staff is looking at options
for utilizing a third party to mine our data and provide the support necessary for full implementation
of the strategic management system.
Snapshot of Current Data
The following charts and graphs include areas of the dashboard report and strategic management
system that we are currently able to access the data and update for the Boards review.
Attendance
As a public school, Westlake Academy’s primary source of funding is directly related to our Average
Daily Attendance (ADA). The ADA is determined by the daily attendance taken each morning at
10:00 am. During the budget process, and based upon historical precedent, Westlake anticipates an
ADA over the year of approximately 97%.
Currently, the Academy has an ADA rate of 98%. This rate is similar to prior fiscal years and as the
school year progresses, absenteeism will increase due to illness, vacation, and other various
reasons.
May 20, 2011 [WESTLAKE ACADEMY – STRATEGIC PLAN]
8 Snapshot of Current Data | Westlake Academy
Quarter 1 Grade Report Comparison
In the strategic plan, one of the desired outcomes is High Student Achievement. In Figures 1
through 9, a year-on-year classroom performance comparison is provided. The data is provided in
several views. In Figures 1 through 6, each grade level is charted by the overall average grades of
each course.
Figure 1 - Grade 7 Summary Figure 2 - Grade 8 Summary Figure 3 - Grade 9 Summary
Figure 4 - Grade 10 Summary Figure 5 - Grade 11 Summary Figure 6 - Grade 12 Summary
70% 85% 100%
Math
Science
English
French
Humanities
PE
Spanish
Theater
FY 12/13 Q1
FY 11/12 Q1
70% 85% 100%
Algebra 1
Science
English
Humanities
PE
Spanish 1
French 1
FY 12/13 Q1
FY 11/12 Q1
70% 85% 100%
English
Geometry
Biology
PE
Spanish 2
Theater
Visual Arts
World Geo.
FY 12/13 Q1
FY 11/12 Q1
70% 85% 100%
Algebra 2
Art
Chemistry
English
PE
Spanish 3
Theater
Physics
World Hist.
FY 12/13 Q1
FY 11/12 Q1
70% 85% 100%
IB Art SL
IB Theater
Physics
Calculus
Chemistry
Economics
IB Biology
IB Economics
IB Hist. Amer.
IB Math …
IB Spanish 4
TOK
IB English 1
FY 12/13 Q1
FY 11/12 Q1
70% 85% 100%
IB Art HL
IB Bio
IB Econ
IB Env. …
IB Hist
IB Math SL
IB Mathstudies
IB Spanish 5
TOK
IB English 2
FY 12/13 Q1
FY 11/12 Q1
[WESTLAKE ACADEMY – STRATEGIC PLAN] May 20, 2011
Westlake Academy | <Table of Contents 9
In Figure 7, the overall average student grade provides a snapshot of the overall performance for
each grade level (reached by averaging all student course grades by grade level).
Figure 7 – Class Grade Averages for all Courses Combined by Grade
Figures 8 and 9 provide a visual representation of where students are currently located scoring in
each course. The red represents students that are failing (receiving a 69 or below in the first
quarter). The yellow represents students that are falling below the desired level identified by
teachers and administration (receiving between a 70 and 84). The green represents students are
performing at a level exceeding the desired level identified by teachers and administration
(receiving an 85 or better).
80%
82%
84%
86%
88%
90%
G7 G8 G9 G10 G11 G12
FY 11/12 Q1 FY 12/13 Q1
[WESTLAKE ACADEMY – STRATEGIC PLAN] May 20, 2011
Westlake Academy | <Table of Contents 11
Figure 8 – FY 11/12 Q1 Passing & Failing Summary Figure 9 – FY 12/13 Q1 Passing & Failing Summary
0 20 40 60 80
G7 English
G8 English
G9 - English
G10 English
IB English 1
IB English 2
G7 Spanish
G8 Spanish 1
G9 Spanish 2
G10 Spanish 3
G11 Spanish 4
G12 Spanish 5
G7 French
G7 Humanities
G8 Humanities
MYP World Geo
MYP World Hist.
G11 Economics
G11 IB HistAmer
G12 IB HistAmer
G11 IB Econ
G12 IB Econ
G11 TOK
G12 TOK
G7 - Science
G8 - Science
G9 Biology
G10 Chemistry
G11 - Physics
G11 IB Biology
G12 IB Biology
G11 Chemistry 1
G12 IB Env Sys
G7 - Math
G8 - Algebra 1
G9 - Geometry
G10 - Algebra 2
G11 IB MathStud
G12 IB MathStud
G11 Calculus
G12 IB Math SL
G9 Theater
G10 Art
G11 - IB Art SL
G12 - IB Art HL
G11 - IBTheater
G9 Visual Arts
G10 Theater
G7 Technology
G8 Technology
G10 Technology
G7 PE
G8 PE
G9 PE
G10 PE
G7 Blacksmith
0 20 40 60 80
G7 English
G8 English
G9 - English
G10 English
IB English 1
IB English 2
English 2
English 4
G7 Spanish
G8 Spanish 1
G9 Spanish 2
G10 Spanish 3
G11 Spanish 4
G12 Spanish 5
Span. Ab Initio
G8 Spanish Audi
G7 French
G8 French
Spanish 5
G7 Humanities
G8 Humanities
MYP World Geo
MYP World Hist.
MYP Government
G11 Economics
G11 IB HistAmer
G12 IB HistAmer
G11 IB Econ
G12 IB Econ
G12 TOK
Special Topics
MYP World Histo
G7 - Science
G8 - Science
G9 Biology
G10 Chemistry
G11 Physics
G11 IB Biology
G12 IB Biology
G11 Chemistry 1
G12 Chemistry 2
G12 IB Env Sys
DP Physics 2
G10 Chemistry
G12 Chem 2-HL
G7 - Math
G8 - Algebra 1
G9 - Geometry
G10 - Algebra 2
G11 IB MathStud
G12 IB MathStud
G11 Calculus
G12 IB Math SL
G 9 Geometry
G7 Theater
G9 Speech
G10 Art
G11 - IB Art HL
G12 - IB Art HL
G11 - IBTheater
G12 - IBTheater
G9 Visual Arts
G10 Theater
G12-IBThAudit
G7 PE
G8 PE
G9 PE
G10 PE Failing
70 - 84
85 +